30 DEC 2015

To:
Managing Director
Eralab Sdn Bhd
Attention: Pn Noraini Shair

APEXS SYNERGY RESOURCES


member of apexsgroup
unit a12b-1, jalan selaman 1/1, dataran palma, 68000 ampang, selangor, malaysia, t: +603.4278.4779 , e: ceo@apexs.my , w: www.apexs.my

QUOTATION

Dear Sir,

SUBJECT: OFFICE RENOVATION, MOVERS AND SUPPLY/INSTALL STANDARD


WORKBENCH FOR LAB USE :: Q1221-321 (REV.0)
We are pleased to submit our price quotation, scope of work and commercial & business
terms as below:

These pricing is worked based on the limited information we received from the client and might
be adjusted it incorporate whatever items or works need to be done to complete the final lab
equipment / interior decoration or environment.

All other variation order shall be charged accordingly, if any.

All payments are in Ringgit Malaysia and must be made payable to our designated company
for this purpose. i.e. APEXS SYNERGY RESOURCES

All payment(s) made / received are not refundable due to any reason or whatsoever.

This Quotation is valid for 14 working days from the date stipulated herein.

PART A: SCHEDULE OF PRICE


SCOPE

DESCRIPTION

A1

Removal of existing partitions /


workbench and wall cabinet
INCLUDING electrical appliances
and cables dismantling

A2

OPTIONAL MOVER:
All of the above items to a new
location

QUANTITI
1 lot at 1 location

PRICE (RM)
3,500

Depending on
location
Each 5KM = RM1800

A3

Relocation of Office File Racks,


tables and others from Middle
Office location to front location

1 Lot

800

A4

Supply Of Workbench For U


Shape See Appendix A
(Sketches)

1 Lot

21,725

Default top Surface :: Mica


surface table
Alloy steel / aluminum leg

Normal wooden cabinet with


small partitions for sample
holder

A5

Installation of the above

A6

OPTIONAL:

1 Lot

2,800

Per Sqft.: USD 37.00

Anti-corrosive / Anti acid surface


3M Film installation and supply
A7

Supply & Install of extension of


workbench G Floor

1 Lot

5,500

Default top surface :: Mica


surface table
Alloy steel / aluminum leg
Normal wooden cabinet with
small partitions for sample
holder
A8

Glass door supply, replacement


and installation

1 Lot

920

A9

3 X 3 GANG Electric plug socket


supply and install

1 Lot

280

GRAND TOTAL
Goodwill onetime discount

35,525
6%

FINAL OFFER PRICE

(2,132)

RM 33,393.00

PART B: SCHEDULE OF PAYMENT / PAYMENT TERMS


SCOPE

DESCRIPTION

PERCENTUM

VALUE (RM)

B1

Upon Purchase Order : prior to start


work

50%

16,696.50

B2

Upon Completion of Installation and


Delivery of EACH Item in Schedule A

45%

15,026.85

B3

Upon Satisfaction and Approval of the


overall Project and Handing Over
meeting / session (Retention)

5%

1,669,65

We shall mobilize only after we receive FULL payment of the first milestone before 6th of
April 2016 for all of the above or else, you are NOT entitled for the Goodwill discount.
Regards,

f
M Shahzar M Idris, CEO
Apex Symphony Sdn Bhd

APPENDIX A :: Sketches For Reviewing Purpose Only

The full drawings shall be produce upon PO.