Beruflich Dokumente
Kultur Dokumente
W
V
D3
LEGEND BOX
D3
D3
D3
D1
D1
D1
W1
D4
D1
W1
D4
Wall Bracket.
D2
D2
D2
D2
V
D1
D1
15 Amp Socket.
V
D3
5 Amp Socket.
Led Type Celing Fitting.
Led Celing Fitting 1"x1".
Exhaust Fan.
Call Bell.
A.C DB.
1.
09-07-2015
SL NO.
DATE
DESCRIPTION
REVISION
DRAWING NO. - GL/14-15/39-4/R1
0
REVISION NO.
WATER TANK
SHEET NO.
10/20
SCALE - 1:100.
COVERED TERRACE
PROJECT:
DETAILED DESIGN AND DRAWING FOR THE CONSTRUCTION OF
C1 TYPE OFFICERS QUARTERS WITH CAR PARKING AND
AREA DEVELOPMENT AT IOCL RESIDENTIAL COMPLEX
BUNIYADABAD, PORT BLAIR, A&N ISLAND UNDER WEST BENGAL
STATE OFFICE.
DRAWING TITLE:
Architectural Details - Ground & First Floor Plan, Terrace
Plan (Electrical Layout).- TM/PM QUARTER.
DEALT BY:
GLOB E CONSULTANCIES
LOBE
CONSULTANCIES
CONSULTANT
NOTES:
18. In no circumstances footing shall be constructed in filled up loose soil
and depth of foundation mentioned in this drawings is minimun with
respect to firm ground ( Original GL/ MGL formed by cutting) which shall
be maintained at site.
19. The Structure is designed for the following criteria:
a) Seismic zone
-V
b) Exposure condition - Severe
c) Fire rating
- 1.5 Hrs
d) Basic wind speed
- 44 m/s
20. Hoops/ Ties/ Links specified for the columns are to be provided in the
region of beam-column junction also. Hoops/ Ties/ Links shall not be
ommited from that area despite placement difficulties. U-bars may be
permitted in such locations.
21. The following Live loads have been considered in the design.
Stirrups as per
beam schedule
150
Ties as per
column schedule
Ties as per
column schedule
Stirrups as per
beam schedule
>Development length
LAP/SLICE IN BEAMS
COLUMN-BEAM JUNCTION AT ROOF LVL IN MIDSPAN
SL.No.
1.
2.
COVER DEFINITION
For BEAMS
Secondary
Beam
Main Beam
45
30
For COLUMNS
Secondary
Beam
Main Beam
22. Wall loads have been considered over a beam wherever shown in the
Architectural drawings.
Stirrups as per
beam schedule
Stirrups as per
beam schedule
30
OCCUPANCY
Roof
Floor
45
8#@200 c/c
10#@300c/c(Extra)
10#@300c/c (Extra)
10#@300c/c (Extra)
8#@200c/c
10#@300c/c
10#@300c/c
8#@200c/c
10#@300c/c
10#@300c/c
0.3L1
0.3L1
Bitumen
Precast Slab/Tile
Flooring
10#@300c/c
0.3L1
0.3L1
Ceiling plaster
8#@200c/c
0.15L1
150
Extra bars
0.3L2
2D
2D
Bottom bars
REVISION
Bottom bars
Bottom bars
COL
COL
L3
L2
L4
REVISION NO.
DESCRIPTION
2D
COL
L1
DATE
2D
Bottom bars
COL
1. 09-07-2015
SL NO.
2D
2D
Confining stirrups
Top bars
Extra bars
0.3L4
Ld
2D
COL
Top bars
0.3L3
0.3L3
Ld
Top bars
0.3L2
Ld
>=H/4
Extra bars
0.3 L1
WHERE SUPPORTED ON
MAIN BEAM OR BED BLOCK
Ld
Top bars
Extra bars
0.3 L1
Db - Diameter of Bar
WHERE DEPTH IS
DIFFERENT FROM
ADJACENT SPAN
INTERIOR
SUPPORT
SL.No.
1.
2.
600
>=H/4
DESCRIPTION
Miscellaneous details.
Structural Details - Key plan at Plinth Lvl., Details of Footing
and Columns, Detail of Staircase.
DRAWING NO.
SHEET NO.
GL/14-15/39-5
11/20
GL/14-15/39-6
12/20
3.
Structural Details - Key Plan at Ground floor Lintel Lvl., L.S of Plinth
Beam, Schedule of Plinth Beam, Schedule of Lintel Beam, Detail of RCC
Loft, Detail of RCC Chajja, Detail of Kitchen Platform.
GL/14-15/39-7
13/20
4.
Structural Details - Key plan at First Floor Lvl., L.S of First Floor Beam,
Schedule of First Floor Lvl Beams, Sections.
GL/14-15/39-8
14/20
Plinth Beam
to detail.
5.
GL/14-15/39-9
15/20
Top Bar-(Extra)
7.
GL/14-15/39-10
GL/14-15/39-11
16/20
17/20
Reinforcement to detail.
8.
GL/14-15/39-12
18/20
1
Top bars-(Through)
Top bars-(Through)
Top Bar-(Extra)
Overlapping region
for Top Reinforcement.
Top Bar-(Extra)
50mm Max
0.3L
57D
9.
As detailed
10.
Structural Details - Key plan at Plinth Lvl., Roof Tie Lvl. and Key plan at
Lintel Lvl, Details of Footing and Columns, L.S of Plinth Beam, Schedule
of Plinth Beam and Roof Tie Beam, and Details of Lintel Beam and
Detail of Truss Layout.
GL/14-15/39-13
2D
300
Stirrups
at Support
Bottom Bar
L
GL/14-15/39-14
20/20
DRAWING TITLE:
Section-1
2D
Overlapping region
for bottom Reinft.
Top bars-(Through)
300
Stirrups at Support
Bottom Bar
0.3L
Stirrups at Midspan
Stirrups at Midspan
To detail
Structural Details - Key plan at Second Floor Lvl. and Roof Tie Lvl.,
Schedule of Second Floor Beam and Roof Tie Beam.
57Dia (Min)+10Db
Confined Ties-10# @
100 c/c(TYP)
To detail
Ld=57dia
Overlapping Region
for Column Bars.
SHEET NO.
11/20
6.
1500 (Min)
To detail
Steel
Fe415
Fe500
Fe415
Fe500
50mm Max
250(Min)
Mix
M20
M20
M25
M25
2D
Confinement Region
Confinement Region
L2
SL.No.
1.
2.
3.
4.
0.3L
200
GROUND LEVEL
0.15L1
0.2L1
L1
8#@200c/c
0.2L1
150
600
U-Bars
to
confine
the
Vertical
Bars in
the
absence
of
regular
Ties.
Development Length+10Db
Stirrups to detail.
RCC beam
1. Mix for all Rcc work shall be M20.Cement used shall conform to IS 8112
or IS 12269.
2. HYSD Bars of Fe415 conforming to IS 1786 or TMT Bars shall be used
as Reinforcement.The same is denoted as #.
3. The Aggregates used for concrete should conform to IS 383-1970
(Reaffirmed 1997). The coarse Aggregates used shall be of 20mm nominal
size.
4. A lean concrete of mix CC 1:4 :8 shall be provided below every Footing.
5. The SBC of the soil has been assumed as 150KN/Sqm for calculation.
6. The Design incorporates the provision contained in IS 1893-2002 for
Design of Earth Quake Resitant Structures using Response Spectrum
method. Reinforcement detailing is suggested as per recommendations of
IS 13920-1993 for ensuring ductility.
