Sie sind auf Seite 1von 23

Project Spreadsheets to BS 8110

REINFORCED CONCRETE
COUNCIL

Client

Made by

Advisory Group

Location3rd Floor slab

from 1 to 5a

rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

MATERIALS
fcu
35
fy
460
fyv
460

h agg
m
m

Density

23.6

N/mm
N/mm
N/mm

1
2
3
4
5
6

5a

20
1.05
1.50

mm

H (mm)

Left

Right

6.500
7.000
7.500

275
275
275

450
1100
1100

1100
1100
450

43

Job No

R68

steel
concrete

COVERS (to links, or if no links, to reinf)


Top cover
20
mm
Btm cover
20
mm
Side cover
20
mm
RIBS
slab depth, hf
Rib width
Centres
1 in
SUPPORTS

Solid (mm)
L (m)

100

mm

150
900
10

mm

Support No

Type

1
4

K
E

mm

taper

K(nife), C(antilever) or E(ncastre)

LOADIN UDLs (kN/m)


Span 1
UDL
PL 1
PL 2
Span 2
UDL
PL 1
PL 2
Span 3
UDL
PL 1
PL 2

to grid

(Normal weight concrete)

kN/m

SPANS
SPAN
SPAN
SPAN
SPAN
SPAN
SPAN

chg

Page

3-Apr-16

Checked Revision

1999 BCA for RCC

LOCATION
Supports from grid

Date

Self
Weight

PLs (kN/m)

Add Dead Imposed


Load
Load

3.93
~~~~
~~~~
~
4.19
~~~~
~~~~
~
3.82
~~~~
~~~~

Position (m)
Position
from left

2.50
8.50

4.00
1.00

~~~~
0.450

~
2.50
8.50

~
4.00
1.00

~~~~
1.450

~
2.50

~
4.00

~~~~

Self

Span 4
Weight
UDL
PL 1 ~~~
PL 2 ~~~
Span 5
~
UDL
PL 1 ~~~
PL 2 ~~~
Span 6
~
UDL
PL 1 ~~~~
PL 2 ~~~~

LOADING PATTERN
DEAD
IMPOSED

Add Dead Imposed


Load
Load

Position
from left

