NERACA MASSA
A.1
PERHITUNGAN PENDAHULUAN
1 hari
= 24 jam
1 ton
= 2.525,2525 kg/jam
Produk Akhir
Kapasitas produksi
= 2.525,2525 kg/jam
= 87 % x 2.525,2525 kg/jam
= 2.196,9228 kg/jam
= F SiC = 2.196,9228 = 54,7913 kmol/jam
Mr SiC
40,0962
Massa impuritis
SiO2 (4,93%)
= 124,5406 kg/jam
C (3,21%)
= 81,0298 kg/jam
Na2O (2,60%)
= 65,6683 kg/jam
FePO4 (2,26%)
= 57,0910 kg/jam
SiC + 2 CO
= 2.196,9228 kg/jam
= 54,7913 kmol/jam
Mol SiO2
96 %
Massa SiO2
= N SiO2 x Mr SiO2
= 56,8640 x 60,0864
= 3.416,7525 kg/jam
= 56,5%
2. Karbon (C)
= 36%
= 6,5%
= 1%
(Lowe, 1958)
= x kg/jam
Mr SiO2
x massa10 Na2O.30SiO2 .60 H 2O
Mr 10 Na2O.30SiO2 .60 H 2O
= 0,0592 x kg/jam
Jumlah bahan baku SiO2 total
= 3.416,7525 kg/jam
= 3.225,6404 kg/jam
= 3.225,6404 kg/jam
36
3.225,6404 kg jam 2.055,2753 kg jam
56,5
10Na2O.30SiO2.60H2O
6,5
3.225,6404
56,5
FePO4
1
3.225,6404
56,5
jam
371,0914 kg jam
jam
57,0910 kg jam
kg
kg
A.2
10Na2O.30SiO2.60H2O
(17)
SiO2
C
(19)
(18)
FePO4
SiO2
C
FePO4
10Na2O.30SiO2.60H2O
371,0914
kg/jam
F(18) SiO2
3.225,6404 kg/jam
F(18) FePO4
57,0910
F(18) C
2.055,2753 kg/jam
F(19) FePO4
57,0910
F(19) C
2.055,2753 kg/jam
F(19) SiO2
Alur 18
kg/jam
Alur 19
=
F(19) Na2O
F(19) H2O
kg/jam
30 Mr SiO2
Mr 10 Na2O.30SiO2 .30 H 2O
3.416,7525 kg/jam
57,0910 kg/jam
114,3110 kg/jam
10 Mr Na2O
Mr 10 Na2O.30SiO2 .30 H 2O
60 Mr H 2O
Mr 10 Na2O.30SiO2 .30 H 2O
Komponen
Alur 17
10Na2O.30SiO2.60H2O
Keluar (kg/jam)
Alur 18
Alur 19
371,0914
SiO2
3.225,6404
3.416,7525
2.055,2753
2.055,2753
FePO4
57,0910
57,0910
Na2O
65,6683
H2O
114,3110
Subtotal
371,0914
Total
5.338,0067
5.709,0981
5.709,0981
5.709,0981
SiO2
C
H2O
(19a)
(19)
FePO4
10Na2O.30SiO2.60H2
O
(20)
SiO2
C
FePO4
10Na2O.30SiO2.60H2
O
3.416,7525 kg/jam
F(19) FePO4
57,0910
F(19) C
2.055,2753 kg/jam
F(19) Na2O
65,6683
kg/jam
F(19) H2O
114,3110
kg/jam
kg/jam
Alur 19a
Dari Tabel 20.44 Perry Handbook, moisture requirements untuk mengubah dan
membentuk slurry menjadi pellet berkisar antara 13,0 13,9 % H2O.
Misalkan, jumlah total = X kg/jam
X
= 5.709,0981 + 0,139 X
= 6.498,0105 kg/jam
F(19a) H2O
788,9125
F(20) SiO2
3.416,7525 kg/jam
F(20) FePO4
57,0910
F(20) C
2.055,2753 kg/jam
(20)
65,6683
kg/jam
903,2235
kg/jam
kg/jam
Alur 20
Na2O
F(20) H2O
kg/jam
Masuk (kg/jam)
Alur 19
Keluar (kg/jam)
Alur 19a
Alur 20
SiO2
3.416,7525
3.416,7525
2.055,2753
2.055,2753
FePO4
57,0910
57,0910
Na2O
65,6683
65,6683
H2O
114,3110
788,9125
903,2235
5.709,0981
788,9125
6.498,0105
Subtotal
Total
6.498,0105
6.498,0105
A.2.3
Burner (B-101)
Fungsi : Tempat pembakaran gas alam sebagai sumber panas Rotary Kiln
Preheater (B-102).
24
O2
N2
CO2
H2O
E-139
B-101
FC
Gas Alam
Udara
Dimana :
- Komposisi gas alam (alur 22) :
X(22)CH4
= 90 %
X(22)C2H6
= 7,5 %
X(22)C3H8
= 1,25 %
(22)
C4H10
= 1,25 %
- Komposisi Udara :
X(23) O2
= 21 %
X(23)N2
= 79 %
- Reaksi :
1. CH4 + 2O2
CO2 + 2H2O
= -1
O2
= -2
CO2
=1
H2O
=2
2. C2H6 +
O2
2CO2 + 3H2O
= -1
O2
= - 72
CO2
=2
H2O
=3
3. C3H8 + 5O2
3CO2 + 4H2O
= -1
O2
= -5
CO2
=3
H2O
=4
4. C4H10 +
13
O2
4CO2 + 5H2O
= -1
O2
= - 13 2
CO2
=4
H2O
=5
(%CH 4 MrCH 4 ) (%C2 H 6 MrC2 H 6 ) (%C3 H 8 MrC3 H 8 ) (%C4 H10 MrC4 H10 )
100%
= 17,9712 kg/kmol
Alur 22
F(22)
400 kg/jam
N(22)
F 22
Mr gas alam
400 kg jam
17,9712
22,2578 kg/jam
kg
kmol
N(22)CH4
0,9 x N(22)
= 20,0320 kg/jam
F(22)CH4
= 321,3633 kg/jam
N(22)C2H6
0,075 x N(22)
= 1,6693 kg/jam
F(22)C2H6
N(22)C2H6 x Mr C2H6
= 50,1968 kg/jam
N(22)C3H8
0,0125 x N(22)
= 0,2782 kg/jam
F(22)C3H8
= 12,2685 kg/jam
N(22)C4H10
0,0125 x N(22)
= 0,2782 kg/jam
F(22)C4H10
= 16,1714 kg/jam
Alur 23
F(23)
(23)
= 11.305,6092 kg/jam
F 23
Mr gas alam
11.305,6902 kg jam
28,8503 kg kmol
N(23)O2
= X(23)O2 x N(23)
82,2929 kg/jam
F(23)O2
= N(23)O2 x Mr O2
2.633,2744 kg/jam
N(23)N2
= X(23)N2 x N(23)
309,5781
F(23)N2
= N(23)N2 x Mr N2
8.672,3349 kg/jam
= 391,8710 kg/jam
kg/jam
Alur 24
N(24) CH4
N(24) C2H6
N(24) C3H8
N(24) C4H10
N(24)O2
20,0320 (1 x 20,0320)
1,6693 (1 x 1,6693)
0,2782 (1 x 0,2782)
0,2782 (1 x 0,2782)
33,1867 kmol/jam
F(24)O2
N(24)O2 x Mr O2
1.061,9345 kg/jam
F(24)N2
F(23)N2
8.672,3349 kg/jam
N(24)CO2
25,3182 kmol/jam
F(24)CO2
N(24)CO2 x Mr CO2
N(24)H2O
1.114,1914 kg/jam
+ (5 x (1 x 0,2782)
(24)
H2O
47,5760 kmol/jam
N(24)H2O x Mr H2O
857,0910 kg/jam
Masuk (kg/jam)
Alur 22
Keluar (kg/jam)
Alur 23
Alur 24
CH4
321,3633
C2H6
50,1968
C3H6
12,2685
C4H8
16,1714
O2
2.633,2744
1.061,9920
N2
8.672,3349
8.672,3349
CO2
1.114,1914
H2O
857,0910
Subtotal
Total
400,0000
11.705,6092
11.305,6092
11.705,6092
11.705,6092
A.2.4
O2
N2
CO2
H2O
SiO2
21
C
FePO4
H2O
10Na2O.30SiO2.60H2O
25
SiO2
C
FePO4
Na2O
O2
N2
CO2
H2O
Dimana :
Asumsi oksigen (O2) tidak bereaksi dengan pasir silika (SiO2) dan Karbon (C).
= 57,0911
F(21) C
= 2055,2733 kg/jam
(21)
= 3416,7525 kg/jam
SiO2
kg/jam
F(21) Na2O
= 65,6683
F(21) H2O
= 903,2235 kg/jam
kg/jam
Alur 24 :
Massa masuk alur 24 Rotary Kiln Preheater (B-102) = Massa keluar alur 24 Burner
(B-101)
F(24)CO2
1.114,1914 kg/jam
F(24)N2
8.672,3349 kg/jam
F(24)O2
1.061,9940 kg/jam
F(24)H2O
857,0910 kg/jam
Alur 25 :
F(25) FePO4
= 57,0911
F(25) C
= 2.055,2733 kg/jam
F(25) SiO2
= 3.416,7525 kg/jam
F(25) Na2O
= 65,6683
kg/jam
kg/jam
Alur 26 :
F(26)CO2
F(24)CO2
1.114,1914 kg/jam
F(26)N2
F(24)N2
8.672,3349 kg/jam
F(26)O2
F(24)O2
1.061,9920 kg/jam
F(26)H2O
1760,3144 kg/jam
Masuk (kg/jam)
Alur 21
Alur 24
Keluar (kg/jam)
Alur 25
Alur 26
SiO2
3.416,7525
3.416,7525
2.055,2753
2.055,2753
FePO4
57,0910
57,0910
Na2O
65,6683
65,6683
O2
1.061,9920
1.061,9920
N2
8.672,3349
8.672,3349
CO2
1.114,1914
1.114,1914
903,2235
857,0910
1.760,3144
6.498,0105
11.706,6092
H2O
Subtotal
Total
18.203,6198
5594,7871
12.608,8327
18.203,6198
Udara
28
25
29
SiC
SiO2
C
FePO4
Na2O
SiO2
C
FePO4
Na2O
Reaksi :
- SiO2 + 3 C
SiC + 2 CO
= -1
= -3
SiC
=1
CO
=2
- CO +
O2
CO2
Konversi CO 100%
CO
= -1
O2
= - 12
CO2
=1
Alur 25
F(25) SiO2
3.416,7525 kg/jam
N(25)SiO2
F ( 25) SiO 2
Mr SiO 2
F(25) FePO4
57,0910
F(25) C
2.055,2753 kg/jam
N(25)C
F ( 25) C
Ar C
F(25) Na2O
65,6683 kg/jam
3.416,7525 kg jam
60,0864 kg kmol
56,8640 kmol/jam
2.055,2753 kg jam
12,0107 kg kmol
171,1204 kmol/jam
kg/jam
Alur 29
N(29)SiO2
F(29)SiO2
N(29)C
F(29)C
N(29)SiC
(29)
SiC
N(25)SiO2 r SiO2
2,0727
N(29)SiO2 x Mr SiO2
124,5406 kg/jam
N(25)C 3 x r SiO2
6,7465
N(29)C x Ar C
81,0298
r SiO2
0,96 x 56,8640
54,7913
kmol/jam
=
2,0727 x 60,0864
kmol/jam
=
6,7465 x 12,0107
54,7913 x 40,0962
kg/jam
kmol/jam
(29)
SiC x Mr SiC
2.196,9228 kg/jam
Alur 27
N(27)O2
F(29)O2
x r CO + r S
54,7913
N(27)O2 x Mr O2
x (1x(2 x r SiO2))
kmol/jam
= 54,7913 x 31,9988
1.753,2558 kg/jam
79 %
N ( 29) O2
21%
206,1196
N(27)N2 x Mr N2
5.774,1120 kg/jam
F(28)N2
F(27)N2
5774,1120 kg/jam
N(28)CO2
r CO
1x(2 x r SiO2)
109,5826
N(27)N2
F(27)N2
79 %
54,7913
21 %
kmol/jam
= 206,1196 x 28,0134
Alur 28
(28)
CO2
kmol/jam
(28)
CO2 x Mr CO2
109,582 x 44,0962
4.822,7903
kg/jam
Masuk (kg/jam)
Alur 25
Keluar (kg/jam)
Alur 27
Alur 28
Alur 29
SiO2
3.416,7525
124,5406
2.055,2753
81,0298
FePO4
57,0910
57,0910
Na2O
65,6683
65,6683
O2
1.753,2558
N2
5.774,1120
5.774,1120
CO2
4.822,7903
SiC
Subtotal
Total
5.594,7870
7.527,3678
13.122,1548
2.196,9228
10.596.9023
2.525,2525
13.122,1548
A.2.6
O2
N2
CO2
H2O
M-102
40
43
O2
N2
CO2
H2O
41
O2
N2
1.114,1914 kg/jam
F(40)N2
8.672,3349 kg/jam
F(40)O2
1.061,9920 kg/jam
F(40)H2O
1.760,3144 kg/jam
F(41)N2
5.774,1120 kg/jam
F(41)CO2
4.822,7903 kg/jam
5.936,9817 kg/jam
F(40)N2 + F(41)N2
14.447,7903 kg/jam
F(43)O2
1.061,9920 kg/jam
F(43)H2O
1.760,3144 kg/jam
Alur 41
Alur 43
F(43)CO2
(43)
N2
Komponen
Alur 40
Keluar (kg/jam)
Alur 41
Alur 43
O2
1.061,9920
N2
8.672,3349
5.774,1120
14.447,3349
CO2
1.114,1914
4.822,7903
5.936,9817
H2O
1.760,3144
Subtotal
12.608,8327
Total
1.061,9920
1.760,3144
10.596,9023
23.205,7350
23.205,7350
23.205,7350
47
H2O
46
44
O2
N2
CO2
H2O
O2
N2
CO2
H2O
45
H2O
CO2
(43)
Alur 46
F(46)CO2
(46)
5.936,9817
kg/jam
N2
N2
14.447,4469 kg/jam
F(43)O2
F(46)O2
1.061,9920
kg/jam
F(43)H2O
F(46)H2O
Alur 45
Alur 47
F(47)H2O
(45)
H2O
1.760,3144
kg/jam
16.010,6797 kg/jam
Masuk (kg/jam)
Alur 43
Keluar (kg/jam)
Alur 45
Alur 47
Alur 46
O2
1.061,9920
1.061,9920
N2
14.447,4469
14.447,4469
CO2
5.936,9817
5.936,9817
H2O
1.760,3144
7.300
7.300
1.760,3144
Subtotal
23.205,7350
7.300
7.300
23.205,7350
Total
30.505,7350
30.505,7350
LAMPIRAN B
PERHITUNGAN NERACA PANAS
Basis perhitungan
1 jam operasi
Satuan Operasi
kJ/jam
Temperatur referensi
250C (298 K)
Kapasitas
20.000 ton/tahun
Tref
n x Cp x dT
Cp x,T a bT cT 2 dT 3
Jika Cp adalah fungsi dari temperatur maka persamaan menjadi :
T2
T2
CpdT (a bT CT
T1
T2
CpdT
dT 3 )dT
T1
a (T2 T1 )
T1
b
c 3
d
2
2
3
4
4
(T2 T1 ) (T2 T1 ) (T2 T1 )
2
3
4
Untuk sistem yang melibatkan perubahan fasa persamaan yang digunakan adalah :
T2
Tb
T1
T1
CpdT Cp dT
l
T2
H Vl Cp v dT
Tb
2
2
dQ
rH r (T ) N CpdTout N CpdTin
dt
T1
T1
B.1
H 2O
1,82964E+01
4,72118E-01
-1,33878E-03
1,31424E-06
0,00000E+00
(Perry, 2007)
O2
2,9883E+01
-1,1384E-02
4,3378E-05
-3,7006E-08
1,0101E-11
N2
2,9412E+01
-3,0068E-03
5,4506E-05
5,1319E-09
-4,2531E-12
CO2
1,9022E+01
7,9629E-02
-7,3707E-05
3,7457E-08
-8,1330E-12
H2O
3,4047E+00
-9,6506E-03
3,2998E-05
-2,0447E-08
4,3023E-12
CH4
3,8387E+01
-2,3664E-02
2,9098E-04
-2,6385E-07
8,0068E-11
C2H6
3,3834E+01
-1,5518E-02
3,7689E-04
-4,1177E-07
1,3889E-10
C3H8
4,7266E+01
-1,3147E-01
1,1700E-03
-1,6970E-06
8,1891E-10
C4H10
6,6709E+01
-1,8552E-01
1,5284E-03
-2,1879E-06
1,0458E-09
(Perry, 2007)
T range (K)
10,87
0,0087
-241.200
273 848
10,95
0,0055
848 1.873
SiC
8,89
0,0029
-284.000
173 1.629
2,637
0.0026
-116.900
273 1.373
SiO2
(Perry, 2007)
Komponen
( kJ/kmol)
CH4
-78.451,6774
C 2 H6
-84.684,0665
C 3 H8
-103.846,7654
C4H10
-126.147,4607
H2O
-241.834,9330
CO2
-393.504,7656
CO
-110.541,1580
SiO2
-851.385,7800
SiC
-117.230,4000
(Perry, 2007)
B.2
20
C
FePO4
10Na2O.30SiO2.60H2
O
o
FePO4
10Na2O.30SiO2.60H2
O
40oC, 1 atm
30 C, 1 atm
dQ
dT
N
out
s
313
298
SiO2
C
CpdT N sin
303
298
CpdT
SiO2
: Qi SiO2
Cp
= N19 SiO2.