7. The nominal cover to reinforcements including links shall be:
a) Footing
-75mm
b) Column
-45mm
c) Beam
-30mm
d) Slab
-20mm
8. The Development length for fully stressed deformed bars of various
mixes shall be :
MISCELLANEOUS DETAILS.
Bottom Bar
Section-2
Note: Reinforcements shown in different layers for clarity.
Otherwise they are in one plane. However, second layer
wherever indicated, shall be provided 20mm below the top bars.
DEALT BY:
GLOB E CONSULTANCIES
LOBE
CONSULTANCIES
CONSULTANT
DETAILS OF COLUMN:
300
4-25#
300
300
Main Steel:4-20#
ABOVE SECOND FLOOR
400
Confined Ties-10#
@ 100 c/c
12# -13Nos.
Both ways.
300
DET OF COL C3
(300x400)
DET OF COL C2
(300x400)
300
SCALE 1:25
200
200thk
RCC Wall
3,000
F3
L1
Midlanding Beam at
1200mm LVL
PB2
SECTION OF STAIRCASE AT - XX
400
300
100
100
100
100
400
900
1,700
250
C2
PB1
1300
F4
C2
C3
C4
1200
PB5
PB10
PB2
F4
PB1
C1
F4
PB1
4,700
3,900
4
PB1
PB1
C2
3,600
5
F4
4,700
7
C1
C2
3,900
6
F2
PB1
DRAWING TITLE:
B
C4
F4
C2
C2
F1
PB4
UP
F2
F1
PB7
C2
1300
PB6
PB11
F4
PB1
C2
PB3
C1
F4
PB12
PB6
F2
PB6
PROJECT:
PB5
1650
PB6
1200
C2
PB10
PB8
PB13
PB8
F4
C4
C3
F4
900
PB6
PB12
F1
PB5
2000
PB10
PB14
PB14
PB7
PB10
F4
PB13
PB5
C3
2,600
Column
F4
C2
1550
PB5
PB6
C2
750
600
PB6
C2
PB1
C2
1,500
200
150
10
400
1st Landing
1,300
12 2nd Landing
11
F4
PB12
300
900
300
PB1
F4
C1
PB8
F4
PB7
C4
200thk HB Wall
1,300
C2
F1
4,650
3,150
3,300
300
PB6
C1
200
8 RISERS OF 150=1,200
Midlanding
Beam at
1200mm LVL
SCALE 1:50
4 RISERS OF 150=600
8 RISERS OF 150=1,200
150
200
200
150
PB8
SHEET NO.
12/20
F2
PB7
C1
1650
200
F2
D
200thk
RCC Wall
20
SCALE 1:50
F3
PB7
C3
F4
PB8
2nd Landing
4,300
F3
F2
C3
PB10
12
PB11
13
0.2
3,000
PB8
F4
200
150
1,500
14
19
300 18
3,900
REVISION NO.
1094
PB10
15
PB12
SCALE 1:25
C1
1300
16
PB9
17
FB2
PLAN OF STAIRCASE
PB8
C1
3,400
10
150
F2
PB7
C3
4,200
19
300 18
1,200
F3
PB7
200thk HB Wall
7 TREAD OF 300=2,100
20
12,250
FF LEVEL
8 RISERS OF 150=1,200
200thk
RCC Wall
600
2nd Landing
Y
1300
13 12
200
15 14
3,900
PB7
F2
E
150
16
DESCRIPTION
Midlanding
Beam at 1200mm LVL
SCALE 1:25
200
17
1,200
18
26,000
3,600
PB9
DETAIL AT 'D'
10
PB10
PB6
PB2
4,300
200thk
HB Wall
1600
PB10
1
150
PB12
DATE
PB5
SL NO.
REVISION
900
1. 09-07-2015
8# @ 200 c/c
600
1,200
2
1,900
1,500
100
400
900
SCALE 1:25
1st Landing
19
450
100
100
1,500
SCALE 1:25
200
150
PB1
3,600
300
800
11
3,000
SCALE 1:25
250
100
DETAIL AT 'C'
SCALE 1:25
100
DETAIL AT 'B'
250
250
250
LB TYP 300x400
3-16#(Top &
Bottom)
150
150
150
1,300
200
100
300
300
L1
0.2
PB12
GROUND LEVEL
1,700
100
100
C
4,650
200
100
800
300
2nd Landing
FF LEVEL
100
100
100
1st Landing
1,500
1,700
100
800
SCALE 1:25
UP
100
Pulverised
sand filling
800
200thk
HB Wall
1,500
100
500
300
Pulverised
sand filling
100
200thk
RCC Wall
200
450
100
100
100
150
100
300
12# -10Nos.
Both ways.
250
100
1,300
200
150
DETAIL AT 'A'
750
1,300
100
100
200
450
10
PB2
Pulverised
sand filling
200
GROUND LEVEL
100
350
100
400
250
100
12mm @ 280 c/c (Extra)
12mm @ 280 c/c (a)
12mm @ 280c/c (b)
GL
Confined Ties-10#
@ 100 c/c
400
250
1,500
250
10# -13Nos.
Both ways.
150
10# -11Nos.
Both ways.
400
250
250
GL
Confined Ties-10#
@ 100 c/c
150
150
200
DET OF COL C4
(300x300)
1,900
900
Confined Ties-10#
@ 100 c/c
1,500
Plinth beam
to detail
200
GL
Plinth beam
to detail GL
GL
Plinth beam
to detail
GL
200
Main Steel:4-20#
Main Steel:6-20#
L1
0.2
100
100
300
PLINTH LEVEL
1,900
100
100
300
300
300
L1
300
Pulverised
sand filling
1,000
0.3
500
300
a
300
100
400
250
100
GL
300
Main Steel:8-20#
300
Main Steel:4-25#
Main Steel:4-25#+4-20#
GL
b
a
300
300
Main Steel:4-20#
Main Steel:4-20#+4-16#
Plinth beam
to detail
a
400
b
a
400
400
400
b
a
200
1,500
a
a
400
4-20#
2,600
9
DEALT BY:
10
GLOB E CONSULTANCIES
LOBE
CONSULTANCIES
CONSULTANT
150
4,300
3,000
3,900
26,000
3,600
10
150
3,900
3,000
4,300
C1
C1
LB1
LB1
C3
C3
C1
C1
3-12#
E
C3
8#@150 c/c
LB2
LB1
C2
200
200
3-12#
3-12#
LB2
100
200
2-12#
2-12#
200
100
2-12#
3-12#
DETAILS OF LB2
DETAILS OF LB1
C2
C2
C2
C2
C1
LB1
LB2
LB2
C2
LB1
3,400
LB1
LB1
C2
C2
8#@150 c/c
LB1
LB1
LB2
C1
12,250
LB1
LB1
D
LB1
LB1
LB1
LB1
C
C
LB1
4,200
600
200
LB1
LB1
C3
200
200
2-12#
LB2
C4
C2
10#@-150c/c
C2
3,900
4
C2
3,600
LB1
3,900
4,700
7
100
3-12#
8#@150 c/c
3-12#
75
8#@150 c/c
8#@150 c/c
200
8#@150 c/c
10#@-150c/c
3-12#
Section at 'AA'
C1
LB1
C2
C2
LB1
200
B
A
4,700
10#@-150c/c 2-12#
200
2,600
LB1
3-12#
600
A
C1
200
C4
C4
100
8#@150 c/c
100
500
(As per Arch drg)
3-12#
600
2-12#
8#@150 c/c
8#@150 c/c
1,500
8#@150 c/c
200
75
4,650
3,150
LB2
10#@-150c/c
3-12#
LB2
100
C3
100
C3
200
LB2
200
C2
250
C4
600
200
Section at 'CC'
600
2,600
9
10
E
1a
1a
3-20#
PB8
8#2L@100
450
450
PB8
450
3-20#(Through)
8#2L@100
300
3-16#
Section-1a
3-16#
PB10
80
10# @ 150c/c
3,800
400
200thk
SB Wall
1,400
400
80thk RCC
platform
800
600
8# @ 150c/c
1. 09-07-2015
(S)-Second Layer
PB1
300
450
2-16#
2-16#
2-16#
3-16#
900
8#
100
PB2
300
450
3-16#
3-16#
2-16#
3-16#
8#
SL NO.