~~~~

~~~~

min

max

1
0

1.4
1.6

LOADING DIAGRAM

5a

REACTIONS (kN/m)
SUPPORT
Characteristic Dead
Max Imposed
Min Imposed
MAX ULTIMATE

23.4
12.8
-8.8
53.3

57.9
29.6
7.5
128.5

48.0
29.3
5.3
114.0

23.8
17.5
-9.0
61.3

~
~
~
~

~
~
~
~

~
~
~
~

Project

Spreadsheets to BS 8110

Client

Advisory Group

Location

3rd Floor slab, from 1 to 5a

REINFORCED CONCRETE
COUNCIL
Made by

rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

Checked

Apr-2016
Revision

chg

1999 BCA for RCC

Page

44
Job No

R68

BENDING MOMENT DIAGRAMS (kNm/m)


100

100

80

80

60

60

40

40

20

20

-20

-20

-40

-40

-60

-60
-80

-80
0

10

15

20

5a

Elastic Moments

SUPPORT No

Elastic M
Redistributed M
b
Redistribution
SPAN No

Elastic M
Redistributed M
b

25

10

15

80.1
72.1
0.900
10.0%

68.4
68.4
1.000
0.0%

85.9
73.0
0.850
15.0%

~
~
~

~
~
~

~
~
#VALUE!

~
~
#VALUE!

~
~
#VALUE!

48.75
45.65
0.936

44.13
50.02
1.133

25

5a

Redistributed Envelope

0.0
0.0
1.000

59.62
57.40
0.963

20

kNm/m
kNm/m
~

SHEAR FORCE DIAGRAMS (kN/m)


80

80

60

60

40

40

20

20

-20

-20

-40

-40

-60

-60

-80

-80

10

15

20

Elastic V
Redistributed V

5a

Elastic Shears
SPAN No

25

10

15

Redistributed Shears

54.1
53.3

63.3
62.1

67.5
67.4

57.2
57.4

56.6
56.6

63.0
61.3

~
~

~
~

~
~

~
~

~
~

~
~

SPAN No

Elastic V
Redistributed V

20

25

5a

Project

Spreadsheets to BS 8110

Client

Advisory Group

Location

3rd Floor slab, from 1 to 5a

REINFORCED CONCRETE
COUNCIL
Made by

rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

SPAN 3
ACTIONS
DESIGN

M kNm/m
b
d mm
As mm
As' mm

TOP STEEL

As prov

mm

BTM STEEL
SHEAR

LINKS
DEFLECTION
& CHECKS

As' prov mm
V kN/m
v N/mm
vc N/mm

Date

Checked

LEFT
CENTRE
68.4 @col face
50.0
1.00
1.13
239.0
236.5
618
457
0
As T 118
2T
20
/rib
2T
12
/rib
+ 4 T8 between
829
As T prov 226
2T
12
/rib
1T
25
/rib
226
As prov 491
56.58
0.889
0.935
Link
6
.
2T6 @ 1,200
L/d 31.712
Allowed 38.473 ok

Apr-2016
Revision

chg

1999 BCA for RCC

Page

/46
Job No

R68

RIGHT
73.0
0.85
239.0
661
As'
4
2T
20
/rib
+ 4 T8 between
As prov
829
1T
16
/rib
As' prov
201
V 61.26
v 1.221
vc 0.935
2T6 @ 175 for 875

% As
Bar & cover
Bar spacing

ok
ok
ok

ok
ok
ok

ok
ok
ok

Dist to link

ok

ok

ok

Project

Spreadsheets to BS 8110

Client

Advisory Group

Location

3rd Floor slab, from 1 to 5a

REINFORCED CONCRETE COUNCIL


Made by

rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Checked

1999 BCA for RCC

Date

Page

Apr-2016
Revision

/47
Job No

chg

R68

APPROXIMATE WEIGHT of REINFORCEMENT


TOP STEEL

No

Type

Dia

Length

Unit Wt

Weight

2
4
2
2
4
2
2
4
2
2
4

T
T
T
T
T
T
T
T
T
T
T

12
8
16
20
8
12
20
8
12
20
8

2150
2150
4475
3375
3375
4425
3625
3625
4675
2400
2400

0.888
0.395
1.578
2.466
0.395
0.888
2.466
0.395
0.888
2.466
0.395

3.8
3.4
14.1
16.6
5.3
7.9
17.9
5.7
8.3
11.8
3.8

1
1
2
2
3
3
4

2
2
2
2
2
1
1

T
T
T
T
T
T
T

16
20
12
20
12
25
16

1150
4900
3175
4750
3175
5900
1725

1.578
2.466
0.888
2.466
0.888
3.853
1.578

3.6
24.2
5.6
23.4
5.6
22.7
2.7

Span 1
Span 2
Span 3

6
7
10

T
T
T

6
6
6

800
800
800

0.222
0.222
0.222

1.1
1.2
1.8

Support 1
Span 1
Support 2
Span 2
Support 3
Span 3
Support 4

BOTTOM STEEL

LINKS

SUMMARY

Support
Span
Support
Span
Support
Span
Support

All figures approximate - see User Guide.

Reinforcement density (kg/m) 9.68

Total rebar per rib, excluding mesh (kg)

190.7

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS I

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

SELF WEIGHT

ave bw
rib area
net self wt
E/O solid
cross rib
addn. solid
total SW

Made by rmw Job No R68


Date
3-Apr-16

1999 BCA for RCC

167.5
167.5
167.5
140.0
0.119
0.119
0.119
0.076
3.129
3.129
3.129
1.993
3.361
3.361
3.361
-1.993
0
0
0
0
0.801555 1.056428 0.69468 #DIV/0!
3.930
4.185
3.823
0.000

140.0
0.076
1.993
-1.993
0
#DIV/0!
0.000

140.0
0.076
1.993
-1.993
0
#DIV/0!
0.000

mm
mm
kN/m
kN/m
kN/m
kN/m
kN/m

ANALYSIS
1.0
0.4

Min load
Max load

x dead load
x dead load +

1.6

x imposed load

(Table 2.1)

Distribution Factors
SUPT 1
R

SUPT 2
L

Af
h -hf
Aw1
Aw2
A sum
sum Ax
x bar
sum Ad
Ix
Stiffness

90000

Sum
Factor

SUPT 3

SUPT 4

90000

SUPT 5

90000

SUPT 6

90000

SUPT 7

90000

L
90000

175

175

175

-100

-100

-100

26250

26250

26250

-15000

-15000

-15000

6125

6125

6125

2000

2000

2000

122375

122375

122375

77000

77000

77000

10391667

3883333.3

10391667

10391667

3883333.3

3883333.3

84.916582 84.916582

84.916582

50.4329

50.4329

50.4329

539513578 539513578

539513578

8902944.1

8902944.1

8902944.1

686716269 686716269

686716269

105648657 98102324 98102324 91562169

91562169

203750981
189664493
0.518519 0.481481 0.51724 0.482759

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!
0

#DIV/0!

#DIV/0!
0

Fixed End Moments


Min load
Cant
UDL
PL 1
PL 2
FEM
Live load
Cant
UDL
PL 1
PL 2
FEM

SPAN 1
R

SPAN 2
R

SPAN 3
R

SPAN 4
R

SPAN 5
R

SPAN 6
R

187.2629 176.1091
177.8434
0
22.64 22.63964 27.29736 27.2974 29.64056 29.64056