SiO2
dT
298
: Qi C
= N19 C.
Cp
dT
298
FePO4 : Qi FePO4
19
=N
Cp
FePO4.
FePO 4
dT
298
Na2O : Qi Na2O
Cp
= N19 Na2O.
Na2O
dT
298
H2O
: Qi H2O
= N H2O.
Cp
H 2O
dT
298
SiO2
: Qo SiO2
= N20 SiO2.
Cp
SiO2
dT
298
: Qo C
20
=N
C.
Cp
dT
298
313
Cp
FePO 4
dT
298
Na2O : Qo Na2O
20
=N
Cp
Na2O.
Na2O
dT
298
H2O
: Qo H2O
= N20 H2O.
Cp
H 2O
dT
298
Masuk (kJ)
Keluar (kJ)
SiO2
104.662,8578
130.875,3542
90.597,4426
106.433,9294
Na2O
367,0758
1.112,5017
FePO4
179,6469
553,6239
2.377,4888
7.143,1090
198.184,5119
246.118,5182
H2O
Jumlah
Hr
Q
Total
47.934,0063
246.118,5182
246.118,5182
H2
SiO2
O
C
FePO4
10Na2O.30SiO2.60H2
O
35oC, 1 atm
20
21
SiO2
: Qo SiO2
= N21 SiO2.
Cp
SiO2
dT
298
: Qo C
= N21 C.
Cp
dT
SiO2
298
Cp
SiO2
dT
298
Na2O : Qo Na2O
21
=N
Na2O.
Cp
SiO2
dT
298
308
H2O
: Qo H2O
= N21 H2O.
Cp
SiO2
dT
298
Masuk (kJ/jam)
Keluar (kJ/jam)
H20
H21
SiO2
104.662,8578
117.694,0320
90.597,4426
98.420,5688
Na2O
367,0758
738,0474
FePO4
179,6469
364,0521
2.377,4888
4.758,5962
198.184,5119
221.975,2965
Hr
24.143,2217
246.118,5182
246.118,5182
H2O
Jumlah
Total
863oC,
1 atm
24
O2
N2
CO2
H2O
E-139
B-101
30oC, 2 atm
FC
Gas Alam
Udara
30oC, 2 atm
1135
303
dQ
r.H r 30 0 C N sout
CpdT N sin CpdT
298
298
dT
CH4(g) + 2O2(g)
C2H6(g) +
CO2(g) + 2H2O(g)
(1)
(2)
C3H8(g)+ 5O2(g)
3CO2(g) + 4H2O(g)
(3)
C4H10(g) +
4CO2(g) + 5H2O(g)
(4)
13
O2(g)
Cpg
303
Hr(1) (30 C) =
Hro(1)
CO2
298
r(1)
= 20,0320 kmol/jam
Hro(1)
Cpg
303
CO2
298
2Cpg
303
CO2
298
r(2)
= 1,6693 kmol/jam
Hro(2)
Hro(O2)
x(0)
= -1.427.830,2637 J/mol
2Cpg
303
Hr(2) (30 C) =
Hro(2)
CO2
298
3Cpg
303
Hr(3) (30 C) =
Hro(3)
CO2
298
r(3)
= 0,2782 kmol/jam
Hro(3)
3Cpg
303
Hr(3) (30 C) =
Hro(3)
CO2
298
4Cpg
303
CO2
298
r(4)
= 0,2782 kmol/jam
Hro(4)
13
Hro(O2)
13
x(0)
= -2.657.046,2667 J/mol
4Cpg
303
CO2
298
r Hr T
i 4
r Hr 30 C
4
i 4
CH4
: QiCH4
22
=N
Cpg
CH4.
CH 4
dT
298
C2H6 : QiC2H6
Cpg
= N22 C2H6.
C2 H 6
dT
298
C3H8 : QiC3H8
22
=N
C3H8.
Cpg
C3 H 8
dT
298
303
C4H10 : QiC4H10
22
=N
C4H10.
Cpg
C4 H10
dT
298
2) Panas Alur 23
303
O2
: QiO2
= N23 O2.
Cpg
O2
dT
298
N2
: QiN2
= N23 N2.
Cpg
N2
dT
298
O2
24
: QoO2
=N
Cpg
O2.
O2
dT
298
TO
TO
N2
24
: QoN2
=N
Cpg
N2.
N2
dT
298
TO
Cpg
= 309,5781 kmol/jam .
N2
dT
CO2
dT
298
TO
CO2
24
: QoCO2
=N
Cpg
CO2.
CO2
dT
298
TO
= 25,3182 kmol/jam .
Cpg
298
H2O
24
QoH2O
=N
Cp
H2O.
H 2O
dT
298
TO
373
373
298
Asumsi tidak ada panas yang hilang selama pembakaran, sehingga dQ/dt = 0
r Hr 30 C + Qo Qi
4
dQ/dt =
i 4
Qo
= 19.752.267,7422 kJ/jam
TO
Qo
24
= N
O2.
Cpg
298
TO
TO
24
O2
dT + N
N2.
Cpg
298
24
N2
dT + N
CO2.
Cpg
CO2
dT
298
To
+ N24 SO2.
24
Cpg SO2 dT + N H2O.
298
TO
Cp
dT
298
TO
TO
298
298
H 2O
TO
Cpg
N2
dT + 25,3182.
Cpg
CO2
dT
298
TO
373
373
298
Maka,
1136
O2
: QiO2
Cpg
= N24 O2.
O2
dT
298
1136
N2
: QiN2
Cpg
= N24 N2.
N2
dT
298
1136
CO2
: QiCO2
Cpg
= N24 CO2.
CO2
dT
298
H2O
24
: QiH2O = N
H2O.
Cp
H 2O
dT
298
1136
373
373
Masuk (kJ/jam)
H22
Keluar (kJ/jam)
H23
H24
CH4
5.112,6799
C2H6
443,7384
C3H8
102,9997
C4H10
136,5174
O2
12.120,7192
912.458,6299
N2
51.908,4869
15.324.661,3469
1.034.452,2923
H2O
2.480.695,4730
Jumlah
5.795.9355
Sub Total
Hr
19.752.267,7422
69.825.1415
19.752.267,7422
19.682.442.6006
19.752.267.7422
19.752.267,7422
Q
Total
64.029,2061
O2
N2
CO2
H2O
SiO2
21
C
FePO4
H2O
10Na2O.30SiO2.60H2O
625oC, 1 atm
25
35oC, 1 atm
SiO2
C
FePO4
Na2O
B-102
617oC, 1 atm
O2
N2
CO2
H2O
863oC, 1 atm
2) Panas Alur 24
Panas masuk pada alur 24 Rotary Kiln Pre-Heater (B-102) sama dengan
panas keluar pada alur 24 Burner (B-101) pada suhu 863
C, yaitu:
19.752.267,7422 kJ/jam.
SiO2
: Qo SiO2
25
=N
Cp
SiO2.
SiO2
dT
298
: Qo C
= N25 C.
Cp
dT
298
FePO4: Qo FePO4
25
=N
Cp
FePO4.
FePO 4
dT
298
Na2O: Qo Na2O
= N25 Na2O.
Cp
Na2O
dT
298
2) Panas Alur 26
Panas keluar pada alur 26, pada suhu 6250C (898 K)
898
O2 : QoO2
26
=N
O2.
Cpg
O2
dT
298
898
Cpg
= N26 N2.
N2: QoN2
N2
dT
298
CO2
26
: QoCO2
=N
Cpg
CO2.
CO2
dT
298
H2O
QiH2O
= N26 H2O.
Cp
H 2O
dT
298
898
373
26
Masuk (kJ/jam)
Keluar (kJ/jam)
H21
H24
H25
H26
SiO2
117.694,0320
2.671.355,9083
98.420,5688
1.673.793,8874
FePO4
364,0521
37.597,9135
Na2O
738,0474
58.688,3334
H2O
4.758,5962
2.480.695,4730
4.934.335,2931
O2
912.458,6299
635.351,9220
N2
15.324.661,3469
9.142.371,2023
1.034.452,2923
221.975,2965 19.752.267,7422
Sub Total
820.748,5786
4.441.436,0427
15.532.806,9960
19.974.243,0387
19.974.243,0387
Hr
19.974.243,0387
19.974.243,0387
Total
27
Udara
28
617oC, 1 atm
29
25
1600oC, 1 atm
SiC
SiO2
C
FePO4
Na2O
SiO2
C
FePO4
Na2O
1135
303
dQ
r.H r 30 0 C N sout
CpdT N sin CpdT
298
298
dT
Reaksi:
SiO2 + 3 C SiC + 2 CO . (1)
Cps
1873
Hr(1) (1600oC)
= Hro(1) +
SiC
298
r(1)
= 54,5894 kmol/jam
Hro(1)
Cps
1873
Hr(1) (1600 C)
Hro(1)
SiC
298
= 513.073,0640 + (-43.900,5072)
= 469.172,5568 J/mol
2)
Reaksi:
CO +
r(2)
Hro(2)
O2 CO2
. (2)
= 109,1789 kmol/jam
= Hro(CO2) - Hro(CO)
Hro(O2)
= -393504,7656 (-110541,1580)
x (0)
= -282.963,6076 J/mol
Cpg
1873
= Hro(2) +
Hr(2) (1600oC)
CO2
Cpg CO 1 2 Cpg O2 dT
298
= -282.963,6076 + 19.721,2229
= -263.242,3847 J/mol
r Hr T = r Hr 1600 C
2
i 2
i 2
b.
= 2.671.355,9083 kJ/jam
QC
= 1.673.793,8874 kJ/jam
QFePO4
= 37.597,9135 kJ/jam
QNa2O
= 58.688,3334 kJ/jam
O2
: QiO2
27
=N
O2.
Cpg
O2
dT
298
= 8.070,0748 kJ/jam
303
N2
QiN2
27
=N
N2
Cpg
N2
dT
298
= 38.384,7444 kJ/jam
Qi
= Q25 + Q27
= 4.487.890,8619 kJ/jam
CO2
Cpg
dT
CO2
298
= 7.849.714,6188 kJ/jam
1673
N2
28
QiN2 = N
Cpg
N2
dT
N2
298
= 24.705.031,1608 kJ/jam
SiO2 : Qo SiO2
29
=N
SiO2.
Cp
SiO2
dT
298
= 255.595,3521 kJ/jam
1873
: Qo C
= N29 C.
Cp
dT
298
= 237.645,8671 kJ/jam
1873
FePO4: Qo FePO4
29
=N
FePO4.
Cp
FePO 4
dT
298
= 143.242,0035 kJ/jam
1873
Na2O: Qo Na
= N29 Na2O.
Cp
Na2O
dT
298
= 219.255,9652 kJ/jam
1873
Cp
= N29 SiC.
SiC: Qo SiC
SiO2
dT
298
= 4.198.999,2511 kJ/jam
Qo
= Q28 + Q29
= 37.609.484,2186 kJ/jam
dQ/dt
r Hr T + Qo Qi
i 2
Masuk (kJ/jam)
Keluar (kJ/jam)
H25
H27
H28
SiO2
2.671.355,9083
255.595,3521
1.673.793,8874
237.645,8671
FePO4
37.597,9135
143.242,0035
Na2O
58.688,3334
219.255,9652
41.98.999,2511
SiC
O2
N2
CO2
Jumlah
4.441.436,0427
8.070,748
H29
38.384,7444 24.705.031,1608
-
7.849.714,6188
Sub Total
4.487.890,8619
37.609.484,2186
Hr
3.128.641,0432
29.992.952,3136
Total
37.609.484,2186
37.609.484,2186
FC
O2
N2
CO2
H2O
FC
M-102
40
625oC, 5 atm
1031oC, 5 atm
41
O2
N2
43
O2
N2
CO2
H2O
FC
1400oC, 5 atm
a. Panas Masuk
1) Panas Masuk Alur 40 :
Panas keluar pada alur 40, pada suhu 6250C (898 K), 5 atm.
898
O2 : QoO2
40
=N
Cpg
O2.
O2
dT
298
902
Cpg
= 33,1867 kmol/jam x
O2
dT
298
= kJ/jam
898
N2: QoN2
= N40 N2.
Cpg
N2
dT
298
898
Cpg
= 309,5781 kmol/jam x
N2
dT
CO2
dT
298
= 9.142.371,2023 kJ/jam
898
CO2
: QoCO2
40
=N
CO2.
Cpg
CO2
dT
298
898
Cpg
= 25,3182 kmol/jam x
298
= 820.748,5786 kJ/jam
H2O
QiH2O
Cp
= N40 H2O.
H 2O
dT
298
898
424,86
424,86
298
= 4.951.462,6314 kJ/jam
= 7.849.714,6188 kJ/jam
QiN2
= 24.705.031,1608 kJ/jam
Q41
= 32.554.745,7796 kJ/jam
Qi
= Q40 + Q41
= 48.104.680,1140 kJ/jam
b. Panas Keluar
1) Panas Keluar Alur 43 :
Asumsi sistem bersifat adiabatis, maka panas keluar pada Mixing Point (M-102)
sama dengan panas masuknya.
Total Qi = Qo = 48.104.680,1140 kJ/jam
To
O2
: QoO2
43
=N
O2.
Cpg
O2
dT
298
TO
TO
N2
: QoN2
= N43 N2.
Cpg
N2
dT
298
TO
= 515,6977 kmol/jam .
Cpg
dT
N2
298
TO
CO2
: QoCO2
43
=N
Cpg
CO2.
CO2
dT
298
TO
= 134,9008 kmol/jam .
Cpg
CO2
dT
298
H2O
QoH2O
= N43 H2O.
Cp
H 2O
dT
298
= 97,7127 kmol/jam x
To
424,86
Cpl dT H Cpv dT
VL
H 2O
H 2O
298
424,86
Total Qo
48.104.680,1140
= N43 O2.
TO
43
Cpg O2 dT + N N2.
298
TO
43
Cpg CO2 dT + N H2O.
298
TO
Cpg
N2
dT + N43 CO2.
298
To
Cp
H 2O
dT +
298
To
43
SO2.
Cpg
SO2
dT
298
48.104.680,1140
TO
TO
298
298
TO
To
424,86
Cpl dT H Cpv dT
VL
H 2O
H 2O
298
424,86
Masuk (kJ/jam)
H40
Keluar (kJ/jam)
H41
H43
635.351,9220
1.111.670,2508
H2O
4.951.462,6314
5.418.737,1112
N2
9.142.371,2023
24.705.031,1608
34.783.399,9431
820.748,5786
7.849.714,6188
6.790.872,8089
15.549.934,3343
32.554.745,7796
48.104.680,1140
CO2
Jumlah
Sub Total
48104680,1140
48.104.680,1140
Hr
Total
48104680,1140
48.104.680,1140
O2
N2
CO2
H2 O
O2
N2
CO2
H2O
600oC, 1 atm
Generator
1031oC, 5 atm
48.104.680,1140 kJ/jam
1
Pr 44 Pr 43
5
1
Pr 44 335,22
5
= 67,044
maka,
873
O2: QoO2
= N43 O2.
Cpg
O2
dT
298
873
= 607.541,5294 kJ/jam
873
N2: QoN2
43
=N
N2.
Cpg
N2
dT
298
873
= 515,6977 kmol/jam .