DATE
DESCRIPTION
REVISION
200
PB3
300
450
2-16#
PB4
300
450
2-16#
2-16#
3-16#
PB5
300
300
2-12#
3-12#
PB6
300
450
4-16#
3-16#
PB7
300
450
4-16#
3-16#
PB8
300
450
2-16#
3-16#
4-16#
900
8#
100
SHEET NO.
13/20
SCALE - 1:50.
200
PROJECT:
PB9
300
450
3-20#+2-20#(S)
10
PB10
300
450
3-20#
3-16#
11
PB11
300
450
2-20#
1-20#
3-16#
12
PB12
300
450
3-20#
3-16#
900
8#
100
8#
200
13
PB13
300
450
3-20#
2-20#(S)
3-16#
900
8#
100
8#
200
14
PB14
300
450
3-20#
2-20#(S)
3-16#
900
8#
100
8#
200
2-20#(S)
REVISION NO.
DRAWING TITLE:
Structural Details - Key Plan at Ground floor Lintel Lvl.,
L.S of Plinth Beam, Schedule of Plinth Beam, Schedule
of Lintel Beam, Detail of RCC Loft, Detail of RCC
Chajja, Detail of Kitchen Platform.
DEALT BY:
GLOB E CONSULTANCIES
LOBE
CONSULTANCIES
CONSULTANT
200
4,300
3,000
26,000
3,600
150
3,900
3,000
4,300
LB1
LB1
C1
C1
10
150
LB1
LB1
C3
3,900
C3
C3
C1
C1
C3
LB2
LB1
C2
C2
C2
C1
C2
300
450
2-16#
2-16#
2-16#
3-16#
900
8#
100 C/C
8#
200C/C
FB2
300
450
4-16#
3-16#
900
8#
100 C/C
8#
200C/C
FB3
300
450
2-16#
2-16#
FB4
300
450
2-16#
FB5
300
300
2-16#
FB6
300
450
FB7
300
8#
150
FB8
LB1
LB2
3-16#
2-16#
3-16#
3-16#
4-16#
3-16#
250
3-16#
3-16#
300
450
4-16#
4-16#
FB9
300
450
2-16#
2-16#
3-16#
10
FB10
300
500
3-16#+2-16#(S)
4-16#
11
FB11
300
450
3-16#
2-16#(S)
2-16#(S)
3-16#
12
CL1
300
300
3-16#+2-16#(S)
3-16#
13
FB12
300
450
3-16#
4-16#
LB2
C2
LB1
3,400
C4
LB2
C2
C2
C3
C3
LB2
C4
C2
4,650
3,150
C2
600
LB2
LB2
B
C4
1,500
C4
A
LB1
2,600
4,700
C2
LB1
C2
3,900
3,600
LB1
C2
C1
LB1
C2
3,900
4,700
C1
200
FB1
LB1
C2
1
C
LB1
LB1
LB2
C1
12,250
LB1
LB1
D
LB1
LB1
LB1
LB1
LB1
4,200
600
2,600
9
500
8#
75
10
900
8#
100
8#
200
10#@300c/c
200
450
8#@200c/c
FB4
10#@150 c/c
600
-200 Lvl
100
225
FB7
Column
Column
8#@200c/c
CL1
FB11
FB1
100
8#@200c/c
FB8
10#@300c/c(Extra)
10#@300c/c(Extra)
200
100
225
450
10#@300c/c
10#@300 c/c
10#@300c/c(Extra)
FB5
10#@300c/c(Extra)
10#@300c/c
10#@300 c/c
8#@200 c/c
8#@150c/c
2,100
RCC Column
1. 09-07-2015
SECTION AT '1-1'
SCALE 1:25
SL NO.
Section at '33'
DATE
DESCRIPTION
REVISION
DRAWING NO. - GL/14-15/39-8/R1
FB10
FB1
Column
C1
600
2,600
FB1
FB10
2000
FB10
FB11
FB11
FB9
C3
FB7
C2
C4
4,700
S1
1050
FB1
C4
FB1
C2
C2
C1
3,900
DRAWING TITLE:
Structural Details - Key plan at First Floor Lvl., L.S of First
Floor Beam, Schedule of First Floor Lvl Beams, Sections.
DEALT BY:
12900
1300
-200
FB6
FB11
FB11
FB2
C2
C2
10#@-150c/c
50
SCALE 1:25
PROJECT:
1
FB4
FB1
SECTION AT '2-2'
900
900
FB11
FB8
FB1
DN
UP
600
50
C1
1200
S1
8#@150 c/c
Column
C2
FB1
FB1
CL1
FB5
8#@200c/c
C2
S2
FB6
S1
FB3
FB6
FB5
S1
C4
200
FB5
C3
FB5
8#@200c/c
FB1
1650
C2
C2
FB6
1500
-200 Lvl
1,500
240
360
C2
FB6
C3
1200
FB6
10#@150 c/c
100
100
240
360
4,650
3,150
300
200
10#@300c/c(Extra)
C2
-200
1300
10#@300c/c
10#@300 c/c
10#@300c/c(Extra)
S2
1450
FB1
FB7
C4
C2
1650
C2
FB1
C2
FB11
Section-2e
C1
FB6
FB11
3-16#
FB6
CL1
Section-2d
8#2L@100
300
C1
FB5
FB5
FB12
3-16#
FB6
S1
CL1
Section-2c
FB6
450
450
8#2L@100
300
Top reinforcement
extended
CL1
Section-2b
8#2L@100
3-16#
300
S1
SHEET NO.
14/20
4,300
FB1
C1
REVISION NO.