0
3.3137 0.246475 7.747772 2.02419
0
0
#DIV/0!
0
0
0
0
0
0
#DIV/0!
25.95
22.89
35.05
29.32
29.64
29.64
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
###
###
0.00

219.7851 229.5637
251.1374
0
31.589 31.58919 37.05228 37.0523 41.85623 41.85623
0
1.9492 0.144985 4.557513 1.1907
0
0
#DIV/0!
0
0
0
0
0
0
#DIV/0!
33.54
31.73
41.61
38.24
41.86
41.86
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
###
###
0.00

Moment Distribution
SUPT 1
Min load

Sum

-25.95
25.953
3.1523
-3.152
-3.386
3.3857
0.6049
-0.605
-0.65
0.6497
0.1161
-0.116
-0.125
0.1247
0.00

SUPT 2

22.88612
6.304672
12.97668
-6.77143
-1.57617
1.209805
1.692857
-1.29937
-0.30245
0.23215
0.324843
-0.24934
-0.05804
0.044547
35.41

-35.0451
5.854338
0.082504
-6.28776
-0.75703
1.12339
0.813072
-1.20656
-0.14527
0.215567
0.15602
-0.23153
-0.02788
0.041365
-35.41

SUPT 3

29.3215
0.16501
2.92717
-1.5141
-3.1439
1.62614
0.56169
-0.2905
-0.6033
0.31204
0.10778
-0.0558
-0.1158
0.05988
29.36

-29.6406
0.154007
0
-1.41312
0
1.517734
0
-0.27116
0
0.291238
0
-0.05203
0
0.055886
-29.36

SUPT 4

29.64056
0
0.077004
0
-0.70656
0
0.758867
0
-0.13558
0
0.145619
0
-0.02602
0
29.75

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

SUPT 5

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

SUPT 6

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

SUPT 7

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

ANALYSIS II

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Live on
Odd Spans

Sum

-33.54
33.538
-8.227
8.2274
-7.154
7.154
-1.579
1.5788
-1.373
1.3728
-0.303
0.3029
-0.263
0.2634
0.00

31.73418
-16.4548
16.76922
-14.3081
4.113689
-3.15751
3.577013
-2.74557
0.789377
-0.60589
0.686394
-0.52685
0.151474
-0.11627
19.91

0
10.788
-10.79
2.5642
-2.564
2.0701
-2.07
0.492
-0.492
0.3972
-0.397
0.0944
-0.094
0.00

21.57545
0
5.128369
-5.39386
4.140116
-1.28209
0.984083
-1.03503
0.794448
-0.24602
0.188836
-0.19861
0.152447
24.81

Live on
Even Spans

Sum

Made by rmw Job No R68


Date
3-Apr-16

1999 BCA for RCC

-15.2794
10.82489
-13.286
1.975787
-2.93197
1.718024
-2.54946
0.379134
-0.56262
0.329672
-0.48922
0.072752
-0.10796
-19.91
-41.6098
20.03434
-9.89043
4.762057
-2.59065
3.844393
-0.61578
0.913792
-0.49712
0.737701
-0.11816
0.175348
-0.09539
0.141558
-24.81

Elastic Support Moments

21.6498
-7.6397
3.95157
-6.643
3.43605
-1.466
0.75827
-1.2747
0.65934
-0.2813
0.1455
-0.2446
0.12652
13.18
38.243
-19.781
10.0172
-5.1813
2.38103
-1.2316
1.9222
-0.9942
0.4569
-0.2363
0.36885
-0.1908
0.08767
-0.0453
25.82

-41.8562
20.20645
0
3.688135
0
3.206978
0
0.707717
0
0.615387
0
0.135804
0
0.118087
-13.18

41.85623
0
10.10323
0
1.844068
0
1.603489
0
0.353858
0
0.307694
0
0.067902
0
56.14

-18.4621
0
-4.83588
0
-1.14946
0
-0.92796
0
-0.22057
0
-0.17807
0
-0.04233
-25.82

0
-9.23106
0
-2.41794
0
-0.57473
0
-0.46398
0
-0.11029
0
-0.08903
0
-12.89

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

(3.2.1.2.2)

Support

All spans
Odd Spans
Even Spans

0
0
0

80.12945 68.35206 73.0033


55.32132 42.53567 85.8904
60.22301 55.17439 16.8669

0
0
0

0
0
0

0
0
0

Redistribution
b b +
Max M
Dead only
All spans
Odd Spans
Even Spans

1
1
0
0
0
0
0

(3.2.2.1)
0.9
1.1
72.1165
35.41488
72.1165
60.85345
66.24531

1
1
68.35206
29.35801
68.35206
42.53567
55.17439

1
1
0
0
0
0
0

1
1
0
0
0
0
0

1
1
0
0
0
0
0

UDL

1
PL1

PL2

UDL

2
PL1

PL2

UDL

3
PL1

PL2

41.796
100.11
100.11
41.796

8.5
13.5
13.5
8.5

0
0
0
0

46.7955
110.314
46.7955
110.314

8.5
13.5
8.5
13.5

0
0
0
0

47.4249
114.3949
114.3949
47.4249

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

method 1
0.85
1.15
73.0068
29.7539
73.0068
73.0068
19.3969

Total Ultimate Loads


Span

Dead only
All spans
Odd Spans
Even Spans
Span

Dead only
All spans
Odd Spans
Even Spans

0
0
0
0

Elastic Shears
Span

All spans 50.295


Odd Spans 54.112
Even Spans 19.545
Span

All spans
Odd Spans
Even Spans

63.31961 67.5429
59.50297 31.9635
30.75167 66.5816
4

0
0
0

56.27077 56.57726
23.33193 51.41681
57.23202 28.82012
5

0
0
0

0
0
0

57.8176
62.97806
18.60478
6

0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

ANALYSIS III

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Made by rmw Job No R68


Date
3-Apr-16

1999 BCA for RCC

Redistributed Shears
Span

Dead only
All spans
Odd Spans
Even Spans

23.361
51.528
53.261
18.618

Span

Dead only
All spans
Odd Spans
Even Spans

26.93504
62.08685
60.35407
31.67818

31.0023
66.3982
32.7538
67.442

0
0
0
0

0
0
0
0

0
0
0
0

24.29318
57.41548
22.54162
56.3717

23.65967
56.5768
53.13461
28.48278

0
0
0
0

0
0
0
0

23.76524
57.81806
61.26025
18.94212
6

0
0
0
0

Imposed Reactions
Support

All spans 11.764 29.60798 29.28643 15.3417 #VALUE! #VALUE! #VALUE!


Odd Spans 12.847 7.497289 5.338907 17.4931 #VALUE! #VALUE! #VALUE!
Even Spans -8.805 11.25493 11.07531 -8.9558 #VALUE! #VALUE! #VALUE!

SPAN MOMENTS
SPAN 1
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
SPAN 2
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

Left

< >

50.29516
54.1118