Cpg
N2
dT
298
= 14.343.054,2748 kJ/jam
TO
Cpg
CO2
dT
298
TO
= 134,9008 kmol/jam .
Cpg
CO2
dT
298
= 3.587.528,9248 kJ/jam
= 373 K
HVL(424,86)
873
QoH2O
= N43 H2O.
Cp
H 2O
dT
298
873
373
= 4,802,377.0773 kJ/jam
= Cp (T43-T44)
= mg. (h43 - h44)
T44
= 873 K = 6000C
h44
= 903,204 kJ/kg
Wt
= mg.(h44-h43)
= (1400,728 - 903,204) kJ/kg
= 23.205,354 kg/jam x 497,524 kJ/kg
=11.545.220,54 kJ/jam
dQ dW
dt
dt
= Qo - Qi
dQ
11.545.220,54
dt
= Q44 Q43
dQ
11.545.220,54
dt
dQ
dt
= - 13.218.957,7677 kJ/kg
Masuk (kJ/jam)
Keluar (kJ/jam)
H43
H44
O2
1.111.670,2508
607.541,5294
H2 O
5.418.737,1112
4.802.377,0773
N2
34,783.399,9431
14.343.054,2748
CO2
6.790.872,8089
3587528,9248
Jumlah
48.104.680,1140
23.340.501,8063
Hr
Total
11.545.220,5400
13.218.957,7677
48.104.680,1140
48.104.680,1140
TC
PC
46
44
O2
N2
CO2
H2O
100oC, 1 atm
o
600 C, 1atm
45
O2
N2
CO2
H2O
H2O
a. Panas Masuk
1) Panas Masuk Alur 44
Panas masuk pada alur 44 sama dengan panas keluar pada alur 44, turbin gas
(JJ-101), yaitu 23.340.501,8063 kJ/jam, dengan suhu gas masuk 873 K =
6000C.
QiH2O
45
=N
H2O.
Cp
H 2O
dT
298
b. Panas Keluar
1) Panas Keluar Alur 47 :
Temperatur steam yang dihasilkan harus sesuai dengan temperatur gas
buang. Perbedaan temperatur yang terkecil antara 2 aliran gas dengan uap,
yang biasa disebut dengan titik penyempitan (pinch point) minimum 20 0C
(P. K Nag, 2002). Pada rancangan ini asumsi titik penyempitan (pinch point)
diambil sebesar 35 0C, maka suhu steam keluar alur 47 adalah 838 K =
5650C.
H2O
838
47
QoH2O = N
H2O.
Cp
H 2O
dT
298
838
587,78
587, 78
298
= 18.838.730,1913 kJ/jam
2)
= Qo
Q44+ Q45
= Q47 + Q46
(23.340.501,8063 +1.989.332,6916)
= 18.838.730,1913 + Q46
6.491.104,3066 kJ/jam = N
O2.
Cpg
To
46
O2
dT + N
298
N2.
Cpg
To
46
CO2.
Cpg
298
N2
dT +
298
To
46
CO2
dT + N
H2O.
Cp
H 2O
dT
298
Kompon
Keluar (kJ/jam)
en
H43
H45
H47
H46
O2
74.092,2539
CO2
393.042,4723
N2
1.346.246,0678
H2O
1.989.332,6916
18.838.730,1913
4.677.723,5125
23.340.501,8063
1.989.332,6916
18.838.730,1913
6.491.104,3066
Jumlah
Sub Total
25.329.834,4979
25.329.834,4979
Hr
Total
25.329.834,4979
25.329.834,4979
47
48
H 2O
46oC, 0.1 atm
H2O
= T. F. (hi-ho)
Pada alur 47
Panas masuk pada alur 47 Turbin Uap (T-202) sama dengan panas keluar
alur 47 pada Steam Boiler (E-201) = 18.838.730,1913 kJ/jam.
h47 (P = 15MPa, T = 838 K) = 3488,71 kJ/kg
s47
= 6,567
s48
= 6,567
Pada alur 48
P
= 10 kPa
hg
=0,211 = 21,1 %
h48
= x.hf + (1-x). hg
= 0,211x 191,83 + (1-0,211)x 2584,7 Kj/kg
= 2.079,83 kJ/kg
T =
hs
h47 hs
h47 h48
= h47 - [T(h47-h48)]
= 3.488,71 - [0.85(3488,71 -2.079,83)]
= 2.291,169 kJ/kg
= T. F. (h47-hs)
= 0,85 x 7.300 kg/jam x (3488,71-2.291,169) kJ/kg
= 7.430.741,905 kJ/jam
h48
= 2.079,83 kJ/kg
Q48
dQ dW
dt
dt
= Qo - Qi
dQ
7.430.741,905
dt
= Q48 Q47
dQ
7.430.741,905
dt
dQ
dt
3.774.770,7137 kJ/kg
Keluar (kJ/jam)
H47
H48
18.838.730,1913
15.182.759,00
Jumlah
18.838.730,1913
15.182.759,00
Sub Total
18.838.730,1913
15.182.759,00
7.430.741,9050
Hr
Komponen
H2 O
3.774.770,7137
Total
22.613.500,9050
22.613.500,9050
LAMPIRAN C
SPESIFIKASI PERALATAN
Spesifikasi peralatan dihitung berdasarkan urutan peralatan dalam flowsheet
pembuatan Silikon Karbida.
Menyimpan
bahan-bahan
FePO4
sebelum
Bahan Kontruksi
Bangunan Beton
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
FePO
Volume FePO4
Kebutuhan FePO4
FFePO 4
FePO
50 kg
0,01742 m 3
3
2.870 kg / m
= 57,0910 kg/jam
= 883 sak
Volume total sak tiap 30 hari : 0,01742 x 883 = 14,3380 m3
Faktor kosong ruangan = 20% dan area jalan dalam gudang = 20% ; sehingga:
Volume ruang yang dibutuhkan
= (1,4) 14,3380 m3
= 20,0732 m3
= pxlxt
= 4m
Lebar
= 3m
Tinggi
= 5m
Menyimpan
bahan-bahan
SiO2
sebelum
Bahan Kontruksi
Bangunan Beton
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
SiO
Volume SiO2
FSiO2
SiO
2.322.461,0880 kg
877,0623 m 3
2.648 kg / cm 3
Faktor kosong ruangan = 20% dan area jalan dalam gudang = 20% sehingga:
= (1,4) 877,0623 m3
= 1.227,8873 m3
Bangunan diperkirakan dibangun dengan panjang 22 m, dengan tinggi tumpukan
SiO2 2 m, sehingga :
V =pxlxt
1.227,8873 m3 = (22) .(l).(2)
l = 27,9065 m
Tinggi bangunan direncanakan 2 x tinggi tumpukan bahan baku = 5 m
Jadi ukuran bangunan gedung yang digunakan adalah :
Panjang
= 22 m
Lebar
= 28 m
Tinggi
= 5m
Menyimpan
bahan-bahan
coke
sebelum
Bahan Kontruksi
Bangunan Beton
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
FCoke
= 2.055,2753 kg/jam
FCoke
Coke
Volume Coke
FCoke
Coke
1.479.798,2154 kg
1.921,8159 m 3
3
770 kg / cm
Faktor kosong ruangan = 20% dan area jalan dalam gudang = 20% sehingga:
Volume ruang yang dibutuhkan
= (1,4) 1921,8159 m3
= 2.690,5422 m3
= 34 m
Lebar
= 40 m
Tinggi
= 5m
Bahan konstruksi
Bentuk
Jenis sambungan
Jumlah
: 1 unit
Kondisi operasi:
Tekanan
= 1 atm
Temperatur
= 30 oC = 303,15 K
= 371,0914 kg/jam
Kebutuhan perancangan
= 30 hari
Faktor kelonggaran
= 20%
Natrium Silikat
Air
= 69 %
= 31 %
Natrium Silikat
Air
= 2.400 kg/m3
= 995,647 kg/m3
(Perry, 1999)
Densitas campuran:
campuran = 0,69 (2400 kg/m3) + 0,31(995,647 kg/m3)
= 1.428,8899 kg/m3
Perhitungan:
a. Volume tangki
Volume larutan =
371,0914
kg
jam
jam
30 hari 24 hari
kg
1.428,8899 m3
= 186,9884 m3
Hs
He
(Perry, 2007)
= Vs + Ve
=
224,3860 m3 = 1,1775 D3
D
= 5,7546 m
= 302,0763 in
Hs= (4/3) x D
= 7,6727 m
= 302,0763 in
r = D
= 2,8773 m
= 113,2786 in
= 5,7546 m
1 5,7546 m
D
4
4
Tinggi tutup
= 1,4386 m
= 7,6727 m + 1,4386 m
= 9,1114 m
c. Tebal tangki
Untuk cylindrical shell:
ts =
P.r
Cc
S .Ej 0,6 P
(Timmerhaus, 2004)
dimana :
P = maximum allowable internal pressure
r = jari-jari tangki
S = maximum allowable working stress
Ej = joint efficiency
Cc= allowance for corrosion
Tinggi cairan :
Hc
= (1 0,2) Hs
= 0,8 (7,6727 m)
= 6,1382 m
= x g x Hc
Phid
P.r
Cc
S .Ej 0,6 P
32,5949 psi 113,2786 in
0,2 in
13.750 psi 0,85 0,6 32,5949 psi
= 0,5164 in
te =
= 0,5160 in
Maka tebal tangki yang digunakan pada cylindrical shell dan ellipsoidal head adalah
sama, sebesar 9/16 in (Brownell & Young, 1959).
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
Jumlah materi
57,0910 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
0,0685 ton/jam
100 ft
Panjang
(Wallas,1988)
0,0685
x100 = 0,0993 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 100 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,3 hp
Pempty
= 0,0993 x 0,3
= 0,0298 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
(Wallas,1988)
100
= 100,3825 ft
cos 50
Daya Vertikal
Pvertikal
H
= 0,001 H.w
(Wallas,1988)
= 100 tg 50 = 8,7488 ft
Pvertikal
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300
Jumlah materi
3.225,6404 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
3,8708 ton/jam
50 ft
Panjang
(Wallas,1988)
3,8708
x100 = 4,3744 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 50 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,15 hp
Pempty
= 4,3744 x 0,15
= 0,8415 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
50
= 50,1912 ft
cos 5 0
Daya Vertikal
Pvertikal
= 0,001 H.w
= 50 tg 50 = 4,3744 ft
Pvertikal
(Wallas,1988)
= 0,0169 hp
Fungsi
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300
Jumlah materi
3.225,6404 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
3,8708 ton/jam
30 ft
Panjang
(Wallas,1988)
3,8708
x100 = 5,6098 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 30 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,1 hp
Pempty
= 5,6098 x 0,1
= 0,5610 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
30
= 30,1147 ft
cos 50
Daya Vertikal
Pvertikal
= 0,001 H.w
(Wallas,1988)
= 30 tg 5 = 2,6246 ft
Pvertikal
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300
Jumlah materi
3.225,6404 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
3,8708 ton/jam
50 ft
Panjang
(Wallas,1988)
3,8708
x100 = 5,6098 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 50 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,15 hp
Pempty
= 5,6098 x 0,15
= 0,8415 hp
Daya Horizontal
(Wallas,1988)
50
= 50,1912 ft
cos 5 0
Daya Vertikal
Pvertikal
= 0,001 H.w
(Wallas,1988)
= 50 tg 50 = 4,3744 ft
Pvertikal
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
Jumlah materi
2.055,2723 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
2,4663 ton/jam
50 ft
Panjang
(Wallas,1988)
2,4663
x100 = 3,5744 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 50 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,15 hp
Pempty
= 3,5744 x 0,15
= 0,5362 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
50
= 50,1912 ft
cos 5 0
= 0,001 H.w
= 50 tg 50 = 4,3744 ft
Pvertikal
(Wallas,1988)
= 0,0108 hp
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
Jumlah materi
2.055,2723 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
2,4663 ton/jam
50 ft
Panjang
(Wallas,1988)
2,4663
x100 = 3,5744 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 50 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,15 hp
Pempty
= 3,5744 x 0,15
= 0,5362 Hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
50
= 50,1912 ft
cos 5 0
Daya Vertikal
Pvertikal
= 0,001 H.w
(Wallas,1988)
= 50 tg 50 = 4,3744 ft
Pvertikal
dari
partikel-partikel
lain
yang
Vibrating Screen
Bahan konstruksi
Stainless steel
Jumlah
1 unit
SiO
= 2.648 kg/m3
Kapasitas screen =
3.225,6404 kg / jam
= 1,2181 m3/jam
3
2.648 kg / m
( Wallas,1988)
( Geankoplis,1977)
( Geankoplis,1977)
Daya motor = 2 Hp
( Perry, 2007 )
( Perry,2007 )
C.12
Grinder (SR-101)
Fungsi
Jenis
Ring-Roll Grinder
Bahan konstruksi
Carbon steel
Jumlah
1 unit
Kapasitas
3.225,6404 kg/jam
= 160 mesh
= 96 m
Dengan menggunakan data yang telah tersedia maka daya Ring-Roll Grinder dapat
dihitung:
W
1
1
= 10 wi
di
d
1
1
= 10 (16,46)
500
96
= 9,4382 Hp
Sesuai dengan Tabel 12.7 a, Wallas,1998 maka ukuran grinder yang digunakan :
Daya motor
= 10 Hp
Diameter Ring
= 24 in
Diameter Roll
= 14 in
C.13
Grinder (SR-102)
Fungsi
Jenis
: Ring-Roll Grinder
Bahan konstruksi
: Carbon steel
Jumlah
: 1 unit
Kapasitas
: 2.055,2723 kg/jam
= 0,75 cm
= 7500 m
= 160 mesh
= 96 m
Dengan menggunakan data yang telah tersedia maka daya Ring-Roll Grinder dapat
dihitung:
W
1
1
= 10 wi
di
d
1
1
= 10 (73,80)
7500
96
= 66,8 Hp
Sesuai dengan Tabel 12.7 a, Wallas,1998 maka ukuran grinder yang digunakan :
Daya motor
= 75 Hp
Diameter Ring
= 44 in
Diameter Roll
= 18 in
C.14
Pompa (P-101)
Fungsi
Jenis Pompa
: Centrifugal Pump
Jumlah
: 1 unit
Kondisi operasi:
Tekanan
= 1 atm
Temperatur
= 30 oC = 303,15 K
= 371,0914 kg/jam
Natrium Silikat
Air
= 69 %
= 31 %
Natrium Silikat
Air
= 2.400 kg/m3
= 995,647 kg/m3
(Perry, 2007)
Densitas campuran:
campuran = 0,69 (2400 kg/m3) + 0,31(995,647 kg/m3)
= 1.428,8899 kg/m3 = 89,2027 lbm/ft3
Data viskositas komponen:
Natrium Silikat
Air
= 0,96 kg/m.s
= 0,00084 kg/m.s
371,0914
1428,8899
kg
jam
kg
m3
Perencanaan pompa:
Untuk aliran turbulen (Nre >2100), dan De > 1 in
De = 3,9 x Q0,45 X 0,13
(Walas, 1988)
(Walas, 1988)
= viskositas (cP)
- Schedule pipa
= 40
- Inside Diameter
= 0,493 in
- Outside Diameter
= 0,675 in
= 0,00133 ft2
Kecepatan linear,
/8 in
= 0,0411 ft (0,0125 m)
Q 2,55 10 3 ft 3 / s
v D
16
16
=
= 0,4545 ; = 0,5
N Re
35,2047
Friction Loss
1. Contraction loss pada keluaran tangki
A
Kc 0,55 1 2
A1