-200
FB5
10# @ 150c/c
2-16#
3,000
C3
C3
FB9
Section-2a
2-16#
2-16#(E)
12,250
3,400
3-16#
300
450
8#2L@100
3-16#
300
4-16#
200
8#2L@100
450
450
4-16#
10
FB1
FB12
8# @ 150c/c
3,900
150
-200
FB11
300
3,600
C1
FB5
C1
FB10
3-16#
3,100
400
C3
FB9
4,250
3,900
7
Depressed Beam top lvl
at -200 from floor lvl
FB1
FB1
3-16#
FB6
400
3,000
FB1
75
8#2L@100
FB8
300
8#2L@100
FB6
2000
2-16#(Through)
26,000
4,300
2-16#(Extra)
1,033
FB5
450
2e
FB12
2d
2-16#(Through)
2-16#(Through)
FB4
450
2c
200
2b
450
2a
FB10
4,200
3,600
3,900
4,700
2,600
GLOB E CONSULTANCIES
LOBE
10
CONSULTANCIES
CONSULTANT
300
450
2-16#
1-16#
2-16#
SF4
300
450
2-16#
1-16#
2-16#
SF5
300
450
3-16#
3-16#
SF6
300
450
2-16#
3-16#
CL2
300
300
3-16#
2-16#
100
8#
200
SF1
C2
SF1
300
450
2-16#
1-16#
1-16#
3-16#
RT2
300
450
3-16#
3-16#
900
8#
100
1,500
SF1
SF1
SF1
C3
C4
C2
SF5
S1
S1
1200
S2
SF1
4,650
3,150
SF1
C2
S1
S1
SF3
8#
C1
SF4
C4
B
C4
DN
200
SF1
C1
SF1
SF2
C2
C2
SF1
SF1
C2
A
C1
C2
600
200
600
RT1
SF5
C2
S2
600
SF1
C2
SF1
C2
C3
1200
SF1
C2
C2
SF1
SF3
12,250
3,400
C4
SF2
SF1
C2
C2
SF1
SF2
SF1
SF1
SF1
SF1
C1
SF1
200
SF5
D
SF1
SF3
8#
2950
900
SF3
3-16#
SF5
SF1
CL2
3-16#
200
E
C3
S1
SF1
450
8#
SF1
300
100
SF1
CL2
SF2
8#
4,300
C1
SF6
S1
SF6
SF1
900
150
3,000
C1
SF1
1-16#
S1
10
SF1
C3
CL2
1-16#
SF2
1500
2-16#
S1
3,900
C3
SF1
450
C1
CL2
300
3,600
SF1
SF6
C1
3200
SF1
3,900
SF1
C3
4,200
3-16#
3,000
SF2
4,300
E
7
WATER TANK SLAB
26,000
SF1
3200
SF1
1
150
RT3
300
450
2-16#
RT4
300
450
2-16#
1-16#
RT5
300
450
2-16#
2,600
3-16#
2-16#
1-16#
2-16#
4,700
2
3,900
4
3,600
5
3,900
6
4,700
9
Roof Line
C3
4,300
RT3
C1
C4
RT1
C2
C3
800
RT1
RT1
RT1
RT1
C1
RT1
PROJECT:
RT1
C4
C2
2800
B
800
Roof Line
2,600
1
RT1
200
RT1
C2
C4
RT1
C2
A
C1
3,900
4
3,600
5
3,900
6
4,700
7
DRAWING TITLE:
Structural Details - Key plan at Second Floor Lvl. and Roof Tie
Lvl., Schedule of Second Floor Beam and Roof Tie Beam.
200
Roof Line
4,700
2
RT1
C2
C2
800
C1
RT1
RT2
RT1
RT1
RT1
RT5
800
RT1
800
1700
C4
800
1,500
RT2
RT4
800
200
RT1
RT1
2800
4,650
3,150
800
SCALE - 1:100.
RT2
C3
SHEET NO.
16/20
Roof Line
C2
RT1
C2
C2
REVISION NO.
C1
RT1
C2
Ridge Line
RT1
RT1
C3
RT1
C2
C2
RT1
RT1
12,250
3,400
RT1
C2
C2
RT1
RT1
C1
RT1
RT1
RT1
DESCRIPTION
RT1
Roof Line
RT2
DATE
REVISION
RT1
RT1
3,000
RT2
3200
SL NO.
10
RT2
RT1
C3
RT2
RT1
C1
3,900
RT1
RT3
C1
150
3,600
RT1
C3
RT2
200
RT1
900
3,900
RT1
4,200
3,000
26,000
150
4,300
3200
10
1. 09-07-2015
1
2,600
2,600
9
10
DEALT BY:
GLOB E CONSULTANCIES
LOBE
CONSULTANCIES
CONSULTANT
1,1
Rafter 65mm-NB
94
1,19
Upto 3.00m
50 NB
3.5m/3.6m
65 NB
1,1
94
94
1,1
2.
Rafter-65mm NB
40mm-NB
2,530
2,393
1,957
1,521
1,085
650
Details at B
SCALE 1:10
51
2,2
1,1
94
84
1, 8
4
,19
40mm NB
7,5
33
07
8,6
94
1,1
,194
Purlins to detail.
1,1
94
1,19
1,3
07
32mm-NB
100
1,748
1,748
1,748
View at 3-3
1,748
150150
Column
1,748
1,748
530
200
12,650
700
Bottom Runner
32mm NB.
1,700
Bottom Runner
Edge plate 8mm thk.
150x150
Bottom Tie
Edge plate 8mm thk.
200x200
400
Column
400
4-Nos 20mm
Holding Down Bolts.
4
4nos 12mm bolts.
2Nos 8mm thk Rafter Edge Plate
200x200mm
Purlin to detail
40mm NB
50mm NB - Bottom tie
Rafter Edge Plate 8mm thk.
Bottom Runner
32mm NB.
8mm thk Bottom Tie
Edge plate - 200x200mm
40mm NB
Details at C
120
SCALE 1:10
8mm thk
Purlin edge Plate
200x150mm
40
Details at D
SCALE 1:10
Rafter 65mm NB
3,000
3,900
1,125 1,388
150
3,900
Roof Line
3,000
1,388 1,125
4,300
1,687
Rafter-65mm
12,250
3,400
Rafter-65mm
T2
T2
4-Nos 20mm
Holding Down Bolts.
300
Column
PROJECT:
T1
T1
T3
T1
1,475
4-Nos 20mm
Holding Down Bolts.
T1
T3
Ridge Line
2800
800
196
Masonry wall
Roof Line
39
200
4-Nos 20mm
Holding Down Bolts.
Rafter-65mm
800
Rafter-65mm
Rafter-65mm
DRAWING TITLE:
Structural Details - Truss Layout and Details of Truss.
Masonry wall
Roof Line
DEALT BY:
400
2,600
4,700
3,900
3,600
3,900
4,700
2,600
GLOB E CONSULTANCIES
LOBE
50
300
50
50
800
800
200
2 Nos. 12mm
thick Base Plate
1700
1,500
SCALE 1:10
T4
800
Rafter-65mm
Details at 'A'
T4
800
4,650
3,150
800
Details at 2-2
Roof Line
2 Nos. 12mm
thick Base Plate
2 Nos. 12mm
thick Base Plate
800
863
Bottom Tie-50mm NB
SHEET NO.
17/20
Rafter-65mm
4,200
Bottom Tie-50mm NB
Roof Line
300
REVISION NO.
Masonry wall
Rafter-65mm
200
8mm thick
Gusset Plate
8mm thick
Gusset Plate
50
DESCRIPTION
REVISION
10
Rafter-65mm NB
400
DATE
Purlins to detail.
Masonry wall
E
Rafter-65mm NB
400
3,600
913
1. 09-07-2015
26,000
4,300
40
SL NO.
150
Details at 5-5
Purlin to detail
120
1,476
Bottom Runner
Edge plate 8mm thk.
40
40 70 40
Column
200
200
150
40mm NB
50mm NB Bottom tie
40mm NB
Purlin to detail
150
40
200
120
800
Details at 6-6
40
200
Bottom
Tie-50mm NB
8mm thk
Bottom Runner
Edge plate 150x150mm
40
200
Rafter-65mm NB
120
2,563
150
40mm NB
40
150
40 70 40
100
530
Purlin to detail
1,2
87
94
1,1
1,
55
Purlin to detail
Rafter 65mm-NB
1.