19.54459
51.52792
53.2607
18.61808

PL1

< >

PL2

< >

Loadings

0
0
0
0
0
0

3.265438
3.513235
3.039503
3.345475
3.457977
2.895415
0
0
0
0
0
0

15.4023
15.4023
6.43019
0.45
0.45
0.45
0.45
0.45
0.45
21.0733
22.7908
8.14401
21.6281
22.4078
7.72708

13.5
13.5
8.5
2.388944
2.636741
1.717614
2.468981
2.581483
1.573527
50.02579
59.61639
13.31017
53.02012
57.39578
11.78554

0
0
0
0
0
0
0
0
0
6.075
6.075
3.825
6.075
6.075
3.825

2.388944
2.636741
1.717614
2.468981
2.581483
1.573527
50.02579
59.61639
13.31017
53.02012
57.39578
11.78554

Left

< >

PL1

< >

PL2

< >

67.54288
31.96354
66.58163
66.39818
32.75384
67.44196

80.12945
55.32132
60.22301
72.1165
60.85345
66.24531

4.285962
4.781334
4.224966
4.213325
4.899554
4.279558
0
0
0
0
0
0

13.5
8.5
13.5
3.429314
3.509844
3.368317
3.356676
3.628063
3.42291
32.11057
-1.81964
48.74988
36.23953
-4.53121
45.64892

0
0
0
0
0
0
0
0
0
-60.5544
-42.9963
-40.648
-52.5415
-48.5284
-46.6703

(3.2.2.1b)
Max

80.12945
55.32132
60.22301
72.1165
60.85345
66.24531

50.02579
59.61639
13.31017
b
53.02012 1.059856
57.39578 0.962752
11.78554 0.885453

Right

56.27077
23.33193
57.23202
57.41548
22.54162
56.3717

Loadings

15.7591
6.68507
15.7591
1.45
1.45
1.45
1.45
1.45
1.45
1.24099
-16.002
19.7536
7.59411
-20.388
14.9788

Right

63.31961
59.50297
30.75167
62.08685
60.35407
31.67818

3.429314
3.509844
3.368317
3.356676
3.628063
3.42291
32.11057
-1.81964
48.74988
36.23953
-4.53121
45.64892

(3.2.2.1b)
Max

68.35206
42.53567
55.17439
68.35206
42.53567
55.17439

32.11057
0
48.74988
b
36.23953 1.128586
0
0
45.64892 0.93639

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS IV

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

SPAN 3
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
SPAN 4
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
SPAN 5
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

Left

< >

56.57726
51.41681
28.82012
56.5768
53.13461
28.48278

Made by rmw Job No R68


Date
3-Apr-16

1999 BCA for RCC

PL1

< >

PL2

< >

Right

57.8176
62.97806
18.60478
57.81806
61.26025
18.94212

Loadings

68.35206
42.53567
55.17439
68.35206
42.53567
55.17439

3.70934
3.371008
4.557751
3.70931
3.483632
4.504403
0
0
0
0
0
0

15.2526
15.2526
6.32332
0
0
0
0
0
0
-68.352
-42.536
-55.174
-68.352
-42.536
-55.174

0
0
0
3.70934
3.371008
4.557751
3.70931
3.483632
4.504403
36.5801
44.12757
10.50308
36.57838
50.01505
8.974576

0
0
0
0
0
0
0
0
0
-68.3521
-42.5357
-55.1744
-68.3521
-42.5357
-55.1744

3.70934
3.371008
4.557751
3.70931
3.483632
4.504403
36.5801
44.12757
10.50308
36.57838
50.01505
8.974576

73.00333
85.89036
16.86687
73.00681
73.00681
19.3969

Left

< >

PL1

< >

PL2

< >

Right

0
0
0
0
0
0

(3.2.2.1b)
Max

0
0
0
0
0
0

Loadings

73.00333
85.89036
16.86687
73.00681
73.00681
19.3969

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
-73.003
-85.89
-16.867
-73.007
-73.007
-19.397

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
-73.0033
-85.8904
-16.8669
-73.0068
-73.0068
-19.3969

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0

Left

< >

PL1

< >

PL2

< >

Right

0
0
0
0
0
0

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

(3.2.2.1b)
Max

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0

Loadings

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

36.5801
44.12757
10.50308
b
36.57838 0.999953
50.01505 1.133419
8.974576 0.854471

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

(3.2.2.1b)
Max

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS V

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

SPAN 6
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

Left

< >

0
0
0
0
0
0

0
0
0
0
0
0

Made by rmw Job No R68


Date
3-Apr-16

1999 BCA for RCC

PL1

< >

PL2

< >

0
0
0
0
0
0

Loadings

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

UDLs at solid(for shear)


UDL
PL left
PL right

Right

15.486
13.5
0

15.486
0
0

15.486
0
0

0
0
0

0
0
0

0
0
0

(3.2.2.1b)
Max

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS I
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

REINFORCEMENT DESIGN

SPAN 1

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

At Edge of Solid

in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

mm

kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

0
120

mm
mm

ok

mm
%

ok

mm
mm

ok

mm

ok

mm
mm
mm

ok

mm
%

ok

mm
mm

ok
ok
ok

ok

314
16
2
402
0.988
72.8
25.0

3-Apr-16

h = 275
BS8110

0.13%
322

Table 3.25

35.29
31.76
150
0.1059
206.44
72.36
374.8
0.00
0
438.1
350

519
519
ok

Job No R68

bw = 167.5
RIGHT
0.900
72.12
64.90
239.0
900
0.1558
46.71
280.29
0.0361
227.05
26.56
32.0
0.0
0.00
0
438.1
653

20
2
628
1.570
65.2
25.0
178.5

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

3.4.4.4
-=-=Fig 3.3

Fig 3.3

653
350
ok

ok
ok
ok

0.26%
96
8
4
201

%
mm

mm

12
2
226
0.556
122.6
25.0
152.2

6.500
SPAN
0.963
57.40
51.66
239.0
900
0.1558
46.71
265.92
0.0287
227.05
26.56
34.0
0.0
0.00
0
438.1
519
0.19
0.18%
83
d'mid = 36.0
23.26
20.93
150
0.0698