Pipa/keluaran tangki,
(Geankoplis, 1997)
A
Kc 0,55 1 1
A2
(Geankoplis, 1997)
= 0,55 (1-0)
= 0,55
hc k c
v2
2
= 0,55
(Geankoplis, 1997)
0,58382
2.0,5
= 2,1422 J/kg
2. Friction pada pipa lurus
Panjang pipa lurus = 60 m
Ff = 4f
(Geankoplis, 1997)
600,5838
2 0,0125
= 4 (0,4545)
= 1.484,6248 J/kg
3. Friction pada 2 buah elbow 90o
hf = n.kf
= 2.(16)
(Perry, 2007)
0,58382
2 0,0125
= 435,5475 J/kg
4. Friction pada 1 buah gate valve
hf = n.kf
= 1.(24)
(Perry, 2007)
0,58382
2 0,0125
= 326,6606 J/kg
(Geankoplis, 1997)
Dimana:
selisih tekanan, p2 - p1
P1 = 101.325 N/m2
P2 = Poperasi + . g. h
; hcairan = 6,1382
Sehingga,
-Ws =
1
187.278,8245 - 101.325
(0) 9,806 (4)
2.248,9751
2
1.428,8899
Ws = - 2.348,3534
Energi pompa, Wp:
Ws = -.Wp
(Geankoplis, 1997)
- 2.348,3534 kg
= 3.354,7906 J/kg
0,7
Daya pompa, P:
P
= m.Wp
(Geankoplis, 1997)
C.15
Jenis
Jumlah
: 1 unit
Kondisi operasi
3.225,6404 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
3,8708 ton/jam
20 ft
Panjang
Menghitung Daya Conveyor
P
(Wallas,1988)
3,7808
x100 = 5,6098 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 20 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,1 hp
Pempty
= 5,6098 x 0,1
= 0,5610 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
20
= 20,0765 ft
cos 5 0
Daya Vertikal
Pvertikal
= 0,001 H.w
(Wallas,1988)
= 20 tg 5 = 1,7498 ft
Pvertikal
= 3225,6404 kg/jam
SiO
Volume SiO2 =
FSiO2
SiO
3.225,6404 kg
1,4618 m 3
3
2.648 kg / m
= (1,2) 1,4618 m3
= 1,7541 m3
= 0,8771 m
= 2m
lebar hopper
= 0,8771 m
Jenis
Jumlah
: 1 unit
Kondisi operasi
: Temperatur (T) : 30 0C
Tekanan (P)
: 1 atm
Jumlah materi
2.055,2753 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
2,4663 ton/jam
20 ft
Panjang
(Wallas,1988)
2,4663
x100 = 3,5744 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 20 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,1 hp
Pempty
= 3,5744 x 0,1
= 0,3574 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
20
= 20,0765 ft
cos 5 0
Daya Vertikal
Pvertikal
= 0,001 H.w
= 20 tg 50 = 1,7498 ft
Pvertikal
(Wallas,1988)
= 0,0043 hp
= 2.055,2753 kg/jam
coke
Volume Coke =
2.055,2753 kg
3,2030 m3
3
770 kg / m
= (1,2) 3,2030 m3
= 3,8436 m3
Diasumsikan panjang hopper = 1 m
Tinggi hopper = 2 x panjang hopper = 2 x 1 m = 2 m
Maka :
3,8436 m3 = p x t x l
3,8436 m3 = 1 m x 2 m x l
l
= 1,9218 m
= 2m
lebar hopper
= 2m
Jenis
Jumlah
: 1 unit
Kondisi operasi
: Temperatur (T) : 30 0C
Tekanan (P)
: 1 atm
Jumlah materi
57,0910 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
0,0685 ton/jam
20 ft
Panjang
(Wallas,1988)
0,0685
x100 = 0,0993 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 20 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,1 hp
Pempty
= 0,0993 x 0,1
= 0,0099 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
20
= 20,0765 ft
cos 5 0
= 0,001 H.w
(Wallas,1988)
= 20 tg 5 = 1,7498 ft
Pvertikal
= 57,0910 kg/jam
FePo4
Volume FePO4 =
57,0910 kg
0,0285 m3
2.400 kg / m3
= (1,2) 0,0343 m3
= 0,0343 m3
Diasumsikan panjang hopper = 0,25 m
Tinggi hopper = 2 x panjang hopper = 2 x 0,25 m = 0,5 m
Maka :
0,0343 m3 = p x t x l
0,0343 m3 = 0,25 m x 0,5 m x l
l
= 0,2740 m
= 0,5 m
lebar hopper
= 0,3 m
C.16
Jenis
: Continuous-bucket Elevator
Bahan
: Malleable-iron
Jumlah
: 1 unit
Kondisi operasi
: Temperatur (T) : 30 0C
Tekanan (P)
: 1 atm
: 3.225,6404 kg/jam
Faktor kelonggaran
: 12 %
Kapasitas materi
Tinggi elevator
= 25 ft
Ukuran bucket
= (6 x 4 x 4 ) in
P 0,07 m 0,63 Z
Dimana : P
m
= daya (kW)
= laju alir massa (kg/s)
Jenis
: Continuous-bucket Elevator
Bahan
: Malleable-iron
Jumlah
: 1 unit
Kondisi operasi
: Temperatur (T) : 30 0C
Tekanan (P)
: 1 atm
: 2055,2753 kg/jam
Faktor kelonggaran
: 12 %
Kapasitas materi
Tinggi elevator
= 25 ft
Ukuran bucket
= (6 x 4 x 4 ) in
P 0,07 m 0,63 Z
Dimana : P
m
= daya (kW)
= laju alir massa (kg/s)
Jenis
: Continuous-bucket Elevator
Bahan
: Malleable-iron
Jumlah
: 1 unit
Kondisi operasi
: Temperatur (T) : 30 0C
Tekanan (P)
: 1 atm
57,0910 kg/jam
Faktor kelonggaran
12 %
Kapasitas materi
Tinggi elevator
= 25 ft
Ukuran bucket
= (6 x 4 x 4 ) in
= 12 in
P 0,07 m 0,63 Z
Dimana : P
= daya (kW)
C.17
Jenis
Mass-Flow Bins
Jumlah
1 unit
Kondisi operasi
Temperatur (T)
: 30 0C
Tekanan (P)
: 1 atm
3.225,7685 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
Valley
B
Storage bins
= 20%
SiO
Volume SiO2
FSiO2
SiO
Faktor kelonggaran
650.289,1046 kg
245,5775 m 3
3
2.648 kg / cm
= 20%
= (1,2) 245,5775 m3
= 294,6929 m3
Vs 14 Di 2 H;
asumsi : Di : H 1 : 3
Vs 34 Di3
Di3
= 125,1350
Di
= 5,0018 m
= 3 x Di = 15,0054 m
1
x 5,0018 m 1,0004 m
5
Tinggi valley
1
x 15,0054 m 3,0011 m
5
Jenis
Mass-Flow Bins
Jumlah
2 unit
Kondisi operasi
Temperatur (T)
: 30 0C
Tekanan (P)
: 1 atm
2.055,2753 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
= 20%
FCoke
Coke
Faktor kelonggaran
414.343,5003 kg
538,1084 m 3
3
770 kg / m
= 20%
= (1,2) 538,1084 m3
= 645,7301 m3
645,7301 m 3
322,8650 m 3
2
Vs 14 Di 2 H;
asumsi : Di : H 1 : 3
Vs 34 Di3
322,8650
= 2,355 Di3
Di3
= 137,0976
Di
= 5,1563 m
= 3 x Di = 15,4690 m
1
x 5,1563 m 1,0312 m
5
Tinggi valley
1
x 15,4690 3,0938 m
5
Jenis
Mass-Flow Bins
Jumlah
1 unit
Kondisi operasi
Temperatur (T)
: 30 0C
Tekanan (P)
: 1 atm
57,0910 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
= 20%
= 11.509,5417 kg (7 hari)
Volume FePO4
Faktor kelonggaran
FFePO 4
FePO
11.509,5417 kg
4,0103 m 3
3
2.870 kg / m
= 20%
= (1,2) 4,0103 m3
= 4,8124 m3
Vs 14 Di 2 H;
asumsi : Di : H 1 : 3
Vs 34 Di3
4,8124
= 2,355 Di3
Di3
= 2,0434
Di
= 1,2690 m
= 3 x Di = 3,8069 m
1
x 1,2689 m 0,2537 m
5
Tinggi valley
1
x 3,8069 m 0,7614 m
5
C.18
menuju
weigh scale
Jenis
Bahan konstruksi
carbon steel
Panjang
10 m
Kondisi operasi
Temperatur
: 30C
Tekanan
: 1 atm
FSiO2
SiO
= 2.648 kg/m3
Direncanakan dalam 1 proses cukup menempuh 1/6 jam kerja (10 menit)
Laju alir volumetrik :
Q
3.225,6404 kg/jam
1,2181 m 3 / jam 3,4.10 4 m 3 / s
3
2.648 kg/m
Daya conveyor :
P = 0,07 F0,82L
dimana :
maka,
P = 0,07. (0,8960)0,82 . 10
= 0,6397 kW = 0,8579 hp
menuju
weigh scale
Jenis
Bahan konstruksi
carbon steel
Panjang
10 m
Kondisi operasi
Temperatur
: 30C
Tekanan
: 1 atm
FCoke
Coke
Direncanakan dalam 1 proses cukup menempuh 1/6 jam kerja (10 menit)
Laju alir volumetrik :
Q
2.055,2733 kg/jam
0,7762 m 3 / jam 2,2.10 4 m 3 / s
3
770 kg/m
Daya conveyor :
P = 0,07 F0,82L
dimana :
P = 0,07. (0,7762)0,82 . 10
= 0,4421 kW = 0,5928 hp
Efisiensi motor = 80%
Daya yang dibutuhkan = 0,5928 hp / 0,8 = 0,741 hp
Maka dipakai motor dengan daya 1 hp.
Jenis
Bahan konstruksi
carbon steel
Panjang
10 m
Kondisi operasi
Temperatur
: 30C
Tekanan
: 1 atm
FFePO 4
FePO
Direncanakan dalam 1 proses cukup menempuh 1/6 jam kerja (10 menit)
Laju alir volumetrik :
Q
57,0910 kg/jam
0,0199 m 3 / jam 5,5.10 6 m 3 / s
3
2.870 kg/m
Daya conveyor :
P = 0,07 F0,82L
dimana :
P = 0,07. (0,0159)0,82 . 10
= 0,0234 kW = 0,0314 hp
Jenis
: Pan Muller
Jumlah
: 1 unit
Kondisi operasi :
Temperatur
= 30C
Tekanan
= 1 atm
Faktor kelonggaran
= 20 %
Laju alir
(kg/m3)
(kg/jam)
Vcampuran
(m3/jam)
SiO2
3225,6404
2648
1,2181
2055,2753
770
2,6692
FePO4
57,0910
2870
0,0199
371,0914
1428,8899
0,2597
5709,0981
1370,0972
4,1669
Natrium
Silikat
Total
b.
Dt2 .H s =
Dt2 ( Dt ) =
.Dt3
(Perry, 2007)
Ve
24
Dt
= Vs + Ve
10,0006 m
7
24
Dt
7
24
Dt
Dt3 = 10,9197 m3
Dt = 2,2186 m = 7,2787 ft = 87,3447 in
Hs = 2,2186 m = 7,2787 ft = 87,3447 in
c. Diameter dan tinggi tutup
Diameter tutup = diameter tangki = 2,2186 m
Rasio axis
= 2:1
Tinggi tutup
1 2,2186
0,5546 m
2 2
ts =
P.r
Cc
S .Ej 0,6 P
(Timmerhaus, 2004)
dimana :
P = maximum allowable internal pressure
r = jari-jari tangki
Faktor keamanan = 20 %
Maka, Pdesign = (1,2) (117,687 kPa)
= 141,225 kPa = 20,4829 psi
Untuk bahan konstruksi Carbon steel, SA 285, Grade C :
S = 13.750 psi
Ej = 0,85
C = 0,02 in/tahun
n = 10 tahun
Cc = 0,02 in/tahun x 10 tahun = 0,2 in
ts =
=
P.r
Cc
S .Ej 0,6 P
= 0,2769 in
Daya standar motor penggerak pan muller dengan volume maksimal 5,1 m3 adalah
225 hp (Perry, 2007).
Jenis
Jumlah
: 1 unit
Bahan konstruksi
Komponen
(kg/jam)
(kg/m3)
Vcampuran
(m3/jam)
SiO2
3225,6404
2648
1,2181
2055,2753
770
2,6692
FePO4
57,0910
2870
0,0199
Natrium Silikat
371,0914
1428,8899
0,2597
H2O
788.9125
995,647
0,7924
Total
6498,0105
1310,2701
4,9593
Tangki granulator
Slurry menduduki 30% dari penampang dalam, residence time jam.
Volume tangki, V
slurry
x residence time
0,2
6498,0105 kg / jam
3
1310
,
2701
kg
/
m
0,5 jam 8,2655 m3
=
0,3
Rasio panjang tangki (L) terhadap diameter (D) adalah L:D = 2:1 (Wallas, 1988)
L
Volume tangki, V
=2D
= 1/4D2L
= 1/2D3
8,2209 m3
= 1/2D3
D
Diameter tangki, D
= 1,7365 m
= 1,7396 m = 68,4893 in = 5,7074 ft
Panjang tangki, L
(Walas,1988)
(Walas,1988)
(Walas,1988)
= P + Po
ts =
P.r
Cc
S .Ej 0,6 P
= 0,2544 in
Maka tebal shell minimum yang diperlukan = 0,2544 in
Tebal shell standard yang digunakan
= 5/16 in
Jenis
: Continuous-bucket Elevator
Bahan
: Malleable-iron
Jumlah
: 1 unit
Kondisi operasi
: Temperatur (T) : 30 0C
Tekanan (P)
: 1 atm
5.280,9157 kg/jam
Faktor kelonggaran
12 %
Kapasitas materi
Tinggi elevator
= 25 ft
Ukuran bucket
= (6 x 4 x 4 ) in
P 0,07 m 0,63 Z
Dimana : P
m
= daya (kW)
= laju alir massa (kg/s)
: reciprocating compressor
Dengan perhitungan:
Laju alir udara masuk = 11.305,6092 kg/jam
Laju alir udara masuk per unit = 2.826,4023 kg/jam
udara
(300C)
= 1,168 kg/m3
\V
udara
2826,4023 kg / jam
1,168 kg / m 3
= 2.419,865 m3/jam
=0,6722 m3/detik
P
k P2
= 2,78 x 10 . mvl. P1.
k 1 P1
dimana: P
: Daya kompresor, kW
-4
k 1 / k
(Perry, 2007)
mvl
P1
P2
: efisiensi kompressor = 80 %
(Walas, 1988)
( Geankoplis, 1997)
mvl
= 2.419,865 m3/jam
k P2
= 2,78 x 10 . mvl. P1.
k 1 P1
-4
k 1 / k
= 52,2507 kW = 70,0693 hp
Efisiensi motor 80 %
P nyata
=
=
70,0693
= 87,5866 hp
0,8
De
(Wallas, 1988)
(Walas, 1988)
Fungsi
Material konstruksi
Jumlah
: 1 unit
Tabel C.3 Komposisi bahan yang masuk Rotary Kiln Preheater (B-102)
Komponen
Laju alir
(kg/jam)
(kg/m3)
Vcampuran
(m3/jam)
SiO2
3225,6404
2648
1,2181
2055,2753
770
2,6692
FePO4
57,0910
2870
0,0199
Natrium Silikat
371,0914
1428,8899
0,2597
H2O
788.9125
995,647
0,7924
Total
6498,0105
1310,2701
4,9593
Beban Panas
= 19.752.267,7422 kJ/jam
(Lamp.B)
= 5.486.741,0395 W
Jumlah Gas Panas
= 863 0C
= 30 0C
= 617 oC
= 625 0C
Bahan Panas
Bahan dingin
Selisih
T2 = 617 0C = 890 K
246 K
T2 = 625 0C = 898 K
T1 = 30 0C= 303 K
595 K
T2-T1 = 587 K
T2-T1 = 349
Temeratur Terendah
T1-T2 = 238 K
LMTD
t 2 t 1
t
ln 2
t 1
349
386,595 K = 113,595 0C
587
ln
238
= 200 W/m.K
(Anonim, 2012a)
Q
h LMTD
5.486.741,74221W
200 W / m 2 .K 386,595K
= 1500 lb/ft2.jam
11.705,5625 lb / jam
7,8037 ft 2
1500 lb / ft 2 . jam
4 7,8037
9,936 ft
= 3,0285 m
R
= 1,51 m = 59,616 in
= 6498,0105 kg
=1310,2701 kg/m3
Densitas campuran
Volume campuran
6498,0105 kg
4,9593 m 3
3
1310,2701 kg / m
(Wallas, 1988)
4,9593 m 3
Volume campuran
61,99125 m 3
0,08
4V
4 24,7964
Panjang rotary kiln, L
7,6672 m 25,1586 ft
2
D
(3,0285 2 )
Kecepatan putaran rotary kiln 0,25 5 rpm, sudut inklinasi 2 5 0 (Perry, 2007)
Dipilih kecepatan putaran = 5 rpm, dan sudut inklinasi 50.
(walas,1988)
P = 5 + (0,11)( 9,936)(25,1586)
= 32,497 hp
Digunakan motor dengan daya 33 hp.