150
150
Details at 1-1
Detail of Base plate
TRUSS LAYOUT
SCALE 1:100
10
CONSULTANCIES
CONSULTANT
59.344
46
.32
10
NK
TA
0
46.5
S/
45.028 45.326
47.493
47.794
45.534
44.974
45.0
0
44.070
45.303
45.545
TO
WA
44.319
RD
SC
OA
ST
44.274
44.269
44.318
44.448
44.397
GU
AR
DJ
ET
47.102
6
3.4
53.00
52.50
46.889
53.090
51.226
51.247
51.199
51.363
47.957 48.616
50.617
47.100 47.164
47.457
47.888
48.013
47.606
48.019
22-04-2014
DATE
DESCRIPTION
33.00m
26.00m
REVISION NO.
21.00m
4. Pavement Area
356.00 Sqm
5. Drain(a)
26.00m
6. Drain(b)
100.00m
6. Slab Culvert
4.00m
SHEET NO.
1/20
SCALE - 1:200
53.470
53.035
51.339
50.955
50.916
LEGEND:
51.061
51.012
PROJECT:
48.074 48.854
48.736
47.956
47.944
47.311
1.
UP
50.920
47.684 47.909
47.815
46.902
AIN
E
E
51.145
46.061
DR
50.347
FO
44.947
OT
47.365
TY
09
E
NC
FE
52.00
INE
50.943
47.699
47.506
46.861
51.916
.00
44.624
51.861
51.976
51
44.210
51.5
0
48.024
.50
44.893
44.139
52.771
51.864
52.156
51.546
51.545
49.000
48.376
45.514
44.934
RO
AD
51.882
47.420
45.359
45
44.486
51.744
49.046
47.975
51.780
52.00
51.351
8.3
76
47.863
47.657
44.826
43.460
52.530
47.846
48.175
PA
T
48.159
47.393
47.419
GA
TE
44.993
50.737
48.087
50
.5
0
48.626
47.987
49.518
47.474
47.837
47.876
50.230
49.991
49.753
48.094
47.909
47.991
50.399
49.100
48.718
48.525
49.116
48.754
49.944
49.943
49.886
48.075
46.333
48.170
47.425
49.496
48.409
49.797
49.881
49.269
48.753
50.553
50
49.962.00
50.035
47.990
47.929
46.262
44.836
50.032
50.824
47.834
45.018
PROPOSED PAVEMENT
50.590
E WAY
44.827
44.775
52.571
52.50
49.339
49.591
46.570
49.368
GUA
R
ROO D
M
0
44.275
TE
52.542
52.417
44.5
GA
51.216
50.00
50.5
44.258
44.182
EL
PIP
TY
2C PE 2C /C 2 III Q
/
PL
C/ TR
INT A
D
H L 2C
/B
VL
-4
46.246
44.936
50.727
49.225
15-07-2014
REVISION
48.525
49.00
49.50
0
46.0
45.223
43.424
49.191
48.998
44.885
44.162
43.373
44.752
52.774
52.564 52.701
48.513
2.
SL NO.
CAR SHED
52.451
52.679
52.908
52.827
49.147
45.696
45.094
44.5
0
44.384
51.50
ILE
T
47.756
46.00
FE
NC
E
TO
L
WAL
ND
44.50
44.714
50.970
52.905
51.689
49.209
48.509
52.855
52.544 52.999
49.896
49.069
47.292
53.555
53.075
45.110
44.630
53.673
SHE
09-07-2015
PORTION REMOVED
53.631
CAR
3.
53.805
53.666
51.5
45.737
49.457
.50
49
44.293
45.216
47.621
53.994
53.535
53.449
53.399
52.576
51.551
49.255
48.938
48.503
48.536
47.944
46.080
45.730
56.179
53.258
44.904
44.193
45.340
RT
ER
44.323
44.144
QU
A
53.50
53.378
50.969
47.578
47.273
53.494
TR
Q56.420
53.017
49.661
51.0
44.360
49.010
48.852
46.00
45.34
45.108
44.87045.00
44.544
44.400 44.763
.00
45.735
45.154
44.919
.5
47
.0
0
.5 46.619
0
46
46.00
.00
46.412
46
.0
46.412
45.406
51.040
49
53.635
53.447
53.496
53.450
53.273
52.688
.5
46
.0
45.320
0
.5
45.437 45.807
45
46.043
47
53.051
47.414
46.50
LIN
0
15
.5
9.8
6
.0
46.091
49.163
TO
TE
POU
48
45.901 45.393
54.514
54.386
54.360
54.363
54.358 54.372
53.839
53.935
54.075
54.791 53.926
7
4.2
53.0
45.835
45.929
AN
49.085
49.899
50.017 50.034
49.782 50.058
49.622 49.620
49.0 49.628 49.618
50.034
0 49.908
49.540
48.777
49.987
49.844
48.521 49.812
48.450
48.477 48.615
47.849
48.448
51.014
50.129
49.807
49.459
52.0
S/T
46.187
45.896
46.826
49.175
52.5
0
47.231
47.0
49.805
49.803
54.380
49.50
49.884
48.216
46.824
46.503
50.616
49.749
.50
53.533
56.414
PS
56.164
49
COM
47.383
46.489
52.660
50.00
50.19950.030
49.5
49.970
47
47.00
46.201
48.310
46.484
P IP
8.8
3
47.377
46.476
Existing Footpath
to be Demolished
53.233
50.569
50.432
56.532
54.415
ay
ew
48.0
48.0
0
52.714
58.516
56.462
54.593
riv
49.686
47.5
46.50
46.378
50.636
IN
48.5
Outlet for
open 52.150
drain
dD
DRA
48.321
47.703
48.162
47.093
47.027
47.033
51.281
53.440 53.
50
53.335
54.665
54.632
54.405
53.705
PARK POLE
54.410
54.403
se
po
47.489
50.5
0
50.298
54.586
54.527
54.519
53.769 53.758
53.162
Proposed Slab
52.908
Culvert
.67
0
48.5
48.456
48.288
48.289
.00
50.626
56.764
54.408
53.393
52.583
ORIENTATION:
55.613
54.411
54.398
11
50
49.953
50.113
49.659
.0
48.612
52.280
Proposed
51.380 Open
52.809
Drain
52.149
51
48.505
48.491
52.912
Drain (b)
54.383
53.923
2.27
Pro
50.072
51.731
49.745
AT
49.072
48.877
54.395
55.220 54.426
55.817
54.056
5.3
52.815
56.516
55.610
54.559
54.211
55.30
54.208
54.00
53.714
52.944
50.945
50.464
50.025
68
51.858
51.533
51.204
51.100
51.134
50.948
50.311
54.478
MANGO TREE
56.593
54.715
55.803
54.689
54.690
P
OT
50.039
49.874
49.107
49.0
49.400
49.823
.5
49.795
54.730
54.925
54.908
54.738
53.646
53.016
Boulder Pitching
55.173
55.094
53.540
51.271
50.659
50
49.890
49.750
50.060
50.306
10
.92
52.968
52.000
56.497
55.631 54.913
55.292
FO
50.151
STN POINT 1
N=1000.00
E=1000.00
Z=50.00
50.0
0
49.967
53.381
Proposed 53.736
cantilever retaining
wall of 2.5m height
51.262
51.143
50.590 51
.0
0
54.981
3.
