Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

INDEX
01 BUILDING STRUCTURE
02 LOADS
03 FINITE ELEMENT 3D MODELS
04 HORIZONTAL ELEMENTS - SLAB & BEAM
05 DESIGN OF COLUMNS
06 DESIGN OF SHEAR WALLS
07 DESIGN OF FOUNDATION
08.

DESIGN OF PARRAPET WALL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

1.0 THE BUILDING STRUCTURE


The proposed structure is a Mosque with imam block and prayer room. The structure is having a dome on
the roof of the main prayer room and a minnar structure on the side. The height of mosque till the top of
the dome is 17.65m from ground floor .Height of the minnar is 26.7m. plan dimension of the building is
approx. 38mx28m.

1.2 DESCRIPTION OF STRUCTURAL SYSTEM


1.2.1

Foundation

The soil investigation report prepared by M/s Technical Laboratory for soil & building material testing
recommends isolated footing for the structure. 150kN/m2 net allowable bearing capacity is recommended
for the isolated footing as per the soil investigation report.
Foundation types is isolated and/or combined footing.
1.2.2

Stability

Lateral stability will be provided in two directions by the main reinforced concrete shear walls. For the
seismic loads the structure will be designed for zone 2B as per UBC 97 and wind load is based on ASCE
7-02.
1.2.3

Design Life

The structure will be designed to perform its intended function satisfactorily at least for a period of 50
years.
1.2.4

Fire Resistance

The structural elements will be designed and detailed to withstand exposure to fire for a period of 2 hours.
1.3 STANDARDS AND CODES
All structural elements are designed in accordance with the applicable requirements and
recommendations of the reference codes and standards, to meet or exceed the specified performance. The
requirements and recommendations of the reference codes and standards are regarded as minimum
criteria and the values specified within this document, where these prove more onerous, are being utilized
for design.
Reference Codes & Standards (latest editions and amendments)
ACI 318-08

Building code requirements for structural concrete

BS8110-p1

Structural Use of concrete- Code of Practice

ASCE 7-05

Minimum Design Loads for Buildings and other Structures

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Uniform Building Code


UBC 1997 Chapter 16

Structural Design Requirements Earthquake Loads

BS 8002

Earth retaining structures

BS 8004

Foundations

BS 8007

Design of concrete structures for retaining aqueous liquids

BS 8102

Protection of structures against water from the ground

BS 8110-1997

Structural use of concrete - all parts

BS 5950

Structural use of steel work in building - all parts

BS 5628

Use of masonry

BS 6399 Parts I and II

Code of Practice for Dead and Imposed Load

BS 4449

Reinforcement of Concrete

CIRIA Report 91

Early-Age Thermal Crack Control in Concrete.

Statutory Requirements
Design requirements of JAFZA/Dubai Municipality
1.4 MATERIALS
1.4.1 Structural Steel
Structural steel is to conform to BS EN 10025: Hot rolled products of on-alloy structural steels and BS
5950: Structural use of steel work. The following design strengths are to be used for steel supplied to BS
4360.
All structural steelwork will generally be designed assuming Grade 43 steel.
BS 43/50
Grade

Thickness Less Than or Equal


To (mm)

43

16
40
63
100
16
40
63
100

50

Sections, Plates & Hollow


Sections (py N/mm2)
275
265
255
245
355
345
340
325

1.4.2 Reinforcement
Reinforcing bars are to be in accordance with BS 4449. Specification for carbon steel bars for the
reinforcement of concrete and welded wire fabric is to be in accordance with BS 4483: Specification of
Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

steel fabric for the reinforcement of concrete. The following design strengths are to be used for the
design of reinforcement:
Mild Steel

High Yield Strength Steel

250 N/mm2

460 N/mm2

Reinforcement will be detailed as appropriate to ensure ductility for the seismic load condition. As per
ACI 318-08 provisions (section 3.5), the reinforcement yield value of fy = 420 N/mm2 shall be used in the
analysis and design. Post tensioning strands should comply with the BS 5896.

1.4.3 Concrete
Concrete is to conform to BS 8110: Structural use of concrete. Unless noted otherwise concrete is to be
normal-weight, with a typical dry density of 2500 kg/m 3. Concrete is to achieve the following 28-day
cube strength.
Superstructure slabs and beams

45 MPa

Columns & walls

45 MPa

Foundation elements

45 Mpa

Blinding concrete, protection screed etc.

20 MPa

Youngs modulus calculated as per ACI 318-05 shall be used in the analysis.

Concrete Cube Strength


45

Concrete Cylinder Strength Youngs modulus (N/mm2)


(0.8 times cube strength)
38

calculated, Ec = 4700fc
29067

1.4.4 Durability Requirements


Concrete elements durability requirements are as follows:
Durability
Parameter
Rapid chloride
permeability
Water permeability
Initial surface
absorption
30 Min Water
absorption
Cover

For concrete enclosed or in


contact with soil

For internal concrete

Reference

1000 coulombs in 28 days

3000 coulombs in 28 days

AASHTO

8 mm in 28 days

15 mm in 28 days

DIN 1048

0.15 %

0.22 %

BS 1881

1.5%

2.0 %

BS 1882

Element/ location

Environment

Min. clear cover (including links)

Basement walls, raft,


buried slabs

Most severe

50mm (Earth face) / 40mm (internal face)

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

External concrete
above ground

Mild / severe

40mm

Slabs

Mild / Severe

30mm

Beams

Mild

30mm

Columns and Walls

Mild

40mm

Watertight concrete is designed, detailed and constructed in accordance with BS 8007. Suitable
plasticizers or pore-blocking admixtures are specified as appropriate locations.
1.4.5 Masonry
All internal partitions are proposed with lightweight blocks of density not greater than 850 kg / m 3 to
reduce the dead loads on the structure. Internal partitions within the office area are proposed with stud
walls for which loading do not exceed 1.5kN/m2. Masonry is to conform to BS 5628- Use of Masonry. It
is assumed that all masonry will be laid in a Class II mortar.
Concrete blocks used elsewhere will have the following compressive strengths:
AAC Blocks

3.2 MPa

Solid concrete blocks

9.0 MPa

Hollow concrete blocks

7.0 Mpa

Lightweight concrete blocks

5.0 Mpa

The type of blocks shall comply with Dubai Municipality's requirements.

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

2.0 LOADS
2.1 Dead Load Design Allowance
Dead loads are calculated in accordance with BS 6399. The following dead load allowances are assumed
where appropriate:
Material

Density (kN/ m3)

Reinforced concrete

25.0

Structural steel work

78.50

Masonry (Light weight blocks)

8.50

Plain concrete

24.00

Sand / Soil

23.00

Glass

27.00

Natural stone (granite)

27.50

2.1.1

Superimposed Dead Load Design Allowances

The superimposed Dead Loads for various floors are as given below:(a) Roof
Roof finish including water proofing

3.0

kN/m2

Services

0.25

kN/m2

Ceiling

0.15

kN/m2

Note:- Actual weights of Mechanical equipments to be considered in the design.


(b) Wall Line Loads
- Internal Partition Walls
Partition walls are of varying height due to the level deference in the roof slab.

A sample calculation is

given below. Partition load are applied according to the height of the wall, in the model.
Height of Floor

5.55

Slab Thickness

0.20

Net Height

4.85

Thickness of Block wall

200

mm

Plaster Thickness

20

mm

Density of Block

8.5

kN/m3

Density of Plaster

22

kN/m3

Arif & Bintoak Consulting Architects and Engineers, Dubai

(Lightweight Blocks)

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Thus for a 4.85 m high block wall having 200 mm thickness


UDL per metre run

8.7

kN/m, say 9.0 kN/m

- Parapet Walls
Parapet walls are of varying height due to the level deference in the roof slab.

A sample calculation is

given below. Partition load are applied according to the height of the wall, in the model.
Height of wall

2400

mm

Assume thickness

200

mm

Density of Concrete

25

kN/m3

UDL per meter run

12

kN/m

2.2 LIVE LOADS


Uniformity Distributed Load (kN/m2)

Specific use
Store

5.0 kN/m2

Lobby / Corridors / Stairs

3.0 kN/m2

Mechanical Areas
General

5.0 kN/m2

Chiller

5.0 kN/m2

Substation / LV room

5.0 kN/m2

Roof Accessible

2.0 kN/m2

Roof Non-accessible

1.5 kN/m2

Note:- Actual weights of Mechanical equipments to be considered in the design.


The superimposed dead loads and live loads for different mechanical equipments are summarized in the
following table.
EQUIPMENT
AHU
ECOLOGY
UNIT

2.3LOADS APPLIED ON THE MODEL


2.3.1 Line Loads
Arif & Bintoak Consulting Architects and Engineers, Dubai

LIVE
LOAD
kN/m2
5
5

SDL
kN/m2
6.50
4.3

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

As per the different wall thickness line loads are applied on the beams.

Loads On Plinth Beam

Loads On +4.5LvL Beam

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Loads On +5.5LvL Beam

Loads On +6.8m LvL Beam

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Loads On 8.55 m LvL Beam


2.3.1 Slab loads

Dead load on slab at +4.5 lvl

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Live load on slab at +4.5 lvl

Dead load on slab at +5.5 lvl

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Live load on slab at +5.5 lvl

Dead load on slab at +6.8 lvl

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Live load on slab at +6.8 lvl

Dead load on slab at +8.55 lvl

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Live load on slab at +8.55 lvl


2.4 SEISMIC LOADS
UBC - 1997 and ACI318-08 are used to determine seismic loading and combinations involving seismic
load for the design of structures.
Chapter 16 of UBC 97 defines appropriate methods for the determination and application of the primary
seismic loads and load combinations. In addition, the American Society of Civil Engineers Standard
ASCE 7 provides clarification and additional explanation of the seismic loadings to those set out in UBC
97.
Preliminary seismic design of the structure (using Auto UBC loading function of ETABS analysis
program) has been undertaken using the Equivalent Lateral Force Procedure as set out in UBC 97.
A conservative approach to the detailed system design requirements for the seismic zone 2 structures has
been adopted in that UBC 97 Clause 1633.1 has been applied to the loading combinations on the basis
that significant Plan irregularities are introduced at a later stage.
In accordance with UBC 97 Section 1629 Criteria Selection, the following are the nominated inputs for
the Seismic Loads.

Seismic Importance Factor, I

1.0

Seismic Zone

2B

Seismic Zone Factor, Z

0.20

Site assessed soil classification

Sc

Seismic coefficient Ca

0.24

Seismic coefficient Cv

0.32

Basic seismic force resisting system

Bearing wall system Ordinary Reinforced Concrete

shear walls (UBC 97 Table 16N Type 1.2.a)

Response Modification Factor, R

Arif & Bintoak Consulting Architects and Engineers, Dubai

4.5

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

2.5 LOAD COMBINATIONS


The various load combinations specified in the ACI code for ultimate limit state and serviceability limit
states are considered in the analysis and design. The load combinations for the seismic loads are as per
UBC. The seismic weight is taken as DL + 25% LL(none Reducible) for evaluating the seismic base
shear. Wind Load is estimated according to the ASCE 7 - 05.
Calculation for E (UBC97)
E = Eh + Ev
= 1 for zone 2B
Seismic zone factor, Z = 0.20 (Table 16-I)
Ca = 0.24 (Soil Profile = Sc) (Table 16-Q)
Cv = 0.32 (Soil Profile = Sc) (Table 16-R)
I=1
(Table 16-k)
Ev = 0.5CaID = 0.5 x 0.24 x 1 x D = 0.12D
Em = Eh = 2.8Eh
SELF = Self weight
DL = Super imposed dead load
L = Live load < 4.8kN/m2 , except garages & areas occupied by public
Ls = Non reducible Live load > 4.8kN/m2 , for garages, areas occupied by public etc
Lr = Roof Live load
T = Temperature
Ex = Seismic load in X direction without eccentricity
Ey = Seismic load in Y direction without eccentricity
Ex1 = Seismic load in X direction with plus eccentricity
Ey1 = Seismic load in Y direction with plus eccentricity
Ex2 = Seismic load in X direction with minus eccentricity
Ey2 = Seismic load in Y direction with minus eccentricity
Spec1 = Single spectrum with u1,u2 & uz
ETABS calculate the wind load as per Figure 6-9 ASCE 7- 05. Refer ETABS manual - Automated Lateral Loads
manual page 3-38.
Wind
Case (As per
Load
direction
Figure 6-9
e1
e2
Case
Angle
ASCE 7-05)
WX1-C1
0
1
0
0
WY1-C1
90
1
0
0
WX2-C2
0
2
0.15
0
WY2-C2
90
2
0.15
0
WX3-C2
0
2
-0.15
0
WY3-C2
90
2
-0.15
0
W4-C3
0
3
0
0
W5-C4
0
4
0.15
0.15
W6-C4
0
4
-0.15
-0.15
W7-C3
90
3
0
0
W8-C4
90
4
0.15
0.15
W9-C4
90
4
-0.15
-0.15
Ultimate Load Combination (ACI 318-08, ASCE 7-05)
UDL01 = 1.4 SELF + 1.4 DL -

(ACI 318-08 :- 9-1)

UDL02 = 1.2 SELF + 1.2 DL + 1.6 L + 1.6 Ls + 0.5 Lr Arif & Bintoak Consulting Architects and Engineers, Dubai

(ACI 318-08 :- 9-2)

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

UDL03 = 1.2 SELF + 1.2 DL + 0.5 L + 1.0 Ls + 1.6 Lr -

(ACI 318-08 :- 9-3)

UT01 = 1.2 SELF + 1.2 DL + 1.6 L + 1.6 Ls + 0.5 Lr + 1.2T


UT02 = 1.2 SELF + 1.2 DL + 1.6 L + 1.6 Ls + 0.5 Lr - 1.2T

(ACI 318-08 :- 9-2)


(ACI 318-08 :- 9-5)

(Ex , Ey Zero Ecc.)

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

UE = 1.2 SELF + 1.2 DL


UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL

+ 0.5 L + 1.0 Ls + 1.0 Ex


+ 0.5 L + 1.0 Ls - 1.0 Ex
+ 0.5 L + 1.0 Ls + 1.0 Ey
+ 0.5 L + 1.0 Ls - 1.0 Ey
+ 0.5 L + 1.0 Ls + 1.0 Ex + 0.3 Ey
+ 0.5 L + 1.0 Ls - 1.0 Ex - 0.3 Ey
+ 0.5 L + 1.0 Ls + 1.0 Ex - 0.3 Ey
+ 0.5 L + 1.0 Ls - 1.0 Ex + 0.3 Ey
+ 0.5 L + 1.0 Ls + 1.0 Ey + 0.3 Ex
+ 0.5 L + 1.0 Ls - 1.0 Ey - 0.3 Ex
+ 0.5 L + 1.0 Ls + 1.0 Ey - 0.3 Ex
+ 0.5 L + 1.0 Ls - 1.0 Ey + 0.3 Ex

13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

UE = 1.2 SELF + 1.2 DL


UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL

+
+
+
+
+
+
+
+
+
+
+
+

0.5 L + 1.0 Ls + 1.0 Ex1


0.5 L + 1.0 Ls - 1.0 Ex1
0.5 L + 1.0 Ls + 1.0 Ey1
0.5 L + 1.0 Ls - 1.0 Ey1
0.5 L + 1.0 Ls + 1.0 Ex1
0.5 L + 1.0 Ls - 1.0 Ex1
0.5 L + 1.0 Ls + 1.0 Ex1
0.5 L + 1.0 Ls - 1.0 Ex1
0.5 L + 1.0 Ls + 1.0 Ey1
0.5 L + 1.0 Ls - 1.0 Ey1
0.5 L + 1.0 Ls + 1.0 Ey1
0.5 L + 1.0 Ls - 1.0 Ey1

25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.

UE = 1.2 SELF + 1.2 DL


UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL
UE = 1.2 SELF + 1.2 DL

+
+
+
+
+
+
+
+
+
+
+
+

(ACI 318-08 :- 9-5) (Ex2 ,Ey2 Minus Ecc.)


0.5 L + 1.0 Ls + 1.0 Ex2
0.5 L + 1.0 Ls - 1.0 Ex2
0.5 L + 1.0 Ls + 1.0 Ey2
0.5 L + 1.0 Ls - 1.0 Ey2
0.5 L + 1.0 Ls + 1.0 Ex2 + 0.3 Ey2
0.5 L + 1.0 Ls - 1.0 Ex2 - 0.3 Ey2
0.5 L + 1.0 Ls + 1.0 Ex2 - 0.3 Ey2
0.5 L + 1.0 Ls - 1.0 Ex2 + 0.3 Ey2
0.5 L + 1.0 Ls + 1.0 Ey2 + 0.3 Ex2
0.5 L + 1.0 Ls - 1.0 Ey2 - 0.3 Ex2
0.5 L + 1.0 Ls + 1.0 Ey2 - 0.3 Ex2
0.5 L + 1.0 Ls - 1.0 Ey2 + 0.3 Ex2

37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.

UE = 1.32 SELF + 1.32 DL


UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL

(ACI 318-08 :- 9-5) (Ex1 ,Ey1 Plus Ecc.)

+ 0.3 Ey1
- 0.3 Ey1
- 0.3 Ey1
+ 0.3 Ey1
+ 0.3 Ex1
- 0.3 Ex1
- 0.3 Ex1
+ 0.3 Ex1

(ACI 318-08 :- 9-5) (Ex , Ey Zero Ecc.)


+
+
+
+
+
+
+
+
+
+
+
+

0.5 L + 1.0 Ls + 1.0 Ex


0.5 L + 1.0 Ls - 1.0 Ex
0.5 L + 1.0 Ls + 1.0 Ey
0.5 L + 1.0 Ls - 1.0 Ey
0.5 L + 1.0 Ls + 1.0 Ex + 0.3 Ey
0.5 L + 1.0 Ls - 1.0 Ex - 0.3 Ey
0.5 L + 1.0 Ls + 1.0 Ex - 0.3 Ey
0.5 L + 1.0 Ls - 1.0 Ex + 0.3 Ey
0.5 L + 1.0 Ls + 1.0 Ey + 0.3 Ex
0.5 L + 1.0 Ls - 1.0 Ey - 0.3 Ex
0.5 L + 1.0 Ls + 1.0 Ey - 0.3 Ex
0.5 L + 1.0 Ls - 1.0 Ey + 0.3 Ex
(ACI 318-08 :- 9-5)(Ex1 , Ey1 Plus Ecc.)

49. -

UE = 1.32 SELF + 1.32 DL + 0.5 L + 1.0 Ls + 1.0 Ex1

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.

UE = 1.32 SELF + 1.32 DL


UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL

+
+
+
+
+
+
+
+
+
+
+

0.5 L + 1.0 Ls - 1.0 Ex1


0.5 L + 1.0 Ls + 1.0 Ey1
0.5 L + 1.0 Ls - 1.0 Ey1
0.5 L + 1.0 Ls + 1.0 Ex1 + 0.3 Ey1
0.5 L + 1.0 Ls - 1.0 Ex1 - 0.3 Ey1
0.5 L + 1.0 Ls + 1.0 Ex1 - 0.3 Ey1
0.5 L + 1.0 Ls - 1.0 Ex1 + 0.3 Ey1
0.5 L + 1.0 Ls + 1.0 Ey1 + 0.3 Ex1
0.5 L + 1.0 Ls - 1.0 Ey1 - 0.3 Ex1
0.5 L + 1.0 Ls + 1.0 Ey1 - 0.3 Ex1
0.5 L + 1.0 Ls - 1.0 Ey1 + 0.3 Ex1

61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.

UE = 1.32 SELF + 1.32 DL


UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL
UE = 1.32 SELF + 1.32 DL

+
+
+
+
+
+
+
+
+
+
+
+

(ACI 318-08 :- 9-5)(Ex2 ,Ey2 Minus Ecc.)


0.5 L + 1.0 Ls + 1.0 Ex2
0.5 L + 1.0 Ls - 1.0 Ex2
0.5 L + 1.0 Ls + 1.0 Ey2
0.5 L + 1.0 Ls - 1.0 Ey2
0.5 L + 1.0 Ls + 1.0 Ex2 + 0.3 Ey2
0.5 L + 1.0 Ls - 1.0 Ex2 - 0.3 Ey2
0.5 L + 1.0 Ls + 1.0 Ex2 - 0.3 Ey2
0.5 L + 1.0 Ls - 1.0 Ex2 + 0.3 Ey2
0.5 L + 1.0 Ls + 1.0 Ey2 + 0.3 Ex2
0.5 L + 1.0 Ls - 1.0 Ey2 - 0.3 Ex2
0.5 L + 1.0 Ls + 1.0 Ey2 - 0.3 Ex2
0.5 L + 1.0 Ls - 1.0 Ey2 + 0.3 Ex2

UE = 1.08 SELF + 1.08 DL


UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL
UE = 1.08 SELF + 1.08 DL

+
+
+
+
+
+
+
+
+
+
+
+

0.5 L + 1.0 Ls + 1.0 Ex


0.5 L + 1.0 Ls - 1.0 Ex
0.5 L + 1.0 Ls + 1.0 Ey
0.5 L + 1.0 Ls - 1.0 Ey
0.5 L + 1.0 Ls + 1.0 Ex + 0.3 Ey
0.5 L + 1.0 Ls - 1.0 Ex - 0.3 Ey
0.5 L + 1.0 Ls + 1.0 Ex - 0.3 Ey
0.5 L + 1.0 Ls - 1.0 Ex + 0.3 Ey
0.5 L + 1.0 Ls + 1.0 Ey + 0.3 Ex
0.5 L + 1.0 Ls - 1.0 Ey - 0.3 Ex
0.5 L + 1.0 Ls + 1.0 Ey - 0.3 Ex
0.5 L + 1.0 Ls - 1.0 Ey + 0.3 Ex

(ACI 318-08 :- 9-5)(Ex1 , Ey1 Plus Ecc.)


UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ex1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ex1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ey1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ey1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ex1 + 0.3 Ey1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ex1 - 0.3 Ey1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ex1 - 0.3 Ey1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ex1 + 0.3 Ey1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ey1 + 0.3 Ex1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ey1 - 0.3 Ex1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ey1 - 0.3 Ex1
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ey1 + 0.3 Ex1

97. 98. 99. 100.


101.
102.
103.
104.
105.

(ACI 318-08 :- 9-5)(Ex2 ,Ey2 Minus Ecc.)


UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ex2
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ex2
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ey2
- UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ey2
- UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ex2 + 0.3 Ey2
- UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ex2 - 0.3 Ey2
- UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ex2 - 0.3 Ey2
- UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ex2 + 0.3 Ey2
- UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ey2 + 0.3 Ex2

(ACI 318-08 :- 9-5) (Ex , Ey Zero Ecc.)


73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

106.
107.
108.

UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ey2 - 0.3 Ex2


UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Ey2 - 0.3 Ex2
UE = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls - 1.0 Ey2 + 0.3 Ex2

109.
110.
111.112.
113.
114.
115.
116.
117.
118.
119.
120.

- UE = 0.9 SELF + 0.9 DL + 1.0 Ex


(ACI 318-08 :- 9-7) (Ex , Ey Zero Ecc.)
- UE = 0.9 SELF + 0.9 DL - 1.0 Ex
UE = 0.9 SELF + 0.9 DL + 1.0 Ey
- UE = 0.9 SELF + 0.9 DL - 1.0 Ey
- UE = 0.9 SELF + 0.9 DL + 1.0 Ex + 0.3 Ey
- UE = 0.9 SELF + 0.9 DL - 1.0 Ex - 0.3 Ey
- UE = 0.9 SELF + 0.9 DL + 1.0 Ex - 0.3 Ey
- UE = 0.9 SELF + 0.9 DL - 1.0 Ex + 0.3 Ey
- UE = 0.9 SELF + 0.9 DL + 1.0 Ey + 0.3 Ex
- UE = 0.9 SELF + 0.9 DL - 1.0 Ey - 0.3 Ex
- UE = 0.9 SELF + 0.9 DL + 1.0 Ey - 0.3 Ex
- UE = 0.9 SELF + 0.9 DL - 1.0 Ey + 0.3 Ex

121.
122.
123.
124.
125.
126.
127.
128.
129.
130.
131.
132.

UE = 0.9 SELF + 0.9 DL


UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL

+ 1.0 Ex1
- 1.0 Ex1
+ 1.0 Ey1
- 1.0 Ey1
+ 1.0 Ex1 + 0.3 Ey1
- 1.0 Ex1 - 0.3 Ey1
+ 1.0 Ex1 - 0.3 Ey1
- 1.0 Ex1 + 0.3 Ey1
+ 1.0 Ey1 + 0.3 Ex1
- 1.0 Ey1 - 0.3 Ex1
+ 1.0 Ey1 - 0.3 Ex1
- 1.0 Ey1 + 0.3 Ex1

133.
134.
135.
136.
137.
138.
139.
140.
141.
142.
143.
144.

UE = 0.9 SELF + 0.9 DL


UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL
UE = 0.9 SELF + 0.9 DL

+ 1.0 Ex2
(ACI 318-08 :- 9-7) (Ex2 , Ey2 Minus Ecc.)
- 1.0 Ex2
+ 1.0 Ey2
- 1.0 Ey2
+ 1.0 Ex2 + 0.3 Ey2
- 1.0 Ex2 - 0.3 Ey2
+ 1.0 Ex2 - 0.3 Ey2
- 1.0 Ex2 + 0.3 Ey2
+ 1.0 Ey2 + 0.3 Ex2
- 1.0 Ey2 - 0.3 Ex2
+ 1.0 Ey2 - 0.3 Ex2
- 1.0 Ey2 + 0.3 Ex2

145.
146.
147.
148.
149.
150.
151.
152.
153.
154.
155.
156.

UE = 1.02 SELF + 1.02 DL


UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL

+ 1.0 Ex
- 1.0 Ex
+ 1.0 Ey
- 1.0 Ey
+ 1.0 Ex + 0.3 Ey
- 1.0 Ex - 0.3 Ey
+ 1.0 Ex - 0.3 Ey
- 1.0 Ex + 0.3 Ey
+ 1.0 Ey + 0.3 Ex
- 1.0 Ey - 0.3 Ex
+ 1.0 Ey - 0.3 Ex
- 1.0 Ey + 0.3 Ex

157.
158.
159.
160.
161.
162.
163.

UE = 1.02 SELF + 1.02 DL


UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL

+ 1.0 Ex1
(ACI 318-08 :- 9-7) (Ex1 , Ey1 Plus Ecc.)
- 1.0 Ex1
+ 1.0 Ey1
- 1.0 Ey1
+ 1.0 Ex1 + 0.3 Ey1
- 1.0 Ex1 - 0.3 Ey1
+ 1.0 Ex1 - 0.3 Ey1

Arif & Bintoak Consulting Architects and Engineers, Dubai

(ACI 318-08 :- 9-7) (Ex1 , Ey1 Plus Ecc.)

(ACI 318-08 :- 9-7) (Ex , Ey Zero Ecc..)

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

164.
165.
166.
167.
168.

UE = 1.02 SELF + 1.02 DL


UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL

- 1.0 Ex1 + 0.3 Ey1


+ 1.0 Ey1 + 0.3 Ex1
- 1.0 Ey1 - 0.3 Ex1
+ 1.0 Ey1 - 0.3 Ex1
- 1.0 Ey1 + 0.3 Ex1

169.
170.
171.
172.
173.
174.
175.
176.
177.
178.
179.
180.

UE = 1.02 SELF + 1.02 DL


UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL
UE = 1.02 SELF + 1.02 DL

+ 1.0 Ex2
(ACI 318-08 :- 9-7) (Ex2 , Ey2 Minus Ecc.)
- 1.0 Ex2
+ 1.0 Ey2
- 1.0 Ey2
+ 1.0 Ex2 + 0.3 Ey2
- 1.0 Ex2 - 0.3 Ey2
+ 1.0 Ex2 - 0.3 Ey2
- 1.0 Ex2 + 0.3 Ey2
+ 1.0 Ey2 + 0.3 Ex2
- 1.0 Ey2 - 0.3 Ex2
+ 1.0 Ey2 - 0.3 Ex2
- 1.0 Ey2 + 0.3 Ex2

181.
182.
183.
184.
185.
186.
187.
188.
189.
190.
191.
192.

UE = 0.78 SELF + 0.78 DL


UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL

+ 1.0 Ex
- 1.0 Ex
+ 1.0 Ey
- 1.0 Ey
+ 1.0 Ex + 0.3 Ey
- 1.0 Ex - 0.3 Ey
+ 1.0 Ex - 0.3 Ey
- 1.0 Ex + 0.3 Ey
+ 1.0 Ey + 0.3 Ex
- 1.0 Ey - 0.3 Ex
+ 1.0 Ey - 0.3 Ex
- 1.0 Ey + 0.3 Ex

193.
194.
195.
196.
197.
198.
199.
200.
201.
202.
203.
204.

UE = 0.78 SELF + 0.78 DL


UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL

+ 1.0 Ex1
(ACI 318-08 :- 9-7) (Ex1 , Ey1 Plus Ecc.)
- 1.0 Ex1
+ 1.0 Ey1
- 1.0 Ey1
+ 1.0 Ex1 + 0.3 Ey1
- 1.0 Ex1 - 0.3 Ey1
+ 1.0 Ex1 - 0.3 Ey1
- 1.0 Ex1 + 0.3 Ey1
+ 1.0 Ey1 + 0.3 Ex1
- 1.0 Ey1 - 0.3 Ex1
+ 1.0 Ey1 - 0.3 Ex1
- 1.0 Ey1 + 0.3 Ex1

205.
206.
207.
208.
209.
210.
211.
212.
213.
214.
215.
216.

UE = 0.78 SELF + 0.78 DL


UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL
UE = 0.78 SELF + 0.78 DL

+ 1.0 Ex2
(ACI 318-08 :- 9-7) (Ex2 , Ey2 Minus Ecc.)
- 1.0 Ex2
+ 1.0 Ey2
- 1.0 Ey2
+ 1.0 Ex2 + 0.3 Ey2
- 1.0 Ex2 - 0.3 Ey2
+ 1.0 Ex2 - 0.3 Ey2
- 1.0 Ex2 + 0.3 Ey2
+ 1.0 Ey2 + 0.3 Ex2
- 1.0 Ey2 - 0.3 Ex2
+ 1.0 Ey2 - 0.3 Ex2
- 1.0 Ey2 + 0.3 Ex2

1.
2.
3.
4.
5.
6.

- UEOS = 1.2 SELF + 1.2 DL


- UEOS = 1.2 SELF + 1.2 DL
- UEOS = 1.2 SELF + 1.2 DL
- UEOS = 1.2 SELF + 1.2 DL
- UEOS = 1.2 SELF + 1.2 DL
- UEOS = 1.2 SELF + 1.2 DL

(ACI 318-08 :- 9-7) (Ex , Ey Zero Ecc..)

+ 0.5L + 1.0Ls + 2.8 Ex


+ 0.5L + 1.0Ls - 2.8 Ex
+ 0.5L + 1.0Ls + 2.8 Ey
+ 0.5L + 1.0Ls - 2.8 Ey
+ 0.5L + 1.0Ls + 2.8 Ex1
+ 0.5L + 1.0Ls - 2.8 Ex1

Arif & Bintoak Consulting Architects and Engineers, Dubai

(UBC 97 :- 1612.4-12-17)

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

7.
8.
9.
10.
11.
12.

- UEOS = 1.2 SELF + 1.2 DL


- UEOS = 1.2 SELF + 1.2 DL
- UEOS = 1.2 SELF + 1.2 DL
- UEOS = 1.2 SELF + 1.2 DL
- UEOS = 1.2 SELF + 1.2 DL
- UEOS = 1.2 SELF + 1.2 DL

+ 0.5L + 1.0Ls + 2.8 Ey1


+ 0.5L + 1.0Ls - 2.8 Ey1
+ 0.5L + 1.0Ls + 2.8 Ex2
+ 0.5L + 1.0Ls - 2.8 Ex2
+ 0.5L + 1.0Ls + 2.8 Ey2
+ 0.5L + 1.0Ls - 2.8 Ey2

13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

- UE = 0.9 SELF + 0.9 DL


- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL
- UE = 0.9 SELF + 0.9 DL

2.8 Ex
2.8 Ex
2.8 Ey
2.8 Ey
2.8 Ex1
2.8 Ex1
2.8 Ey1
2.8 Ey1
2.8 Ex2
2.8 Ex2
2.8 Ey2
2.8 Ey2

+
+
+
+
+
+
-

Project No: 1563

(UBC 97 :- 1612.4-12-18)

(ACI 318-08 :- 9-5)


USP01 = 1.2 SELF + 1.2 DL + 0.5 L + 1.0 Ls + 1.0 Spec1
USP02 = 1.32 SELF + 1.32 DL + 0.5 L + 1.0 Ls + 1.0 Spec1
USP03 = 1.08 SELF + 1.08 DL + 0.5 L + 1.0 Ls + 1.0 Spec1
(ACI 318-08 :- 9-7)
USP04 = 0.9 SELF + 0.9 DL + 1.0 Spec1
USP05 = 1.02 SELF + 1.02 DL + 1.0 Spec1
USP06 = 0.78 SELF + 0.78 DL + 1.0 Spec1
(UBC 97 :- 1612.4-12-17)
USP01OS = 1.2 SELF + 1.2 DL + 0.5L + 1.0Ls + 2.8 Spec1
(UBC 97 :- 1612.4-12-18)
USP02OS = 0.9 SELF + 0.9 DL + 2.8 Spec1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

UW = 1.2 SELF + 1.2 DL


UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL

+ 1.6 Lr + 0.8 WX1-C1


+ 1.6 Lr + 0.8 WY1-C1
+ 1.6 Lr + 0.8 WX2-C2
+ 1.6 Lr + 0.8 WY2-C2
+ 1.6 Lr + 0.8 WX3-C2
+ 1.6 Lr + 0.8 WY3-C2
+ 1.6 Lr + 0.8 W4-C3
+ 1.6 Lr + 0.8 W5-C4
+ 1.6 Lr + 0.8 W6-C4
+ 1.6 Lr + 0.8 W7-C3
+ 1.6 Lr + 0.8 W8-C4
+ 1.6 Lr + 0.8 W9-C4

13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

UW = 1.2 SELF + 1.2 DL


UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL

+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr
+ 1.6 Lr

25.
26.
27.
28.
29.

UW = 1.2 SELF + 1.2 DL


UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL

+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 WX1-C1


+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 WY1-C1
+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 WX2-C2
+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 WY2-C2
+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 WX3-C2

(ACI 318-08 :- 9-3)

- 0.8 WX1-C1
- 0.8 WY1-C1
- 0.8 WX2-C2
- 0.8 WY2-C2
- 0.8 WX3-C2
- 0.8 WY3-C2
- 0.8 W4-C3
- 0.8 W5-C4
- 0.8 W6-C4
- 0.8 W7-C3
- 0.8 W8-C4
- 0.8 W9-C4

Arif & Bintoak Consulting Architects and Engineers, Dubai

(ACI 318-08 :- 9-4)

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

30.
31.
32.
33.
34.
35.
36.

UW = 1.2 SELF + 1.2 DL


UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL

+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 WY3-C2


+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 W4-C3
+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 W5-C4
+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 W6-C4
+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 W7-C3
+ 0.5 L+ 1.0 Ls + 0.5 Lr + 1.6 W8-C4
+ 0.5 L+ 1.0 Ls + 0.5 Lr +1.6 W9-C4

37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.

UW = 1.2 SELF + 1.2 DL


UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL
UW = 1.2 SELF + 1.2 DL

+ 0.5 L+ 1.0 Ls + 0.5 Lr


+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr
+ 0.5 L+ 1.0 Ls + 0.5 Lr

49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.

UW = 0.9 SELF + 0.9 DL


UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL

+ 1.6 WX1-C1
+ 1.6 WY1-C1
+ 1.6 WX2-C2
+ 1.6 WY2-C2
+ 1.6 WX3-C2
+ 1.6 WY3-C2
+ 1.6 W4-C3
+ 1.6 W5-C4
+ 1.6 W6-C4
+ 1.6 W7-C3
+ 1.6 W8-C4
+ 1.6 W9-C4

61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.

UW = 0.9 SELF + 0.9 DL


UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL
UW = 0.9 SELF + 0.9 DL

- 1.6 WX1-C1
- 1.6 WY1-C1
- 1.6 WX2-C2
- 1.6 WY2-C2
- 1.6 WX3-C2
- 1.6 WY3-C2
- 1.6 W4-C3
- 1.6 W5-C4
- 1.6 W6-C4
- 1.6 W7-C3
- 1.6 W8-C4
- 1.6 W9-C4

- 1.6 WX1-C1
- 1.6 WY1-C1
- 1.6 WX2-C2
- 1.6 WY2-C2
- 1.6 WX3-C2
- 1.6 WY3-C2
- 1.6 W4-C3
- 1.6 W5-C4
- 1.6 W6-C4
- 1.6 W7-C3
- 1.6 W8-C4
- 1.6 W9-C4
(ACI 318-08 :- 9-6)

Service Load Combination (UBC 97)


(No increase in allowable stress shall be used with this load combination)
1. SDL = 1.0 SELF + 1.0 DL
2. SDL = 1.0 SELF + 1.0 DL + 1.0 L + 1.0 LS + 1.0 LR

( 1612.3.1-12-7 )
( 1612.3.1-12-8 )

1.
2.
3.
4.
5.
6.
7.

( 1612.3.1-12-9 )

SE = 1.0 SELF + 1.0 DL + 0.714 EX


SE = 1.0 SELF + 1.0 DL + 0.714 EX
SE = 1.0 SELF + 1.0 DL - 0.714 EX
SE = 1.0 SELF + 1.0 DL - 0.714 EX
SE = 1.0 SELF + 1.0 DL + 0.214 EX
SE = 1.0 SELF + 1.0 DL - 0.214 EX
SE = 1.0 SELF + 1.0 DL + 0.214 EX

+ 0.214 EY
- 0.214 EY
+ 0.214 EY
- 0.214 EY
+ 0.714 EY
+ 0.714 EY
- 0.714 EY

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

8. SE = 1.0 SELF + 1.0 DL - 0.214 EX - 0.714 EY


9.
10.
11.
12.
13.
14.
15.
16.

SE = 1.0 SELF + 1.0 DL + 0.714 EX1


SE = 1.0 SELF + 1.0 DL + 0.714 EX1
SE = 1.0 SELF + 1.0 DL - 0.714 EX1
SE = 1.0 SELF + 1.0 DL - 0.714 EX1
SE = 1.0 SELF + 1.0 DL + 0.214 EX1
SE = 1.0 SELF + 1.0 DL - 0.214 EX1
SE = 1.0 SELF + 1.0 DL + 0.214 EX1
SE = 1.0 SELF + 1.0 DL - 0.214 EX1

+ 0.214 EY1
- 0.214 EY1
+ 0.214 EY1
- 0.214 EY1
+ 0.714 EY1
+ 0.714 EY1
- 0.714 EY1
- 0.714 EY1

17.
18.
19.
20.
21.
22.
23.
24.

SE = 1.0 SELF + 1.0 DL + 0.714 EX2


SE = 1.0 SELF + 1.0 DL + 0.714 EX2
SE = 1.0 SELF + 1.0 DL - 0.714 EX2
SE = 1.0 SELF + 1.0 DL - 0.714 EX2
SE = 1.0 SELF + 1.0 DL + 0.214 EX2
SE = 1.0 SELF + 1.0 DL - 0.214 EX2
SE = 1.0 SELF + 1.0 DL + 0.214 EX2
SE = 1.0 SELF + 1.0 DL - 0.214 EX2

+ 0.214 EY2
- 0.214 EY2
+ 0.214 EY2
- 0.214 EY2
+ 0.714 EY2
+ 0.714 EY2
- 0.714 EY2
- 0.714 EY2

25.
26.
27.
28.
29.
30.
31.
32.

SE = 0.9 SELF + 0.9 DL + 0.714 EX


SE = 0.9 SELF + 0.9 DL + 0.714 EX
SE = 0.9 SELF + 0.9 DL - 0.714 EX
SE = 0.9 SELF + 0.9 DL - 0.714 EX
SE = 0.9 SELF + 0.9 DL + 0.214 EX
SE = 0.9 SELF + 0.9 DL - 0.214 EX
SE = 0.9 SELF + 0.9 DL + 0.214 EX
SE = 0.9 SELF + 0.9 DL - 0.214 EX

33.
34.
35.
36.
37.
38.
39.
40.

SE = 0.9 SELF + 0.9 DL + 0.714 EX1


SE = 0.9 SELF + 0.9 DL + 0.714 EX1
SE = 0.9 SELF + 0.9 DL - 0.714 EX1
SE = 0.9 SELF + 0.9 DL - 0.714 EX1
SE = 0.9 SELF + 0.9 DL + 0.214 EX1
SE = 0.9 SELF + 0.9 DL - 0.214 EX1
SE = 0.9 SELF + 0.9 DL + 0.214 EX1
SE = 0.9 SELF + 0.9 DL - 0.214 EX1

+ 0.214 EY1
- 0.214 EY1
+ 0.214 EY1
- 0.214 EY1
+ 0.714 EY1
+ 0.714 EY1
- 0.714 EY1
- 0.714 EY1

41.
42.
43.
44.
45.
46.
47.
48.

SE = 0.9 SELF + 0.9 DL + 0.714 EX2


SE = 0.9 SELF + 0.9 DL + 0.714 EX2
SE = 0.9 SELF + 0.9 DL - 0.714 EX2
SE = 0.9 SELF + 0.9 DL - 0.714 EX2
SE = 0.9 SELF + 0.9 DL + 0.214 EX2
SE = 0.9 SELF + 0.9 DL - 0.214 EX2
SE = 0.9 SELF + 0.9 DL + 0.214 EX2
SE = 0.9 SELF + 0.9 DL - 0.214 EX2

+ 0.214 EY2
- 0.214 EY2
+ 0.214 EY2
- 0.214 EY2
+ 0.714 EY2
+ 0.714 EY2
- 0.714 EY2
- 0.714 EY2

49.
50.
51.
52.
53.
54.
55.
56.

SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.536 EX + 0.161 EY


SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.536 EX - 0.161 EY
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.536 EX + 0.161 EY
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.536 EX - 0.161 EY
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.161 EX + 0.536 EY
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.161 EX + 0.536 EY
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.161 EX - 0.536 EY
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.161 EX - 0.536 EY

57.
58.
59.
60.
61.
62.

SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.536 EX1 + 0.161 EY1
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.536 EX1 - 0.161 EY1
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.536 EX1 + 0.161 EY1
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.536 EX1 - 0.161 EY1
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.161 EX1 + 0.536 EY1
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.161 EX1 + 0.536 EY1

+ 0.214 EY
- 0.214 EY
+ 0.214 EY
- 0.214 EY
+ 0.714 EY
+ 0.714 EY
- 0.714 EY
- 0.714 EY

Arif & Bintoak Consulting Architects and Engineers, Dubai

( 1612.3.1-12-10 )

( 1612.3.1-12-11 )

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

63. SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.161 EX1 - 0.536 EY1
64. SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.161 EX1 - 0.536 EY1
65.
66.
67.
68.
69.
70.
71.
72.

SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.536 EX2 + 0.161 EY2
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.536 EX2 - 0.161 EY2
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.536 EX2 + 0.161 EY2
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.536 EX2 - 0.161 EY2
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.161 EX2 + 0.536 EY2
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.161 EX2 + 0.536 EY2
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.161 EX2 - 0.536 EY2
SE = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.161 EX2 - 0.536 EY2

1.
2.
3.
4.

SW = 1.0 SELF + 1.0 DL + 1.0 WX1C1


SW = 1.0 SELF + 1.0 DL - 1.0 WX1C1
SW = 1.0 SELF + 1.0 DL + 1.0 WY1C1
SW = 1.0 SELF + 1.0 DL - 1.0 WY1C1

5.
6.
7.
8.

SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75WX1C1


SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75WX1C1
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75WY1C1
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75WY1C1

( 1612.3.1-12-11 )

9.
10.
11.
12.
13.
14.
15.
16.

SW = 1.0 SELF + 1.0 DL + 1.0 WX2C2


SW = 1.0 SELF + 1.0 DL - 1.0 WX2C2
SW = 1.0 SELF + 1.0 DL + 1.0 WY2C2
SW = 1.0 SELF + 1.0 DL - 1.0 WY2C2
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75WX2C2
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75WX2C2
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75WY2C2
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75WY2C2

( 1612.3.1-12-9 )

17.
18.
19.
20.