= P + Po
= 38,888 kPa + 101,325 kPa
= 140,213 kPa
S = 13750 psi
Ej = 0,85
C = 0,02 in/tahun
n = 10 tahun
Cc = 0,02 in/tahun x 10 tahun = 0,2 in
ts =
=
P.r
Cc
S .Ej 0,6 P
= 0,3246 in
Tebal shell standard yang digunakan
= 3/8 in
: reciprocating compressor
Dengan perhitungan:
Laju alir udara masuk
udara
\V
(300C)
= 7.527,3678 kg/jam
= 1,168 kg/m3
=
udara
7.527,3578 kg / jam
1,168 kg / m 3
= 6.444,6642 m3/jam
= 1,7902 m3/detik
P
k P2
= 2,78 x 10 . mvl. P1.
k 1 P1
-4
k 1 / k
(Perry, 2007)
dimana: P
: Daya kompresor, kW
mvl
P1
P2
: efisiensi kompressor = 80 %
mvl
= 6.444,6642 m3/jam
k P2
= 2,78 x 10 . mvl. P1.
k 1 P1
-4
(Walas, 1988)
( Cengel dan Michael, 1995 )
k 1 / k
= 33,9751 kW
= 45,5613 hp
P nyata
=
=
45,5613
= 56,9512 hp
0,8
De
(Wallas, 1988)
(Walas, 1988)
Fungsi
Jenis
Material konstruksi
Jumlah
: 2 unit
Vcampuran
(kg/jam)
(kg/m3)
(m3/jam)
SiO2
3416,7525
2648
1,2903
2055,2753
770
2,6692
FePO4
57,0910
2870
0,0199
Na2O
65,6683
2270
0,0289
Total
5594,7871
1395,7921
4,0083
Komponen
slurry
x residence time
0,5
5594,7871 kg / jam
3
1395
,
7921
kg
/
m
2 jam 16,0333 m3
=
0,5
Rasio tinggi (T) terhadap diameter (D) adalah L:D = 1:1
Volume tangki, V
= 1/4D2L
= 1/4D3
V
16,0333 m3
= 1/4D3
= 2,7335 m
= 2,7335 m
T1
fire brick
T0
magnesite
steel plate
T2
T3
50 0C = 325 K
Region 1:
x x0
T0-T1 = q0 1
k 01
Region 2:
x x1
T1-T2 = q0 2
k12
Region 3:
x x2
T2-T1 = q0 3
k 23
Magnesite:
Tebal, x
= x1
k k1
x1 x0 0
T0 T1 1 q
0
2
(Perry, 2007)
x1
k k1
x1 x0 0
T0 T1 1 q
0
2
2,53 1,6
=
1873 1273 110.000
2
= 0,028 m
Kaolin insulating firebrick
Tebal, x
= x2
k k1
x 2 x1 2
T1 T2 1 q
0
2
x2
(Perry, 2007)
k k1
x 2 x1 2
T1 T2 1 q
0
2
0,4 0,134
=
1273 333 115.769,53
2
= 0,008 m
= x3
k k1
x 2 x1 2
T1 T2 1 q
0
2
x3
k k1
x 2 x1 2
T1 T2 1 q
0
2
(Lamp. B)
= 8.331,3756 kW
Daya, P
8.331,3756
0,96
= 8.678,51625 Kw
= 11.638,082 hp
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 16000C
Jumlah materi
2.525,2525 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
3,0303 ton/jam
30 ft
Panjang
Menghitung Daya Conveyor
P
(Wallas,1988)
3,0303
x100 = 3,4474 ft/menit
87,9
Daya Empty
Horsepower conveyor dengan panjang 30 ft dan tebal belt conveyor 24 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,1 hp
Pempty
= 3,4474 x 0,1
= 0,3474 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
30
= 30,1147 ft
cos 5 0
= 0,001 H.w
(Wallas,1988)
= 30 tg 50 = 2,6246 ft
Pvertikal
Efisiensi motor 80 %
Daya yang diperlukan untuk menggerakkan motor 0,3679/0,8 = 0,46 hp
Maka digunakan motor standar dengan daya 1 hp.
ke
crusher
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
Jumlah materi
2.525,2525 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
3,0303 ton/jam
30 ft
Panjang
(Wallas,1988)
3,0303
x100 = 4,3917 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 30 ft dan tebal belt conveyor 18 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,1 hp
Pempty
= 4,3917 x 0,1
= 0,4392 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
30
= 30,1147 ft
cos 5 0
Daya Vertikal
Pvertikal
H
Pvertikal
= 0,001 H.w
(Wallas,1988)
= 30 tg 50 = 2,6246 ft
= 0,001 x 2,6246 x 3,0303
= 0,0080 hp
Efisiensi motor 80 %
Daya yang diperlukan untuk menggerakkan motor 0,4624/0,8 = 0,578 hp
Maka digunakan motor standar dengan daya 1 hp.
C.28
Fungsi
Crusher (SR-103)
:
Jenis
Bahan konstruksi
Carbon steel
Jumlah
1 unit
Kapasitas
= (0,961 df - do)/0,039
( Wallas, 1998)
dimana ;
dr =
diameter roll
df =
diameter umpan
do =
Diperkirakan umpan memiliki ukuran berkisar 1,5 in, diambil ukuran (df) = 1,5 in
Pemecahan menggunakan Smooth Roll crusher dengan diameter celah roll dengan
ukuran (do) = 0,5 in
dr
= (0,961 df - do)/0,039
= (0,961 x 1,5 - 0,5)/0,039
= 24,141 in
Perhitungan Daya
P = 0,3 ms R*
( Timmerhaus,2004)
( Timmerhaus,2004)
P = 0,3 ms R*
= 0,3 (0,7015 kg/s)(16)
= 3,367 kW = 4,5152 hp
Digunakan motor dengan daya 5 hp
Sesuai dengan tabel 12.8 b, Wallas,1998 maka ukuran crusher yang digunakan :
Diamete Roll
= 24 in
= 14 in
Kecepatan Roll
= 125 rpm
ke bucket
elevator
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
Jumlah materi
2.525,2525 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
3,0303 ton/jam
15 ft
Panjang
Menghitung Daya Conveyor
P
(Wallas,1988)
3,0303
x100 = 4,3817 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 15 ft dan tebal belt conveyor 16 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,1 hp
Pempty
= 4,3817 x 0,1
= 0,4382 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
15
= 15,0574 ft
cos 5 0
Daya Vertikal
Pvertikal
= 0,001 H.w
(Wallas,1988)
= 15 tg 5 = 1,3123 ft
Pvertikal
Efisiensi motor 80 %
Daya yang diperlukan untuk menggerakkan motor 0,4568 /0,8 = 0,578 hp
Maka digunakan motor standar dengan daya 1 hp.
C.30
Fungsi
Jenis
: Continuous-bucket Elevator
Bahan
: Malleable-iron
Jumlah
: 1 unit
Kondisi operasi
: Temperatur (T) : 30 0C
Tekanan (P)
: 1 atm
Jumlah materi
2.525,2525 kg/jam
Faktor kelonggaran
12 %
Kapasitas materi
Tinggi elevator = 25 ft
Ukuran bucket
= (6 x 4 x 4 ) in
(Tabel 21-9, Perry, 2007)
P 0,07 m 0,63 Z
(Timmerhaus,2004)
Dimana : P
= daya (kW)
C.31
Fungsi
Jenis
Mass-Flow Bins
Jumlah
1 unit
Kondisi operasi
Temperatur (T)
: 30 0C
Tekanan (P)
: 1 atm
Jumlah materi
2.525,2525 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
Ftotal
Valley
B
Storage bins
Komponen
BM
(kg/jam)
Mol
(kgmol/kg) (kmol/jam)
Fraksi
Densitas
(kg/m3)
SiO2
124,5406
60,0864
2,0727
0,0319
2.648
81,0298
12,0107
6,7465
0,1037
770
FePO4
57,0910
150,8164
0,3785
0,0058
2.870
Na2O
65,6683
61,9790
1,0595
0,0163
2.400
2.196,9228
40,0962
54,7913
0,8423
3.210
SiC
2.923,8574
509.090,9139 kg
174,1162 m 3
3
2.923,8574 kg / cm
Faktor kelonggaran
= 20%
= (1,2) 174,1162 m3
= 208,9394 m3
Vs 14 Di 2 H;
asumsi : Di : H 1 : 3
Vs 34 Di3
Di3
= 88,7216
Di
= 4,4601 m
= 3 x Di = 13,3803 m
1
x 4,4601 m 0,8920 m
5
Tinggi valley
1
x 13,3803 m 2,6761 m
5
ke Gudang
Produk (TT-107)
Jenis
Jumlah
1 unit
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
Jumlah materi
2.525,2525 kg/jam
Faktor kelonggaran
20 %
Kapasitas materi
3,0303 ton/jam
100 ft
Panjang
(Wallas,1988)
3,0303
x100 = 4,3917 ft/menit
69
Daya Empty
Horsepower conveyor dengan panjang 100 ft dan tebal belt conveyor 16 inci dapat
dilihat dari grafik 5.5c Wallas yaitu = 0,3 hp
Pempty
= 4,3917 x 0,3
= 1,3175 hp
Daya Horizontal
Phorizontal = (0,4 + L/300)(w/100)
L
(Wallas,1988)
100
= 100,3825 ft
cos 5 0
Daya Vertikal
Pvertikal
H
= 0,001 H.w
(Wallas,1988)
= 100 tg 5 = 8,7488 ft
Pvertikal
Efisiensi motor 80 %
Daya yang diperlukan untuk menggerakkan motor 1,3663/0,8 = 1,7079 hp
Maka digunakan motor standar dengan daya 2 hp.
Jenis
Bahan Kontruksi
Bangunan Beton
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
30 kg
0,01026 m 3
2923,8574 kg / cm 3
= 1,2 x 0,01026 m3
= 0,01231m3
Kebutuhan Produk SiC
= 2.525,2525 kg/jam
Lama Penyimpanan
= 30 hari
= 60.606 sak
Volume total sak tiap 30 hari : 0,01231 x 60.606 = 621,8429 m3
Faktor kosong ruangan = 20% dan area jalan dalam gudang = 20% ; sehingga:
Volume ruang yang dibutuhkan
= (1,4) 621,8429 m3
= 870,5801 m3
= pxlxt
870,5801 m3
= (20) .(l).(2)
l = 21,7645
Tinggi bangunan direncanakan 2 x tinggi tumpukan bahan baku = 5 m
Jadi ukuran bangunan gedung yang digunakan adalah :
Panjang
= 20 m
Lebar
= 22 m
Tinggi
= 5m
: reciprocating compressor
Dengan perhitungan:
Tabel C. 6 Komposisi bahan yang masuk ke Kompresor Gas Buang (C-103)
Komponen
(kg/m3)
Vcampuran (m3/jam)
CO2
1.114,1914
0,5970
1866,3173
N2
8.672,3349
0,3800
22821,9338
O2
1061,9452
0,4341
2446,3147
H2O
1.760,3144
0,2446
7196,7066
Total
12.608,7859
0,3673
34.331,2724
gas buang
\
3152,1965 kg / jam
0,3673 kg / m 3
= 8.582,0759 m3/jam
= 2,3839 m3/detik
k P2
= 2,78 x 10 . mvl. P1.
k 1 P1
dimana: P
: Daya kompresor, kW
-4
k 1 / k
mvl
P1
P2
: efisiensi kompressor = 80 %
k P2
= 2,78 x 10 . mvl. P1.
k 1 P1
-4
(Perry, 2007)
(Walas, 1988)
(Cengel dan Michael, 1995 )
k 1 / k
= 493,97 kW
= 662,4245 hp
P nyata
662,4245
= 828,0307 hp
0,8
De
(Wallas, 1988)
(Walas, 1988)
: Reciprocating Compressor
Jumlah : 4 unit
Dengan perhitungan:
Tabel C.7 Komposisi bahan yang masuk ke Kompresor Gas Buang (C-104)
Laju Alir (kg/jam)
(kg/m3)
Vcampuran (m3/jam)
CO2
4.822,4561
0,3205
15.046,6648
N2
5.774,1120
0,204
28.304,4707
Total
10.596,5681
0,2444
43.351,1355
Komponen
= 10.596,5681 kg/jam
= 2.649,1420 kg/jam
gas buang
= 0,2444 kg/m3
\V
2.4649,1420 kg / jam
0,2444 kg / m 3
= 10.837,7839 m3/jam
= 3,0105 m3/detik
P
k P2
= 2,78 x 10 . mvl. P1.
k 1 P1
dimana: P
: Daya kompresor , kW
-4
k 1 / k
mvl
P1
P2
: efisiensi kompressor = 80 %
k P2
= 2,78 x 10 . mvl. P1.
k 1 P1
-4
(Perry, 2007)
(Walas, 1988)
(Cengel dan Michael, 2005 )
k 1 / k
= 613,005 kW
= 822,0533 hp
P aktual
=
=
822,0533
= 1027,567 hp
0,8
De
(Wallas, 1988)
(Walas, 1988)
Jenis
Bahan konstruksi
Carbon Steel
1 unit
Jumlah
Kondisi operasi:
Laju alir, F
= 23.205,354 kg/jam
Tekanan suction, P1
= 5 atm
Suhu suction, T1
= 1031 oC = 1304 K
Entalpi suction, h1
= 1400,728 kJ/kg
= 600 oC = 873 K
Entalpi discharge, h2
= 903,204 kJ/kg
Effisiensi turbin, t
= 80%
= mg. Wt
= mg.(h1-h2)
= (1400,728 - 903,204) kJ/kg
= 23.205,354 kg/jam x 497,524 kJ/kg
= 11.545.220,54 kJ/jam
Daya yang dibutuhkan generator adalah daya semu (NG), dan daya yang
dihasilkan generator, P (daya nyata):
P
= NG. t
NG
= Pt. G.tr. t
Jenis
Bahan Konstruksi
: Carbon steel
= Q44-Q46
= (23.340.501,8063 - 6.491.104,3066) kJ/jam
= 16.849.397,4997 kJ/jam
= 6276,504 hp
Luas permukaan perpindahan panas, A = P 10 ft2/hp
= 6.276,504 hp 10 ft2/hp
= 62.765,04 ft2
(Kern, 1965)
Nt
A
62.765,04
Desain
Bahan konstruksi
: Carbon Steel
Jumlah
:1 unit
Kondisi operasi:
Laju alir, F
= 7300 kg/jam
Tekanan suction, P1
= 148 atm
Suhu suction, T1
= 565 oC
Entalpi suction, h1
= 3488,71 kJ/kg
= 46 oC
Entalpi discharge, h2
= 2.291,169 kJ/kg
Effisiensi turbin, t
= 85%
Effisiensi generator, G = 94 %
Effisiensi transmisi, tr = 100%
Maka daya yang dihasilkan turbin, Pt adalah
Pt
= t. F. (h1-h2)
= 0,85 x 7.300 kg/jam x (3488,71-2.291,169) kJ/kg
= 7.430.741,905 kJ/jam
= 2.064,095 kW
= 2, 064 MW
Daya yang dibutuhkan generator adalah daya semu (NG), dan daya yang
dihasilkan generator, P (daya nyata):
= Pt. G.tr
NG
= 6.984.897,391 x 0.85
= 5937162,782 kJ/jam
= 1.649,2119 kW
= 1,6492 MW
Jenis
Bahan Kontruksi
Bangunan Beton
Kondisi
Tekanan
: 1 atm
Suhu
: 300C
Laju alir
2.525,2525 kg/jam
Produk SiC didinginkan selama kurang lebih selama 3 hari hingga mencapai suhu
400C.