52.841
51.976
AL
L
2.0
55.183
54.763
55.156
55.0054.944
55.307 55.380
55.217
UP
0
.5
52
3.11
52
.0
0
EW
50.240
55.012
54.806
ASHOKA TREE
55.413
51.245
TO
50.156
54.759
54.130
53.017
53.0
0
55.810
56.472
5.3 55.189
55.226
6
55.241
54.926
53.5
50.271
50.161
53.545
51.993
COCONUT TREE
58.876
55.253
55.192
55.064
54.873
52.918 8.0
50.592
50.494
55.151
55.160
55.214
54.0
50.729
57.458
55.794
9.4
2
55.226
55.35
.5
51.134
51.014
50.498
50.408
50.584
50.496
54
53.566
55.20
55.011
54.554
53.532
52.094
56.230
55.316
55.254
TREE
59.365
57.535
TE
AR
17.2
9
87
55.770
53.656
RL
QU
50.50
50.485
50.499
50.551
1.
51.600
50.798
54.790
.5
0
.0
57
Proposed
cantilever retaining
50.728
wall of 2.5m height
OP
OS
E
(PA D PA
V
54.386RK
ING EME
NT
)
51.628
52.985
51.462
52.757
52.055
51.036
56
56
Proposed Location
.0
55.964
0
of Bore Holes. 55.642
55.317
54.475
53.301
50.830
51.325
50.890
.0
51
50.998
8.2
56.433
55.975
55.586
54.001
51.300
51.021
58.784
50.875
.00
55.506
55.505
55.332
PR
55.5
Drain (a)
59.921
57.282
53.231
52.174 52.853
53.016
52.133
51.380
51.363
.50
.
55
54.879
52.994
52.280
.50
51.065
51.107
57
56.179
55.569
50
SURVEY LINE
59.00
58.557
58
51.669
Drain (a)
55.80
59.054
.5
57.954
57.225
0
56.0
55.505
55.490
55.469
54.555
54.725
59.50
59.356
58.095
56.821
55.871
51.816
52.059
51
57.658
53.823
SURVEY STATION
60.680
58
51.555
55.458
53.782
ELECTRIC POST
62.050
61.040
60.00
59.864
0
.5
56
52
61.770
61.007 61.096
59.432
57.781
55.202
.0
8.1
1.2
4
54.722
54.303
52.0
59.624
IN
G
55.246
54.636
52.257
61.50
61.303
61.00
60.821
60.665
60.50
PROPOSED BUILDING
EXISTING DRIV
8.02
53
.0
0
52.225
61.127
Proposed T.M Bungalow
58.761
55.463 AL
.85
55.00
52.399
62.316
IN
27
TBM
1
62.00
61.095
57.825
57.722
RE
55.476 TA
55.572
55.171
55.235
51.611
55.581
55.454
55.165
55.725
55.642
61.638
60.137
P
HO UMP
US
E
54.741
55.537
55.369
62.137
62.573
62.439
61.573
61.557
Drain (b)
58.787
61.822
W
E
TA AT PS
NK ER
Pa
th
Fo
po
sed
.97
55.696
55
53.343
53.212
52.511
55.504
55.529
.5
10
.39
55.523
55.434
55.268
55.316
53.046
55.638
55.933
23
Pro
55.389
54.954
Existing Quarter
to be Demolished
59.087
4.
4.22
54
.5
ot
55.036
54.776
4
62.157
61
61.048
.50
61
.00
61.973
60
.50
60.0
0
58.396
5
9
23 .5
60.471
58
61.115
.5 59.00.800
0
57.777 58
.00
57.739
0
62.0
53.641
62.007
61.680
55.524
Existing R/wall
61.031
to be Demolished
58.849
53.531
FENCE
X
55.566
.5
53.627
55.655
55.639
EXISTING ROAD
Section line
61.468
61.323
60.344
58.614
55
54.412
ALL
60.709
58.250
57.715
58.057
57.647
57.743 57.773
55.972
54.531
54.946
ND W
60.839
59.240
57.915
55.658
55.147
52.167
8.41
56.852
56.257
Proposed Cantilever
Retaining wall of 3.0m
height.
7
POU
58.096
55.024
Drain (b)
COM
59.963
55.121
.00
55
54.916
3.29
57.677
55.935
1 .5
3.77
56.073
56.00
Drain (b)
55.670
53.5
52.476
8
60.491
55.80
54.423 0
54.0
59.080
56.809
56.50
1.96
60.235
59.954
59.926
59.568
60.316
54.249
0.4
57.546
55.499
55.50
55.343
55.036
55.192
55.046
7.3
56.760
56.363
DELETED
57.280
3.1
9
56.651
COM
POU
N
DW
ALL
E
5.73LIN
IPE
P57.00
59.370
2.5
0
59.368
58.817
57.472
57.50
59.318
0.8
2
58.00
57.876
4.3
DELETED
59.190
58.855
ST
59.0
0
58.763
58.5
0
57.848
10
11
59.139
PROPOSED FOOTPATH
DRAWING TITLE:
PROPOSED CANTILEVER RETAINING WALL
48.883
48.904
49.022
49.335
49.324
46.070
DRA
IN
48.619
49.332
48.607
50.166
Entrance
48.371
ROAD
ARDS
BUNIY
DEALT BY:
48.331
48.368
TOW
ADAB
AD
55.20
48.643
GLOB E CONSULTANCIES
LOBE
PROPOSED LEVEL
CONSULTANCIES
CONSULTANT
10
26,000
4,300
3,000
3,900
10
26,000
3,600
3,900
3,000
4,300
4,300
3,000
3,900
3,600
3,900
3,000
4,300
SCHEDULE OF OPENINGS:
300
1200
900
900
PLANTERS
4,700
3,900
1100
1500
1500
1150
200
900
3,900
4,700
2,600
2,600
4,700
1000
2100
D1
900
2100
D2
800
2100
D3
PVC Door
800
2100
D4
750
2100
D5
1200
2100
1500
1200
W1
800
1200
Ventilator Loueverd
600
450
200
2500
900
D3
1300
800
DRESSING
800
C
200
1500
850
200
4450
1350
1450
1000
D
600
TOILET
4600
100
1100
V
1050
1200
1500
1500
1600
100
100
CUP BOARD
1800
Loft at
2.10m
DRAWING
1500
200
1300
ARCH OPENING
D1
900 100
1850
200
1000
1100
450 200
800
ARCH OPENING
1500
1900
800
ARCH OPENING
3500
100
500
D2
200
1450
1200
1500
4500
UP
4600
1150
1200
WARD ROBE
2050
1750
4450
2100
Loft at
2.10m
1500
DINNING
BED ROOM - 1
900
900
100
1700
700
800
100
2150
800
200
STORE
3600
300
4450
4450
D2
D1
ARCH OPENING
2050
100
300
1200
3600
1300
2700
E
200
4000
100
900
D1
600
1300
3600
700
3500
600
600
Work top
at 0.80m
200
200
100
950
1600
1200
1150
200
100
KITCHEN
600
700
1500
800
TOILET
D3
800
950
3800
D3
800 100
200
1500
2300
1200
COMMON
TOILET
1600
450
200
200
WARD ROBE
100
1150
W
1500
600
1500
1450
200
A
W
PASSAGE
300
1500
600
450 450
100
AREA STATEMENT:
-0.45m
3,600
600
3500
-0.45m
2,600
CUP BOARD
1850
100
3600
700
1750
2400
1200
200
Work top
at 0.80m
DRAWING
1500
600
1200
1850
Loft at
2.10m
950
1450
450
600
3800
1500
3800
1150
100
100
700
800
D2
D1
100 900
KITCHEN