SW = 1.0 SELF + 1.0 DL + 1.0 WX3C2


SW = 1.0 SELF + 1.0 DL - 1.0 WX3C2
SW = 1.0 SELF + 1.0 DL + 1.0 WY3C2
SW = 1.0 SELF + 1.0 DL - 1.0 WY3C2

21.
22.
23.
24.

SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75WX3C2


SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75WX3C2
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75WY3C2
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75WY3C2

25.
26.
27.
28.

SW = 1.0 SELF + 1.0 DL + 1.0 W4C3


SW = 1.0 SELF + 1.0 DL - 1.0 W4C3
SW = 1.0 SELF + 1.0 DL + 1.0 W5C4
SW = 1.0 SELF + 1.0 DL - 1.0 W5C4

29.
30.
31.
32.

SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75 W4C3


SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75 W4C3
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75 W5C4
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75 W5C4

( 1612.3.1-12-11 )

33.
34.
35.
36.

SW = 1.0 SELF + 1.0 DL + 1.0 W6C4


SW = 1.0 SELF + 1.0 DL - 1.0 W6C4
SW = 1.0 SELF + 1.0 DL + 1.0 W7C3
SW = 1.0 SELF + 1.0 DL - 1.0 W7C3

( 1612.3.1-12-9 )

37.
38.
39.
40.

SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75


SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75

41. SW = 1.0 SELF + 1.0 DL + 1.0 W8C4


42. SW = 1.0 SELF + 1.0 DL - 1.0 W8C4
43. SW = 1.0 SELF + 1.0 DL + 1.0 W9C4
Arif & Bintoak Consulting Architects and Engineers, Dubai

( 1612.3.1-12-9 )

( 1612.3.1-12-11 )

( 1612.3.1-12-9 )

( 1612.3.1-12-11 )

( 1612.3.1-12-9 )

W6C4
W6C4
W7C3
W7C3

( 1612.3.1-12-11 )

( 1612.3.1-12-9 )

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

44. SW = 1.0 SELF + 1.0 DL - 1.0 W9C4


45.
46.
47.
48.

SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75


SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.75
SW = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR - 0.75

W8C4
W8C4
W9C4
W9C4

1. SSP = 1.0 SELF + 1.0 DL +0.714 Spec1


2. SSP = 0.9 SELF + 0.9DL + 0.714 Spec1
3. SSP = 1.0 SELF + 1.0 DL + 0.75L + 0.75LS + 0.75LR + 0.536 Spec1

Arif & Bintoak Consulting Architects and Engineers, Dubai

( 1612.3.1-12-11 )

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

3.0 FINITE ELEMENT 3D MODEL- ETABS


For the preliminary dimensioning of slabs/beams and columns, individual floors are modeled in SAFE.
The dimensions of the columns are fixed from the total reactions obtained at the base level.
For the final design, a three-dimensional finite element model is prepared using ETABS. The loads and
load combinations as mentioned in the earlier sections are used in the analysis. Seismic loading is
evaluated and applied using the in-built module of ETABS considering accelerations in two orthogonal
directions. P-Delta analysis is also done for the structure. The ETAB analysis input and output are
included in the report.
The details of the input to the software are summarized in the following sections.
3.1 Building Geometry
The beams and columns are modeled as line elements whereas slabs and shear walls are modeled as shell
elements. Rigid diaphragm is in order to account for the high in-plane stiffness of the floor slabs.
3.1.1 Storey Input:
S T O R Y D A T A (UNITS - KN-M)
STORY

FL LVL
FL LVL
FL LVL
FL LVL
FL LVL
FL LVL
FL LVL
FL LVL
FL LVL
FL LVL
GF
BASE

SIMILAR TO

+27.
+25.
+22.
+18.
+15.
+13.
+8.5
+6.8
+5.5
+4.5

None
None
None
None
None
None
None
None
None
None
None
None

HEIGHT

2.000
3.450
3.600
2.850
2.100
5.300
1.750
1.300
1.000
3.350
2.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

ELEVATION

27.200
25.200
21.750
18.150
15.300
13.200
7.900
6.150
4.850
3.850
0.500
-1.500

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

ISOMETRIC VIEW OF BUILDING


3.1.2 Material Properties
(a) Mass per unit volume for reinforced concrete: 2.5 t/m3
(b) Weight per unit volume for reinforced concrete: 25 kN/m3
(c) Poissons Ratio: 0.2
3.1.3 Stiffness Modifiers
In order to account for the cracked concrete sections in the analysis, stiffness modifiers are used in the
analysis.The values used are:-

Beams

: 0.35

Slabs

: 0.25

Columns / Walls

: 0.70

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

3.2 Primary Load Cases


(a) Dead Load This consist of self weight of the structural elements alone
(b) SDL This is for Superimposed Dead Loads consisting of loads due to floor finishes, internal
partitions, services etc.
(c) Live Load This includes live loads at each floor level
(d) UBC lateral load (X direction) This consist of the base shear evaluation and application of the storey
shear forces at the centre of mass at each floor level with 5% eccentricity in global-X direction
(e) UBC lateral load (Y direction) This consist of the base shear evaluation and application of the storey
shear forces at the centre of mass at each floor level with 5% eccentricity in global-Y direction

3.2.1 Load Combinations


(a) Load Combinations
ETABS v9.7.4
L O A D I N G

C O M B I N A T I O N S

COMBO

COMBO
TYPE

SDL01

ADD

SDL02

ADD

SE01

ADD

SE02

ADD

SE03

ADD

SE04

ADD

SE05

ADD

CASE

CASE
TYPE

SELF
DL
SELF
DL
L
LS
LR
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

Arif & Bintoak Consulting Architects and Engineers, Dubai

SCALE
FACTOR
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
0.7140
0.2140
1.0000
1.0000
0.7140
-0.2140
1.0000
1.0000
-0.7140
0.2140
1.0000
1.0000
-0.7140
-0.2140
1.0000
1.0000
0.2140
0.7140

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SE06

ADD

SE07

ADD

SE08

ADD

SE09

ADD

SE10

ADD

SE11

ADD

SE12

ADD

SE13

ADD

SE14

ADD

SE15

ADD

SE16

ADD

SE17

ADD

SE18

ADD

SE19

ADD

SE20

ADD

SE21

ADD

SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.0000
1.0000
-0.2140
0.7140
1.0000
1.0000
0.2140
-0.7140
1.0000
1.0000
-0.2140
-0.7140
1.0000
1.0000
0.7140
0.2140
1.0000
1.0000
0.7140
-0.2140
1.0000
1.0000
-0.7140
0.2140
1.0000
1.0000
-0.7140
-0.2140
1.0000
1.0000
0.2140
0.7140
1.0000
1.0000
-0.2140
0.7140
1.0000
1.0000
0.2140
-0.7140
1.0000
1.0000
-0.2140
-0.7140
1.0000
1.0000
0.7140
0.2140
1.0000
1.0000
0.7140
-0.2140
1.0000
1.0000
-0.7140
0.2140
1.0000
1.0000
-0.7140
-0.2140
1.0000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SE22

ADD

SE23

ADD

SE24

ADD

SE25

ADD

SE26

ADD

SE27

ADD

SE28

ADD

SE29

ADD

SE30

ADD

SE31

ADD

SE32

ADD

SE33

ADD

SE34

ADD

SE35

ADD

SE36

ADD

EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.2140
0.7140
1.0000
1.0000
-0.2140
0.7140
1.0000
1.0000
0.2140
-0.7140
1.0000
1.0000
-0.2140
-0.7140
0.9000
0.9000
0.7140
0.2140
0.9000
0.9000
0.7140
-0.2140
0.9000
0.9000
-0.7140
0.2140
0.9000
0.9000
-0.7140
-0.2140
0.9000
0.9000
0.2140
0.7140
0.9000
0.9000
-0.2140
0.7140
0.9000
0.9000
0.2140
-0.7140
0.9000
0.9000
-0.2140
-0.7140
0.9000
0.9000
0.7140
0.2140
0.9000
0.9000
0.7140
-0.2140
0.9000
0.9000
-0.7140
0.2140
0.9000
0.9000
-0.7140
-0.2140

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SE37

ADD

SE38

ADD

SE39

ADD

SE40

ADD

SE41

ADD

SE42

ADD

SE43

ADD

SE44

ADD

SE45

ADD

SE46

ADD

SE47

ADD

SE48

ADD

SE49

ADD

SE50

ADD

SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
L
LS
LR
EX
EY
SELF
DL
L
LS
LR
EX
EY

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.9000
0.9000
0.2140
0.7140
0.9000
0.9000
-0.2140
0.7140
0.9000
0.9000
0.2140
-0.7140
0.9000
0.9000
-0.2140
-0.7140
0.9000
0.9000
0.7140
0.2140
0.9000
0.9000
0.7140
-0.2140
0.9000
0.9000
-0.7140
0.2140
0.9000
0.9000
-0.7140
-0.2140
0.9000
0.9000
0.2140
0.7140
0.9000
0.9000
-0.2140
0.7140
0.9000
0.9000
0.2140
-0.7140
0.9000
0.9000
-0.2140
-0.7140
1.0000
1.0000
0.7500
0.7500
0.7500
0.5360
0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
0.5360
-0.1610

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SE51

ADD

SE52

ADD

SE53

ADD

SE54

ADD

SE55

ADD

SE56

ADD

SE57

ADD

SE58

ADD

SE59

ADD

SELF
DL
L
LS
LR
EX
EY
SELF
DL
L
LS
LR
EX
EY
SELF
DL
L
LS
LR
EX
EY
SELF
DL
L
LS
LR
EX
EY
SELF
DL
L
LS
LR
EX
EY
SELF
DL
L
LS
LR
EX
EY
SELF
DL
L
LS
LR
EX1
EY1
SELF
DL
L
LS
LR
EX1
EY1
SELF
DL
L
LS
LR
EX1

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.0000
1.0000
0.7500
0.7500
0.7500
-0.5360
0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
-0.5360
-0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
0.1610
0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
-0.1610
0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
0.1610
-0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
-0.1610
-0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
0.5360
0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
0.5360
-0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
-0.5360

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SE60

ADD

SE61

ADD

SE62

ADD

SE63

ADD

SE64

ADD

SE65

ADD

SE66

ADD

SE67

ADD

SE68

ADD

EY1
SELF
DL
L
LS
LR
EX1
EY1
SELF
DL
L
LS
LR
EX1
EY1
SELF
DL
L
LS
LR
EX1
EY1
SELF
DL
L
LS
LR
EX1
EY1
SELF
DL
L
LS
LR
EX1
EY1
SELF
DL
L
LS
LR
EX2
EY2
SELF
DL
L
LS
LR
EX2
EY2
SELF
DL
L
LS
LR
EX2
EY2
SELF
DL
L
LS
LR

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
-0.5360
-0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
0.1610
0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
-0.1610
0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
0.1610
-0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
-0.1610
-0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
0.5360
0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
0.5360
-0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
-0.5360
0.1610
1.0000
1.0000
0.7500
0.7500
0.7500

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SE69

ADD

SE70

ADD

SE71

ADD

SE72

ADD

SW01

ADD

SW02

ADD

SW03

ADD

SW04

ADD

SW05

ADD

SW06

ADD

SW07

ADD

SW08

ADD

EX2
EY2
SELF
DL
L
LS
LR
EX2
EY2
SELF
DL
L
LS
LR
EX2
EY2
SELF
DL
L
LS
LR
EX2
EY2
SELF
DL
L
EX2
EY2
LS
LR
SELF
DL
WX1C1
SELF
DL
WX1C1
SELF
DL
WY1C1
SELF
DL
WY1C1
SELF
DL
L
LS
LR
WX1C1
SELF
DL
L
LS
LR
WX1C1
SELF
DL
L
LS
LR
WY1C1
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

-0.5360
-0.1610
1.0000
1.0000
0.7500
0.7500
0.7500
0.1610
0.5360
0.9000
0.9000
0.7500
0.7500
0.7500
-0.1610
0.5360
1.0000
1.0000
0.7500
0.7500
0.7500
0.1610
-0.5360
1.0000
1.0000
0.7500
-0.1610
-0.5360
0.7500
0.7500
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SW09

ADD

SW10

ADD

SW11

ADD

SW12

ADD

SW13

ADD

SW14

ADD

SW15

ADD

SW16

ADD

SW17

ADD

SW18

ADD

SW19

ADD

SW20

ADD

SW21

ADD

SW22

ADD

L
LS
LR
WY1C1
SELF
DL
WX2C2
SELF
DL
WX2C2
SELF
DL
WY2C2
SELF
DL
WY2C2
SELF
DL
L
LS
LR
WX2C2
SELF
DL
L
LS
LR
WX2C2
SELF
DL
L
LS
LR
WY2C2
SELF
DL
L
LS
LR
WY2C2
SELF
DL
WX3C2
SELF
DL
WX3C2
SELF
DL
WY3C2
SELF
DL
WY3C2
SELF
DL
L
LS
LR
WX3C2
SELF
DL
L
LS

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SW23

ADD

SW24

ADD

SW25

ADD

SW26

ADD

SW27

ADD

SW28

ADD

SW29

ADD

SW30

ADD

SW31

ADD

SW32

ADD

SW33

ADD

SW34

ADD

SW35

ADD

SW36

ADD

LR
WX3C2
SELF
DL
L
LS
LR
WY3C2
SELF
DL
L
LS
LR
WY3C2
SELF
DL
W4C3
SELF
DL
W4C3
SELF
DL
W5C4
SELF
DL
W5C4
SELF
DL
L
LS
LR
W4C3
SELF
DL
L
LS
LR
W4C3
SELF
DL
L
LS
LR
W5C4
SELF
DL
L
LS
LR
W5C4
SELF
DL
W6C4
SELF
DL
W6C4
SELF
DL
W7C3
SELF
DL
W7C3

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.7500
-0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SW37

ADD

SW38

ADD

SW39

ADD

SW40

ADD

SW41

ADD

SW42

ADD

SW43

ADD

SW44

ADD

SW45

ADD

SW46

ADD

SW47

ADD

SW48

ADD

SSP01

ADD

SELF
DL
L
LS
LR
W6C4
SELF
DL
L
LS
LR
W6C4
SELF
DL
L
LS
LR
W7C3
SELF
DL
L
LS
LR
W7C3
SELF
DL
W8C4
SELF
DL
W8C4
SELF
DL
W9C4
SELF
DL
W9C4
SELF
DL
L
LS
LR
W8C4
SELF
DL
L
LS
LR
W8C4
SELF
DL
L
LS
LR
W9C4
SELF
DL
L
LS
LR
W9C4
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
-1.0000
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
0.7500
1.0000
1.0000
0.7500
0.7500
0.7500
-0.7500
1.0000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

SSP02

ADD

SSP03

ADD

UDL01

ADD

UDL02

ADD

UDL03

ADD

UT01

ADD

UT02

ADD

UE01

ADD

UE02

ADD

UE03

ADD

UE04

ADD

UE05

ADD

UE06

ADD

SPEC1
SELF
DL
SPEC1
SELF
DL
L
LS
LR
SPEC1
SELF
DL
SELF
DL
L
LS
LR
SELF
DL
L
LS
LR
SELF
DL
L
LS
LR
T
SELF
DL
L
LS
LR
T
SELF
DL
L
LS
EX
SELF
DL
L
LS
EX
SELF
DL
L
LS
EY
SELF
DL
L
LS
EY
SELF
DL
L
LS
EX
EY
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Spectra
Static
Static
Spectra
Static
Static
Static
Static
Static
Spectra
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.7150
0.9000
0.9000
0.7150
1.0000
1.0000
0.7500
0.7500
0.7500
0.5360
1.4000
1.4000
1.2000
1.2000
1.6000
1.6000
0.5000
1.2000
1.2000
0.5000
1.0000
1.6000
1.2000
1.2000
1.6000
1.6000
0.5000
1.2000
1.2000
1.2000
1.6000
1.6000
0.5000
-1.2000
1.2000
1.2000
0.5000
1.0000
1.0000
1.2000
1.2000
0.5000
1.0000
-1.0000
1.2000
1.2000
0.5000
1.0000
1.0000
1.2000
1.2000
0.5000
1.0000
-1.0000
1.2000
1.2000
0.5000
1.0000
1.0000
0.3000
1.2000
1.2000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE07

ADD

UE08

ADD

UE09

ADD

UE10

ADD

UE11

ADD

UE12

ADD

UE13

ADD

UE14

ADD

UE15

ADD

UE16

ADD

UE17

ADD

L
LS
EX
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EX1
SELF
DL
L
LS
EX1
SELF
DL
L
LS
EY1
SELF
DL
L
LS
EY1
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.5000
1.0000
-1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
1.2000
1.2000
0.5000
1.0000
-1.0000
1.2000
1.2000
0.5000
1.0000
1.0000
1.2000
1.2000
0.5000
1.0000
-1.0000
1.2000
1.2000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE18

ADD

UE19

ADD

UE20

ADD

UE21

ADD

UE22

ADD

UE23

ADD

UE24

ADD

UE25

ADD

UE26

ADD

UE27

ADD

UE28

ADD

L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EX2
SELF
DL
L
LS
EX2
SELF
DL
L
LS
EY2
SELF

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.5000
1.0000
1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
1.2000
1.2000
0.5000
1.0000
-1.0000
1.2000
1.2000
0.5000
1.0000
1.0000
1.2000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE29

ADD

UE30

ADD

UE31

ADD

UE32

ADD

UE33

ADD

UE34

ADD

UE35

ADD

UE36

ADD

UE37

ADD

UE38

ADD

DL
L
LS
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EX
SELF
DL
L
LS
EX

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.2000
0.5000
1.0000
-1.0000
1.2000
1.2000
0.5000
1.0000
1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
1.0000
-0.3000
1.2000
1.2000
0.5000
1.0000
-1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
1.2900
1.2900
0.5000
1.0000
-1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE39

ADD

UE40

ADD

UE41

ADD

UE42

ADD

UE43

ADD

UE44

ADD

UE45

ADD

UE46

ADD

UE47

ADD

UE48

ADD

UE49

ADD

SELF
DL
L
LS
EY
SELF
DL
L
LS
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.2900
1.2900
0.5000
1.0000
1.0000
1.2900
1.2900
0.5000
1.0000
-1.0000
1.2900
1.2900
0.5000
1.0000
1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
0.3000
1.2900
1.2900
0.5000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE50

ADD

UE51

ADD

UE52

ADD

UE53

ADD

UE54

ADD

UE55

ADD

UE56

ADD

UE57

ADD

UE58

ADD

UE59

ADD

UE60

ADD

EX1
SELF
DL
L
LS
EX1
SELF
DL
L
LS
EY1
SELF
DL
L
LS
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.0000
1.2900
1.2900
0.5000
1.0000
-1.0000
1.2900
1.2900
0.5000
1.0000
1.0000
1.2900
1.2900
0.5000
1.0000
-1.0000
1.2900
1.2900
0.5000
1.0000
1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE61

ADD

UE62

ADD

UE63

ADD

UE64

ADD

UE65

ADD

UE66

ADD

UE67

ADD

UE68

ADD

UE69

ADD

UE70

ADD

UE71

ADD

EY1
EX1
SELF
DL
L
LS
EX2
SELF
DL
L
LS
EX2
SELF
DL
L
LS
EY2
SELF
DL
L
LS
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

-1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
1.2900
1.2900
0.5000
1.0000
-1.0000
1.2900
1.2900
0.5000
1.0000
1.0000
1.2900
1.2900
0.5000
1.0000
-1.0000
1.2900
1.2900
0.5000
1.0000
1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
1.0000
0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE72

ADD

UE73

ADD

UE74

ADD

UE75

ADD

UE76

ADD

UE77

ADD

UE78

ADD

UE79

ADD

UE80

ADD

UE81

ADD

UE82

ADD

EY2
EX2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EX
SELF
DL
L
LS
EX
SELF
DL
L
LS
EY
SELF
DL
L
LS
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EX
EY
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.0000
-0.3000
1.2900
1.2900
0.5000
1.0000
-1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
1.1100
1.1100
0.5000
1.0000
-1.0000
1.1100
1.1100
0.5000
1.0000
1.0000
1.1100
1.1100
0.5000
1.0000
-1.0000
1.1100
1.1100
0.5000
1.0000
1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
0.3000
1.1100
1.1100
0.5000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE83

ADD

UE84

ADD

UE85

ADD

UE86

ADD

UE87

ADD

UE88

ADD

UE89

ADD

UE90

ADD

UE91

ADD

UE92

ADD

UE93

ADD

EY
EX
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EY
EX
SELF
DL
L
LS
EX1
SELF
DL
L
LS
EX1
SELF
DL
L
LS
EY1
SELF
DL
L
LS
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS
EX1
EY1
SELF
DL
L
LS

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

-1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
1.1100
1.1100
0.5000
1.0000
-1.0000
1.1100
1.1100
0.5000
1.0000
1.0000
1.1100
1.1100
0.5000
1.0000
-1.0000
1.1100
1.1100
0.5000
1.0000
1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
0.3000
1.1100
1.1100
0.5000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE94

ADD

UE95

ADD

UE96

ADD

UE97

ADD

UE98

ADD

UE99

ADD

UE100

ADD

UE101

ADD

UE102

ADD

UE103

ADD

UE104

ADD

EY1
EX1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EY1
EX1
SELF
DL
L
LS
EX2
SELF
DL
L
LS
EX2
SELF
DL
L
LS
EY2
SELF
DL
L
LS
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS
EX2
EY2
SELF
DL
L
LS

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
1.1100
1.1100
0.5000
1.0000
-1.0000
1.1100
1.1100
0.5000
1.0000
1.0000
1.1100
1.1100
0.5000
1.0000
-1.0000
1.1100
1.1100
0.5000
1.0000
1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE105

ADD

UE106

ADD

UE107

ADD

UE108

ADD

UE109

ADD

UE110

ADD

UE111

ADD

UE112

ADD

UE113

ADD

UE114

ADD

UE115

ADD

UE116

ADD

UE117

ADD

UE118

ADD

EX2
EY2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EY2
EX2
SELF
DL
L
LS
EY2
EX2
SELF
DL
EX
SELF
DL
EX
SELF
DL
EY
SELF
DL
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EY
EX
SELF
DL
EY
EX

