OFFICE MEMORANDUM
DATE: August 6, 1992 File No, 28012
28013, 28051, 51011
53022, 67022
‘TO: Otto W. Kalmbach
District 3 Design Division
FROM: Kurt L. Kunde, Supervising Engineer
Safety Programs Unit
Traffic and Safety Division
SUBJECT: 1994 Call For Projects - Safety Candidates
We have reviewed the list of potential safety projects in your July 10, 1992 memorandum.
Following is a brief description of the results of our review for each project:
28012 - —US-31 from the south junction of M-37 northerly to S, Airport Rozd. ‘This
widening project is 3.7 malles long and beyond the scope of a safety project.
‘This project will not be programmed as a safety project.
28012 - —US-31 from Townhall Road northerly to Silver Lake Road. This $182,000
resurfacing project meets the guidelines set for skidproofing projects. We plan
to submit the project in our 1994 Call For Projects using safety funds.
28013 - Three widening projects (from 4 to 5 lanes) along US-31 in Traverse City,
‘These projects were products of our Traverse City TOPICS report. The cost
and scope are beyond that of a safety project. Therefore, these projects were
put into the Improve/Expand category. These projects will not be funded with
safety funds,
280S1 - M-37 from the south county line northerly to M-113. Within the limits of this
project are the curves at Bartlett and Center Road which have been addressed
in past correspondence. We have forwarded, to you, the most recent accident
review, cost benefit analysis, and proposed alignments for your review. It is
possible safety funds could be used if the curve(s) could be upgraded for the
cosi(s) indicated in that correspondence. Please advise as soon as possible.
51011 - —US-31 from south of 12th to Ninth Street in Manistee, We plan to submit this
widening project in our 1994 Call For Projects using safety funds.
53022 US-10 in Custer. A review of the accident history for the project did not
reveal collisions related to roadside, driveway, or parking control sufficient to
qualify for safety funds. This project will not be funded using safety funds.Otto W, Kalmbach 2 August 7, 1992
67022 - The accident history for this 2-3 lane widening project revealed some left turn
related collisions. “A cost benefit analysis was calculated with a 12.5 year
T.OR. which falls outside the guidelines for a safety project. Therefore, this
project will not be funded with safety fonds.
If you have any questions, please contact me at your convenience.
Tee
KLK-KLS:mik
ce: 1, Bartha
S. Blackledge
B. Concadson
A. Slabosky
G. Walker
C. Overton
Safety Programs Unit