800
1500
2150
100
1800
CUP BOARD
750
800
500
1700
D2
1900
ARCH OPENING
100
600
100
CUP BOARD
1350
200
Loft at
2.10m
W1
1850
STORE
100
3500
100
100
2050
W1
100
750
3600
2850
100
DRESSING
1150
1200
1600
D1
800
200
ARCH OPENING
1300
200
200
D3
2600
1500
BED ROOM - 2
Loft at
2.10m
700
2700
800
200
800
200 750
100
DINNING
WARD ROBE
TOILET
3600
ARCH OPENING
1500
200
200
D3
800
100
100
2500
1500
3,150
1050
750 200
BED ROOM - 2
200
1450
V
600
1500
600
ARCH OPENING
200
1500
SIT OUT
850
900
4,650
200
1300
D3
DRESSING
200
900
300 600 300
800
1500
2500
TOILET
C
200
750
900
D1
1500
1500
3,400
12,250
1500
4450
850
1350
1450
1000
D
WARD ROBE
1500
COMMON
TOILET
100
1200
900
450
100
900
200
600
100
2300
450 450
100
TOILET
800
1150
200
200
1200
WARD ROBE
600
1500
800 100
200
1150
W
1500
3800
4,200
1150
200
2050
900
1500
3300
1500
1,500
1100
RAMP
V
450
1600
200 450
725
1650
600
800
4600
200
1500
1650
200
1500
1000
2400
1250
1100
1200
V
1050
100
500
SIT OUT
700
1000
1150
1200
1500
100
100
Loft at
2.10m
DRAWING
500
1450
1100
200
100
CUP BOARD
1800
UP
1200
600
D3
800
ARCH OPENING
1900
1500
D1
900 100
1850
3500
100
DINNING
ARCH OPENING
4450
2100
900
1200
900
100
1700
700
800
500
800
3600
1500
950
4000
BED ROOM - 1
450 200
1750
1500
4500
2150
D2
950
4500
3600
300
4450
DRAWING
100
1500
1600
1200
3600
200
STORE
200
Loft at
2.10m
2050
ARCH OPENING
2050
800
3500
1300
D2
D1
Loft at
2.10m
1300
ARCH OPENING
900
100
100
1300
2700
E
200
BED ROOM - 1
1600
D1
600
200
700
600
Work top
at 0.80m
200
600
3500
600
100
600
700
950
4000
800
TOILET
D3
800
1500
1500
D3
950
3800
1500
WARD ROBE
450
800 100
200
600
2300
1200
1600
COMMON
TOILET
600
3800
1500
1500
600
450 450
100
200
200
WARD ROBE
1150
500
1150
200
100
CUP BOARD
1850
KITCHEN
300
Loft at
2.10m
1500
600
1200
3600
700
1750
200
1450
450
100
200
W
1500
3800
1150
100
100
700
500
800
1850
4600
200
725
200
Work top
at 0.80m
800
D2
D1
100 900
D4
750
PLANTERS
Loft at
2.10m
W1
KITCHEN
100
1800
CUP BOARD
W1
800
1700
D2
2150
1500
ARCH OPENING
100
600
100
D4
750
CUP BOARD
1000
200
750
3600
750
100
REAR
YARD
1850
STORE
100
3500
1,500
100
2050
DINNING
800
100
100
DRESSING
1150
1200
ARCH OPENING
WARD ROBE
1500
BED ROOM - 2
Loft at
2.10m
ARCH OPENING
1500
200 750
100
700
D1
800
ARCH OPENING
D3
2600
1300
800
3600
2700
100
100
TOILET
200
1050
2500
1500
3,150
V
600
WARD ROBE
200
D3
800
4450
200
850
900
4,650
200
750 200
BED ROOM - 2
900
900
D1
1500
1500
3,400
12,250
1500
600
4500
D
100
900
200
1500
750
1900
450
COMMON
TOILET
TOILET
1200
200
2050
600
100
2300
450 450
100
1600
1500
200
600
1500
800
1500
1150
Loft at
2.10m
V
450
D3
3800
4,200
BED ROOM - 1
200 450
1600
600
100
950
4000
1200
1500
WARD ROBE
950
1150
200
800 100
200
10
3,900
3,600
3,900
4,700
2,600
10
TM/PM BUNGALOW;
GROUND FLOOR AREA
FIRST FLOOR AREA
Total area
= 288.00 Sqm
= 326.10 Sqm
= 614.10 Sqm
SERVANT QUARTER
GROUND FLOOR AREA
= 49.95 Sqm
DELETE
+8.95m
+8.95m
3.
+6.45m
09-07-2015
2.
15-07-2014
1.
22-04-2014
+6.45m
SL NO.
+3.45m
DATE
DESCRIPTION
REVISION
+3.45m
REVISION NO.
+0.45m
+0.45m
+0.00m
+0.00m
REAR ELEVATION
FRONT ELEVATION
+6.45m
SHEET NO.
4/20
SCALE - 1:100.
SCHEDULE OF FINISHES
+8.95m
PROJECT:
+8.95m
+6.45m
DRAWING TITLE:
+3.45m
+3.45m
+0.45m
+0.45m
+0.00m
+0.00m
Drawing Room
Dining Room
Bed Room
Dressing
Toilet
Sit Out
Store Room
Kitchen
DEALT BY:
GLOB E CONSULTANCIES
LOBE
CONSULTANCIES
CONSULTANT
2530
100
2500
Ceramic Flooring
900
250
900
1200
3000
2100
900
DINNING
Vitrified Flooring
50thk
Sill Band
900
100
40
40
STORE
75
200thk SB
Masonary Wall
600
Sun Shade
KITCHEN
Plinth Wall
PCC-1:3:6
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
Plinth Beam
STORE
250
1200
3000
75
DINNING
Vitrified Flooring
50thk
Sill Band
100
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
Plinth Wall
PCC-1:3:6
100thk HB
Masonary Wall
Vitrified Flooring
620
600
100
800
600
400
900
KITCHEN
200thk
Lintel band
2100
900
100
40
40
CUP BOARD
80thk precast
RCC Slab
(Work top)
2200
100
40
900
RCC Loft
900
100
800
Sun Shade
600
400
620
900
100
40
40
200thk
Lintel band
100thk HB
Masonary Wall
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
450
GL
Vitrified Flooring
600
40
900
2100
2100
420 420 420
Vitrified Flooring
CUP BOARD
450
600
RCC Loft
PL
+0.00m
CUP BOARD
KITCHEN
KITCHEN
620
1200
3000
STORE
Vitrified Flooring
900
50thk
Sill Band
+0.45m
80thk precast
RCC Slab
(Work top)
620
900
900
200thk
Lintel band
DINNING
Work Top
Work Top
RCC Loft
CUP BOARD
Vitrified Flooring
2100
800
STORE
400
75
900
2100
100thk HB
Masonary Wall
Vitrified Flooring
250
2100
CUP BOARD
3400
PCC 1:3:4
800
200thk SB
Masonary Wall
600
Sun Shade
2100
DINNING
900
+3.45m
900
2200
3000
2200
800
Work Top
50thk
Sill Band
200thk
Lintel band
3000
75
3000
1750
CUP BOARD
620
2200
3000
Dado Work
3400
Ceramic Flooring
RCC Loft
2100
420 420 420
900
600
200
900
600
Sun Shade
1900
3400
Ceramic Flooring
900
Ceramic Flooring
900
750
+6.45m
Eaves