218.75
45.00
124.4
0.00
0
438.1
218

0.13%
322
dmid = 239.0
0.00
0.00
150
0.0000
230.85
27.00
0.0
0.00
0
438.1
0

%
mm
kNm/m

L=

LEFT
1.000
0.00
0.00
243.0
900
0.1558
48.29
289.75
0.0000
230.85
27.00
34.0
0.0
0.00
0
438.1
0

kNm/m

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide

Date

1999 BCA for RCC

20
2
628
1.570
105.8
25.0
152.2

between bars
3.12.11.1
3.12.11.2.4

0.26%
24
8
4
201

ok

ok
ok

218
16
2
402
1.004
114.2
25.0

ok

ok
ok

188
12
2
226
0.565
80.4
25.0

Table 3.25

between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS II
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
3-Apr-16

SPAN 1 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

0.0

N/mm

ok
%

263.3
20.80
1.49
1.25
38.64
27.20
0.00

ok

268.1
7.00
1.36
1.00
0.00
0.00
0.00

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from cl
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

53.26
0.450
29.51
0.7251
0.7976
67.0
6
175
0

kN/m
m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm

ok

mm

REINFORCEMENT DESIGN

0.0

SPAN 2

L=

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

ok
ok

LEFT
0.900
72.12
64.90
239.0
900
0.1558
46.71
280.29
0.0361
227.05
26.56
32.0
0.0
0.00
0
438.1
653
0.13%
322
dmid = 239.0
28.87
25.98
150
0.0866
213.21
57.31
293.5
0.00
0
438.1
278

62.09
1.100
40.55
1.0129
0.9345
67.0
6
175
350

NOMINAL
0.0
6
1200
2400
0
0.0

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

ok

7.000

0.0

3.12.7.2

h = 275
bw = 167.5
RIGHT
1.000
68.35
61.52
239.0
900
0.1558
46.71
280.29
0.0342
227.05
26.56
32.0
0.0
0.00
0
438.1
618

SPAN
0.936
45.65
41.08
239.0
900
0.1558
46.71
265.92
0.0228
227.05
26.56
32.0
0.0
0.00
0
438.1
413
0.19
0.18%
83
d'mid = 36.0
16.32
14.69
150
0.0490
225.20
30.68
0.0
0.00
0
438.1
149

0.13%
322
21.78
19.61
150
0.0654
220.15
41.88
149.6
0.00
0
438.1
203

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS III
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
3-Apr-16

SPAN 2 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm

653
278
20
2
628
1.570
105.8
25.0
137.0

ok

ok
ok
ok

413
413
20
2
628
1.570
65.2
25.0
218.3

ok

ok
ok
ok

0.26%
24
8
4
201

%
mm
mm
mm
mm

ok

mm
mm

ok

%
mm

ok

mm

188
12
2
226
0.565
80.4
25.0
268.1
7.00
1.36
1.00
0.00
0.00
0.00

N/mm

ok
%

618
203
20
2
628
1.570
105.8
25.0
137.0

between bars
3.12.11.1
3.12.11.2.4

0.26%
0
8
4
201

ok

ok
ok

ok

149
12
2
226
0.565
122.6
25.0

ok

ok
ok

215.3
20.80
1.83
1.16
44.18
29.29
0.00

188
12
2
226
0.565
80.4
25.0
228.7

Table 3.25

between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

67.44
1.100
45.37
1.1332
0.9345
67.0
6
175
525

kN/m
m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

ok

0.0

ok
ok

NOMINAL
0.0
6
1200
2400
0
0.0

57.42
1.100
36.34
0.9078
0.9345
67.0
6
175
0

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

ok

0.0

3.12.7.2

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS IV
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

REINFORCEMENT DESIGN

Date

1999 BCA for RCC

SPAN 3

L=

7.500

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

LEFT
1.000
68.35
61.52
239.0
900
0.1558
46.71
280.29
0.0342
227.05
26.56
32.0
0.0
0.00
0
438.1
618

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
mm
mm
mm

ok

mm
%

ok

mm
mm
mm

ok
ok

mm
mm
mm

ok

mm
%

ok

mm
mm

h = 275
BS8110

0.13%
322

Table 3.25

ok

ok
ok
ok

457
457
25
1
491
1.239
25.0
25.0
186.5

48.53
43.68
150
0.1457
191.00
106.67
422.5
0.36
4
438.1
486

ok

ok
ok
ok

0.26%
0
8
4
201

%
mm

mm

618
265
20
2
628
1.570
105.8
25.0
137.0

ok

147
12
2
226
0.565
80.4
25.0

3-Apr-16

bw = 167.5
RIGHT
0.850
73.01
65.71
239.0
900
0.1445
43.32
259.91
0.0365
227.05
26.56
34.0
0.0
0.00
0
438.1
661

SPAN
1.133
50.02
45.01
236.5
900
0.1558
42.42
262.41
0.0255
224.68
26.28
32.0
0.0
0.00
0
438.1
457
0.19
0.18%
83
d'mid = 38.5
12.88
11.60
150
0.0395
224.68
26.28
0.0
0.00
0
438.1
118

0.13%
322
dmid = 236.5
27.67
24.90
150
0.0830
214.42
54.62
274.3
0.00
0
438.1
265

%
mm

Job No R68

661
486
20
2
628
1.570
105.8
25.0
137.0

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

3.4.4.4
-=-=Fig 3.3

Fig 3.3

!!!
between bars
3.12.11.1
3.12.11.2.4

0.26%
32
8
4
201

ok

ok
ok

118
12
2
226
0.571
122.6
25.0

ok

ok
ok

147
16
1
201
0.502
0.0
0.0

Table 3.25

between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS V
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
3-Apr-16

SPAN 3 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

228.7
7.00
1.54
1.00
0.00
0.00
0.00

N/mm

ok
%

ok

252.1
20.80
1.59
1.16
38.47
31.71
0.00

287.3

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

REINFORCEMENT DESIGN
MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

56.58
1.100
35.59
0.8890
0.9345
67.0
6
175
0

kN/m

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

ok

0.0

SPAN 4
- No Span 4 LEFT
0.850
73.01
65.71
-36.0
900
0.1445
0.98
5.90
1.6095
-28.77
-16.07
34.0
438.1
59.81
-1950
438.1
-2418
0.13%
0
dmid = -36.0
73.01
65.71
150
9.6570
-28.77
-16.07
438.1
64.72
