For concereting works concerete require at one pile Water required for one Cu M M25 (25 LTR FOR 1 BAG)* Target to complete Pile in one day Total QTY of M25 IN 250 PILES Total Water Required for one day for concereting For Curing Works(considering Curing Period 28 Days) For First three days (Three times daily) For 4th to 14 th day(Two times daily) For 15th to 28th day(one time daily) Average Water required for curing one pile for one day(20ltr*3times) total water required in one day for curing(for 250 piles) min water required for one day max water required on thired day for 750 piles(casted at site)