REQUIUREMENT OF WATER AT SITE PER DAY


For concereting works
concerete require at one pile
Water required for one Cu M M25 (25 LTR FOR 1 BAG)*
Target to complete Pile in one day
Total QTY of M25 IN 250 PILES
Total Water Required for one day for concereting
For Curing Works(considering Curing Period 28 Days)
For First three days (Three times daily)
For 4th to 14 th day(Two times daily)
For 15th to 28th day(one time daily)
Average Water required for curing one pile for one day(20ltr*3times)
total water required in one day for curing(for 250 piles)
min water required for one day
max water required on thired day for 750 piles(casted at site)

*M25=11.4 BAG PER CUM THEORTICAL


*20LTR WATER EACH TIME FOR EACH PILE CURING

QTY.

Cu M
Ltr
Nos.
Cu M
Ltr

0.2
275
250
50
13750

Ltr
Ltr
Ltr
Ltr

60
15000
28750
48750