-2143
438.1
-2142591112

ok
ok

L=

61.26
0.450
48.86
1.2206
0.9345
67.0
6
175
875

NOMINAL
0.0
6
1200
3600
0
0.0

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

0.0

ok

0.000

3.12.7.2

h=0
bw = 140

SPAN
#VALUE!
~
#VALUE!
-36.0
900
#VALUE!
0.98
-121.00
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 36.0
73.01
65.71
150
9.6570
#VALUE!
#VALUE!
#VALUE!
64.72
#VALUE!
#VALUE!
#VALUE!

RIGHT
~
~
#VALUE!
-36.0
900
0.1558
1.06
6.36
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
73.01
65.71
150
9.6570
-27.98
-17.81
438.1
64.65
-2143
438.1
-2142591120

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VI
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
3-Apr-16

SPAN 4 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm

mm
mm
mm

ok

mm
mm

#VALUE!

mm
mm

ok

#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

ok

ok
ok
ok

0.26%
0
8
5
0

%
mm

-2418
0
20
2
628
-12.467
50.8
25.0
137.0

#VALUE!

N/mm

ok
%

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.0
7.00
0.62
1.00
0.00
0.00
0.00

#VALUE!
0
20
2
628
-12.467
50.8
25.0
137.0

#DIV/0!
between bars
3.12.11.1
3.12.11.2.4

0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Table 3.25

between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m
m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VII
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

REINFORCEMENT DESIGN

SPAN 5
- No Span 5 -

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
mm
mm

ok

mm
%

ok

mm
mm
mm

ok
ok

mm
mm
mm

ok

mm
%

#VALUE!

mm
mm

ok

#VALUE!
#VALUE!
#VALUE!

#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Job No R68
3-Apr-16

h=0
BS8110

SPAN
#VALUE!
~
#VALUE!
-38.5
900
#VALUE!
1.21
-124.52
#VALUE!
#VALUE!
#VALUE!
32.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 38.5
0.00
0.00
150
0.0000
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!

RIGHT
~
~
#VALUE!
-34.0
900
0.1558
0.95
5.67
#VALUE!
#VALUE!
#VALUE!
36.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
25
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

#VALUE!
0
16
2
402
-8.448
59.2
25.0
137.0

0.13%
0
0.00
0.00
150
0.0000
-32.30
-3.78
438.1
0.00
0
438.1
0

ok

ok
ok
ok

0.26%
#VALUE!
#VALUE!
#VALUE!
0

%
mm

mm

#VALUE!
0
20
2
628
-12.467
50.8
25.0
137.0

0.000

bw = 140

0.13%
0
dmid = -38.5
0.00
0.00
150
0.0000
-34.20
-4.00
438.1
0.00
0
438.1
0

%
mm

mm

L=

LEFT
~
~
#VALUE!
-36.0
900
0.1558
1.06
6.36
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

Date

1999 BCA for RCC

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

between bars
3.12.11.1
3.12.11.2.4

0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!
12
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Table 3.25

between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VII
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
3-Apr-16

SPAN 5 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

N/mm

ok
%

#VALUE!
7.00
#VALUE!
1.00
0.00
0.00
0.00

#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

REINFORCEMENT DESIGN
MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

SPAN 6
- No Span 6 LEFT
~
~
#VALUE!
-34.0
900
0.1558
0.95
5.67
#VALUE!
#VALUE!
#VALUE!
36.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
dmid = -34.0
0.00
0.00
150
0.0000
-32.30
-3.78
438.1
0.00
0
438.1
0

L=

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.034
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

0.000

h=0
bw = 140

SPAN
#VALUE!
~
#VALUE!
-34.0
900
#VALUE!
0.95
-118.19
#VALUE!
#VALUE!
#VALUE!
32.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 34.0
0.00
0.00
150
0.0000
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!

BS8110

RIGHT
~
kNm/m
#VALUE!
-32.0
900
0.1558
0.84
5.02
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
0.00
0.00
150
0.0000
-30.40
-3.56
438.1
0.00
0
438.1
0

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS IX
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Date

1999 BCA for RCC

Job No R68
3-Apr-16

SPAN 6 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm

mm
mm
mm

ok

mm
mm

#VALUE!

mm
mm

ok

#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

ok

ok
ok
ok

0.26%
#VALUE!
#VALUE!
#VALUE!
0

%
mm

#VALUE!
0
16
2
402
-8.448
59.2
25.0
137.0

#VALUE!

N/mm

ok
%

#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
7.00
#VALUE!
1.00
0.00
0.00
0.00

#VALUE!
0
12
2
226
-5.049
67.6
25.0
137.0

between bars
3.12.11.1
3.12.11.2.4

0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!

#VALUE!
12
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Table 3.25

between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

0.00
-0.034
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m
m
kN
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.032
0.00
0.0000
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

GRAPH DATA I

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Made by rmw Job No R68


Date
3-Apr-16

1999 BCA for RCC

LOADING DIAGRAM
Beam
Supports
UDL's
Dead
Imposed