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

-1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
1.0000
-0.3000
1.1100
1.1100
0.5000
1.0000
-1.0000
0.3000
0.9000
0.9000
1.0000
0.9000
0.9000
-1.0000
0.9000
0.9000
1.0000
0.9000
0.9000
-1.0000
0.9000
0.9000
1.0000
0.3000
0.9000
0.9000
-1.0000
-0.3000
0.9000
0.9000
1.0000
-0.3000
0.9000
0.9000
-1.0000
0.3000
0.9000
0.9000
1.0000
0.3000
0.9000
0.9000
-1.0000
-0.3000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE119

ADD

UE120

ADD

UE121

ADD

UE122

ADD

UE123

ADD

UE124

ADD

UE125

ADD

UE126

ADD

UE127

ADD

UE128

ADD

UE129

ADD

UE130

ADD

UE131

ADD

UE132

ADD

UE133

ADD

UE134

ADD

UE135

ADD

UE136

ADD

SELF
DL
EY
EX
SELF
DL
EY
EX
SELF
DL
EX1
SELF
DL
EX1
SELF
DL
EY1
SELF
DL
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EY1
EX1
SELF
DL
EY1
EX1
SELF
DL
EY1
EX1
SELF
DL
EY1
EX1
SELF
DL
EX2
SELF
DL
EX2
SELF
DL
EY2
SELF

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.9000
0.9000
1.0000
-0.3000
0.9000
0.9000
-1.0000
0.3000
0.9000
0.9000
1.0000
0.9000
0.9000
-1.0000
0.9000
0.9000
1.0000
0.9000
0.9000
-1.0000
0.9000
0.9000
1.0000
0.3000
0.9000
0.9000
-1.0000
-0.3000
0.9000
0.9000
1.0000
-0.3000
0.9000
0.9000
-1.0000
0.3000
0.9000
0.9000
1.0000
0.3000
0.9000
0.9000
-1.0000
-0.3000
0.9000
0.9000
1.0000
-0.3000
0.9000
0.9000
-1.0000
0.3000
0.9000
0.9000
1.0000
0.9000
0.9000
-1.0000
0.9000
0.9000
1.0000
0.9000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE137

ADD

UE138

ADD

UE139

ADD

UE140

ADD

UE141

ADD

UE142

ADD

UE143

ADD

UE144

ADD

UE145

ADD

UE146

ADD

UE147

ADD

UE148

ADD

UE149

ADD

UE150

ADD

UE151

ADD

UE152

ADD

DL
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
EX
SELF
DL
EX
SELF
DL
EY
SELF
DL
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EX
EY

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.9000
-1.0000
0.9000
0.9000
1.0000
0.3000
0.9000
0.9000
-1.0000
-0.3000
0.9000
0.9000
1.0000
-0.3000
0.9000
0.9000
-1.0000
0.3000
0.9000
0.9000
1.0000
0.3000
0.9000
0.9000
-1.0000
-0.3000
0.9000
0.9000
1.0000
-0.3000
0.9000
0.9000
-1.0000
0.3000
0.9900
0.9900
1.0000
0.9900
0.9900
-1.0000
0.9900
0.9900
1.0000
0.9900
0.9900
-1.0000
0.9900
0.9900
1.0000
0.3000
0.9900
0.9900
-1.0000
-0.3000
0.9900
0.9900
1.0000
-0.3000
0.9900
0.9900
-1.0000
0.3000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE153

ADD

UE154

ADD

UE155

ADD

UE156

ADD

UE157

ADD

UE158

ADD

UE159

ADD

UE160

ADD

UE161

ADD

UE162

ADD

UE163

ADD

UE164

ADD

UE165

ADD

UE166

ADD

UE167

ADD

UE168

ADD

UE169

ADD

SELF
DL
EY
EX
SELF
DL
EY
EX
SELF
DL
EY
EX
SELF
DL
EY
EX
SELF
DL
EX1
SELF
DL
EX1
SELF
DL
EY1
SELF
DL
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EY1
EX1
SELF
DL
EY1
EX1
SELF
DL
EY1
EX1
SELF
DL
EY1
EX1
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.9900
0.9900
1.0000
0.3000
0.9900
0.9900
-1.0000
-0.3000
0.9900
0.9900
1.0000
-0.3000
0.9900
0.9900
-1.0000
0.3000
0.9900
0.9900
1.0000
0.9900
0.9900
-1.0000
0.9900
0.9900
1.0000
0.9900
0.9900
-1.0000
0.9900
0.9900
1.0000
0.3000
0.9900
0.9900
-1.0000
-0.3000
0.9900
0.9900
1.0000
-0.3000
0.9900
0.9900
-1.0000
0.3000
0.9900
0.9900
1.0000
0.3000
0.9900
0.9900
-1.0000
-0.3000
0.9900
0.9900
1.0000
-0.3000
0.9900
0.9900
-1.0000
0.3000
0.9900
0.9900

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE170

ADD

UE171

ADD

UE172

ADD

UE173

ADD

UE174

ADD

UE175

ADD

UE176

ADD

UE177

ADD

UE178

ADD

UE179

ADD

UE180

ADD

UE181

ADD

UE182

ADD

UE183

ADD

UE184

ADD

UE185

ADD

UE186

ADD

EX2
SELF
DL
EX2
SELF
DL
EY2
SELF
DL
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
EX
SELF
DL
EX
SELF
DL
EY
SELF
DL
EY
SELF
DL
EX
EY
SELF
DL
EX
EY

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.0000
0.9900
0.9900
-1.0000
0.9900
0.9900
1.0000
0.9900
0.9900
-1.0000
0.9900
0.9900
1.0000
0.3000
0.9900
0.9900
-1.0000
-0.3000
0.9900
0.9900
1.0000
-0.3000
0.9900
0.9900
-1.0000
0.3000
0.9900
0.9900
1.0000
0.3000
0.9900
0.9900
-1.0000
-0.3000
0.9900
0.9900
1.0000
-0.3000
0.9900
0.9900
-1.0000
0.3000
0.8100
0.8100
1.0000
0.8100
0.8100
-1.0000
0.8100
0.8100
1.0000
0.8100
0.8100
-1.0000
0.8100
0.8100
1.0000
0.3000
0.8100
0.8100
-1.0000
-0.3000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE187

ADD

UE188

ADD

UE189

ADD

UE190

ADD

UE191

ADD

UE192

ADD

UE193

ADD

UE194

ADD

UE195

ADD

UE196

ADD

UE197

ADD

UE198

ADD

UE199

ADD

UE200

ADD

UE201

ADD

UE202

ADD

UE203

ADD

SELF
DL
EX
EY
SELF
DL
EX
EY
SELF
DL
EY
EX
SELF
DL
EY
EX
SELF
DL
EY
EX
SELF
DL
EY
EX
SELF
DL
EX1
SELF
DL
EX1
SELF
DL
EY1
SELF
DL
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EX1
EY1
SELF
DL
EY1
EX1
SELF
DL
EY1
EX1
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.8100
0.8100
1.0000
-0.3000
0.8100
0.8100
-1.0000
0.3000
0.8100
0.8100
1.0000
0.3000
0.8100
0.8100
-1.0000
-0.3000
0.8100
0.8100
1.0000
-0.3000
0.8100
0.8100
-1.0000
0.3000
0.8100
0.8100
1.0000
0.8100
0.8100
-1.0000
0.8100
0.8100
1.0000
0.8100
0.8100
-1.0000
0.8100
0.8100
1.0000
0.3000
0.8100
0.8100
-1.0000
-0.3000
0.8100
0.8100
1.0000
-0.3000
0.8100
0.8100
-1.0000
0.3000
0.8100
0.8100
1.0000
0.3000
0.8100
0.8100
-1.0000
-0.3000
0.8100
0.8100

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UE204

ADD

UE205

ADD

UE206

ADD

UE207

ADD

UE208

ADD

UE209

ADD

UE210

ADD

UE211

ADD

UE212

ADD

UE213

ADD

UE214

ADD

UE215

ADD

UE216

ADD

UEOS01

ADD

UEOS02

ADD

UEOS03

ADD

EY1
EX1
SELF
DL
EY1
EX1
SELF
DL
EX2
SELF
DL
EX2
SELF
DL
EY2
SELF
DL
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EX2
EY2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
EY2
EX2
SELF
DL
L
LS
EX
SELF
DL
L
LS
EX
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.0000
-0.3000
0.8100
0.8100
-1.0000
0.3000
0.8100
0.8100
1.0000
0.8100
0.8100
-1.0000
0.8100
0.8100
1.0000
0.8100
0.8100
-1.0000
0.8100
0.8100
1.0000
0.3000
0.8100
0.8100
-1.0000
-0.3000
0.8100
0.8100
1.0000
-0.3000
0.8100
0.8100
-1.0000
0.3000
0.8100
0.8100
1.0000
0.3000
0.8100
0.8100
-1.0000
-0.3000
0.8100
0.8100
1.0000
-0.3000
0.8100
0.8100
-1.0000
0.3000
1.2000
1.2000
0.5000
1.0000
2.8000
1.2000
1.2000
0.5000
1.0000
-2.8000
1.2000
1.2000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UEOS04

ADD

UEOS05

ADD

UEOS06

ADD

UEOS07

ADD

UEOS08

ADD

UEOS09

ADD

UEOS10

ADD

UEOS11

ADD

UEOS12

ADD

UEOS13

ADD

UEOS14

ADD

UEOS15

ADD

UEOS16

ADD

UEOS17

ADD

L
LS
EY
SELF
DL
L
LS
EY
SELF
DL
L
LS
EX1
SELF
DL
L
LS
EX1
SELF
DL
L
LS
EY1
SELF
DL
L
LS
EY1
SELF
DL
L
LS
EX2
SELF
DL
L
LS
EX2
SELF
DL
L
LS
EY2
SELF
DL
L
LS
EY2
SELF
DL
EX
SELF
DL
EX
SELF
DL
EY
SELF
DL
EY
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.5000
1.0000
2.8000
1.2000
1.2000
0.5000
1.0000
-2.8000
1.2000
1.2000
0.5000
1.0000
2.8000
1.2000
1.2000
0.5000
1.0000
-2.8000
1.2000
1.2000
0.5000
1.0000
2.8000
1.2000
1.2000
0.5000
1.0000
-2.8000
1.2000
1.2000
0.5000
1.0000
2.8000
1.2000
1.2000
0.5000
1.0000
-2.8000
1.2000
1.2000
0.5000
1.0000
2.8000
1.2000
1.2000
0.5000
1.0000
-2.8000
0.9000
0.9000
2.8000
0.9000
0.9000
-2.8000
0.9000
0.9000
2.8000
0.9000
0.9000
-2.8000
0.9000
0.9000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UEOS18

ADD

UEOS19

ADD

UEOS20

ADD

UEOS21

ADD

UEOS22

ADD

UEOS23

ADD

UEOS24

ADD

UW01

ADD

UW02

ADD

UW03

ADD

UW04

ADD

UW05

ADD

UW06

ADD

UW07

ADD

UW08

ADD

UW09

ADD

UW10

ADD

EX1
SELF
DL
EX1
SELF
DL
EY1
SELF
DL
EY1
SELF
DL
EX2
SELF
DL
EX2
SELF
DL
EY2
SELF
DL
EY2
SELF
DL
LR
WX1C1
SELF
DL
LR
WY1C1
SELF
DL
LR
WX2C2
SELF
DL
LR
WY2C2
SELF
DL
LR
WX3C2
SELF
DL
LR
WY3C2
SELF
DL
LR
W4C3
SELF
DL
LR
W5C4
SELF
DL
LR
W6C4
SELF
DL
LR
W7C3

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

2.8000
0.9000
0.9000
-2.8000
0.9000
0.9000
2.8000
0.9000
0.9000
-2.8000
0.9000
0.9000
2.8000
0.9000
0.9000
-2.8000
0.9000
0.9000
2.8000
0.9000
0.9000
-2.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UW11

ADD

UW12

ADD

UW13

ADD

UW14

ADD

UW15

ADD

UW16

ADD

UW17

ADD

UW18

ADD

UW19

ADD

UW20

ADD

UW21

ADD

UW22

ADD

UW23

ADD

UW24

ADD

UW25

ADD

SELF
DL
LR
W8C4
SELF
DL
LR
W9C4
SELF
DL
LR
WX1C1
SELF
DL
LR
WY1C1
SELF
DL
LR
WX2C2
SELF
DL
LR
WY2C2
SELF
DL
LR
WX3C2
SELF
DL
LR
WY3C2
SELF
DL
LR
W4C3
SELF
DL
LR
W5C4
SELF
DL
LR
W6C4
SELF
DL
LR
W7C3
SELF
DL
LR
W8C4
SELF
DL
LR
W9C4
SELF
DL
L
LS
LR
WX1C1

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
1.6000
-0.8000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UW26

ADD

UW27

ADD

UW28

ADD

UW29

ADD

UW30

ADD

UW31

ADD

UW32

ADD

UW33

ADD

UW34

ADD

UW35

ADD

UW36

ADD

SELF
DL
L
LS
LR
WY1C1
SELF
DL
L
LS
LR
WX2C2
SELF
DL
L
LS
LR
WY2C2
SELF
DL
L
LS
LR
WX3C2
SELF
DL
L
LS
LR
WY3C2
SELF
DL
L
LS
LR
W4C3
SELF
DL
L
LS
LR
W5C4
SELF
DL
L
LS
LR
W6C4
SELF
DL
L
LS
LR
W7C3
SELF
DL
L
LS
LR
W8C4
SELF
DL

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
1.6000
1.2000
1.2000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UW37

ADD

UW38

ADD

UW39

ADD

UW40

ADD

UW41

ADD

UW42

ADD

UW43

ADD

UW44

ADD

UW45

ADD

UW46

ADD

L
LS
LR
W9C4
SELF
DL
L
LS
LR
WX1C1
SELF
DL
L
LS
LR
WY1C1
SELF
DL
L
LS
LR
WX2C2
SELF
DL
L
LS
LR
WY2C2
SELF
DL
L
LS
LR
WX3C2
SELF
DL
L
LS
LR
WY3C2
SELF
DL
L
LS
LR
W4C3
SELF
DL
L
LS
LR
W5C4
SELF
DL
L
LS
LR
W6C4
SELF
DL
L
LS

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.5000
1.0000
0.5000
1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UW47

ADD

UW48

ADD

UW49

ADD

UW50

ADD

UW51

ADD

UW52

ADD

UW53

ADD

UW54

ADD

UW55

ADD

UW56

ADD

UW57

ADD

UW58

ADD

UW59

ADD

UW60

ADD

UW61

ADD

UW62

ADD

UW63

ADD

UW64

ADD

LR
W7C3
SELF
DL
L
LS
LR
W8C4
SELF
DL
L
LS
LR
W9C4
SELF
DL
WX1C1
SELF
DL
WY1C1
SELF
DL
WX2C2
SELF
DL
WY2C2
SELF
DL
WX3C2
SELF
DL
WY3C2
SELF
DL
W4C3
SELF
DL
W5C4
SELF
DL
W6C4
SELF
DL
W7C3
SELF
DL
W8C4
SELF
DL
W9C4
SELF
DL
WX1C1
SELF
DL
WY1C1
SELF
DL
WX2C2
SELF
DL
WY2C2

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static

0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
1.2000
1.2000
0.5000
1.0000
0.5000
-1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

UW65

ADD

UW66

ADD

UW67

ADD

UW68

ADD

UW69

ADD

UW70

ADD

UW71

ADD

UW72

ADD

USP01

ADD

USP02

ADD

USP03

ADD

USP04

ADD

USP05

ADD

USP06

ADD

USP01OS

ADD

USP02OS

ADD

SELF
DL
WX3C2
SELF
DL
WY3C2
SELF
DL
W4C3
SELF
DL
W5C4
SELF
DL
W6C4
SELF
DL
W7C3
SELF
DL
W8C4
SELF
DL
W9C4
SELF
DL
L
LS
SPEC1
SELF
DL
L
LS
SPEC1
SELF
DL
L
LS
SPEC1
SELF
DL
SPEC1
SELF
DL
SPEC1
SELF
DL
SPEC1
SELF
DL
L
LS
SPEC1
SELF
DL
SPEC1

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Spectra
Static
Static
Static
Static
Spectra
Static
Static
Static
Static
Spectra
Static
Static
Spectra
Static
Static
Spectra
Static
Static
Spectra
Static
Static
Static
Static
Spectra
Static
Static
Spectra

0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
0.9000
0.9000
-1.6000
1.2000
1.2000
0.5000
1.0000
1.0000
1.2900
1.2900
0.5000
1.0000
1.0000
1.1100
1.1100
0.5000
1.0000
1.0000
0.9000
0.9000
1.0000
0.9900
0.9900
1.0000
0.8100
0.8100
1.0000
1.2000
1.2000
0.5000
1.0000
2.8000
0.9000
0.9000
2.8000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

3.3 Output Summary


(a) Centre of Mass and Stiffness
C E N T E R S
C E N T E R S

O F
O F

D I A P H R A G M
STORY
LEVEL

C U M U L A T I V E
R I G I D I T Y
M A S S

FL LVL +8.5
FL LVL +6.8
FL LVL +5.5
FL LVL +5.5
FL LVL +5.5
FL LVL +4.5

/CENTER OF MASS-/
MASS

D1
D1
D1
D2
D3
D1

&

D A T A

DIAPHRAGM
NAME

M A S S

/--CENTER OF RIGIDITY--/

ORDINATE-X ORDINATE-Y ORDINATE-X ORDINATE-Y

0.000E+00
0.000E+00
0.000E+00
0.000E+00
0.000E+00
0.000E+00

0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000

16.549
5.811
20.375
32.515
9.404
37.256

16.686
17.050
29.821
9.425
8.720
13.850

(b) Modal Periods and Frequencies


M O D A L
MODE
NUMBER

Mode 1
Mode 2
Mode 3
Mode 4
Mode 5
Mode 6
Mode 7
Mode 8
Mode 9
Mode 10
Mode 11
Mode 12
Mode 13
Mode 14
Mode 15
Mode 16
Mode 17
Mode 18
Mode 19
Mode 20
Mode 21
Mode 22
Mode 23
Mode 24
Mode 25

P E R I O D S
PERIOD
(TIME)

A N D

F R E Q U E N C I E S
FREQUENCY
(CYCLES/TIME)

0.57099
0.51597
0.50551
0.45263
0.37977
0.35695
0.33827
0.31494
0.28364
0.26486
0.25644
0.24068
0.20688
0.20038
0.18955
0.17986
0.16865
0.15176
0.13903
0.12071
0.10837
0.09682
0.05534
0.05267
0.03467

Arif & Bintoak Consulting Architects and Engineers, Dubai

1.75136
1.93811
1.97820
2.20931
2.63320
2.80154
2.95620
3.17522
3.52564
3.77555
3.89956
4.15492
4.83364
4.99060
5.27564
5.55992
5.92946
6.58922
7.19291
8.28449
9.22807
10.32882
18.06988
18.98718
28.84015

CIRCULAR FREQ
(RADIANS/TIME)

11.00410
12.17748
12.42943
13.88153
16.54490
17.60257
18.57435
19.95049
22.15227
23.72249
24.50163
26.10611
30.37067
31.35690
33.14783
34.93400
37.25588
41.40130
45.19436
52.05301
57.98164
64.89788
113.53639
119.29997
181.20802

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

(c) Total Reactive Forces


TOTAL REACTIVE FORCES (RECOVERED LOADS) AT ORIGIN
LOAD

SELF
DL
L
LS
LR
T
EX
EY
EX1
EY1
EX2
EY2
WX1C1
WY1C1
WX2C2
WY2C2
WX3C2
WY3C2
W4C3
W5C4
W6C4
W7C3
W8C4
W9C4
SPEC1

FX

4.471E-09
1.518E-09
1.063E-09
0.000E+00
0.000E+00
0.000E+00
1.566E+03
1.336E-08
-1.566E+03
1.304E-08
-1.566E+03
1.369E-08
-8.301E+01
5.912E-10
-6.226E+01
3.934E-10
-6.226E+01
4.934E-10
-6.226E+01
-4.673E+01
-4.673E+01
-6.226E+01
-4.673E+01
-4.673E+01
8.671E+02

FY

FZ

1.538E-05
5.339E-06
3.664E-06
0.000E+00
0.000E+00
0.000E+00
2.906E-05
-1.566E+03
3.163E-05
-1.566E+03
2.649E-05
-1.566E+03
3.123E-06
-3.874E+01
1.517E-06
-2.905E+01
3.168E-06
-2.905E+01
2.905E+01
2.181E+01
2.181E+01
-2.905E+01
-2.181E+01
-2.181E+01
7.786E+02

MX

1.452E+04
1.239E+04
1.442E+03
0.000E+00
0.000E+00
0.000E+00
-3.448E-08
5.118E-08
-4.112E-08
5.428E-08
-2.784E-08
4.808E-08
-3.624E-09
2.945E-09
-7.850E-10
2.653E-09
-4.651E-09
1.764E-09
-5.307E-09
-2.222E-09
-5.745E-09
-8.123E-10
1.347E-09
-2.567E-09
5.816E+02

2.653E+05
1.920E+05
2.623E+04
0.000E+00
0.000E+00
0.000E+00
1.086E+01
3.493E+03
9.744E+00
3.493E+03
1.198E+01
3.492E+03
1.166E+00
1.509E+02
1.229E+00
1.133E+02
5.209E-01
1.131E+02
-1.124E+02
-8.402E+01
-8.467E+01
1.140E+02
8.590E+01
8.523E+01
1.148E+04

(d) Storey Drifts

Seismic
STORY

FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
FL
FL
FL
FL
FL
FL
FL

DIRECTION

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+25.
+22.
+18.
+15.
+13.
+8.5
+6.8
+5.5
+4.5

LVL
LVL
LVL
LVL
LVL
LVL
LVL

+25.
+22.
+18.
+15.
+13.
+8.5
+6.8

X
X
X
X
X
X
X
X
X
X
Y
Y
Y
Y
Y
X
X

LOAD

EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EY
EY
EY
EY
EY
EY
EY

Arif & Bintoak Consulting Architects and Engineers, Dubai

MAX DRIFT

1/23203
1/23191
1/23193
1/22347
1/22104
1/1737
1/1078
1/1281
1/1706
1/696
1/60135
1/59737
1/59655
1/52842
1/37175
1/955
1/778

