INTRODUCTION The Patnode Substation is being constructed for the

interconnection of Horizon Wind Energys Marble River Wind Farm which consists
of 73 wind turbine generators (WTGs) each with a nominal rating of 3.0MW for a
total generation capacity of 219MW. Patnode Substation will be operated by NYPA
when complete. TRC is providing protective relay settings for all relays other than
those for line protection at Patnode Substation. This document provides the
criteria used by TRC to complete the relay settings. A separate document
provides the relay setting criteria for the Marble River Wind Farm collector
substation.