Untuk kapasitas 3 hari dapat dihitung :
FSiC
181.818,1800 kg
62,1839 m3
3
2.923,8574 kg / cm
Faktor kosong ruangan = 20% dan area jalan dalam gudang = 20% ; sehingga:
Volume ruang yang dibutuhkan
= (1,4) 62,1839 m3
= 87,0575 m3
= pxlxt
= 8,7057 m
= 20 m
Lebar
= 9 m
Tinggi
= 8 m
LAMPIRAN D
PERHITUNGAN SPESIFIKASI PERALATAN UTILITAS
D. 1
Screening (SC-01)
Fungsi
Jenis
: Bar screen
Jumlah
: 1 unit
Bahan konstruksi
: Stainless steel
2m
20 mm
2m
20 mm
= 30 oC
Densitas air ()
= 995,5 kg/m3
= 11.104,7956 kg/jam
(Geankoplis, 1997)
11.104,7956 kg/jam
= 0,003099 m3/s
995,5 kg/m 3 3600 s/jam
= 2m
Lebar screen
= 2m
20x + 20 (x + 1) = 2000
40x = 1980
x = 49,5 50 buah
Q2
2
2 g Cd A 2
0,003099
2
2
2 9,80,6 2,04
Jenis
: Centrifugal pump
Jumlah
: 1 unit
BP-01
SC-01
PU-01
Kondisi operasi :
P = 1 atm
T = 30 oC
Laju alir massa (F)
Densitas air ()
= 995,50 kg/m3
= 62,1470 lbm/ft3
Viskositas air ()
= 0,8007 cP
= 0,0005 lbm/ft.s
6,8005 lbm s
62,1470 lbm ft 3
= 0,1094 ft3/s
: 2 in
Schedule number
: 40
: 2,875 in = 0,2396 ft
: 0,03322 ft2
0,1094 ft 3 / s
=
= 3,2940 ft/s = 1,0040 m/s
0,03322 ft 2
v D
= 78.282,2729 (Turbulen)
Untuk pipa commercial steel diperoleh harga = 0,000046
Pada NRe = 7,8282.104 dan /D =
0,000046 m
= 0,0007
0,0627 m
(Geankoplis,1997)
Friction Loss
1. Contraction loss pada keluaran tangki
A
Kc 0,55 1 1
A2
(Geankoplis, 1997)
= 0,55 (1-0)
= 0,55
hc k c
v2
2
0,55
(Geankoplis, 1997)
1,00402
2.1
= 0,2772 J/kg
2. Friction pada pipa lurus
Panjang pipa lurus = 40 m
Ff = 4f
(Geankoplis, 1997)
40 1,0040
2 0,0627
= 4 (0,0048)
= 6,1724 J/kg
3. Friction pada 2 buah elbow 90o
hf = n.kf
(Geankoplis, 1997)
= 2.(0,75)
1,00402
2 0,0627
= 12,0554 J/kg
4. Friction pada 1 buah gate valve
hf = n.kf
(Geankoplis, 1997)
= 1.(0,17)
1,00402
2 0,0627
= 1,3663 J/kg
5. Expansion loss pada tank entrance
kex =
(Geankoplis, 1997)
= (1-0)2
=1
hex = kex
=1
(Geankoplis, 1997)
(1,0040)2
2
= 0,5040 J/kg
(Geankoplis, 1997)
Dimana:
diameter pipa konstan, v1 = v2
selisih tinggi pipa, z2 z1 = 10 m
tekanan konstan, p2 = p1
Sehingga,
-Ws =
1
(0) 9,806 (10) 0 20,3752
2
Ws = -118.4352 J/kg
(Geankoplis, 1997)
- 118.4352 J/kg
= 148,0441 J/kg
0,8
Daya pompa, P:
P = m.Wp
(Geankoplis, 1997)
PU-02
PU-03
Fungsi
Laju Alir
(kg/jam)
D
optimun
(inci)
ID
Daya
(inci)
(ft/s)
(hp)
Daya
Standar
(hp)
11.104,7956
2,4650
2,4690
3,2940
0,3469
1/2
0,5552
0,0092
0,2690
0,0100
0,000013
1/8
PU-05
PU-06
PU-07
PU-08
PU-09
PU-10
PU-11
PU-12
PU-13
PU-14
PU-15
D.3
0,2988
0,0197
0,2690
0,0055
0,000007
1/8
11.104,7956
2,4650
2,4690
3,2940
0,2415
1/2
11.104,7956
2,4650
2,4690
3,2940
0,7018
1/2
788,9125
0,7499
1,0490
1,2957
0,0211
1/2
7.300,0000
2,0409
2,0670
3,0873
0,2617
1/2
0,0654
0,0017
0,2690
0,0016
0,000001
1/8
0,0487
0,0039
0,2690
0,0011
0,0000004
1/8
7.300,0000
2,0409
2,0670
3,0873
0,1255
1/2
7.300,0000
2,0409
2,0670
3,0873
0,2255
1/2
0,0055
0,0005
0,2690
0,0001
0,0000001
1/8
1.398,1007
0,9701
1,0490
2,2961
0,0361
1/2
7.300,0000
2,0614
2,4690
2,2339
52,7141
53
Jumlah
: 1 unit
Bahan kontruksi
546
B-601
L1
P1
Kondisi operasi :
Temperatur
= 30 oC
Densitas air ()
= 995,5 kg/m3
= 11.104,7956 kg/jam
Lama penampungan
= 24 jam
= 20%
(Geankoplis, 1997)
Sehingga:
Jumlah air masuk (W)
Volume bak
1 fk W
1 0,2266.515,0944
995,5
= 321,2638 m3
Desain Perancangan :
Bak dibuat persegi panjang
Panjang bak (P)
= PLT
= (3T) (2T) (T)
V
= 6 T2
= (V/6)1/3
= (321,2638/6)1/3
= 3,7691 m
Sehingga, dari ukuran tinggi bak (T) didapat dimensi lainnya sebagai berikut:
= 3T
= 3 3,7691
= 11,3073 m
= 2T
= 2 3,7691
= 7,538
D. 4 Clarifier (CL-01)
Fungsi
Jenis
Jumlah
: 1 unit
Bahan konstruksi
LUMPUR
= 11.104,7956 kg/jam
= 0,5552 kg/jam
= 0,2998 kg/jam
Densitas Al2(SO4)3
= 2.710 kg/m3
(Perry, 2007)
Densitas Na2CO3
= 1.327 kg/m3
(Perry, 2007)
Densitas air
= 996,24kg/m3
(Geankoplis,1997)
Reaksi koagulasi :
Al2(SO4)3 + 3 Na2CO3 + 3 H2O 2 Al(OH)3 + 3 Na2SO4 + 3CO2
= 3-10 m
Settling time
= 1-3 jam
11.104,7956
11.104,7956 0,5552 0,2998
995,5
2.710
1.327
Densitas larutan,
Volume cairan, V
Faktor kelonggaran
= 20%
Volume clarifier
a.
= 995,539 kg/m3
Hs
Vs =
D 2 H s
(Brownell & Young, 1959)
4
D 3
3
D
Hc
Vs =
D 2 H c
................................................................................. (Perry, 2007)
12
D 3
24
V = Vs + Vc
3D 3
8
13,3865 m3 = 1,178097 D3
D
= 2,2482 m
Hs = (4/3) D = 2,9976 m
b.
= 7,3759 ft = 88,5105 in
= 9,8345 ft
2,2482 m
= 1,1241 m
2
Tinggi tutup =
= 3,6879 ft
(11,1554)(4,1216)
(13,3865)
= 3,4347 m
PD
2SE 1,2P
(161,802 kPa) (88,5105 in)
+ 1/8 in
= 1/4 in
Daya Pengaduk
Daya Clarifier
P = 0,006 D2 ............................................................................... (Ulrich, 1984)
Dimana :
P = daya yang dibutuhkan, kW
Sehingga,
P = 0,006 (2,2482)2 = 0,0303 kW = 0,041 hp
0,041 hp
0,6
= 0,068 hp
Bentuk
Bahan konstruksi
Jenis sambungan
Jumlah
: 1 unit
Kondisi operasi :
Temperatur
= 30 oC
Tekanan
= 50 ppm
= 0,5552 kg/jam
Densitas Al2(SO4)3 30 ()
(Perry, 2007)
= 30 hari
Faktor kelonggaran : 20 %
Volume tangki, Vt = 1,2 0,9777 m3 = 1,1732 m3
2. Diameter dan tinggi tangki
Hs
D 2 H s
(Brownell & Young, 1959)
4
3D 3
8
3
1,1732 m 3 D 3
8
9,386 D 3
Vs =
0,996 D 3
D 0,999 m
Maka: D = 0,999 m = 39,322 in
H = 1,498 m
3. Tebal shell dan tutup tangki
Tinggi cairan dalam tangki =
(0,9777)(1,498)
(1,1732)
= 1,2485 m
= 4,096 ft
Tekanan hidrostatik :
P = g h = 1363 kg/m3 9,8 m/det2 1,2485 m
= 16,677 kPa
Tekanan operasi :
Poperasi = 101,325 kPa
Ptotal = 101,325 kPa + 16,677 kPa = 118,001 kPa
Faktor keamanan : 20 %
Pdesign = (1,2) (118,001 kPa) = 141,602 kPa
Joint efficiency
: E = 0,8
Allowable stress
Faktor korosi
: C = 1/80 in
Umur alat
: n = 10 tahun
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(141,602 kPa)
0,1539 in
Tebal shell dan tutup standar yang digunakan = 1/4 in (Brownell & Young, 1959)
Perancangan Sistem Pengaduk
Jenis pengaduk
Jumlah baffle
: 4 buah
E/Da = 1
; E = 0,333 m
L/Da = 1/4
W/Da = 1/5
J/Dt = 1/12
dimana :
Da
N ( Da) 2
1363(1)(0,333)2
= 151.069,7427
10-3
Pada tangki bersekat dengan NRe > 10.000, angka daya tidak bergantung pada
angka Reynolds, dan viskositas tidak merupakan faktor. Dalam daerah ini aliran
sudah turbulen penuh, maka perhitungan dengan pengadukan menggunakan rumus:
5
K .n 3 .D a
P T
gc
0,042
= 0,05 hp
0,8
Bentuk
Bahan konstruksi
Jenis sambungan
Jumlah
: 1 unit
Kondisi operasi :
Temperatur
= 30 oC
Tekanan
= 27 ppm
= 0,2998 kg/jam
Densitas Na2CO3 30 ()
Viskositas Na2CO3 30 ()
(Perry, 2007)
= 30 hari
Faktor kelonggaran : 20 %
Volume tangki, Vt = 1,2 0,5423 m3 = 0,6507 m3
2. Diameter dan tinggi tangki
Hs
D 2 H s
(Brownell & Young, 1959)
4
3D 3
8
3
0,6507 m 3 D 3
8
D 0,820 m
Vs =
(0,5423)(1,231)
(0,6507)
= 1,0256 m
Tekanan hidrostatik :
P = g h = 1363 kg/m3 9,8 m/det2 1,231 m
= 13,338 kPa
Tekanan operasi :
: E = 0,8
Allowable stress
Faktor korosi
: C = 1/80 in
Umur alat
: n = 10 tahun
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(134,2433 kPa)
0,148 in
Tebal shell dan tutup standar yang digunakan = 1/4 in (Brownell & Young, 1959)
Perancangan Sistem Pengaduk
Jenis pengaduk
Jumlah baffle
: 4 buah
E/Da = 1
; E = 0,273 m
L/Da = 1/4
W/Da = 1/5
J/Dt = 1/12
dimana :
Da
N ( Da) 2
1.327 kg / m3 (1rps)(0,273 m) 2
5.10-7 Pa.s
= 1,808 x105
Pada tangki bersekat dengan NRe > 10.000, angka daya tidak bergantung pada
angka Reynolds, dan viskositas tidak merupakan faktor. Dalam daerah ini aliran
sudah turbulen penuh, maka perhitungan dengan pengadukan menggunakan rumus:
5
K T .n 3 .D a
gc
0,0152
= 0,019 hp
0,8
Jumlah
: 1 unit
Bahan kontruksi
546
B-702
L1
P1
Kondisi operasi :
Temperatur
= 30 oC
Densitas air ()
= 995,50 kg/m3
(Geankoplis, 1997)
995,50
3
= 321,264 m
Desain Perancangan :
Bak dibuat persegi panjang
Panjang bak (P)
= PLT
= (3T) (2T) (T)
V
= 6 T3
= (V/6)1/3
= (321,264/6)1/3
= 3,7691 m
Sehingga, dari ukuran tinggi bak (T) didapat dimensi lainnya sebagai berikut:
P
= 3T
= 3 3,7691 m
= 11,3073 m
= 2T
= 2 3,7691
= 7,5382 m
Bentuk
: 1 unit
Kondisi operasi :
Temperatur
= 30 oC
= 11.104,7956 kg/jam
Densitas air ()
(Geankoplis, 1997)
= 20
Faktor keamanan
Volume air, Va
Volume tangki
b. Diameter tangki
Hs
Vs =
V = Vs + 2Ve =
3,3465 m3 = 1,309 D3
12V
D =
Hs = (4/3) D
= 1,3674 m = 53,833 in
= 1,8232 m = 71,777 in
1,3674 m
= 0,342 m
4
Tinggi tutup
Tinggi penyaring
= 1/4 2,507 m
= 0,627 m
= 1,880 m
d. Tebal tangki
Tekanan hidrostatik :
P = g h = 995,50 kg/m3 9,8 m/det2 1,880
= 18,3423 kPa
Tekanan operasi : Poperasi = 101,325 kPa
Ptotal = 101,325 kPa + 18,3423 kPa = 119,667 kPa
Faktor keamanan : 20 %
Pdesign = (1,2) (119,667 kPa) = 143,6008 kPa
Joint efficiency
: E = 0,8
: C = 1/80 in
Umur alat
: n = 10 tahun
(Peters,dkk.,2004)
PD
nC
2SE 1,2P
(143,6008 kPa) (53,833 in)
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(143,6008 kPa)
0,1651 in
Maka tebal tangki yang digunakan pada silinder dan ellipsoidal adalah sama sebesar
0,1651 in.