MY

-2.840E+05
-2.710E+05
-3.104E+04
0.000E+00
0.000E+00
0.000E+00
-3.488E+03
-1.469E+01
-3.486E+03
-1.536E+01
-3.489E+03
-1.401E+01
-3.227E+02
-8.107E-01
-2.425E+02
-7.131E-01
-2.416E+02
-5.029E-01
-2.414E+02
-1.816E+02
-1.808E+02
-2.426E+02
-1.825E+02
-1.817E+02
1.310E+04

MZ

2.672E-01
5.462E-02
5.148E-02
0.000E+00
0.000E+00
0.000E+00
2.471E+04
-4.065E+04
2.530E+04
-4.093E+04
2.411E+04
-4.037E+04
1.119E+03
-1.444E+03
6.447E+02
-1.126E+03
1.034E+03
-1.041E+03
1.950E+03
1.286E+03
1.642E+03
-2.139E+02
-3.386E+02
1.751E+01
2.593E+04

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL
FL
FL
FL
GF
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
GF

LVL
LVL
LVL
LVL

+5.5
+5.5
+4.5
+4.5

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+25.
+22.
+18.
+15.
+13.
+8.5
+6.8
+5.5
+4.5

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+25.
+22.
+18.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+4.5
+4.5

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+25.
+22.
+18.
+15.
+13.
+8.5
+6.8
+5.5
+4.5

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+25.
+22.
+18.
+15.
+13.
+8.5
+6.8
+6.8
+5.5
+5.5
+4.5
+4.5

X
Y
X
Y
X
Y
X
X
X
X
X
X
X
X
X
X
Y
Y
Y
Y
Y
X
X
X
Y
X
Y
X
Y
X
X
X
X
X
X
X
X
X
X
Y
Y
Y
Y
Y
X
X
Y
X
Y
X
Y
X
Y

EY
EY
EY
EY
EY
EY
EX1
EX1
EX1
EX1
EX1
EX1
EX1
EX1
EX1
EX1
EY1
EY1
EY1
EY1
EY1
EY1
EY1
EY1
EY1
EY1
EY1
EY1
EY1
EX2
EX2
EX2
EX2
EX2
EX2
EX2
EX2
EX2
EX2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

1/1556
1/1357
1/931
1/984
1/947
1/567
1/23617
1/23606
1/23608
1/22838
1/22537
1/1221
1/972
1/1282
1/1472
1/622
1/61272
1/60877
1/60793
1/54005
1/37067
1/859
1/701
1/1396
1/1312
1/845
1/916
1/851
1/539
1/22803
1/22789
1/22792
1/21876
1/21688
1/2461
1/1034
1/1279
1/1539
1/724
1/59039
1/58639
1/58558
1/51728
1/37284
1/1074
1/876
1/1648
1/1757
1/1406
1/1038
1/1005
1/1065
1/598

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Wind
FL LVL +25. X
FL LVL +22. X
FL LVL +18. X
FL LVL +15. X
FL LVL +13. X
FL LVL +8.5 X
FL LVL +6.8 X
FL LVL +5.5 X
FL LVL +5.5 Y
FL LVL +4.5 X
GF
X
FL LVL +8.5 X
FL LVL +6.8 X
FL LVL +5.5 X
FL LVL +5.5 Y
FL LVL +4.5 X
FL LVL +4.5 Y
GF
X
GF
Y
FL LVL +25. X
FL LVL +22. X
FL LVL +18. X
FL LVL +15. X
FL LVL +13. X
FL LVL +8.5 X
FL LVL +6.8 X
FL LVL +5.5 X
FL LVL +5.5 Y
FL LVL +4.5 X
FL LVL +4.5 Y
GF
X
GF
Y
FL LVL +8.5 X
FL LVL +6.8 X
FL LVL +5.5 X
FL LVL +5.5 Y
FL LVL +4.5 X
FL LVL +4.5 Y
GF
X
GF
Y
FL LVL +25. X
FL LVL +22. X
FL LVL +18. X
FL LVL +15. X
FL LVL +13. X
FL LVL +13. Y
FL LVL +8.5 X
FL LVL +6.8 X
FL LVL +5.5 X
FL LVL +4.5 X
FL LVL +4.5 Y
GF
X
FL LVL +8.5 X
FL LVL +6.8 X
FL LVL +5.5 X
FL LVL +5.5 Y
FL LVL +4.5 X

WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2

Arif & Bintoak Consulting Architects and Engineers, Dubai

1/314570
1/314207
1/314213
1/312071
1/303420
1/12880
1/8875
1/17877
1/33299
1/14012
1/13884
1/15374
1/12528
1/24997
1/28099
1/15463
1/13633
1/15248
1/13600
1/380186
1/380018
1/380045
1/369146
1/363089
1/26500
1/10264
1/13857
1/27636
1/8177
1/14308
1/9251
1/14412
1/15064
1/12280
1/24471
1/34083
1/15261
1/14293
1/14966
1/14502
1/467696
1/466096
1/464430
1/446911
1/449774
1/865490
1/7185
1/6061
1/12682
1/8409
1/16422
1/7476
1/32071
1/26109
1/50393
1/41591
1/31766

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL
GF
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF
GF
FL
FL
FL
FL
FL
FL
FL

LVL +4.5 Y
X
Y
LVL +25. X
LVL +22. X
LVL +18. X
LVL +15. X
LVL +13. X
LVL +8.5 X
LVL +6.8 X
LVL +5.5 X
LVL +4.5 X
LVL +4.5 Y
X
LVL +25. X
LVL +22. X
LVL +18. X
LVL +15. X
LVL +13. X
LVL +8.5 X
LVL +6.8 X
LVL +5.5 X
LVL +5.5 Y
LVL +4.5 X
X
LVL +25. X
LVL +22. X
LVL +18. X
LVL +15. X
LVL +13. X
LVL +8.5 X
LVL +6.8 X
LVL +5.5 X
LVL +4.5 X
LVL +4.5 Y
X
Y
LVL +25. X
LVL +22. X
LVL +18. X
LVL +15. X
LVL +13. X
LVL +13. Y
LVL +8.5 X
LVL +8.5 Y
LVL +6.8 X
LVL +5.5 X
LVL +5.5 Y
LVL +4.5 X
LVL +4.5 Y
X
Y
LVL +25. X
LVL +22. X
LVL +18. X
LVL +15. X
LVL +13. X
LVL +13. Y
LVL +8.5 X

WY3C2
WY3C2
WY3C2
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

1/24962
1/31689
1/24189
1/421248
1/420978
1/421036
1/406734
1/402431
1/8358
1/7089
1/14998
1/9774
1/16897
1/8686
1/498306
1/497706
1/497936
1/469146
1/470974
1/35285
1/14191
1/20233
1/39914
1/16701
1/19404
1/642169
1/641282
1/641078
1/634244
1/622123
1/6084
1/5070
1/10417
1/6973
1/9609
1/6206
1/10098
1/429662
1/427900
1/425930
1/405461
1/404019
1/674689
1/31571
1/48758
1/11474
1/21076
1/25336
1/12098
1/20634
1/13737
1/19389
1/507189
1/506440
1/506175
1/499650
1/488931
1/943350
1/17026

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL
FL
FL
FL
FL
FL
GF
GF
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
GF

LVL
LVL
LVL
LVL
LVL
LVL

+6.8
+6.8
+5.5
+5.5
+4.5
+4.5

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+25.
+22.
+18.
+15.
+13.
+13.
+8.5
+6.8
+5.5
+5.5
+4.5
+4.5

X
Y
X
Y
X
Y
X
Y
X
X
X
X
X
Y
X
X
X
Y
X
Y
X

W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4

Project No: 1563

1/12948
1/24019
1/13755
1/23920
1/7580
1/10363
1/8461
1/10495
1/656785
1/651809
1/645413
1/587760
1/576580
1/837889
1/11055
1/9400
1/19826
1/31240
1/13083
1/25887
1/11595

(e) Storey Displacements


DISPLACEMENTS AT DIAPHRAGM CENTER OF MASS (UNDER Earthquake) (mm)
DISPLACEMENTS AT DIAPHRAGM CENTER OF MASS
STORY

DIAPHRAGM

FL LVL +22. D1
FL LVL +15. D1
FL LVL +13. D1
FL LVL +8.5 D1
FL LVL +6.8 D1
FL LVL +5.5 D1
FL LVL +5.5 D2
FL LVL +5.5 D3
FL LVL +4.5 D1
FL LVL +22. D1
FL LVL +15. D1
FL LVL +13. D1
FL LVL +8.5 D1
FL LVL +6.8 D1
FL LVL +5.5 D1
FL LVL +5.5 D2
FL LVL +5.5 D3
FL LVL +4.5 D1
FL LVL +22. D1
FL LVL +15. D1
FL LVL +13. D1
FL LVL +8.5 D1
FL LVL +6.8 D1
FL LVL +5.5 D1
FL LVL +5.5 D2
FL LVL +5.5 D3
FL LVL +4.5 D1
FL LVL +22. D1
FL LVL +15. D1

LOAD

EX
EX
EX
EX
EX
EX
EX
EX
EX
EY
EY
EY
EY
EY
EY
EY
EY
EY
EX1
EX1
EX1
EX1
EX1
EX1
EX1
EX1
EX1
EY1
EY1

Arif & Bintoak Consulting Architects and Engineers, Dubai

UX

1.0154
0.7403
0.7207
0.6560
0.8274
0.4396
2.7510
1.9597
2.6351
0.0188
0.0165
0.2437
0.2374
0.3905
0.0040
2.6061
1.2866
0.3928
0.9985
0.7282
0.7338
0.6590
0.8360
0.4415
2.3045
1.7851
2.6990
0.0267
0.0222

UY

-0.0743
-0.0649
0.6212
0.7337
-0.1558
0.0240
0.6655
0.3491
0.3492
0.3884
0.2811
1.3243
1.1838
0.0616
0.7158
1.9104
0.6147
4.1541
-0.0594
-0.0542
0.6815
0.7927
-0.1525
0.0249
0.7352
0.2996
-0.1520
0.3814
0.2761

RZ

0.00005
0.00005
0.00005
0.00006
0.00009
0.00013
-0.00003
0.00015
-0.00004
0.00005
0.00005
0.00008
0.00008
0.00007
0.00000
0.00049
0.00016
0.00054
0.00005
0.00005
0.00006
0.00007
0.00009
0.00013
-0.00016
0.00011
-0.00018
0.00005
0.00005

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5

D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1

EY1
EY1
EY1
EY1
EY1
EY1
EY1
EX2
EX2
EX2
EX2
EX2
EX2
EX2
EX2
EX2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
EY2

Project No: 1563

0.2377
0.2361
0.3865
0.0031
2.8145
1.3681
0.3630
1.0324
0.7524
0.7077
0.6531
0.8187
0.4377
3.1976
2.1343
2.5711
0.0109
0.0109
0.2498
0.2388
0.3945
0.0049
2.3977
1.2051
0.4227

1.2961
1.1563
0.0601
0.7154
1.8779
0.6378
4.3880
-0.0892
-0.0756
0.5609
0.6747
-0.1591
0.0231
0.5958
0.3986
0.8504
0.3953
0.2861
1.3524
1.2113
0.0632
0.7163
1.9429
0.5915
3.9202

0.00008
0.00008
0.00007
0.00000
0.00055
0.00018
0.00061
0.00005
0.00005
0.00005
0.00006
0.00009
0.00013
0.00009
0.00019
0.00010
0.00005
0.00005
0.00009
0.00008
0.00007
0.00000
0.00043
0.00014
0.00048

DISPLACEMENTS AT DIAPHRAGM CENTER OF MASS (UNDER Wind)(mm)


STORY

FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

DIAPHRAGM

+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.

D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1

LOAD

WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WY2C2

Arif & Bintoak Consulting Architects and Engineers, Dubai

UX

0.0739
0.0536
0.0589
0.0544
0.0687
0.0019
0.2853
0.1099
0.2903
-0.0001
0.0002
0.0112
0.0117
0.0200
0.0002
0.1533
0.0750
0.0161
0.0609
0.0441
0.0401
0.0399
0.0488
0.0008
0.3609
0.1400
0.1976
0.0012

UY

-0.0106
-0.0086
0.0651
0.0767
-0.0149
0.0031
0.0765
0.0144
0.0376
0.0030
0.0018
0.0483
0.0507
-0.0037
0.0027
0.0962
0.0207
0.2381
-0.0128
-0.0099
0.0294
0.0386
-0.0123
0.0021
0.0335
0.0271
0.1900
0.0012

RZ

0.00000
0.00000
0.00001
0.00001
0.00001
0.00000
-0.00001
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00003
0.00001
0.00003
0.00000
0.00000
0.00000
0.00000
0.00001
0.00000
0.00004
0.00001
0.00004
0.00000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5

D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1

WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

0.0010
0.0075
0.0086
0.0143
0.0000
0.1468
0.0687
0.0074
0.0499
0.0362
0.0483
0.0417
0.0542
0.0020
0.0671
0.0249
0.2378
-0.0013
-0.0007
0.0093
0.0090
0.0156
0.0003
0.0831
0.0438
0.0168
0.0547
0.0395
0.0365
0.0322
0.0369
0.0013
0.0788
0.0183
0.2087
0.0461
0.0333
0.0236
0.0233
0.0252
0.0005
0.1932
0.0662
0.1384
0.0360
0.0261
0.0312
0.0250
0.0302
0.0015
-0.0749
-0.0387
0.1750
0.0545
0.0397
0.0531
0.0497
0.0668
0.0016

0.0006
0.0319
0.0338
-0.0030
0.0019
0.0670
0.0191
0.2145
-0.0031
-0.0030
0.0683
0.0765
-0.0101
0.0026
0.0812
-0.0056
-0.1336
0.0033
0.0021
0.0405
0.0422
-0.0026
0.0021
0.0773
0.0120
0.1428
-0.0095
-0.0073
0.0154
0.0222
-0.0082
0.0004
-0.0124
-0.0070
-0.1758
-0.0115
-0.0087
-0.0063
-0.0007
-0.0072
0.0000
-0.0311
0.0096
0.0159
-0.0027
-0.0023
0.0293
0.0340
-0.0052
0.0005
0.0126
-0.0202
-0.2799
-0.0050
-0.0046
0.0879
0.0983
-0.0138
0.0044

0.00000
0.00000
0.00000
0.00000
0.00000
0.00003
0.00001
0.00003
0.00000
0.00000
0.00001
0.00001
0.00001
0.00000
-0.00004
-0.00001
-0.00004
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00001
0.00000
0.00002
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-0.00003
-0.00001
-0.00003
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00001
0.00001
0.00001
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-0.00006
-0.00002
-0.00006
0.00001
0.00001
0.00001
0.00001
0.00001
0.00000

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+5.5
+5.5
+4.5

D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1
D1
D1
D1
D1
D1
D1
D2
D3
D1

Project No: 1563

W7C3
W7C3
W7C3
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4

0.3063
0.1297
0.2331
0.0460
0.0334
0.0361
0.0365
0.0477
0.0007
0.3639
0.1499
0.1570
0.0359
0.0262
0.0437
0.0381
0.0527
0.0017
0.0959
0.0449
0.1929

0.1328
0.0238
0.1804
-0.0082
-0.0066
0.0482
0.0565
-0.0114
0.0030
0.0795
0.0327
0.2857
0.0007
-0.0003
0.0837
0.0911
-0.0094
0.0035
0.1199
0.0030
-0.0148

(f) Story Maximum and Average Lateral Displacements (mm)

0.00001
0.00001
0.00002
0.00000
0.00000
0.00000
0.00000
0.00001
0.00000
0.00005
0.00002
0.00005
0.00000
0.00000
0.00001
0.00001
0.00001
0.00000
-0.00003
-0.00001
-0.00002

STORY

LOAD

FL LVL +22. EX
FL LVL +15. EX
FL LVL +13. EX
FL LVL +8.5 EX
FL LVL +6.8 EX
FL LVL +5.5 EX
FL LVL +4.5 EX
FL LVL +22. EY
FL LVL +15. EY
FL LVL +13. EY
FL LVL +8.5 EY
FL LVL +6.8 EY
FL LVL +5.5 EY
FL LVL +4.5 EY
FL LVL +22. EX1
FL LVL +15. EX1
FL LVL +13. EX1
FL LVL +8.5 EX1
FL LVL +6.8 EX1
FL LVL +5.5 EX1
FL LVL +4.5 EX1
FL LVL +22. EY1
FL LVL +15. EY1
FL LVL +13. EY1
FL LVL +8.5 EY1
FL LVL +6.8 EY1
FL LVL +5.5 EY1
FL LVL +4.5 EY1
FL LVL +22. EX2
FL LVL +15. EX2
FL LVL +13. EX2
FL LVL +8.5 EX2

DIR

MAXIMUM

X
X
X
X
X
X
X
Y
Y
Y
Y
X
X
Y
X
X
X
Y
X
X
X
Y
Y
Y
Y
X
X
Y
X
X
X
X

1.0846
0.8309
1.0241
1.1222
1.2350
3.0888
3.1746
0.4546
0.3715
1.7517
2.1533
0.6811
5.2950
6.5230
1.0706
0.8228
1.0582
1.4356
1.2531
3.4823
4.4345
0.4463
0.3646
1.7127
2.0996
0.6726
5.8124
7.0257
1.0986
0.8390
0.9900
1.0863

Arif & Bintoak Consulting Architects and Engineers, Dubai

AVERAGE

1.0178
0.7404
0.7310
0.6734
0.8168
1.6459
2.8713
0.3884
0.2812
1.3290
1.1933
0.3883
2.2019
3.8802
1.0009
0.7283
0.7423
0.7354
0.8254
1.8427
3.0092
0.3814
0.2762
1.3012
1.1645
0.3843
2.3688
4.1125
1.0346
0.7525
0.7196
0.6682

RATIO

1.066
1.122
1.401
1.667
1.512
1.877
1.106
1.171
1.321
1.318
1.804
1.754
2.405
1.681
1.070
1.130
1.426
1.952
1.518
1.890
1.474
1.170
1.320
1.316
1.803
1.750
2.454
1.708
1.062
1.115
1.376
1.626

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5

EX2
EX2
EX2
EY2
EY2
EY2
EY2
EY2
EY2
EY2
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WX1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WY1C1
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WX2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WY2C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WX3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2
WY3C2
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3
W4C3

X
X
X
Y
Y
Y
Y
X
X
Y
X
X
Y
Y
X
X
X
Y
Y
Y
Y
X
X
Y
X
X
X
X
X
X
X
X
X
Y
Y
X
X
Y
X
X
Y
Y
X
X
X
Y
Y
Y
Y
X
X
Y
X
X
X
X
X
X
X

Project No: 1563

1.2170
3.6832
4.0333
0.4629
0.3783
1.7907
2.2078
0.6895
4.7775
6.0204
0.0804
0.0621
0.0967
0.1419
0.1059
0.3427
0.3475
0.0062
0.0063
0.0693
0.0995
0.0345
0.3234
0.3868
0.0648
0.0493
0.0593
0.0672
0.0737
0.5513
0.6234
0.0035
0.0041
0.0460
0.0664
0.0246
0.3216
0.3678
0.0557
0.0440
0.0994
0.1440
0.0852
0.3864
0.6654
0.0059
0.0057
0.0580
0.0829
0.0272
0.1634
0.2125
0.0572
0.0428
0.0491
0.0490
0.0544
0.3243
0.5726

Arif & Bintoak Consulting Architects and Engineers, Dubai

0.8081
1.9431
2.9734
0.3953
0.2862
1.3568
1.2225
0.3923
2.0349
3.6479
0.0741
0.0536
0.0658
0.0711
0.0680
0.1715
0.3156
0.0030
0.0018
0.0484
0.0518
0.0195
0.1290
0.2235
0.0611
0.0441
0.0425
0.0405
0.0482
0.2757
0.2393
0.0012
0.0010
0.0320
0.0345
0.0140
0.1222
0.2036
0.0501
0.0362
0.0685
0.0735
0.0537
0.1048
0.2488
0.0033
0.0021
0.0405
0.0433
0.0152
0.0712
0.1317
0.0548
0.0395
0.0395
0.0330
0.0367
0.1094
0.2475

1.506
1.896
1.356
1.171
1.322
1.320
1.806
1.757
2.348
1.650
1.085
1.160
1.470
1.996
1.559
1.999
1.101
2.106
3.451
1.433
1.920
1.770
2.507
1.730
1.062
1.117
1.393
1.660
1.528
1.999
2.606
2.808
4.077
1.437
1.926
1.755
2.631
1.806
1.113
1.213
1.451
1.959
1.586
3.687
2.675
1.810
2.707
1.430
1.914
1.783
2.294
1.613
1.044
1.082
1.244
1.486
1.480
2.963
2.314

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL

LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL
LVL

+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5
+22.
+15.
+13.
+8.5
+6.8
+5.5
+4.5

W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W5C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W6C4
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W7C3
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W8C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4
W9C4

X
X
X
X
X
X
X
X
X
X
Y
X
X
Y
X
X
Y
Y
X
X
X
X
X
Y
Y
X
X
Y
X
X
Y
Y
X
X
X

Project No: 1563

0.0471
0.0345
0.0272
0.0262
0.0356
0.2529
0.3033
0.0388
0.0297
0.0469
0.0626
0.0461
0.4112
0.5459
0.0621
0.0497
0.1284
0.1862
0.1061
0.3733
0.4207
0.0508
0.0397
0.0718
0.1054
0.0744
0.6124
0.5134
0.0424
0.0349
0.1209
0.1741
0.0849
0.2892
0.4285

0.0462
0.0333
0.0263
0.0224
0.0251
0.1266
0.1798
0.0361
0.0261
0.0329
0.0316
0.0301
0.0248
0.2578
0.0548
0.0397
0.0884
0.0950
0.0660
0.1867
0.2480
0.0461
0.0334
0.0488
0.0529
0.0470
0.3062
0.2820
0.0361
0.0262
0.0839
0.0898
0.0520
0.1186
0.1922

1.021
1.038
1.035
1.170
1.418
1.998
1.687
1.073
1.138
1.423
1.982
1.532
16.569
2.117
1.133
1.251
1.452
1.959
1.609
2.000
1.696
1.100
1.189
1.470
1.993
1.582
2.000
1.820
1.175
1.330
1.442
1.938
1.632
2.438
2.230

4.0 HORIZONTAL ELEMENTS: - SLAB AND BEAM.


4.1 SELECTION OF FLOOR SYSTEM.

The floor system is with slab and beam system.