Board
500
200
600
D4
200 800
1900
600
Roof Tie
Beam
COVERED TERRACE
2500
1850
3500
Work top
at 0.80m
200
1200
1900
Eaves
Board
100
250
500
600
200
700
3500
Roof Tie
Beam
KITCHEN
750
200
100
800
500
800
Work top
at 0.80m
Roof Tie
Beam
+8.95m
700
700
100
800
100
KITCHEN
800
1850
1900
800
D2
500
D2
800
D2
800
500
3600
200
3600
3500
D4
750
100
D2
100
D2
800
800
W1
700
700
3600
W1
800 200
1850
D2
Work top
at 0.80m
KITCHEN
100
CUP BOARD
750
200
1900
600
D4
750
CUP BOARD
1900
700
600
W1
800 200
100
CUP BOARD
500
200
750
200
Plinth Wall
PCC-1:3:6
Plinth Beam
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
SECTION AT 'D-D'
Plinth Beam
SCALE-1:100
Roof Tie
Beam
SECTION AT 'A-A'
Plinth Wall
PCC-1:3:6
Plinth Beam
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
4300
900
2500
100
600
3000
2100
100
3000
2100
150 Risers
150
Hand Rail
Vitrified
Flooring
Ramp
PL
250
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
Plinth Wall
PCC-1:3:6
Plinth Beam
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
SECTION AT 'C-C'
SCALE-1:100
200
600
4200
First Landing
1200
600
KITCHEN
GL
900
900
2100
80thk precast
RCC Slab
(Work top)
Vitrified Flooring
PL
Vitrified Flooring
2850
300 Treads
+0.45m
+0.00m
Hand Rail
Hand Rail
300
200thk SB
Masonary Wall
900
200
KITCHEN
200
600
900
1200
3000
900
5350
600
1400
1600
SECTION AT 'B-B'
SCALE-1:100
2850
First Landing
80thk precast
RCC Slab
(Work top)
Vitrified Flooring
3000
200thk SB
Masonary Wall
900
1600
2500
900
900
600
200
900
200 700
950
1400
1200
900
200 700
200thk SB
Masonary Wall
200thk
Lintel band
Dado Work
Vitrified
Flooring
Hand Rail
Ceramic Flooring
450
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
Plinth Wall
PCC-1:3:6
Plinth Beam
50thk
Sill Band
+3.45m
900
2100
PCC Wall
1:3:6
Vitrified
Flooring
200thk
Lintel band
Flooring
CUP BOARD
DINNING
1200
100
900
900
2100
2100
Dado Work
3000
Arch opening
TOILET
200thk
Lintel band
RCC Loft
1600
100
2100
CUP BOARD
3000
2100
900
250
600
Hand Rail
COVERED
TERRACE
Ceramic Flooring
Dado Work
100
200thk SB
Masonary Wall
200thk SB
Masonary Wall
Hand Rail
Ceramic Flooring
450
Plinth Wall
PCC-1:3:6
Plinth Beam
Vitrified
Flooring
+6.45m
Hand Rail
1600
600
GL
1600
2500
900
900
2100
900
100thk HB
Masonary Wall
PL
+0.00m
100
600
+0.45m
600
200thk
Lintel band
RCC Loft
Eaves
Board
150
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
900
900
600
900
600
5475
Vitrified
Flooring
450
100thk CC-1:4:8
Bed Concrete
100thk
Pulverised sand
Earth Filling
GL
Plinth Wall
PCC-1:3:6
Plinth Beam
1.
09-07-2015
SL NO.
SCALE-1:100
DATE
DESCRIPTION
REVISION
DRAWING NO. - GL/14-15/39-1/R1
25
75
1,000
100
50
50
4,125
SCALE-1:50
PROJECT:
DETAILED DESIGN AND DRAWING FOR THE CONSTRUCTION OF
C1 TYPE OFFICERS QUARTERS WITH CAR PARKING AND
AREA DEVELOPMENT AT IOCL RESIDENTIAL COMPLEX
BUNIYADABAD, PORT BLAIR, A&N ISLAND UNDER WEST BENGAL
STATE OFFICE.
75
SCALE-1:50
ELEVATION
SCALE-1:50
85
805
450 85
150
150
650
975
x
SECTION AT 'x-x'
300
130
450
100
750
75
+0.00m
450150
+0.45m
900
730
150
1,200
2,850
1,200
200
3,000
1,400
1,750
+0.45m
+0.00m
1000
200
75
1,600
+3.45m
SCALE - 1:100.
150
75
1,600
150
150 150
100 100
100 100
50
200
200
200
100
200
1,200
1,400
75
3,000
75
1,525
75
75
+3.45m
800
950
3,000
1,750
200
150
900
150
+6.45m
SHEET NO.
6/20
75
950
1,400
75875
1,325
4,400
200
REVISION NO.
+6.45m
1,325
Plinth Wall
PCC-1:3:6
Plinth Beam
200
3000
3000
900
900
2100
2100
200thk SB
Masonary Wall
PCC Wall
1:3:6
Vitrified
Flooring
-200
Depressed
beam
DRESSING
DINNING
Flooring
PCC Wall
1:3:6
Pulverised
Sand Filling
200
2100
1100
1900
200thk SB
masonary Wall
100thk HB
Masonary Wall
+3.45m
TOILET
450
250
900
50thk
Sill Band
Vitrified Flooring
TOILET
1600
200thk SB
Masonary Wall
100thk HB
Masonary Wall
250
Ceramic Flooring
Arch opening
1900
2500
900
900
900
900
900
2100
820
250
200
75
1200
2180
BED ROOM - 1
200thk SB
Masonary Wall
Vitrified
Flooring
100thk HB
Masonary Wall
Hand Rail
Ceramic Flooring
Dado Work
75
GL
600
WARD ROBE
900
200thk SB
masonary Wall
PL
PCC Wall
1:3:6
-200
Depressed
beam
Dado Work
1600
200thk SB
Masonary Wall
Ceramic Flooring
+6.45m
TOILET DRESSING
450
+0.00m
900
Vitrified Flooring
RCC Loft
50thk
Sill Band
500
200
200thk SB
Masonary Wall
Pulverised
Sand Filling
900
250
BED ROOM - 1
1200
75
900
900
200thk SB
masonary Wall
600
+0.45m
Dado Work
COVERED TERRACE
Hand Rail
Eaves
Board
1500
Ceramic Flooring
75
1200
250
50thk
Sill Band
600
WARD ROBE
1200
600
75
RCC Loft
Pulverised
Sand Filling
900
Ceramic Flooring
+6.45m
Hand Rail
2500
Hand Rail
Eaves
Board
+3.45m
1600
+8.95m
1200
+8.95m
2530
Roof Tie
Beam
800
+8.95m
Roof Tie
Beam
800
200thk
Gable Wall
DRAWING TITLE:
Architectural Details - Details of Kitchen at Ground Floor,
Sections,Elevation, Detail of Hand Rail at First Floor Lvl,
Detail of Hand Rail at Ground Lvl.- TM/PM QUARTER.
1,200
DEALT BY:
GLOB E CONSULTANCIES
LOBE
CONSULTANCIES
CONSULTANT