Tebal shell standar yang digunakan = 1/4 in
Bentuk
Bahan konstruksi
Kondisi penyimpanan
Jumlah
Kondisi operasi :
Temperatur
= 30 oC
= 11.104,7956 kg/jam
Densitas air
= 995,5 kg/m3
(Geankoplis, 1997)
1
D 2 H
4
1
6
19,564 m 3 D 2 D
4
5
3
19,564 m 3 D 3
10
V
D = 3,4927 m ;
H = 4,1913 m
Tinggi cairan dalam tangki
(33,465 )(4,1913)
= 3,493 m
(40,158)
PD
2SE 1,2P
Bentuk
Bahan konstruksi
Jenis sambungan
Jumlah
: 1 unit 2 tangki
M-01
Kondisi operasi :
Temperatur
= 30 oC
Densitas air ()
=7m
Vair =
= 16,732 m3
Faktor kelonggaran : 20 %
Volume tangki, Vt = 1,2 24,045 m3 = 20,079 m3
2. Diameter dan tinggi tangki
Direncanakan : Tinggi tangki : diameter tangki Hs : D = 5 : 4
Volume tangki (Vt)
Vt
= D2 Hs
Vt
20,079 =
5
D3
16
5
D3
16
= 2,772 m
tinggi tangki
Ht
= Hs =
Htotal = 7 + 3,326
5
D
4
= 3,326 m
= 10,326 m
16,732 m 3
3,326 m = 2,7715 m
Tinggi cairan dalam tangki, h =
20,0795 m 3
Tekanan hidrostatik :
P = g h = 995,5 kg/m3 9,8 m/det2 2,7715 m = 27,0452 kPa
Tekanan operasi :
Poperasi = 1 atm = 101,325 kPa
Ptotal = 101,325 kPa + 27,0452 kPa = 128,370 kPa
Faktor keamanan : 20 %
Pdesign = (1,2) (131,325) = 154,044 kPa
PD
nC
2SE 1,2P
(154,044ckPa) (215,846)
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(154,044 kPa)
0,212 in
Bentuk
Bahan konstruksi
Jumlah
: 1 unit
Kondisi operasi :
Temperatur
= 30 oC
Tekanan
= 0,0654 kg/jam
Densitas H2SO4 5 ()
Viskositas H2SO4 5 ()
Kebutuhan perancangan
= 30 hari
(Perry, 1997)
(Othmer, 1968)
3. Volume tangki
Vlarutan =
Faktor kelonggaran : 20 %
Volume tangki, Vt = 1,2 0,9154 m3 = 1,0985 m3
4. Diameter dan tinggi tangki
Hs
D 2 H s
(Brownell & Young, 1959)
4
3D 3
8
3
1,0985 m 3 D 3
8
D 0,9769 m
Vs =
(0,9154)(1,4654)
(1,0985)
= 1,2212 m
Tekanan hidrostatik :
P = g h = 1.028,86 kg/m3 9,8 m/det2 1,2212 m
= 12,313 kPa
Tekanan operasi :
Poperasi = 101,325 kPa
: E = 0,8
Allowable stress
: C = 1/80 in
Umur alat
: n = 10 tahun
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(136,366 kPa)
0,1522 in
Jumlah baffle
: 4 buah
E/Da = 1
; E = 0,3256 m
L/Da = 1/4
W/Da = 1/5
J/Dt = 1/12
dimana :
Da
N ( Da) 2
1.028,86 kg / m3 (1rps)(0,3256 m) 2
3,5.10-6 Pa.s
= 3,1174 x105
Pada tangki bersekat dengan NRe > 10.000, angka daya tidak bergantung pada
angka Reynolds, dan viskositas tidak merupakan faktor. Dalam daerah ini aliran
sudah turbulen penuh, maka perhitungan dengan pengadukan menggunakan rumus:
5
K T .n 3 .D a
gc
0,0282
= 0,0353 hp
0,8
Bentuk
: unit
Kondisi operasi :
Temperatur
= 30 oC
= 7.300 kg/jam
Densitas air ()
= 995,5 kg/m3
Kebutuhan perancangan
= 1 jam
(Geankoplis, 1997)
= 3 ft = 0,9144 m = 36,0003 in
Faktor keamanan : 20 %
Tinggi resin
= 2,5460 ft
= 0,776 m
= 0,9144 ft = 0,2286 m
Joint efficiency : E
= 0,8
Allowable stress : S
Faktor korosi :
= 1/80 in
Umur alat :
= 10 tahun
(Peters,dkk., 2004)
PD
nC
2SE 1,2P
(137,8443 kPa) (36,003)
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(137,8443 kPa)
0,151 in
Bentuk
Bahan konstruksi
Jumlah
: 2 unit
Kondisi operasi :
Temperatur
= 30 oC
Tekanan
= 0,0487 kg/jam
Densitas NaOH 4 ()
Viskositas NaOH 4 ()
Kebutuhan perancangan
= 30 hari
(Perry, 1997)
(Othmer, 1968)
Faktor kelonggaran : 20 %
Hs
D 2 H s
(Brownell & Young, 1959)
4
3D 3
8
3
1,0113 m 3 D 3
8
D 0,9504 m
Vs =
(0,8428)(1,4256)
(1,0113)
= 1,188 m
Tekanan hidrostatik :
P = g h = 1039,76 kg/m3 9,8 m/det2 1,188 m
= 12,1052 kPa
Tekanan operasi :
Poperasi = 101,325 kPa
Ptotal = 101,325 kPa + 12,1052 kPa = 113,430 kPa
Faktor keamanan : 20 %
Pdesign = (1,2) (113,430 kPa) = 136,116 kPa
Joint efficiency
: E = 0,8
Allowable stress
Faktor korosi
: C = 1/80 in
Umur alat
: n = 10 tahun
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(136,116 kPa)
0,1514 in
Jumlah baffle
: 4 buah
E/Da = 1
; E = 0,3168 m
L/Da = 1/4
W/Da = 1/5
J/Dt = 1/12
dimana :
Da
N ( Da)2
= 1,631 x105
Pada tangki bersekat dengan NRe > 10.000, angka daya tidak bergantung pada
angka Reynolds, dan viskositas tidak merupakan faktor. Dalam daerah ini aliran
sudah turbulen penuh, maka perhitungan dengan pengadukan menggunakan rumus:
5
K T .n 3 .D a
gc
0,0249
= 0,0311 hp
0,8
Bentuk
: 2 unit
Kondisi operasi :
Temperatur
= 30 oC
= 7.300 kg/jam
Densitas air ()
= 995,5 kg/m3
Kebutuhan perancangan
= 1 jam
(Geankoplis, 1997)
= 3 ft = 0,9144
= 7,07 ft2
Faktor keamanan : 20 %
Tinggi resin
= 2,5460 ft
= 0,7760 m
= 0,9144 ft = 0,2286 m
= 0,8
Allowable stress : S
Faktor korosi :
= 1/80 in
Umur alat :
= 10 tahun
PD
nC
2SE 1,2P
(137,8443 kPa) (36,003)
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(137,8443 kPa)
0,151 in
Bentuk
Bahan konstruksi
Jenis sambungan
Jumlah
: 1 unit
Kondisi operasi :
Temperatur
= 90 oC
Tekanan
= 1 atm
= 7.300 kg/jam
Densitas air ()
Kebutuhan perancangan
= 1 jam
= 7,3333 m3
Faktor kelonggaran : 20 %
= 8,7996 m3
Hs
D 2 H s
Volume silinder tangki (Vs) = Vs =
(Brownell & Young, 1959)
4
Vs =
3D 3
4
10D 3
V = Vs + 2Ve =
12
12V
D =
10
Hs = (4/3) D
= 1,4984 m = 58,9743 in
= 1,9973 m = 71,777 in
1,3674 m
= 0,3745 m
4
(7,333)(2,762)
(8,7996)
= 2,2885 m
Tekanan hidrostatik :
P = g h = 965,34 kg/m3 9,8 m/det2 2,2885 m
= 22,327 kPa
Tekanan operasi :
Poperasi = 101,325 kPa
Ptotal
Faktor keamanan : 20 %
Pdesign = (1,2) (145,6774 kPa) = 148,3821kPa
Joint efficiency
: E = 0,8
Allowable stress
Faktor korosi
: C = 1/80 in
Umur alat
: n = 10 tahun
PD
nC
2SE 1,2P
(148,3821kPa) (58,9743 in)
10 ( 180 in )
2(120658,248 kPa)(0,8) 1,2(148,3821kPa)
0,1704 in
Bentuk
Temperatur
= 30 C
Tekanan
= 1 atm
= 2 ppm
= 0,004 kg/jam
Densitas Ca(ClO)2 70
Kebutuhan perancangan
= 270 hari
Faktor keamanan
= 20
(Perry, 2007)
Hs
Perhitungan
a. Ukuran Tangki
Volume larutan, Vl
1
V D 2 H
4
1
3
0,0349 m3 D 2 D
4
2
3
0,0349 m3 D 3
8
Maka: D = 0,3094 m ; H = 0,4641 m
Tinggi cairan dalam tangki
(0,0291)(0,4641)
= 0,3867 m
(0,0349)
b. Tebal tangki
Tekanan hidrostatik
P = xgxl
= 1272 kg/m3 x 9,8 m/det2 x 0,3867 m
= 4,8207 kPa
Tekanan operasi = 1 atm = 101,325 kPa
P = 4,8207 kPa + 101,325 kPa = 106,1457 kPa
Faktor kelonggaran = 20 %
Maka, Pdesign = (1,2) (106,1457 kPa) = 127,3748 kPa
Joint efficiency = 0,8
Allowable stress = 12,650 psia = 87.218,714 kP
Tebal shell tangki:
PD
n.C
2SE 1,2P
(127,3748 kPa) (0,3867m)
10.1/80
2(87.218,714 kPa)(0,8) 1,2(127,3748 kPa)
0,133 in
Da
c. Daya Pengaduk
Jenis pengaduk
Jumlah baffle
: 4 buah
; E = 0,1031 m
L/Da =
dengan :
Dt
= diameter tangki
Da
= diameter impeller
= lebar baffle
= 6,719710-4 lbm/ftdetik
Bilangan Reynold,
N Re
N D a 2
N Re
79,408810,10312
6,7194 104
13.567,274
Pada tangki bersekat dengan NRe > 10.000, angka daya tidak bergantung pada
angka Reynolds, dan viskositas tidak merupakan faktor. Dalam daerah ini aliran
sudah turbulen penuh, maka perhitungan dengan pengadukan menggunakan rumus:
5
K T .n 3 .D a
gc
0,00011
= 0,00014 hp
0,8
Bentuk
Bahan konstruksi
Jenis sambungan
Jumlah
: 1 unit
Kondisi operasi :
Temperatur
= 30C
Tekanan
= 1 atm
= 1398,1007 kg/jam
Densitas air
= 995,5 kg/m3
(Perry, 2007)
= 20
Perhitungan:
a. Volume tangki
Volume air, Va
b. Diameter tangki
Direncanakan perbandingan diameter dengan tinggi silinder, D : H =2 : 3
1 2
D H
4
1
3
40,4473 m3 D 2 D
4
2
3
40,4473 m3 D3
8
V
Maka, D = 3,2501 m
H = 4,8752 m
Tinggi air dalam tangki =
33,7061 x 4,8752
= 4,0627 m
44,4473
c. Tebal tangki
Tekanan hidrostatik
P = xgxl
= 995,68 kg/m3 x 9,8 m/det2 x 4,0627 m
= 39,6351 kPa
Tekanan operasi = 1 atm = 101,325 kPa
P = 39,6351 kPa + 101,325 kPa = 140,960 kPa
Faktor kelonggaran = 20 %
Maka, Pdesign = (1,2) (140,960 kPa) = 169,152 kPa
Joint efficiency = 0,8
Allowable stress = 12,650 psia = 87.218,714 kP
PD
2SE 1,2P
(169,152 kPa) (127,958 m)
LAMPIRAN E
PERHITUNGAN ASPEK EKONOMI
Dalam rencana pra rancangan pabrik pembuatan Silikon Karbida digunakan
asumsi sebagai berikut :
Pabrik beroperasi selama 330 hari dalam setahun
Kapasitas maksimum adalah 20.000 ton/tahun
Perhitungan didasarkan pada harga peralatan tiba di pabrik atau purchased-equipment
delivered (Peters, 2004)
Harga alat disesuaikan dengan basis 30 Maret 2012, dimana nilai tukar dollar
terhadap rupiah adalah US$ 1 = Rp 9.175,00.
(Anonim, 2012c)
E.1
= 10.000 m2
Nama Bangunan
Pos Jaga
Luas
Harga /per m2
Jumlah
(m2)
( Rp)
(Rp)
50
1.250.000
62.500.000
Tempat Parkir
300
500.000
150.000.000
Poliklinik
100
1.250.000
125.000.000
Kantin
100
500.000
50.000.000
Tempat Ibadah
150
1.250.000
187.500.000
Perkantoran
250
1.250.000
312.500.000
100
1.250.000
125.000.000
Bengkel
100
1.250.000
125.000.000
Gudang Peralatan
150
1.250.000
187.500.000
10
Laboratorium
200
1.250.000
250.000.000
11
Ruang Kontrol
180
1.250.000
225.000.000
12
Area Perluasan
1000
200.000
200.000.000
13
Area Proses
2500
3.500.000
8.750.000.000
14
2420
1.250.000
3.025.000.000
16
Area Produk
200
1.250.000
250.000.000
17
200
5.000.000
1.000.000.000
19
700
750.000
525.000.000
20
Perumahan Karyawan
500
1.250.000
625.000.000
21
Pengolahan Air
750
3.500.000
2.625.000.000
22
Perpustakaan
50
1.250.000
62.500.000
Total
10000 m2
Rp 18.862.500.000
X
Cx Cy 2
X1
Ix
I y
dimana: Cx
Cy
X1
X2
Ix
Iy
Untuk menentukan indeks harga pada tahun 2012 digunakan metode regresi
koefisien korelasi :
n X i Yi X i Yi
n X i 2 X i 2 n Yi 2 Yi 2
(Montgomery, 1992)
Tahun (Xi)
2001
2002
2003
2004
2005
2006
2007
2008
16036
Indeks (Yi)
1093,9
1104,2
1123,6
1178,5
1244,5
1302,3
1373,3
1449,3
9869,6
Xi.Yi
2188893,9
2210608,4
2250570,8
2361714
2495222,5
2612413,8
2756213,1
2910194,4
19785830,9
Xi
4004001
4008004
4012009
4016016
4020025
4024036
4028049
4032064
32144204
Yi
1196617,21
1219257,64
1262476,96
1388862,25
1548780,25
1695985,29
1885952,89
2100470,49
12298403
=8
Xi
= 16036
Yi = 9869,6
Yi = 12298403
= variabel tahun ke n
n X i Yi X i Yi
n X i 2 X i 2
(Montgomery, 1992)
Maka :
b
106
Capacity, gal
104
10
105
10
105
10
Carbon steel
310 kPa (30 psig) Carbon-steel tank (spherical)
103
10-1
P-82
Jan,2002
10
10
103
Capacity, m3
Gambar LE.2
Indeks harga tahun 2012 (Ix) adalah 1629,7178. Maka estimasi harga tangki untuk
(X2) 224,3860 m3 adalah :
224,3860
1
= Rp 1.828.316.696,-/unit
Cx = US$ 9500
Cx
0 , 49
Rp. 9.175
1629,7178
x
1 US$
1102,5
Kode
Unit
Ket*)
TT-104
1.828.316.696
1.828.316.696
C-101
678.125.231
678.125.231
C-102
447.395.803
447.395.803
C-103
329.293.119
329.293.119
C-104
447.395.803
447.395.803
C-105
447.395.803
447.395.803
C-106
447.395.803
447.395.803
S-101
1.416.555.036
1.416.555.036
SR-101
566.622.015
566.622.015
10
SR-102
436.138.589
436.138.589
11
C-107
308.353.694
925.061.082
12
C-108
164.513.652
493.540.957
13
C-109
81.375.028
244.125.083
14
M-101
539.952.471
1.079.904.942
15
L-102
156.759.861
156.759.861
16
C-110
39.953.316
39.953.316
17
JC-101
4.276.719.004
17.106.876.014
18
B-102
255.907.112
255.907.112
19
JC-102
7.286.030.455
7.286.030.455
20
B-103
138.198.471
276.396.942
21
C-111
329.293.119
329.293.119
22
C-112
329.293.119
329.293.119
SR-103
219.264.300
219.264.300
24
C-113
217.252.438
217.252.438
25
C-114
164.513.652
164.513.652
26
TT-106
1.765.523.378
1.765.523.378
27
C-115
678.125.231
678.125.231
28
JC-103
9.136.085.076
36.544.340.304
29
JC-104
10.985.395.843
10.985.395.843
30
T-201
4.024.429.095
4.024.429.095
31
E-201
1.641.462.246
1.641.462.246
32
T-202
1.831.065.562
1.831.065.562
33
P-101
NI
20.343.757
20.343.757
34
TT-05 SiO2
NI
2.089.559.027
2.089.559.027
35
TT-05 coke
NI
2.185.162.700
4.370.325.401
36
TT-05 FePO4
NI
278.240.757
278.240.757
Total
100.397.616.896
Impor (I)
93.639.147.954
6.758.468.941
Kode
Unit
Ket*)
SC
NI
CL
SF
139.377.542
139.377.542
4.351.602.917
4.351.602.917
279.958.976
279.958.976
TU-I
1.271.751.302
1.271.751.302
DE
1.707.823.285
1.707.823.285
CE
37.684.397
37.684.397
AE
37.684.397
37.684.397
TP-01
146.666.931
146.666.931
TP-02
109.874.394
109.874.394
10
TP-03
142.014.251
142.014.251
11
TP-04
136.373.850
136.373.850
12
TP-05
26.201.392
26.201.392
13
M-01
828.301.058
828.301.058
13
TU-2
789.658.614
789.658.614
14
PU-01
NI
29.547.191
29.547.191
15
PU-02
NI
29.547.191
29.547.191
16
PU-03
NI
2.168.383
2.168.383
17
PU-04
NI
3.812.234
3.812.234
18
PU-05
NI
29.547.191
29.547.191
19
PU-06
NI
29.547.191
29.547.191
20
PU-07
NI
12.345.743
12.345.743
21
PU-08
NI
25.727.303
25.727.303
22
PU-09
NI
2.511.391
2.511.391
23
PU-10
NI
2.270.638
2.270.638
24
PU-11
NI
25.727.303
25.727.303
25
PU-12
NI
25.727.303
25.727.303
26
PU-13
NI
2.211.517
2.211.517
27
PU-14
NI
14.911.640
14.911.640
28
PU-15
NI
25.992.960
25.992.960
29
Generator
NI
106.800.000
427.200.000
Total
9.796.331.039
Impor (I)
9.133.996.994
662.334.046
*)
Untuk harga alat impor sampai di lokasi pabrik ditambahkan biaya sebagai
berikut:
-
Biaya transportasi
= 5
Biaya asuransi
= 1
Bea masuk
= 15
PPn
= 10
PPh
= 10
= 0,5
Transportasi lokal
= 0,5
= 0,5
= 43
Total
Untuk harga alat non impor sampai di lokasi pabrik ditambahkan biaya
sebagai berikut:
-
PPn
= 10
PPh
= 10
Transportasi lokal
= 0,5
= 0,5
= 21
Total
Maka, total harga peralatan adalah:
Harga impor
= Rp
8.797.171.615,-
E.1.1.9
Jenis Kendaraan
Unit
Tipe
Direktur
Fortuner
Manajer
Bus karyawan
Mobil karyawan
5
6
7
Harga/ Unit
Harga Total
(Rp)
(Rp)
400.000.000
400.000.000
220.000.000
880.000.000
Bus
300.000.000
700.000.000
Minibus L-300
150.000.000
300.000.000
Truk
Truk
250.000.000
1.200.000.000
Mobil pemasaran
L-300
120.000.000
480.000.000
Truk tangki
350.000.000
700.000.000
Mobil pemadam
kebakaran
Kijang Innova
Total
4.660.000.000
Total MITL = A + B + C + D + E + F + G + H + I + J
= Rp 448.773.376.002,-
= MITL + MITTL
= Rp 448.773.376.002,- + Rp 151.266.425.823,= Rp 600.039.801.824,-
Pasir Silika
Kebutuhan
= 3.225,6404 kg/jam
Harga
= Rp 900,- kg-1
Harga total
(PT.Purewatercare)
= Rp 6.270.644.938,-
2.