4.2 ANALYSIS AND DESIGN OF RCC FLOOR SLABS AND BEAMS.

RCC floor slab and beams are modeled as finite elements in SAFE software. The program performs both
analysis and design. Floor plates are modeled using area element of maximum mesh size one meter.
Beams are modeled as line elements and supports as wall supports.
Slab thickness is decided based on stiffness requirements for deflection criteria. Long-term and short-term
deflections are checked for the serviceability limit states.
Design of the slabs and beams are performed by SAFE program. Slab is divided into x-strips and ystrips. Program performs design considering the highest moments in these strips. This design is then
verified by hand checks or spreadsheets.

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Stiffness of the floor and supporting members above and below is modeled in SAFE. Following
parameters are defined in the model.
Poisson ratio

0.2

Long-term deflection multiplier

2.75 (200mm thick slab)


2.78 (225mm thick slab)
2.85 (300mm thick slab)

The long-term deflection multiplier is calculated as per ACI 318-08, conservatively considering area of
general mesh only.
Slab thickness is optimized by trial and error analysis so that deflection is acceptable within limits.
Punching shear is checked as per the guidelines in BS 8110-1, for the slabs.
ETAB and SAFE design output are used for the detailing of beams.

4.3 DETAILING OF SLABS.

Slabs will be detailed as per the standard detailing practices. A general mesh is provided at bottom and at
top. Additional top and bottom bars will be provided corresponding to design output of SAFE model.
Where ever necessary shear reinforcement or drops will be provided considering punching shear
requirements.

SUMMARY OF RESULTS

A. Slab Deflection Details


a) Slab at +4.5 lvl

Deflection( Long Term)


Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

b) Slab at +5.5 lvl

Deflection( Long Term)


c) Slab at +6.8 lvl

Deflection( Long Term)

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

d) Slab at +8.55 lvl

Deflection( Long Term)

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

B)Slab Reinforcement Details


a) ) Slab at +4.5 lvl

X and Y -direction Top R/f at +4.5Lvl

X and Y -direction Bot R/f at +4.5Lvl

b) ) Slab at +5.5 lvl


Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Xan Y -direction Top R/f at +5.5Lvl

X and Y -direction Bot R/f at +5.5Lvl

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Xan Y -direction Top R/f at +6.8Lvl

X and Y -direction Bot R/f at +6.8Lvl

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Xan Y -direction Top R/f at +8.55Lvl

X and Y -direction Bot R/f at +8.55Lvl

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

B. BEAMS
Concrete Beam Design - Flexural & Shear Design Rebar Areas
Concrete Beam Design - Flexural & Shear Design Rebar Areas
Story