PL's
Dead
Imposed

0
21
0
0
0
0
-5.0463
0
0
0
0
6.43
6.4302 10.43
0.45
0.45
10.43 18.93
18.93 19.93

-5.046
6.5
6.5
-5.0463
0
6.5
6.5
6.5
6.4302
0
6.69
10.43 6.4302 10.69
0
0
10.43 10.43
10.43 10.43

13.5
13.5
-5.0463
0
13.5
13.5
13.5
6.6851
0
6.32
10.685 6.6851 10.32
7.95
7.95
10.685 19.19
19.185 20.19

21
21
-5.0463
0
21
21
21
6.3233
0
0.00
10.323 6.3233 0.00
6.5
6.5
10.685 10.69
10.685 10.69

21
0
0

21
21
-5.0463
0
21
21
0
0.00
0
0.00
13.5
13.5
10.323 10.32
10.323 10.32

21
0
0

21
21
-5.0463
0
21
21
0
0.00
0
0.00
13.5
13.5
10.323 10.32
10.323 10.32

21
0
0

21
-5.0463
21
0
0
21
0
0

21
0

21
0.00
0.00

21
0
0

21
0.00
0.00

MOMENT DIAGRAMS
SPAN 1
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

Edge of solid

0
0
0
0
0
0
0
0
0
0
0
0
0

0.325
-15.532
-16.773
-6.0124
0
-15.933
-16.496
-5.7113
-4.2087
-11.741
-16.496
0
0

0.65
-26.738
-29.219
-9.6456
0
-27.539
-28.666
-9.0434
-6.7519
-20.453
-28.666
0
0

0.975
-34.629
-38.351
-11.537
0
-35.831
-37.521
-10.634
-8.076
-26.845
-37.521
0
0

1.3
-40.894
-45.855
-12.749
0
-42.496
-44.749
-11.545
-8.9246
-32.099
-44.749
0
0

1.625
-45.531
-51.733
-13.283
0
-47.535
-50.35
-11.777
-9.2978
-36.213
-50.35
0
0

1.95
-48.542
-55.984
-13.137
0
-50.946
-54.325
-11.33
-9.1956
-39.189
-54.325
0
0

2.275
-49.926
-58.609
-12.311
0
-52.73
-56.672
-10.204
-8.6179
-41.026
-56.672
0
0

2.6
-49.683
-59.606
-10.807
0
-52.888
-57.393
-8.398
-7.5648
-41.724
-57.393
0
0

2.925
-47.813
-58.976
-8.6233
0
-51.419
-56.487
-5.9132
-6.0363
-41.284
-56.487
0
0

3.25
-44.316
-56.72
-5.7605
0
-48.322
-53.954
-2.7493
-4.0323
-39.704
-53.954
0
0

3.575
-39.192
-52.837
-2.2185
0
-43.599
-49.794
1.0938
-1.5529
-36.986
-49.794
1.0938
0

3.9
-32.442
-47.327
2.0027
0
-37.25
-44.007
5.6161
1.4019
-33.129
-44.007
5.6161
0

4.225
-24.064
-40.19
6.9031
0
-29.273
-36.594
10.818
4.8322
-28.133
-36.594
10.818
0

4.55
-14.06
-31.426
12.483
0
-19.669
-27.553
16.698
8.7379
-22
-27.553
16.698
0

4.875
-2.4291
-21.035
18.741
0
-8.4388
-16.886
23.258
13.119
-14.725
-16.886
23.258
0

5.2
10.829
-9.0176
25.679
0
4.4185
-4.5919
30.497
17.976
-6.3123
-6.3123
30.497
0

5.525
25.714
4.6268
33.296
0
18.903
9.3291
38.415
23.308
3.2388
0
38.415
0

5.85
42.225
19.898
41.593
0
35.014
24.877
47.013
29.558
13.929
0
47.013
0

6.175
60.364
36.796
50.568
0
52.752
42.052
56.289
42.255
25.757
0
56.289
0

6.5
80.129
55.321
60.223
0
72.117
60.853
66.245
56.091
38.725
0
72.117
0

0
6.5
80.129
55.321
60.223
0
72.117
60.853
66.245
56.091
38.725
0
72.117
0

0.35
6.85
57.455
44.544
37.885
0
49.842
49.799
43.606
40.218
26.519
0
49.842
0

0.7
7.2
36.71
34.585
17.477
0
29.499
39.564
22.897
25.697
12.234
0
39.564
0

1.05
7.55
17.897
25.445
-1.0005
0
11.086
30.147
4.1185
17.811
-0.7004
-0.7004
30.147
0

1.4
7.9
1.0133
17.124
-17.547
0
-5.397
21.549
-12.73
11.987
-12.283
-12.73
21.549
0

1.75
8.25
-9.8895
12.172
-28.114
0
-15.899
16.321
-23.597
8.5201
-19.68
-23.597
16.321
0

2.1
8.6
-18.187
8.4635
-36.075
0
-23.796
12.336
-31.859
5.9244
-25.252
-31.859
12.336
0

2.45
8.95
-24.554
5.5742
-42.105
0
-29.762
9.1701
-38.191
3.9019
-29.474
-38.191
9.1701
0

2.8
9.3
-28.99
3.5039
-46.205
0
-33.798
6.8231
-42.592
2.4527
-32.343
-42.592
6.8231
0

3.15
9.65
-31.496
2.2525
-48.374
0
-35.903
5.2951
-45.062
1.5767
-33.862
-45.062
5.2951
0

3.5
10
-32.071
1.82
-48.613
0
-36.078
4.586
-45.602
1.274
-34.029
-45.602
4.586
0

3.85
10.35
-30.716
2.2064
-46.922
0
-34.322
4.6958
-44.212
1.5445
-32.845
-44.212
4.6958
0

4.2
10.7
-27.43
3.4117
-43.3
0
-30.636
5.6246
-40.891
2.3882
-30.31
-40.891
5.6246
0

4.55
11.05
-22.214
5.436
-37.747
0
-25.019
7.3723
-35.639
3.8052
-26.423
-35.639
7.3723
0

4.9
11.4
-15.068
8.2792
-30.264
0
-17.472
9.9388
-28.457
5.7954
-21.185
-28.457
9.9388
0

5.25
11.75
-5.9907
11.941
-20.851
0
-7.9939
13.324
-19.345
8.3589
-14.595
-19.345
13.324
0

5.6
12.1
5.0169
16.422
-9.5065
0
3.4143
17.529
-8.3021
11.496
-6.6546
-8.3021
17.529
0

5.95
12.45
17.955
21.722
3.768
0
16.753
22.552
4.6713
15.206
2.6376
0
22.552
0

6.3
12.8
32.823
27.841
18.973
0
32.022
28.394
19.575
22.976
13.281
0
32.022
0

6.65
13.15
49.623
34.779
36.108
0
49.222
35.056
36.41
34.736
24.345
0
49.222
0

7
13.5
68.352
42.536
55.174
0
68.352
42.536
55.174
47.846
29.775
0
68.352
0

0
13.5
68.352
42.536
55.174
0
68.352
42.536
55.174
47.846
29.775
0
68.352
0

0.375
13.875
48.208
24.327
44.811
0
48.208
23.683
44.938
33.746
17.029
0
48.208
0

0.75
14.25
30.209
8.2629
35.338
0
30.209
6.9745
35.591
24.736
5.784
0
35.591
0

1.125
14.625
14.355
-5.6562
26.753
0
14.355
-7.5887
27.133
18.727
-3.9593
-7.5887
27.133
0

1.5
15
0.6454
-17.43
19.058
0
0.6461
-20.007
19.564
13.341
-12.201
-20.007
19.564
0

1.875
15.375
-10.919
-27.06
12.252
0
-10.918
-30.28
12.884
8.5763
-18.942
-30.28
12.884
0

2.25
15.75
-20.339
-34.544
6.335
0
-20.337
-38.409
7.094
4.4345
-24.181
-38.409
7.094
0

2.625
16.125
-27.613
-39.883
1.3074
0
-27.612
-44.393
2.1929
0.9152
-27.918
-44.393
2.1929
0

3
16.5
-32.743
-43.078
-2.831
0
-32.741
-48.231
-1.819
-1.9817
-30.154
-48.231
0
0

3.375
16.875
-35.728