Coke
Kebutuhan
= 2.055,2753 kg/jam
Harga
Harga total
(PT. Pertamina)
3.
= 57,0910 kg/jam
Harga
= Rp 9.175,- kg-1
Harga total
= Rp 1.131.429.052,-
4.
= 371,0914 kg/jam
Harga
= Rp. 2.293,75,-
Harga total
(anonim, 2012d)
= Rp 1.838.572.210,-
Alum [Al2(SO4)3]
Kebutuhan
= 0,5552 kg/jam
Harga
= Rp 4.500,- kg-1
Harga total
(anonim, 2012e)
= Rp 5.396.930,-
2.
= 0,2998 kg/jam
Harga
= Rp 6.000,- kg-1
Harga total
= Rp3.885.790,-
3.
Kaporit
Kebutuhan
= 0,004 kg/jam
Harga
= Rp 17.000,- kg-1
Harga total
= Rp 146.680,-
4.
= 0,0654 kg/jam
Harga
= Rp 4.000,- kg-1
Harga total
5.
= 0,0487 kg/jam
Harga
= Rp 10.000,- kg-1
Harga total
(PT.Bratachem)
= Rp 1.051.524,-
6.
Gas Alam
Kebutuhan = 18,805 mmbtu/jam
Harga
= US$ 5,5,-/mmbtu
E.2.3 Kas
E.2.3.1 Gaji Pegawai
Tabel E.6 Perincian Gaji Pegawai
Jabatan
Jumlah
Gaji/bulan
Jumlah gaji/bulan
(Rp)
(Rp)
Dewan Komisaris
15.000.000
45.000.000
Staff Ahli
20.000.000
60.000.000
Direktur
25.000.000
25.000.000
Sekretaris
4.000000
8.000.000
Manajer Produksi
12.000.000
12.000.000
Manajer Teknik
12.000.000
12.000.000
12.000.000
12.000.000
12.000.000
12.000.000
10.000.000
10.000.000
8.000.000
8.000.000
8.000.000
8.000.000
8.000.000
8.000.000
8.000.000
8.000.000
8.000.000
8.000.000
10.000.000
10.000.000
6.000.000
6.000.000
6.000.000
6.000.000
6.000.000
6.000.000
4.500.000
4.500.000
6.000.000
6.000.000
8.000.000
8.000.000
5.000.000
5.000.000
4.000.000
96.000.000
3.000.000
240.000.000
3.000.000
36.000.000
Karyawan Proses
Karyawan Laboratorium, R&D
Karyawan Utilitas
24
8
12
12
3.000.000
36.000.000
3.000.000
24.000.000
3.000.000
24.000.000
3.000.000
12.000.000
2.500.000
10.000.000
2.500.000
7.500.000
3.000.000
9.000.000
Karyawan Pembelian
3.000.000
18.000.000
10
3.000.000
30.000.000
Petugas Keamanan
12
2.000.000
24.000.000
2.000.000
12.000.000
Dokter
4.000.000
8.000.000
Perawat
2.000.000
6.000.000
Petugas Kebersihan
1.000.000
8.000.000
Supir
10
1.500.000
15.000.000
Total
170
687.000.000
Total gaji pegawai selama 1 (satu) bulan = Rp 687.000.000,Total gaji pegawai selama 3 (tiga) bulan = Rp 2.061.000.000,-
Jenis Biaya
Gaji Pegawai
Administrasi Umum
Pemasaran
Total
PD
IP
HPT
12
dimana:
PD
= piutang dagang
IP
HPT
Penjualan :
1. Harga jual Silikon Karbida = Rp 31.000,-/kg
(anonim, 2012f)
Produksi Silikon Karbida
= 2.525,2525 kg/jam
E.3
E.3.1
menagih,
dan
memelihara
penghasilan
melalui
penyusutan
(Rusdji,2004). Pada perancangan pabrik ini, dipakai metode garis lurus atau straight
line method. Dasar penyusutan menggunakan masa manfaat dan tarif penyusutan
sesuai dengan Undang-undang Republik Indonesia
Tabel E.9 Aturan depresiasi sesuai UU Republik Indonesia No. 17 Tahun 2000
M
T
Kelompok Harta
asa
Berwujud
arif
(t
ahun)
(
%)
I. Bukan Bangunan
1.Kelompok 1
2. Kelompok 2
2
5
6
,25
Permanen
2,5
II. Bangunan
1
3. Kelompok 3
dimana: D
= Harga peralatan
= Tarif penyusutan
Tabel E.10 Perhitungan Biaya Depresiasi sesuai UURI No. 17 Tahun 2000
Umur
Komponen
Biaya (Rp)
Depresiasi (Rp)
(tahun)
Bangunan
18.862.500.000
20
943.125.000
Peralatan proses dan utilitas
216.763.228.756
17
13.547.701.797
Instrumentrasi dan pengendalian proses
40.545.639.911
5
5.068.204.989
Perpipaan
93.566.861.334
5
11.695.857.667
Instalasi listrik
31.188.953.778
5
3.898.619.222
Insulasi
31.188.953.778
5
3.898.619.222
Inventaris kantor
4.678.343.067
4
1.169.585.767
Perlengkapan keamanan dan kebakaran
3.118.895.378
5
389.861.922
Sarana transportasi
4.660.000.000
10
582.500.000
Rp 41.194.075.586,TOTAL
Semua modal investasi tetap langsung (MITL) kecuali tanah mengalami
penyusutan yang disebut depresiasi, sedangkan modal investasi tetap tidak langsung
(MITTL) juga mengalami penyusutan yang disebut amortisasi.
Pengeluaran untuk memperoleh harta tak berwujud dan pengeluaran lainnya
yang mempunyai masa manfaat lebih dari 1 (satu) tahun untuk mendapatkan,
menagih, dan memelihara penghasilan dapat dihitung dengan amortisasi dengan
menerapkan taat azas (UURI Pasal 11 ayat 1 No. Tahun 2000). Para Wajib Pajak
menggunakan tarif amortisasi untuk harta tidak berwujud dengan menggunakan masa
manfaat kelompok masa 4 (empat) tahun sesuai pendekatan prakiraan harta tak
berwujud yang dimaksud (Rusdji, 2004).
Untuk masa 4 tahun, maka biaya amortisasi adalah 25 dari MITTL. sehingga :
Biaya amortisasi
2. Perawatan bangunan
Diperkirakan 10 dari harga bangunan (Timmerhaus et al, 2004).
= 0,1 Rp 18.862.500.000,-
Perawatan bangunan
Perawatan kenderaan
Perawatan instrumen
Perawatan perpipaan
7. Perawatan insulasi
Diperkirakan 10 dari harga insulasi (Timmerhaus et al, 2004).
Perawatan insulasi
= Rp 1.648.800.000,-
= Rp 2.473.200.000,-
Biaya Asuransi
1. Biaya asuransi pabrik. adalah 3,1 permil dari modal investasi tetap
langsung (Asosiasi Asuransi Jiwa Indonesia-AAJI, 2009).
= 0,0031 Rp 600.039.801.824,= Rp 1.391.197.466,2. Biaya asuransi karyawan.
Biaya asuransi pabrik adalah 4,24% dari gaji (PT. Jamsostek, 2007).
Maka biaya asuransi karyawan
= Rp 1.740.743.066,-
Yang menjadi objek pajak adalah perolehan hak atas tanah dan atas bangunan
(Pasal 2 ayat 1 UU No.20/00).
Dasar pengenaan pajak adalah Nilai Perolehan Objek Pajak (Pasal 6 ayat 1 UU
No.20/00).
Nilai Perolehan Objek Pajak Tidak Kena Pajak ditetapkan sebesar Rp.
30.000.000,- (Pasal 7 ayat 1 UU No.21/97).
Besarnya pajak yang terutang dihitung dengan cara mengalikkan tarif pajak
dengan Nilai Perolehan Objek Kena Pajak (Pasal 8 ayat 2 UU No.21/97).
Rp
4.000.000.000
- Bangunan
Rp 18.625.000.000
Total NJOP
Rp
(Rp.
Rp
22.655.000.000,-
Rp
1.132.000.000,-
22.625.000.000,30.000.000,- )
= P + Q + R + S + T + U +V + W + X + Y +Z
= Rp 305.408.267.894,-
E.3.2
Biaya Variabel
E.3.2.1 Biaya Variabel Bahan Baku Proses dan Utilitas per tahun
Biaya persediaan bahan baku proses dan utilitas selama 90 hari adalah
Rp 12.930.676.254,Biaya persediaan bahan baku proses dan utilitas selama setahun adalah
= 12/3 x Rp 12.930.676.254,- = Rp. 51.722.705.016,Biaya Variabel Tambahan
= Rp 5.689.497.552,-
= Rp 57.696.677.445,-
E.4
E.4.1
Pajak Penghasilan
Berdasarkan UURI Nomor 36 Pasal 17 ayat 1b Tahun 2008, Tentang
Perubahan Keempat atas Undang-Undang Nomor 7 Tahun 1983 Tentang
Pajak Penghasilan (http://www.dpr.go.id/undang2/uu08/uu08-36, 2011),
wajib Pajak badan dalam negeri dan bentuk usaha tetap adalah sebesar 28%.
Undang-undang ini mulai berlaku terhitung tanggal 1 Januari 2009.
Maka pajak penghasilan yang harus dibayar adalah:
28 Rp 255.610.573.218,- = Rp 71.570.960.501,Laba setelah pajak
Laba setelah pajak
E.5
PM =
PM =
255.610.573.218
x 100 %
619.999.993.800
= 41,23 %
E.5.2
Biaya Tetap
100
Total Penjualan Biaya Variabel
BEP =
305.408.267.894
x 100 %
619.999.993.800 57.696.677.445
= 54,31 %
Kapasitas produksi pada titik BEP
E.5.3
ROI
184.039.612.717
x 100 %
832.949.969.624
= 22,09 %
1
x 1 tahun
0,2209
POT
POT
= 4,53 tahun
RON =
184.039.612.717
x 100 %
499.769.981.775
RON = 36,82 %
E.5.7
Thn
Laba sebelum
pajak (Rp)
Pajak (Rp)
0
1
2
3
4
5
6
7
8
9
10
255.610.573.218
281.171.630.540
309.288.793.594
340.217.672.954
374.239.440.249
411.663.384.274
452.829.722.701
498.112.694.971
547.923.964.468
602.716.360.915
71.570.960.501
78.728.056.551
86.600.862.206
95.260.948.427
104.787.043.270
115.265.747.597
126.792.322.356
139.471.554.592
153.418.710.051
168.760.581.056
IRR
= 34 % +
Laba Sesudah
pajak (Rp)
184.039.612.717
202.443.573.989
222.687.931.388
244.956.724.527
269.452.396.979
296.397.636.677
326.037.400.345
358.641.140.379
394.505.254.417
433.955.779.859
Penyusutan
(Rp)
P/F
pada i
= 34%
79.010.682.042
79.010.682.042
79.010.682.042
79.010.682.042
40.024.489.820
15.073.326.797
15.073.326.797
15.073.326.797
15.073.326.797
15.073.326.797
-832.949.969.624
263.050.294.759
281.454.256.031
301.698.613.430
323.967.406.569
309.476.886.799
311.470.963.474
341.110.727.142
373.714.467.177
409.578.581.215
449.029.106.656
1
0,7463
0,5569
0,4156
0,3102
0,2315
0,1727
0,1289
0,0962
0,0718
0,0536
PV pada i = 34%
-832.949.969.624
196.306.190.119
156.746.634.011
125.388.849.954
100.480.578.279
71.631.530.014
53.800.805.272
43.970.538.929
35.950.217.614
29.403.163.034
24.056.171.420
4.784.709.021
P/F
pada i
= 35%
1
0,7407
0,5487
0,4064
0,3011
0,2230
0,1652
0,1224
0,0906
0,0671
0,0497
PV pada i = 35%
-832.949.969.624
194.852.070.192
154.433.062.294
122.623.020.243
97.536.292.930
69.017.524.314
51.453.503.953
41.740.629.811
33.874.255.784
27.500.039.701
22.332.472.532
-17.587.097.869
Rp 4.784.709.021, (35 % - 34 %)
Rp 4.784.709.021,- (Rp - 17.587.097.869 ,-)
= 34,21%
700,000,000,000
biaya tetap
biaya variabel
biaya produksi
500,000,000,000
total penjualan
400,000,000,000
300,000,000,000
Hasil
Penjualan
(Rp)
600,000,000,000
200,000,000,000
100,000,000,000
0
0
10
20
30
40
50
60
70
80
90
100
Gambar E.4 Kurva Break Even Point Pabrik Pembuatan Silikon Karbida
Biaya tetap
305.408.267.894
305.408.267.894
305.408.267.894
305.408.267.894
305.408.267.894
305.408.267.894
305.408.267.894
305.408.267.894
305.408.267.894
305.408.267.894
305.408.267.894
Biaya variabel
0
5.769.667.745
11.539.335.489
17.309.003.234
23.078.670.978
28.848.338.723
34.618.006.467
40.387.674.212
46.157.341.956
51.927.009.701
57.696.677.445
Penjualan
0
61.999.999.380
123.999.998.760
185.999.998.140
247.999.997.520
309.999.996.900
371.999.996.280
433.999.995.660
495.999.995.040
557.999.994.420
619.999.993.800
Gambar E.4 Kurva Break Even Point Pabrik Pembuatan Silikon Karbida
FC
T-101
1
C-101
FC
FC
C-102
T-102
C-104
S-101
TT-105
C-108
FC
SR-101
C-103
Generator
FC
JJ-202
28
C-106
T-103
FC
SR-102
C-105
TC
C-109
C-107
25
PC
FC
M-102
LI
T-104
24
JC-102
PC
E - 201
Generator
FC
JJ-201
23
JC-103
L-101
FC
17
Dibuang ke Udara
27
FC
22
PC
16
Udara
JC-104
P-101
14
LC
M-101
TC
FC
B-102
B-102
18
15
B-103
8
Air
C -110
FC
19
C-111
A-101
A-101
20
C-112
C-114
SR-103
TC
L-102
L-102
LC
13
B-102
TT-106
FC
Keterangan:
A-101
: Cooling Yard
B-101
: Burner
B-102
: Rotary Kiln Pre-heater
B-103
: Electric Furnace
C-101
: Belt Conveyor
C-101
: Belt Conveyor
C-102
: Belt Conveyor
C-103
: Belt Conveyor
C-104
: Belt Conveyor
C-105
: Belt Conveyor
C-105
: Belt Conveyor
C-106
: Belt Conveyor
C-107
: Belt Conveyor Feeder
C-108
: Bucket Elevator
C-109
:Screw Conveyor
C-110
: Bucket Elevator
C-111
: Belt Conveyor
C-112
: Belt Conveyor
C-113
: Belt Conveyor
C-114
: Bucket Elevator
C-115
: Belt Conveyor
C-116
: Belt Conveyor
E-201
: Steam Boiler
JC-101
: Compressor
JC-102
: Compressor
JC-103
: Compressor
JC-104
: Compressor
JJ-201
: Gas Turbine
JJ-202
: Steam Turbine
L-101
: Weigh Scale
L-102
: Pelletizing Machine
L-103
: Packaging Machine
M-101
: Mixer
M-102
: Mixing Point
P-101
: Pompa
S-101
: Screen
SR-101 : Grinder
SR-102 : Grinder
SR-103 : Crusher
TT-101 : Gudang FePO4
TT-102 : Gudang Pasir Silika
TT-103 : Gudang Karbon
TT-104 : Tangki Natrium Silikat
TT-105 : Storage Bins
TT-106 : SiC Silo
TT-107 : Gudang Penyimpanan Produk
C-113
FC
FC
Gas Alam
L-103
10
C-115
26
PC
FC
21
TT-107
C-116
Udara
12
11
JC-101