Beam

Section

Level

Bay

Name

FL LVL +8.55

B279

B35X80

FL LVL +8.55

B279

B35X80

FL LVL +8.55

B279

B35X80

FL LVL +8.55

B280

B35X80

FL LVL +8.55

B280

FL LVL +8.55
FL LVL +8.55

Location

Top

Bottom

Shear

Rebar Area

Rebar Area

Rebar Area

End-I

241.483

241.483

0.000

Middle

241.483

287.103

0.000

End-J

925.524

403.897

0.000

End-I

1322.413

722.171

0.441

B35X80

Middle

349.078

1315.204

0.000

B280

B35X80

End-J

1351.843

706.247

0.450

B281

B35X80

End-I

1034.087

450.278

0.003

FL LVL +8.55

B281

B35X80

Middle

269.102

500.924

0.000

FL LVL +8.55

B281

B35X80

End-J

269.102

381.287

0.000

FL LVL +8.55

B448

B35X80

End-I

847.224

309.151

0.000

FL LVL +8.55

B448

B35X80

Middle

184.990

589.043

0.000

FL LVL +8.55

B448

B35X80

End-J

506.075

293.460

0.000

FL LVL +8.55

B452

B35X80

End-I

351.782

278.660

0.000

FL LVL +8.55

B452

B35X80

Middle

178.900

581.060

0.000

FL LVL +8.55

B452

B35X80

End-J

847.224

298.946

0.000

FL LVL +8.55

B453

B80X120

End-I

3522.358

5184.933

2.025

FL LVL +8.55

B453

B80X120

Middle

923.773

7628.790

0.000

FL LVL +8.55

B453

B80X120

End-J

3553.096

5711.898

2.499

FL LVL +8.55

B454

B80X120

End-I

3583.905

5204.624

2.081

FL LVL +8.55

B454

B80X120

Middle

937.279

7824.379

0.000

FL LVL +8.55

B454

B80X120

End-J

3606.451

5911.561

2.637

FL LVL +8.55

B470

B35X100

End-I

1074.667

456.868

0.154

FL LVL +8.55

B470

B35X100

Middle

273.259

830.748

0.000

FL LVL +8.55

B470

B35X100

End-J

608.882

432.107

0.000

FL LVL +8.55

B486

B60X80

End-I

2005.493

896.556

0.122

FL LVL +8.55

B486

B60X80

Middle

526.859

2173.138

0.000

FL LVL +8.55

B486

B60X80

End-J

2032.024

923.634

0.144

FL LVL +8.55

B494

B60X80

End-I

2742.302

1452.385

0.788

FL LVL +8.55

B494

B60X80

Middle

725.928

2987.090

0.408

FL LVL +8.55

B494

B60X80

End-J

2832.188

1452.385

0.825

FL LVL +8.55

B500

B35X80

End-I

84.133

267.908

0.000

FL LVL +8.55

B500

B35X80

Middle

84.133

343.015

0.000

FL LVL +8.55

B500

B35X80

End-J

423.784

140.393

0.000

FL LVL +8.55

B501

B35X80

End-I

446.230

147.780

0.000

FL LVL +8.55

B501

B35X80

Middle

88.555

375.457

0.000

FL LVL +8.55

B501

B35X80

End-J

90.564

309.056

0.000

FL LVL +8.55

B502

B35X80

End-I

308.216

102.280

0.000

FL LVL +8.55

B502

B35X80

Middle

96.997

96.553

0.000

FL LVL +8.55

B502

B35X80

End-J

307.175

101.936

0.000

FL LVL +8.55

B531

B35X100

End-I

218.603

72.686

0.000

FL LVL +8.55

B531

B35X100

Middle

43.590

190.375

0.000

FL LVL +8.55

B531

B35X100

End-J

43.590

184.614

0.000

FL LVL +8.55

B642

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B642

B30X50

Middle

120.075

453.055

0.000

FL LVL +8.55

B642

B30X50

End-J

0.000

459.908

0.000

FL LVL +8.55

B643

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B643

B30X50

Middle

143.218

500.460

0.000

FL LVL +8.55

B643

B30X50

End-J

0.000

550.906

0.000

FL LVL +8.55

B644

B30X50

End-I

0.000

486.746

0.000

FL LVL +8.55

B644

B30X50

Middle

126.922

454.650

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Location

Top

Bottom

Shear

Rebar Area

Rebar Area

Rebar Area

0.000

433.766

0.000

Level

Bay

Name

FL LVL +8.55

B644

B30X50

FL LVL +8.55

B645

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B645

B30X50

Middle

99.481

433.766

0.000

FL LVL +8.55

B645

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B647

B30X50

End-I

0.000

259.625

0.000

FL LVL +8.55

B647

B30X50

Middle

58.186

287.128

0.000

FL LVL +8.55

B647

B30X50

End-J

0.000

293.860

0.000

FL LVL +8.55

B648

B30X50

End-I

0.000

235.308

0.000

FL LVL +8.55

B648

B30X50

Middle

109.440

433.766

0.000

FL LVL +8.55

B648

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B649

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B649

B30X50

Middle

138.444

487.724

0.000

FL LVL +8.55

B649

B30X50

End-J

0.000

532.068

0.000

FL LVL +8.55

B650

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B650

B30X50

Middle

132.551

473.861

0.000

FL LVL +8.55

B650

B30X50

End-J

0.000

508.862

0.000

FL LVL +8.55

B651

B30X50

End-I

0.000

196.096

0.000

FL LVL +8.55

B651

B30X50

Middle

107.615

433.766

0.000

FL LVL +8.55

B651

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B652

B30X50

End-I

0.000

329.027

0.000

FL LVL +8.55

B652

B30X50

Middle

65.070

270.581

0.000

FL LVL +8.55

B652

B30X50

End-J

0.000

140.640

0.000

FL LVL +8.55

B654

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B654

B30X50

Middle

88.755

433.766

0.000

FL LVL +8.55

B654

B30X50

End-J

0.000

414.536

0.000

FL LVL +8.55

B655

B30X50

End-I

0.000

463.935

0.000

FL LVL +8.55

B655

B30X50

Middle

121.104

433.766

0.000

FL LVL +8.55

B655

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B656

B30X50

End-I

0.000

482.959

0.000

FL LVL +8.55

B656

B30X50

Middle

140.440

524.582

0.000

FL LVL +8.55

B656

B30X50

End-J

0.000

539.940

0.000

FL LVL +8.55

B657

B30X50

End-I

0.000

611.606

0.000

FL LVL +8.55

B657

B30X50

Middle

158.540

592.038

0.000

FL LVL +8.55

B657

B30X50

End-J

0.000

541.987

0.000

FL LVL +8.55

B658

B30X50

End-I

0.000

545.901

0.000

FL LVL +8.55

B658

B30X50

Middle

158.773

593.973

0.000

FL LVL +8.55

B658

B30X50

End-J

0.000

612.531

0.000

FL LVL +8.55

B659

B30X50

End-I

0.000

541.090

0.000

FL LVL +8.55

B659

B30X50

Middle

140.731

527.718

0.000

FL LVL +8.55

B659

B30X50

End-J

0.000

490.055

0.000

FL LVL +8.55

B660

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B660

B30X50

Middle

122.039

433.766

0.000

FL LVL +8.55

B660

B30X50

End-J

0.000

467.597

0.000

FL LVL +8.55

B661

B30X50

End-I

0.000

419.129

0.000

FL LVL +8.55

B661

B30X50

Middle

89.632

433.766

0.000

FL LVL +8.55

B661

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B663

B30X50

End-I

0.000

137.868

0.000

FL LVL +8.55

B663

B30X50

Middle

65.444

270.914

0.000

FL LVL +8.55

B663

B30X50

End-J

0.000

330.943

0.000

FL LVL +8.55

B664

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B664

B30X50

Middle

105.086

424.057

0.000

FL LVL +8.55

B664

B30X50

End-J

0.000

190.961

0.000

End-J

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Location

Top

Bottom

Shear

Level

Bay

Name

Rebar Area

Rebar Area

Rebar Area

FL LVL +8.55

B665

B30X50

End-I

0.000

494.561

0.000

FL LVL +8.55

B665

B30X50

Middle

128.912

462.305

0.000

FL LVL +8.55

B665

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B666

B30X50

End-I

0.000

517.270

0.000

FL LVL +8.55

B666

B30X50

Middle

134.687

480.517

0.000

FL LVL +8.55

B666

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B667

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B667

B30X50

Middle

112.666

433.766

0.000

FL LVL +8.55

B667

B30X50

End-J

0.000

246.402

0.000

FL LVL +8.55

B668

B30X50

End-I

0.000

201.635

0.000

FL LVL +8.55

B668

B30X50

Middle

67.651

299.878

0.000

FL LVL +8.55

B668

B30X50

End-J

0.000

342.232

0.000

FL LVL +8.55

B670

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B670

B30X50

Middle

99.209

433.766

0.000

FL LVL +8.55

B670

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B671

B30X50

End-I

0.000

433.766

0.000

FL LVL +8.55

B671

B30X50

Middle

126.807

453.886

0.000

FL LVL +8.55

B671

B30X50

End-J

0.000

486.293

0.000

FL LVL +8.55

B672

B30X50

End-I

0.000

548.509

0.000

FL LVL +8.55

B672

B30X50

Middle

142.611

499.763

0.000

FL LVL +8.55

B672

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B673

B30X50

End-I

0.000

465.165

0.000

FL LVL +8.55

B673

B30X50

Middle

121.418

456.099

0.000

FL LVL +8.55

B673

B30X50

End-J

0.000

433.766

0.000

FL LVL +8.55

B694

B50X50

End-I

144.499

960.037

0.000

FL LVL +8.55

B694

B50X50

Middle

144.499

987.489

0.000

FL LVL +8.55

B694

B50X50

End-J

277.659

144.499

0.000

FL LVL +8.55

B696

B50X50

End-I

233.696

189.675

0.000

FL LVL +8.55

B696

B50X50

Middle

148.650

1003.646

0.000

FL LVL +8.55

B696

B50X50

End-J

148.650

958.668

0.000

FL LVL +8.55

B697

B50X50

End-I

116.225

797.721

0.000

FL LVL +8.55

B697

B50X50

Middle

116.225

939.857

0.000

FL LVL +8.55

B697

B50X50

End-J

588.176

194.092

0.000

FL LVL +8.55

B698

B50X50

End-I

582.429

192.214

0.000

FL LVL +8.55

B698

B50X50

Middle

115.103

943.203

0.000

FL LVL +8.55

B698

B50X50

End-J

115.103

798.098

0.000

FL LVL +8.55

B732

B30X100

End-I

217.789

423.808

0.000

FL LVL +8.55

B732

B30X100

Middle

182.946

633.620

0.000

FL LVL +8.55

B732

B30X100

End-J

921.143

305.658

0.102

FL LVL +8.55

B733

B30X100

End-I

921.143

381.726

0.164

FL LVL +8.55

B733

B30X100

Middle

228.334

569.902

0.000

FL LVL +8.55

B733

B30X100

End-J

235.383

435.924

0.000

FL LVL +6.8

B227

B40X60

End-I

103.524

73.334

0.000

FL LVL +6.8

B227

B40X60

Middle

20.660

82.756

0.000

FL LVL +6.8

B227

B40X60

End-J

66.939

69.225

0.000

FL LVL +6.8

B228

B40X60

End-I

57.540

19.161

0.000

FL LVL +6.8

B228

B40X60

End-J

57.461

19.135

0.000

FL LVL +6.8

B229

B40X60

End-I

95.888

65.712

0.000

FL LVL +6.8

B229

B40X60

Middle

20.426

76.533

0.000

FL LVL +6.8

B229

B40X60

End-J

102.347

63.629

0.000

FL LVL +6.8

B230

B40X60

End-I

79.478

26.456

0.000

FL LVL +6.8

B230

B40X60

End-J

76.717

25.539

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Location

Top

Bottom

Shear

Level

Bay

Name

Rebar Area

Rebar Area

Rebar Area

FL LVL +6.8

B231

B40X60

End-I

114.968

53.089

0.000

FL LVL +6.8

B231

B40X60

Middle

22.939

70.900

0.000

FL LVL +6.8

B231

B40X60

End-J

99.363

62.467

0.000

FL LVL +6.8

B232

B40X60

End-I

79.947

26.612

0.000

FL LVL +6.8

B232

B40X60

End-J

80.125

26.672

0.000

FL LVL +6.8

B233

B40X60

End-I

121.646

54.064

0.000

FL LVL +6.8

B233

B40X60

Middle

24.268

84.699

0.000

FL LVL +6.8

B233

B40X60

End-J

69.882

83.082

0.000

FL LVL +6.8

B234

B40X60

End-I

39.008

12.994

0.000

FL LVL +6.8

B234

B40X60

End-J

38.883

12.952

0.000

FL LVL +6.8

B416

B40X60

End-I

61.564

67.180

0.000

FL LVL +6.8

B416

B40X60

Middle

25.867

61.660

0.000

FL LVL +6.8

B416

B40X60

End-J

129.683

43.131

0.000

FL LVL +6.8

B423

B40X60

End-I

210.013

69.750

0.000

FL LVL +6.8

B423

B40X60

Middle

461.982

145.146

0.000

FL LVL +6.8

B423

B40X60

End-J

708.322

242.523

0.000

FL LVL +6.8

B432

B40X60

End-I

708.322

241.125

0.000

FL LVL +6.8

B432

B40X60

Middle

525.191

144.311

0.000

FL LVL +6.8

B432

B40X60

End-J

74.792

24.899

0.000

FL LVL +6.8

B444

B25X60

End-I

442.701

262.855

0.095

FL LVL +6.8

B444

B25X60

Middle

154.838

442.701

0.000

FL LVL +6.8

B444

B25X60

End-J

596.556

259.190

0.222

FL LVL +6.8

B448

B40X60

End-I

708.322

279.839

0.000

FL LVL +6.8

B448

B40X60

Middle

187.100

708.322

0.000

FL LVL +6.8

B448

B40X60

End-J

715.902

312.856

0.000

FL LVL +6.8

B452

B40X60

End-I

708.322

269.038

0.000

FL LVL +6.8

B452

B40X60

Middle

160.970

708.322

0.000

FL LVL +6.8

B452

B40X60

End-J

708.322

241.588

0.000

FL LVL +6.8

B456

B40X60

End-I

732.211

319.857

0.000

FL LVL +6.8

B456

B40X60

Middle

191.273

703.147

0.000

FL LVL +6.8

B456

B40X60

End-J

497.674

380.903

0.000

FL LVL +6.8

B463

B40X60

End-I

935.365

406.586

0.000

FL LVL +6.8

B463

B40X60

Middle

242.912

708.322

0.000

FL LVL +6.8

B463

B40X60

End-J

590.226

388.606

0.000

FL LVL +6.8

B466

B25X60

End-I

72.540

246.324

0.000

FL LVL +6.8

B466

B25X60

Middle

72.540

305.893

0.000

FL LVL +6.8

B466

B25X60

End-J

367.192

121.145

0.022

FL LVL +6.8

B467

B25X60

End-I

173.422

164.467

0.000

FL LVL +6.8

B467

B25X60

Middle

77.288

230.277

0.000

FL LVL +6.8

B467

B25X60

End-J

391.545

129.090

0.000

FL LVL +6.8

B470

B25X60

End-I

1076.820

442.701

0.408

FL LVL +6.8

B470

B25X60

Middle

273.182

521.271

0.000

FL LVL +6.8

B470

B25X60

End-J

777.079

375.275

0.364

FL LVL +6.8

B500

B40X60

End-I

79.656

73.911

0.000

FL LVL +6.8

B500

B40X60

Middle

36.369

61.782

0.000

FL LVL +6.8

B500

B40X60

End-J

156.752

52.109

0.000

FL LVL +6.8

B501

B40X60

End-I

150.262

49.957

0.000

FL LVL +6.8

B501

B40X60

Middle

36.541

64.110

0.000

FL LVL +6.8

B501

B40X60

End-J

125.315

83.614

0.000

FL LVL +6.8

B502

B40X60

End-I

72.523

97.445

0.000

FL LVL +6.8

B502

B40X60

Middle

33.691

66.987

0.000

FL LVL +6.8

B502

B40X60

End-J

90.904

81.746

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Location

Top

Bottom

Shear

Rebar Area

Rebar Area

Rebar Area

43.311

97.045

0.000

Level

Bay

Name

FL LVL +6.8

B530

B25X60

End-I

FL LVL +6.8

B530

B25X60

Middle

43.311

131.826

0.000

FL LVL +6.8

B530

B25X60

End-J

218.135

72.271

0.000

FL LVL +5.5

B188

B25X50

End-I

25.855

53.842

0.000

FL LVL +5.5

B188

B25X50

Middle

12.986

117.680

0.000

FL LVL +5.5

B188

B25X50

End-J

65.102

40.666

0.000

FL LVL +5.5

B190

B25X50

End-I

64.199

40.943

0.000

FL LVL +5.5

B190

B25X50

Middle

12.806

117.307

0.000

FL LVL +5.5

B190

B25X50

End-J

26.660

52.579

0.000

FL LVL +5.5

B208

B25X50

End-I

315.388

114.663

0.000

FL LVL +5.5

B208

B25X50

Middle

114.663

237.059

0.000

FL LVL +5.5

B208

B25X50

End-J

440.605

191.860

0.000

FL LVL +5.5

B276

B25X50

End-I

72.433

24.085

0.000

FL LVL +5.5

B276

B25X50

Middle

14.446

38.926

0.000

FL LVL +5.5

B276

B25X50

End-J

21.761

72.441

0.000

FL LVL +5.5

B277

B25X50

End-I

22.241

73.420

0.000

FL LVL +5.5

B277

B25X50

Middle

14.681

38.900

0.000

FL LVL +5.5

B277

B25X50

End-J

73.627

24.481

0.000

FL LVL +5.5

B292

B25X65

End-I

86.147

129.682

0.000

FL LVL +5.5

B292

B25X65

Middle

17.201

195.270

0.000

FL LVL +5.5

B292

B25X65

End-J

86.229

130.266

0.000

FL LVL +5.5

B427

B25X50

End-I

130.987

131.700

0.000

FL LVL +5.5

B427

B25X50

Middle

27.805

220.468

0.000

FL LVL +5.5

B427

B25X50

End-J

139.820

96.936

0.000

FL LVL +5.5

B428

B25X50

End-I

157.994

68.340

0.000

FL LVL +5.5

B428

B25X50

Middle

42.393

185.462

0.000

FL LVL +5.5

B428

B25X50

End-J

213.828

70.757

0.000

FL LVL +5.5

B433

B25X50

End-I

289.508

95.933

0.000

FL LVL +5.5

B433

B25X50

Middle

91.487

215.183

0.000

FL LVL +5.5

B433

B25X50

End-J

361.472

152.957

0.000

FL LVL +5.5

B437

B25X50

End-I

391.852

171.028

0.010

FL LVL +5.5

B437

B25X50

Middle

102.257

331.320

0.000

FL LVL +5.5

B437

B25X50

End-J

361.472

129.979

0.000

FL LVL +5.5

B438

B25X50

End-I

63.951

196.974

0.000

FL LVL +5.5

B438

B25X50

Middle

63.951

254.163

0.000

FL LVL +5.5

B438

B25X50

End-J

324.041

106.818

0.000

FL LVL +5.5

B439

B25X50

End-I

199.921

74.575

0.000

FL LVL +5.5

B439

B25X50

Middle

44.779

113.900

0.000

FL LVL +5.5

B439

B25X50

End-J

225.975

117.344

0.000

FL LVL +5.5

B440

B25X50

End-I

295.609

97.543

0.000

FL LVL +5.5

B440

B25X50

Middle

64.549

241.813

0.000

FL LVL +5.5

B440

B25X50

End-J

327.112

107.819

0.000

FL LVL +5.5

B441

B25X50

End-I

209.329

69.279

0.000

FL LVL +5.5

B441

B25X50

Middle

41.509

201.300

0.000

FL LVL +5.5

B441

B25X50

End-J

87.472

124.534

0.000

FL LVL +5.5

B442

B25X65

End-I

593.656

400.819

0.145

FL LVL +5.5

B442

B25X65

Middle

154.464

587.842

0.000

FL LVL +5.5

B442

B25X65

End-J

579.463

265.394

0.126

FL LVL +5.5

B443

B25X50

End-I

198.770

114.626

0.000

FL LVL +5.5

B443

B25X50

Middle

43.456

212.583

0.000

FL LVL +5.5

B443

B25X50

End-J

219.236

113.965

0.000

FL LVL +5.5

B444

B25X50

End-I

350.525

115.441

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Location

Top

Bottom

Shear

Level

Bay

Name

Rebar Area

Rebar Area

Rebar Area

FL LVL +5.5

B444

B25X50

Middle

79.328

261.792

0.000

FL LVL +5.5

B444

B25X50

End-J

361.472

132.573

0.000

FL LVL +5.5

B497

B25X50

End-I

123.390

74.285

0.000

FL LVL +5.5

B497

B25X50

Middle

72.293

307.980

0.000

FL LVL +5.5

B497

B25X50

End-J

361.472

120.786

0.000

FL LVL +5.5

B507

B25X50

End-I

71.379

161.678

0.000

FL LVL +5.5

B507

B25X50

Middle

32.123

66.646

0.000

FL LVL +5.5

B507

B25X50

End-J

153.025

53.187

0.000

FL LVL +5.5

B677

B25X50

End-I

507.808

220.411

0.078

FL LVL +5.5

B677

B25X50

Middle

131.648

361.472

0.000

FL LVL +5.5

B677

B25X50

End-J

442.543

192.686

0.122

FL LVL +5.5

B683

B25X50

End-I

454.353

221.469

0.156

FL LVL +5.5

B683

B25X50

Middle

118.149

390.622

0.000

FL LVL +5.5

B683

B25X50

End-J

361.472

237.802

0.071

FL LVL +4.5

B174

B25X50

End-I

118.039

361.472

0.000

FL LVL +4.5

B174

B25X50

Middle

118.039

390.448

0.086

FL LVL +4.5

B174

B25X50

End-J

453.919

197.532

0.244

FL LVL +4.5

B260

B25X50

End-I

464.787

202.156

0.154

FL LVL +4.5

B260

B25X50

Middle

120.790

332.662

0.000

FL LVL +4.5

B260

B25X50

End-J

371.017

162.094

0.067

FL LVL +4.5

B418

B25X50

End-I

361.251

243.322

0.010

FL LVL +4.5

B418

B25X50

Middle

107.927

381.370

0.000

FL LVL +4.5

B418

B25X50

End-J

414.100

180.547

0.037

FL LVL +4.5

B489

B25X50

End-I

807.713

345.440

0.506

FL LVL +4.5

B489

B25X50

Middle

262.910

589.553

0.000

FL LVL +4.5

B489

B25X50

End-J

1046.814

361.472

0.667

FL LVL +4.5

B490

B25X50

End-I

361.472

361.472

0.088

FL LVL +4.5

B490

B25X50

Middle

177.873

464.062

0.000

FL LVL +4.5

B490

B25X50

End-J

693.508

298.293

0.241

FL LVL +4.5

B497

B25X50

End-I

361.472

166.185

0.000

FL LVL +4.5

B497

B25X50

Middle

147.699

342.921

0.000

FL LVL +4.5

B497

B25X50

End-J

571.815

247.424

0.078

FL LVL +4.5

B507

B25X50

End-I

97.504

307.395

0.000

FL LVL +4.5

B507

B25X50

Middle

228.994

97.504

0.053

FL LVL +4.5

B507

B25X50

End-J

373.245

163.051

0.124

FL LVL +4.5

B508

B25X50

End-I

234.962

77.694

0.000

FL LVL +4.5

B508

B25X50

Middle

131.009

46.543

0.000

FL LVL +4.5

B508

B25X50

End-J

83.144

27.637

0.000

FL LVL +4.5

B509

B25X50

End-I

64.362

63.357

0.000

FL LVL +4.5

B509

B25X50

Middle

40.968

66.900

0.000

FL LVL +4.5

B509

B25X50

End-J

15.802

82.257

0.000

FL LVL +4.5

B510

B25X50

End-I

307.615

101.462

0.000

FL LVL +4.5

B510

B25X50

Middle

173.044

60.751

0.000

FL LVL +4.5

B510

B25X50

End-J

0.000

0.000

0.000

FL LVL +4.5

B677

B25X50

End-I

206.439

122.978

0.000

FL LVL +4.5

B677

B25X50

Middle

122.978

361.472

0.000

FL LVL +4.5

B677

B25X50

End-J

473.439

205.834

0.176

FL LVL +4.5

B680

B25X50

End-I

361.472

235.090

0.032

FL LVL +4.5

B680

B25X50

Middle

118.367

361.472

0.000

FL LVL +4.5

B680

B25X50

End-J

455.215

241.212

0.162

FL LVL +4.5

B682

B50X50

End-I

282.600

93.748

0.000

FL LVL +4.5

B682

B50X50

Middle

56.195

309.446

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Level

Bay

Name

FL LVL +4.5

B682

B50X50

FL LVL +4.5

B718

FL LVL +4.5

B718

FL LVL +4.5

Location

Top

Bottom

Shear

Rebar Area

Rebar Area

Rebar Area

End-J

275.703

91.471

0.000

B25X65

End-I

483.316

335.219

0.109

B25X65

Middle

124.660

118.061

0.013

B718

B25X65

End-J

313.755

335.582

0.000

FL LVL +4.5

B720

B25X65

End-I

283.260

306.054

0.000

FL LVL +4.5

B720

B25X65

Middle

95.957

287.357

0.000

FL LVL +4.5

B720

B25X65

End-J

60.640

105.081

0.000

GF

B188

B25X50

End-I

85.479

86.248

0.000

GF

B188

B25X50

Middle

17.928

157.977

0.000

GF

B188

B25X50

End-J

89.966

81.773

0.000

GF

B190

B25X50

End-I

88.762

81.924

0.000

GF

B190

B25X50

Middle

17.688

157.529

0.000

GF

B190

B25X50

End-J

85.888

84.952

0.000

GF

B208

B25X50

End-I

641.239

276.523

0.263

GF

B208

B25X50

Middle

164.968

427.533

0.000

GF

B208

B25X50

End-J

425.286

185.325

0.176

GF

B227

B40X60

End-I

275.690

166.157

0.000

GF

B227

B40X60

Middle

54.823

118.613

0.000

GF

B229

B40X60

End-I

181.575

83.553

0.000

GF

B229

B40X60

Middle

36.178

92.088

0.000

GF

B229

B40X60

End-J

157.772

101.093

0.000

GF

B230

B40X60

End-I

125.127

41.619

0.000

GF

B230

B40X60

End-J

113.023

37.601

0.000

GF

B231

B40X60

End-I

184.184

87.171

0.000

GF

B231

B40X60

Middle

36.696

94.039

0.000

GF

B231

B40X60

End-J

155.329

104.562

0.000

GF

B232

B40X60

End-I

123.449

41.062

0.000

GF

B232

B40X60

End-J

114.631

38.135

0.000

GF

B233

B40X60

End-I

186.215

84.050

0.000

GF

B233

B40X60

Middle

37.099

89.960

0.000

GF

B254

B25X50

End-I

344.534

181.420

0.000

GF

B254

B25X50

Middle

119.311

152.716

0.000

GF

B254

B25X50

End-J

129.177

67.938

0.000

GF

B256

B25X50

End-I

95.622

174.427

0.000

GF

B256

B25X50

Middle

95.622

186.106

0.000

GF

B256

B25X50

End-J

365.890

159.893

0.000

GF

B263

B25X50

End-I

177.136

58.690

0.000

GF

B263

B25X50

Middle

94.159

161.742

0.000

GF

B263

B25X50

End-J

281.157

175.180

0.000

GF

B279

B40X60

End-I

708.322

264.154

0.000

GF

B279

B40X60

Middle

158.056

598.646

0.000

GF

B279

B40X60

End-J

562.931

185.805

0.000

GF

B281

B40X60

End-I

563.014

185.832

0.000

GF

B281

B40X60

Middle

161.977

589.526

0.000

GF

B281

B40X60

End-J

708.322

270.727

0.000

GF

B288

B25X50

End-I

50.162

158.452

0.000

GF

B288

B25X50

Middle

31.486

112.288

0.000

GF

B288

B25X50

End-J

116.955

69.401

0.000

GF

B289

B25X50

End-I

99.877

69.313

0.000

GF

B289

B25X50

Middle

26.994

102.887

0.000

GF

B289

B25X50

End-J

47.992

135.721

0.000

GF

B291

B40X60

End-I

245.592

81.516

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Location

Top

Bottom

Shear

Level

Bay

Name

Rebar Area

Rebar Area

Rebar Area

GF

B291

B40X60

Middle

500.472

144.908

0.000

GF

B291

B40X60

End-J

708.322

242.124

0.000

GF

B292

B40X60

End-I

708.322

297.677

0.000

GF

B292

B40X60

Middle

179.175

699.344

0.000

GF

B292

B40X60

End-J

708.322

299.562

0.000

GF

B293

B40X60

End-I

708.322

242.944

0.000

GF

B293

B40X60

Middle

496.178

145.397

0.000

GF

B293

B40X60

End-J

230.076

76.387

0.000

GF

B416

B40X60

End-I

213.455

107.559

0.000

GF

B416

B40X60

Middle

50.864

165.364

0.000

GF

B416

B40X60

End-J

255.677

248.134

0.000

GF

B423

B40X60

End-I

51.721

116.313

0.000

GF

B423

B40X60

Middle

39.072

26.295

0.000

GF

B423

B40X60

End-J

105.197

35.002

0.000

GF

B424

B25X50

End-I

527.511

270.852

0.111

GF

B424

B25X50

Middle

147.758

503.640

0.000

GF

B424

B25X50

End-J

572.054

247.524

0.116

GF

B427

B25X50

End-I

361.472

121.094

0.000

GF

B427

B25X50

Middle

72.477

209.043

0.000

GF

B427

B25X50

End-J

157.871

208.922

0.000

GF

B430

B25X50

End-I

136.234

45.201

0.000

GF

B430

B25X50

Middle

32.288

122.081

0.000

GF

B430

B25X50

End-J

162.516

53.873

0.000

GF

B432

B40X60

End-I

479.341

158.449

0.000

GF

B432

B40X60

Middle

292.273

94.913

0.000

GF

B432

B40X60

End-J

37.050

148.133

0.000

GF

B433

B25X50

End-I

155.826

79.945

0.000

GF

B433

B25X50

Middle

62.051

160.150

0.000

GF

B433

B25X50

End-J

314.283

103.637

0.000

GF

B437

B25X50

End-I

352.490

116.081

0.000

GF

B437

B25X50

Middle

69.483

224.736

0.000

GF

B437

B25X50

End-J

336.194

110.778

0.000

GF

B438

B40X60

End-I

254.195

84.908

0.000

GF

B438

B40X60

Middle

149.385

180.708

0.000

GF

B438

B40X60

End-J

428.353

181.089

0.000

GF

B439

B35X50

End-I

177.417

111.821

0.000

GF

B439

B35X50

Middle

44.018

154.217

0.000

GF

B439

B35X50

End-J

221.513

73.441

0.000

GF

B440

B25X50

End-I

320.345

105.614

0.000

GF

B440

B25X50

Middle

63.232

208.717

0.000

GF

B440

B25X50

End-J

261.348

86.340

0.000

GF

B441

B40X60

End-I

317.030

105.096

0.000

GF

B441

B40X60

Middle

62.989

204.836

0.000

GF

B441

B40X60

End-J

265.307

88.029

0.000

GF

B444

B25X50

End-I

418.000

182.213

0.058

GF

B444

B25X50

Middle

122.278

361.472

0.000

GF

B444

B25X50

End-J

470.667

204.656

0.082

GF

B455

B25X50

End-I

361.472

156.721

0.054

GF

B455

B25X50

Middle

93.731

320.311

0.000

GF

B455

B25X50

End-J

295.309

150.929

0.000

GF

B456

B25X60

End-I

662.477

287.084

0.056

GF

B456

B25X60

Middle

171.420

442.701

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Level

Bay

Name

GF

B456

B25X60

GF

B457

GF

B457

GF

Location

Top

Bottom

Shear

Rebar Area

Rebar Area

Rebar Area

End-J

595.383

258.692

0.036

B40X60

End-I

226.562

75.224

0.000

B40X60

Middle

45.099

150.125

0.000

B457

B40X60

End-J

216.416

152.865

0.000

GF

B458

B40X60

End-I

152.274

242.572

0.000

GF

B458

B40X60

Middle

42.058

221.186

0.000

GF

B458

B40X60

End-J

211.213

70.147

0.000

GF

B459

B40X60

End-I

1016.070

476.927

0.000

GF

B459

B40X60

Middle

283.534

809.404

0.000

GF

B459

B40X60

End-J

1096.944

474.924

0.000

GF

B460

B40X60

End-I

1017.982

462.508

0.000

GF

B460

B40X60

Middle

276.373

809.323

0.000

GF

B460

B40X60

End-J

1068.346

462.871

0.000

GF

B466

B25X50

End-I

361.472

128.583

0.000

GF

B466

B25X50

Middle

76.947

191.291

0.000

GF

B466

B25X50

End-J

252.303

83.378

0.000

GF

B467

B25X50

End-I

315.381

113.038

0.000

GF

B467

B25X50

Middle

65.261

262.813

0.000

GF

B467

B25X50

End-J

330.772

109.012

0.000

GF

B470

B35X50

End-I

1297.461

506.060

0.422

GF

B470

B35X50

Middle

328.225

629.594

0.000

GF

B470

B35X50

End-J

953.042

410.182

0.311

GF

B474

B25X50

End-I

1020.577

361.472

0.149

GF

B474

B25X50

Middle

256.728

440.442

0.000

GF

B474

B25X50

End-J

256.728

361.472

0.000

GF

B476

B40X60

End-I

708.322

278.556

0.000

GF

B476

B40X60

Middle

261.040

484.868

0.000

GF

B476

B40X60

End-J

1007.275

437.070

0.000

GF

B477

B40X60

End-I

708.322

274.316

0.000

GF

B477

B40X60

Middle

262.452

495.688

0.000

GF

B477

B40X60

End-J

1012.890

439.446

0.000

GF

B478

B40X60

End-I

363.884

497.187

0.000

GF

B478

B40X60

Middle

223.308

665.770

0.000

GF

B478

B40X60

End-J

857.948

373.641

0.000

GF

B479

B40X60

End-I

708.322

276.680

0.000

GF

B479

B40X60

Middle

260.220

479.841

0.000

GF

B479

B40X60

End-J

1004.017

435.691

0.000

GF

B480

B40X60

End-I

708.322

277.756

0.000

GF

B480

B40X60

Middle

251.580

503.310

0.000

GF

B480

B40X60

End-J

969.709

421.159

0.000

GF

B481

B40X60

End-I

708.322

241.254

0.000

GF

B481

B40X60

Middle

144.389

708.322

0.000

GF

B481

B40X60

End-J

293.486

477.937

0.000

GF

B489

B25X50

End-I

544.021

235.715

0.007

GF

B489

B25X50

Middle

170.586

361.472

0.000

GF

B489

B25X50

End-J

663.953

285.997

0.047

GF

B490

B25X50

End-I

582.826

252.053

0.114

GF

B490

B25X50

Middle

185.110

543.541

0.000

GF

B490

B25X50

End-J

722.965

310.509

0.235

GF

B492

B35X50

End-I

281.963

93.344

0.000

GF

B492

B35X50

Middle

82.861

269.455

0.000

GF

B492

B35X50

End-J

419.430

138.381

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Location

Top

Bottom

Shear

Level

Bay

Name

Rebar Area

Rebar Area

Rebar Area

GF

B498

B25X50

End-I

552.124

239.132

0.264

GF

B498

B25X50

Middle

142.774

419.426

0.000

GF

B498

B25X50

End-J

142.774

361.472

0.000

GF

B500

B40X60

End-I

256.581

174.546

0.000

GF

B500

B40X60

Middle

68.039

250.119

0.000

GF

B500

B40X60

End-J

342.634

113.533

0.000

GF

B501

B40X60

End-I

284.769

95.057

0.000

GF

B501

B40X60

Middle

72.019

234.240

0.000

GF

B501

B40X60

End-J

362.828

122.543

0.000

GF

B502

B40X60

End-I

192.416

63.925

0.000

GF

B502

B40X60

Middle

91.252

49.311

0.000

GF

B502

B40X60

End-J

247.828

82.255

0.000

GF

B507

B25X50

End-I

139.620

203.411

0.000

GF

B507

B25X50

Middle

81.554

145.444

0.000

GF

B507

B25X50

End-J

253.119

101.070

0.000

GF

B508

B25X50

End-I

91.689

201.549

0.000

GF

B508

B25X50

Middle

53.369

90.274

0.000

GF

B508

B25X50

End-J

219.627

119.216

0.016

GF

B509

B25X50

End-I

308.880

101.874

0.000

GF

B509

B25X50

Middle

110.861

61.356

0.000

GF

B509

B25X50

End-J

223.243

127.234

0.000

GF

B510

B25X50

End-I

163.417

271.632

0.043

GF

B510

B25X50

Middle

53.725

128.300

0.154

GF

B510

B25X50

End-J

219.532

132.249

0.210

GF

B511

B25X50

End-I

237.162

226.085

0.000

GF

B511

B25X50

Middle

68.406

234.704

0.000

GF

B511

B25X50

End-J

346.946

115.678

0.000

GF

B512

B25X50

End-I

27.774

338.552

0.035

GF

B512

B25X50

Middle

92.135

136.094

0.165

GF

B512

B25X50

End-J

354.170

116.627

0.230

GF

B513

B25X50

End-I

362.253

158.331

0.000

GF

B513

B25X50

Middle

257.627

94.691

0.000

GF

B513

B25X50

End-J

0.000

77.680

0.000

GF

B530

B25X50

End-I

64.090

69.413

0.000

GF

B530

B25X50

Middle

40.901

91.748

0.000

GF

B530

B25X50

End-J

206.238

68.264

0.000

GF

B531

B35X50

End-I

209.002

69.314

0.000

GF

B531

B35X50

Middle

41.547

92.881

0.000

GF

B531

B35X50

End-J

85.464

62.954

0.000

GF

B677

B25X60

End-I

386.312

442.701

0.222

GF

B677

B25X60

Middle

190.514

647.475

0.000

GF

B677

B25X60

End-J

738.915

319.236

0.253

GF

B680

B25X50

End-I

410.623

179.061

0.000

GF

B680

B25X50

Middle

107.042

226.323

0.000

GF

B680

B25X50

End-J

361.472

153.660

0.000

GF

B683

B25X50

End-I

431.180

187.841

0.000

GF

B683

B25X50

Middle

112.270

308.852

0.000

GF

B683

B25X50

End-J

429.386

187.075

0.000

GF

B684

B25X50

End-I

548.051

237.415

0.017

GF

B684

B25X50

Middle

141.754

361.472

0.000

GF

B684

B25X50

End-J

249.326

151.505

0.000

GF

B685

B25X50

End-I

268.460

95.697

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Beam Design - Flexural & Shear Design Rebar Areas


Story

Beam

Section

Location

Top

Bottom

Shear

Level

Bay

Name

Rebar Area

Rebar Area

Rebar Area

GF

B685

B25X50

Middle

53.105

361.472

0.000

GF

B685

B25X50

End-J

149.404

197.387

0.000

GF

B686

B25X50

End-I

237.390

187.312

0.267

GF

B686

B25X50

Middle

74.381

207.186

0.000

GF

B720

B35X50

End-I

216.129

355.031

0.000

GF

B720

B35X50

Middle

81.313

148.805

0.000

GF

B720

B35X50

End-J

386.557

127.639

0.000

GF

B721

B35X50

End-I

188.736

140.447

0.000

GF

B721

B35X50

Middle

79.491

114.153

0.000

GF

B721

B35X50

End-J

387.694

187.906

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

5.0 DESIGN OF COLUMNS


Preliminary dimensioning of columns are carried out by evaluating the load of individual floors based on
the influence area and summing up to get the load carried at the base level. Later, these column loads
calculated were verified by comparing these values with the values obtained by adding the reactions at the
support points in SAFE models.
The structure is modeled in ETABS and the in-built feature of the software is used for design of the
columns and walls. The columns are modeled as line elements in 3-D model. The analysis is performed
after applying all loads and specifying load combinations. All the load combinations are considered in the
design of elements. The software performs design of columns for biaxial bending by generating
interaction curves.
Output for Column Design
Concrete Column Design - P-M-M Interaction & Shear Design
Story

Column

Section

Column

PMM Ratio

Flexural

Shear22

Shear33

Level

Line

Name

End

or Rebar %

Rebar Area

Rebar Area

Rebar Area

FL LVL +6.8

C27

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C27

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C27

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C27

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C27

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C27

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C27

D40

Top

1.000%

1256.637

0.000

0.000

GF

C27

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C28

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C28

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C28

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C28

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C28

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C28

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C28

D40

Top

1.000%

1256.637

0.000

0.000

GF

C28

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C29

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C29

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C29

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C29

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C29

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C29

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C29

D40

Top

1.000%

1256.637

0.000

0.000

GF

C29

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C30

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C30

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C30

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C30

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C30

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C30

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C30

D40

Top

1.000%

1256.637

0.000

0.000

GF

C30

D40

Bottom

1.000%

1256.637

0.000

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Column Design - P-M-M Interaction & Shear Design


Story

Column

Section

Column

PMM Ratio

Flexural

Shear22

Shear33

Level

Line

Name

End

or Rebar %

Rebar Area

Rebar Area

Rebar Area

FL LVL +6.8

C31

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C31

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C31

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C31

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C31

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C31

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C31

D40

Top

1.000%

1256.637

0.000

0.000

GF

C31

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C32

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C32

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C32

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C32

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C32

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C32

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C32

D40

Top

1.000%

1256.637

0.000

0.000

GF

C32

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C33

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C33

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C33

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C33

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C33

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C33

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C33

D40

Top

1.000%

1256.637

0.000

0.000

GF

C33

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C34

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C34

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C34

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C34

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C34

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C34

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C34

D40

Top

1.000%

1256.637

0.000

0.000

GF

C34

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C58

C25X45

Top

1.000%

1125.000

0.000

0.000

GF

C58

C25X45

Bottom

1.000%

1125.000

0.000

0.000

FL LVL +5.5

C64

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C64

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C64

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C64

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C64

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C64

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C69

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C69

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C69

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C69

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C71

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C71

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C71

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C71

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C77

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C77

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C77

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C77

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C77

C25X65

Top

1.000%

1625.000

0.000

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Column Design - P-M-M Interaction & Shear Design