-44.127
-6.0802
0
-35.726
-49.925
-4.9417
-4.2562
-30.889
-49.925
0
0

3.75
17.25
-36.567
-43.032
-8.4402
0
-36.566
-49.474
-7.1752
-5.9081
-30.123
-49.474
0
0

4.125
17.625
-35.262
-39.792
-9.911
0
-35.261
-46.878
-8.5195
-6.9377
-27.854
-46.878
0
0

4.5
18
-31.813
-34.407
-10.493
0
-31.81
-42.137
-8.9745
-7.3448
-24.085
-42.137
0
0

4.875
18.375
-26.218
-26.877
-10.185
0
-26.215
-35.251
-8.5403
-7.1294
-18.814
-35.251
0
0

5.25
18.75
-18.478
-17.202
-8.988
0
-18.476
-26.22
-7.217
-6.2916
-12.935
-26.22
0
0

5.625
19.125
-8.5934
-5.3822
-6.9019
0
-8.5908
-15.045
-5.0044
-3.7675
-6.0154
-15.045
0
0

6
19.5
3.4362
8.5825
-3.9266
0
3.4389
-1.7243
-1.9025
6.0078
-2.7486
-2.7486
6.0078
0

6.375
19.875
17.611
24.692
-0.062
0
17.614
13.741
2.0885
17.284
-0.0434
-0.0434
17.614
0

6.75
20.25
33.93
42.947
4.6917
0
33.933
31.351
6.9687
30.063
3.2842
0
33.933
0

7.125
20.625
52.394
63.346
10.335
0
52.397
51.107
12.738
44.342
7.2343
0
52.397
0

7.5
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
73.003
85.89
16.867
0
73.007
73.007
19.397
60.123
11.807
0
73.007
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0.45
5.4
-21.073 19.796
-22.791 -0.8136
-8.144 30.286
-21.628
-22.408
-7.7271
-5.7008
-15.954

13.139
3.7823
35.29
21.201
-0.5695

35.29

1.1

5.9

SPAN 2
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

15.367 15.988
24.206 20.915
-3.4825 1.7534
8.6128
28.869
1.5934
16.944
-2.4378

14.729
21.784
2.6998
14.641
1.2274

28.869 21.784

SPAN 3
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

1.1

7.05

15.345 48.53
-4.795 59.095
27.298 9.135
15.345
-6.6845
27.669
19.109
-3.3565

48.533
46.984
11.513
41.366
6.3945

27.669 48.533

SPAN 4
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

312099557.xls

08:04:45

04/03/2016

73.003 73.003
85.89 85.89
16.867 16.867
73.007
73.007
19.397
60.123
11.807

73.007
73.007
19.397
60.123
11.807

73.007 73.007

21
0
0

21
0.00
0.00

21
0
0

21
0.00
0.00

21
0
0

21
0.00
0.00

21
0
0

21
0.00
0.00

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

GRAPH DATA II

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls on CD

Made by rmw Job No R68


Date
3-Apr-16

1999 BCA for RCC

SPAN 5
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0

0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0

0
0
0
0
0

0.45
0.45
43.364
47.181
16.651
44.597
46.33
15.724
15.724
46.33
0

0.45
0.45
29.864
33.681
8.151
31.097
32.83
7.2245
7.2245
32.83
0

0.45
0.45
29.864
33.681
8.151
31.097
32.83
7.2245
7.2245
32.83
0

6.5
6.5
-63.32
-59.503
-30.752
-62.087
-60.354
-31.678
-62.087
-31.678
0

0
6.5
67.543
31.964
66.582
66.398
32.754
67.442
32.754
67.442
0

1.45
7.95
44.692
22.27
43.731
43.547
23.06
44.591
23.06
44.591
0

1.45
7.95
31.192
13.77
30.231
30.047
14.56
31.091
14.56
31.091
0

1.45
7.95
31.192
13.77
30.231
30.047
14.56
31.091
14.56
31.091
0

7
13.5
-56.271
-23.332
-57.232
-57.415
-22.542
-56.372
-57.415
-22.542
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

7.5
21
-57.818
-62.978
-18.605
-57.818
-61.26
-18.942
-61.26
-18.942
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

SPAN 6
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

SHEAR FORCE DIAGRAMS


SPAN 1
Local X
X
V(e) all
V(e) odd
V(e) even
V(r) all
V(r) odd
V(r) even
Lower bound
Upper bound
Beam
GRIDS

312099557.xls

0
0
0
0
0
0
0
0
0
0
0

0
0
50.295
54.112
19.545
51.528
53.261
18.618
18.618
53.261
0

6.5
-59.62

6.5
85.89

0.45
0.45
29.864
33.681
8.151
31.097
32.83
7.2245
7.2245
32.83
0

13.5
13.5
-59.616 85.89

SPAN 2

21
21
-59.616 85.89

1.45
7.95
31.192
13.77
30.231
30.047
14.56
31.091
14.56
31.091
0

21
21
-59.616 85.89

SPAN 3

21
21
-59.616 85.89

SPAN 4

0
13.5
56.577
51.417
28.82
56.577
53.135
28.483
28.483
56.577
0

21
21
-59.616 85.89

08:04:45

04/03/2016

0
21
0
0
0
0
0
0
0
0
0

SPAN 5

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

SPAN 6

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

0
21
0
0
0
0
0
0
0
0
0

Disclaimer
All advice or information from the British Cement Association and/or Reinforced
Concrete Council is intended for those who will evaluate the significance and
limitations of its contents and take responsibility for its use and application. No
liability (including that for negligence) for any loss resulting from such advice or
information is accepted by the BCA, RCC or their subcontractors, suppliers or
advisors. Users should note that all BCA software and publications are subject to
revision from time to time and should therefore ensure that they are in possession
of the latest version.
This spreadsheet should be used in compliance with the accompanying publication
'Spreadsheets for concrete design to BS 8110 & EC2' available from British
Cement Association, Telford Avenue, Crowthorne, Berkshire RG45 6YS.

Status of spreadsheet
Public release version.
Revision history RCC32 Ribbed Slabs (A & D)

Date

Version

04-Aug-99RCC32 v1.0

Action

Size (kB)

First public release.


Includes version comments

761

Das könnte Ihnen auch gefallen