Story

Column

Level

Line

GF

C77

FL LVL +5.5

C79

FL LVL +5.5

Section

Column

PMM Ratio

Flexural

Shear22

Shear33

Name

End

or Rebar %

Rebar Area

Rebar Area

Rebar Area

C25X65

Bottom

1.000%

1625.000

0.000

0.000

C25X65

Top

1.000%

1625.000

0.000

0.000

C79

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C79

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C79

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C79

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C79

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +6.8

C83

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C83

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C83

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C83

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C83

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C83

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C83

D40

Top

1.000%

1256.637

0.000

0.000

GF

C83

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C89

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C89

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C89

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C89

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C89

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C89

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C90

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C90

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C90

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C90

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C90

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C90

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +6.8

C91

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +6.8

C91

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C91

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C91

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C91

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C91

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C91

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C91

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C93

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C93

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C93

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C93

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +8.55

C96

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +8.55

C96

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +6.8

C96

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +6.8

C96

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +5.5

C96

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +5.5

C96

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +4.5

C96

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +4.5

C96

C60X60

Bottom

1.000%

3600.000

0.000

0.000

GF

C96

C60X60

Top

1.000%

3600.000

0.000

0.000

GF

C96

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +8.55

C97

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +8.55

C97

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +6.8

C97

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +6.8

C97

C60X60

Bottom

1.000%

3600.000

0.000

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Column Design - P-M-M Interaction & Shear Design


Story

Column

Section

Column

PMM Ratio

Flexural

Shear22

Shear33

Level

Line

Name

End

or Rebar %

Rebar Area

Rebar Area

Rebar Area

FL LVL +5.5

C97

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +5.5

C97

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +4.5

C97

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +4.5

C97

C60X60

Bottom

1.000%

3600.000

0.000

0.000

GF

C97

C60X60

Top

1.000%

3600.000

0.000

0.000

GF

C97

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +8.55

C98

C60X100

Top

3.803%

22818.894

0.000

0.000

FL LVL +8.55

C98

C60X100

Bottom

2.933%

17596.458

0.000

0.000

FL LVL +6.8

C98

C60X100

Top

2.933%

17596.458

0.000

0.000

FL LVL +6.8

C98

C60X100

Bottom

1.393%

8360.140

0.000

0.000

FL LVL +5.5

C98

C60X100

Top

1.393%

8360.140

0.000

0.000

FL LVL +5.5

C98

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +4.5

C98

C60X100

Top

1.000%

6000.000

0.000

0.000

FL LVL +4.5

C98

C60X100

Bottom

1.000%

6000.000

0.000

0.000

GF

C98

C60X100

Top

1.000%

6000.000

0.000

0.000

GF

C98

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +8.55

C99

C60X100

Top

3.714%

22284.116

0.000

0.000

FL LVL +8.55

C99

C60X100

Bottom

2.871%

17224.491

0.000

0.000

FL LVL +6.8

C99

C60X100

Top

2.871%

17224.491

0.000

0.000

FL LVL +6.8

C99

C60X100

Bottom

1.326%

7958.708

0.000

0.000

FL LVL +5.5

C99

C60X100

Top

1.326%

7958.708

0.000

0.000

FL LVL +5.5

C99

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +4.5

C99

C60X100

Top

1.000%

6000.000

0.000

0.000

FL LVL +4.5

C99

C60X100

Bottom

1.000%

6000.000

0.000

0.000

GF

C99

C60X100

Top

1.000%

6000.000

0.000

0.000

GF

C99

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +5.5

C100

C25X50

Top

1.000%

1250.000

0.000

0.000

FL LVL +5.5

C100

C25X50

Bottom

1.000%

1250.000

0.000

0.000

FL LVL +4.5

C100

C25X50

Top

1.000%

1250.000

0.000

0.000

FL LVL +4.5

C100

C25X50

Bottom

1.000%

1250.000

0.000

0.000

GF

C100

C25X50

Top

1.000%

1250.000

0.000

0.000

GF

C100

C25X50

Bottom

1.000%

1250.000

0.000

0.000

FL LVL +5.5

C101

C25X50

Top

1.000%

1250.000

0.000

0.000

FL LVL +5.5

C101

C25X50

Bottom

1.000%

1250.000

0.000

0.000

FL LVL +4.5

C101

C25X50

Top

1.000%

1250.000

0.000

0.000

FL LVL +4.5

C101

C25X50

Bottom

1.000%

1250.000

0.000

0.000

GF

C101

C25X50

Top

1.000%

1250.000

0.000

0.000

GF

C101

C25X50

Bottom

1.000%

1250.000

0.000

0.000

FL LVL +6.8

C104

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C104

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C104

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +5.5

C104

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C104

D40

Top

1.000%

1256.637

0.000

0.000

FL LVL +4.5

C104

D40

Bottom

1.000%

1256.637

0.000

0.000

GF

C104

D40

Top

1.000%

1256.637

0.000

0.000

GF

C104

D40

Bottom

1.000%

1256.637

0.000

0.000

FL LVL +6.8

C105

C25X65

Top

1.000%

1625.000

1.145

0.000

FL LVL +6.8

C105

C25X65

Bottom

1.000%

1625.000

1.143

0.000

FL LVL +5.5

C105

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C105

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C105

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C105

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C105

C25X65

Top

1.000%

1625.000

0.000

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Column Design - P-M-M Interaction & Shear Design


Story

Column

Section

Column

PMM Ratio

Flexural

Shear22

Shear33

Level

Line

Name

End

or Rebar %

Rebar Area

Rebar Area

Rebar Area

GF

C105

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C107

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C107

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C107

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C107

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C108

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C108

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C108

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C108

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C108

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C108

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +6.8

C109

C25X65

Top

1.000%

1625.000

0.315

0.000

FL LVL +6.8

C109

C25X65

Bottom

1.517%

2465.505

0.312

0.000

FL LVL +5.5

C109

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C109

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C109

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C109

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C109

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C109

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C110

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C110

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C110

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C110

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C110

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C110

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +8.55

C111

C60X60

Top

1.000%

3600.000

0.000

0.429

FL LVL +8.55

C111

C60X60

Bottom

1.000%

3600.000

0.000

0.426

FL LVL +6.8

C111

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +6.8

C111

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +5.5

C111

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +5.5

C111

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +4.5

C111

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +4.5

C111

C60X60

Bottom

1.000%

3600.000

0.000

0.000

GF

C111

C60X60

Top

1.000%

3600.000

0.000

0.000

GF

C111

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +8.55

C112

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +8.55

C112

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +6.8

C112

C60X60

Top

1.000%

3600.000

0.198

0.000

FL LVL +6.8

C112

C60X60

Bottom

1.000%

3600.000

0.196

0.000

FL LVL +5.5

C112

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +5.5

C112

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +4.5

C112

C60X60

Top

1.000%

3600.000

0.000

0.000

FL LVL +4.5

C112

C60X60

Bottom

1.000%

3600.000

0.000

0.000

GF

C112

C60X60

Top

1.000%

3600.000

0.000

0.000

GF

C112

C60X60

Bottom

1.000%

3600.000

0.000

0.000

FL LVL +8.55

C113

C60X100

Top

2.684%

16102.846

0.000

0.000

FL LVL +8.55

C113

C60X100

Bottom

2.073%

12436.033

0.000

0.000

FL LVL +6.8

C113

C60X100

Top

1.537%

9219.039

0.000

0.000

FL LVL +6.8

C113

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +5.5

C113

C60X100

Top

1.000%

6000.000

0.000

0.000

FL LVL +5.5

C113

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +4.5

C113

C60X100

Top

1.000%

6000.000

0.000

0.000

FL LVL +4.5

C113

C60X100

Bottom

1.000%

6000.000

0.000

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Column Design - P-M-M Interaction & Shear Design


Story

Column

Section

Column

PMM Ratio

Flexural

Shear22

Shear33

Level

Line

Name

End

or Rebar %

Rebar Area

Rebar Area

Rebar Area

GF

C113

C60X100

Top

1.000%

6000.000

0.000

0.000

GF

C113

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +8.55

C114

C60X100

Top

2.765%

16587.165

0.000

0.000

FL LVL +8.55

C114

C60X100

Bottom

2.174%

13044.048

0.000

0.000

FL LVL +6.8

C114

C60X100

Top

1.536%

9215.837

0.000

0.000

FL LVL +6.8

C114

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +5.5

C114

C60X100

Top

1.000%

6000.000

0.000

0.000

FL LVL +5.5

C114

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +4.5

C114

C60X100

Top

1.000%

6000.000

0.000

0.000

FL LVL +4.5

C114

C60X100

Bottom

1.000%

6000.000

0.000

0.000

GF

C114

C60X100

Top

1.000%

6000.000

0.000

0.000

GF

C114

C60X100

Bottom

1.000%

6000.000

0.000

0.000

FL LVL +6.8

C117

C25X65

Top

1.000%

1625.000

0.000

0.128

FL LVL +6.8

C117

C25X65

Bottom

1.000%

1625.000

0.000

0.127

FL LVL +5.5

C117

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C117

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C117

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C117

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C117

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C117

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C118

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C118

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C118

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C118

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C118

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C118

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C119

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C119

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C119

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C119

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C119

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C119

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +6.8

C120

C25X65

Top

1.099%

1786.384

0.000

0.000

FL LVL +6.8

C120

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C120

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C120

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C120

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C120

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C120

C25X65

Top

1.261%

2049.861

0.000

0.000

GF

C120

C25X65

Bottom

1.638%

2660.998

0.000

0.000

GF

C123

C30X30

Top

1.000%

900.000

0.000

0.000

GF

C123

C30X30

Bottom

1.000%

900.000

0.000

0.000

GF

C124

C30X30

Top

1.000%

900.000

0.000

0.000

GF

C124

C30X30

Bottom

1.000%

900.000

0.000

0.000

FL LVL +4.5

C125

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C125

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C125

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C125

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C126

C25X65

Top

1.695%

2754.103

0.000

0.000

FL LVL +4.5

C126

C25X65

Bottom

1.297%

2108.144

0.000

0.000

GF

C126

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C126

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +8.55

C127

C45X45

Top

2.873%

5818.134

0.000

0.000

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

Concrete Column Design - P-M-M Interaction & Shear Design


Story

Column

Section

Column

PMM Ratio

Flexural

Shear22

Shear33

Level

Line

Name

End

or Rebar %

Rebar Area

Rebar Area

Rebar Area

FL LVL +8.55

C127

C45X45

Bottom

2.377%

4813.286

0.000

0.000

FL LVL +6.8

C127

C45X45

Top

1.747%

3538.280

0.000

0.000

FL LVL +6.8

C127

C45X45

Bottom

1.498%

3033.243

0.000

0.000

FL LVL +5.5

C127

C45X45

Top

1.498%

3033.243

0.000

0.000

FL LVL +5.5

C127

C45X45

Bottom

1.009%

2042.896

0.000

0.000

FL LVL +4.5

C127

C45X45

Top

1.009%

2042.896

0.000

0.000

FL LVL +4.5

C127

C45X45

Bottom

1.000%

2025.000

0.000

0.000

GF

C127

C45X45

Top

1.000%

2025.000

0.000

0.000

GF

C127

C45X45

Bottom

1.000%

2025.000

0.000

0.000

FL LVL +8.55

C128

C45X45

Top

2.885%

5843.011

0.000

0.000

FL LVL +8.55

C128

C45X45

Bottom

2.409%

4878.604

0.000

0.000

FL LVL +6.8

C128

C45X45

Top

1.754%

3551.587

0.000

0.000

FL LVL +6.8

C128

C45X45

Bottom

1.506%

3050.437

0.000

0.000

FL LVL +5.5

C128

C45X45

Top

1.506%

3050.437

0.000

0.000

FL LVL +5.5

C128

C45X45

Bottom

1.025%

2075.248

0.000

0.000

FL LVL +4.5

C128

C45X45

Top

1.025%

2075.248

0.000

0.000

FL LVL +4.5

C128

C45X45

Bottom

1.000%

2025.000

0.000

0.000

GF

C128

C45X45

Top

1.000%

2025.000

0.000

0.000

GF

C128

C45X45

Bottom

1.000%

2025.000

0.000

0.000

FL LVL +4.5

C129

C25X45

Top

1.000%

1125.000

0.000

0.000

FL LVL +4.5

C129

C25X45

Bottom

1.000%

1125.000

0.000

0.000

GF

C129

C25X45

Top

1.000%

1125.000

0.000

0.000

GF

C129

C25X45

Bottom

1.000%

1125.000

0.000

0.000

GF

C130

C25X45

Top

1.000%

1125.000

0.000

0.000

GF

C130

C25X45

Bottom

1.000%

1125.000

0.000

0.000

GF

C131

C25X45

Top

1.000%

1125.000

0.000

0.000

GF

C131

C25X45

Bottom

1.000%

1125.000

0.000

0.000

FL LVL +5.5

C54

C25X65

Top

1.149%

1866.941

0.000

0.517

FL LVL +5.5

C54

C25X65

Bottom

1.000%

1625.000

0.000

0.516

FL LVL +4.5

C54

C25X65

Top

1.000%

1625.000

0.000

0.000

FL LVL +4.5

C54

C25X65

Bottom

1.000%

1625.000

0.000

0.000

GF

C54

C25X65

Top

1.000%

1625.000

0.000

0.000

GF

C54

C25X65

Bottom

1.000%

1625.000

0.000

0.000

FL LVL +5.5

C135

C25X100

Top

1.000%

2500.000

0.000

0.206

FL LVL +5.5

C135

C25X100

Bottom

1.000%

2500.000

0.000

0.206

FL LVL +4.5

C135

C25X100

Top

1.000%

2500.000

0.000

0.000

FL LVL +4.5

C135

C25X100

Bottom

1.000%

2500.000

0.000

0.000

GF

C135

C25X100

Top

1.000%

2500.000

0.000

0.000

GF

C135

C25X100

Bottom

1.000%

2500.000

0.000

0.000

6.0 DESIGN OF SHEAR WALLS


The shear walls provide stiffness and stability to the structure against lateral force due to seismic and
wind. The size of the shear walls are such that the lateral deflection and inter-storey drift values are within
Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

the permissible limits as prescribed in the UBC code. The shear wall elements are modeled as shell
elements in the 3-D model. They are assigned Pier Labels so that they can be designed as shear walls.
The in-built design capability of ETABS is used for design of wall elements. The software designs each
pier elements by taking the geometry as defined in the analysis model and by developing 3-D interaction
surfaces for each Pier.
Wall Design Output
Story
FL LVL
+8.55
FL LVL
+8.55
FL LVL
+6.8
FL LVL
+6.8
FL LVL
+5.5
FL LVL
+5.5
FL LVL
+4.5
FL LVL
+4.5
GF
GF
FL LVL
+5.5
FL LVL
+5.5
FL LVL
+4.5
FL LVL
+4.5
GF
GF
FL LVL
+5.5
FL LVL
+5.5
FL LVL
+4.5
FL LVL
+4.5
GF
GF
FL LVL
+5.5
FL LVL

Pier
Lbl
RW0
1
RW0
1
RW0
1
RW0
1
RW0
1
RW0
1
RW0
1
RW0
1
RW0
1
RW0
1

StnLo
c

Edge
Bar

EndB
ar

Top

10M

10M

0.25

0.0115

0.003 T 1

750

Bot

10M

10M

0.25

0.0042

0.003 B 1

750

Top

10d

10d

0.25

0.0136

0.0036 T 1

500

Bot

10d

10d

0.25

0.0037

0.0036 B 1

500

Top

10d

10d

0.25

0.0037

0.0036 T 1

500

Bot

10d

10d

0.25

0.0025

0.0036 B 1

500

Top

10d

10d

0.25

0.005

0.0036 T 1

500

Bot

10d

10d

0.25

0.0025

0.0036 B 1

500

Top

10d

10d

0.25

0.0025

0.0036 T 1

500

Bot

10d

10d

0.25

0.0041

0.0036 B 1

500

P2

Top

10d

10d

0.25

0.0059

0.0031 T 1

625

P2

Bot

10d

10d

0.25

0.0052

0.0031 B 1

625

P2

Top

10d

10d

0.25

0.0049

0.0031 T 1

625

P2
P2
P2

Bot
Top
Bot

10d
10d
10d

10d
10d
10d

0.25
0.25
0.25

0.0037
0.0067
0.0109

0.0031 B 1
0.0031 T 1
0.0031 B 1

625
625
625

P3

Top

10d

10d

0.25

0.0025

0.0031 T 1

625

P3

Bot

10d

10d

0.25

0.0031

0.0031 B 1

625

P3

Top

10d

10d

0.25

0.0058

0.0031 T 1

625

P3
P3

Bot
Top

10d
10d

10d
10d

0.25
0.25

0.0064
0.0095

0.0031 B 1
0.0031 T 1

P3

Bot

10d

10d

0.25

0.0152

0.0031 B 1

625
625
809.1
56

P4
P4

Top
Bot

14d
14d

14d
14d

0.25
0.25

0.0025
0.0025

0.0075 T 1
0.0075 B 1

625
625

Arif & Bintoak Consulting Architects and Engineers, Dubai

EndSp
cng

ReqRa
tio

CurrRa
tio

PierL
eg

Shear
Av

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

+5.5
FL LVL
+4.5
FL LVL
+4.5
GF
GF
FL LVL
+15.95
FL LVL
+15.95
FL LVL
+13.85
FL LVL
+13.85
FL LVL
+8.55
FL LVL
+8.55
FL LVL
+6.8
FL LVL
+6.8
FL LVL
+5.5
FL LVL
+5.5
FL LVL
+4.5
FL LVL
+4.5
GF
GF
FL LVL
+15.95
FL LVL
+15.95
FL LVL
+13.85
FL LVL
+13.85
FL LVL
+8.55
FL LVL
+8.55
FL LVL
+6.8
FL LVL
+6.8
FL LVL
+5.5
FL LVL
+5.5
FL LVL
+4.5

Project No: 1563

P4

Top

14d

14d

0.25

0.0025

0.0075 T 1

625

P4
P4
P4

Bot
Top
Bot

14d
14d
14d

14d
14d
14d

0.25
0.25
0.25

0.0025
0.0025
0.0025

0.0075 B 1
0.0075 T 1
0.0075 B 1

625
625
625

P5

Top

10d

10d

0.25

0.0025

0.0025 T 1

750

P5

Bot

10d

10d

0.25

0.0025

0.0025 B 1

750

P5

Top

10M

10M

0.25

0.0025

0.0033 T 1

750

P5

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P5

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P5

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P5

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P5

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P5

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P5

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P5

Top

10d

10d

0.25

0.0025

0.0024 T 1

750

P5
P5
P5

Bot
Top
Bot

10d
10M
10M

10d
10M
10M

0.25
0.25
0.25

0.0025
0.0025
0.0025

0.0024 B 1
0.0028 T 1
0.0028 B 1

750
750
750

P6

Top

8d

8d

0.25

0.0025

0.0017 T 1

750

P6

Bot

8d

8d

0.25

0.0025

0.0017 B 1

750

P6

Top

10M

10M

0.25

0.0025

0.0033 T 1

750

P6

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P6

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P6

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P6

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P6

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P6

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P6

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P6

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

FL LVL
+4.5
GF
GF
FL LVL
+15.95
FL LVL
+15.95
FL LVL
+13.85
FL LVL
+13.85
FL LVL
+8.55
FL LVL
+8.55
FL LVL
+6.8
FL LVL
+6.8
FL LVL
+5.5
FL LVL
+5.5
FL LVL
+4.5
FL LVL
+4.5
GF
GF
FL LVL
+15.95
FL LVL
+15.95
FL LVL
+13.85
FL LVL
+13.85
FL LVL
+8.55
FL LVL
+8.55
FL LVL
+6.8
FL LVL
+6.8
FL LVL
+5.5
FL LVL
+5.5
FL LVL
+4.5
FL LVL
+4.5
GF

Project No: 1563

P6
P6
P6

Bot
Top
Bot

10M
10M
10M

10M
10M
10M

0.25
0.25
0.25

0.0025
0.0025
0.0025

0.0028 B 1
0.0028 T 1
0.0028 B 1

750
750
750

P7

Top

8d

8d

0.25

0.0025

0.0017 T 1

750

P7

Bot

8d

8d

0.25

0.0025

0.0017 B 1

750

P7

Top

10M

10M

0.25

0.0025

0.0033 T 1

750

P7

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P7

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P7

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P7

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P7

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P7

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P7

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P7

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P7
P7
P7

Bot
Top
Bot

10M
10M
10M

10M
10M
10M

0.25
0.25
0.25

0.0025
0.0025
0.0025

0.0028 B 1
0.0028 T 1
0.0028 B 1

750
750
750

P8

Top

8d

8d

0.25

0.0025

0.0017 T 1

750

P8

Bot

8d

8d

0.25

0.0025

0.0017 B 1

750

P8

Top

10M

10M

0.25

0.0025

0.0033 T 1

750

P8

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P8

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P8

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P8

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P8

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P8

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P8

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P8

Top

10M

10M

0.25

0.0025

0.0028 T 1

750

P8
P8

Bot
Top

10M
10M

10M
10M

0.25
0.25

0.0025
0.0025

0.0028 B 1
0.0028 T 1

750
750

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

GF
FL LVL
+25.85
FL LVL
+25.85
FL LVL
+27.85
FL LVL
+27.85
FL LVL
+22.4
FL LVL
+22.4
FL LVL
+18.8
FL LVL
+18.8
FL LVL
+13.85
FL LVL
+13.85
FL LVL
+8.55
FL LVL
+8.55
FL LVL
+6.8
FL LVL
+6.8
FL LVL
+5.5
FL LVL
+5.5
FL LVL
+4.5
FL LVL
+4.5
GF
GF

Project No: 1563

P8

Bot

10M

10M

0.25

0.0025

0.0028 B 1

750

P9

Top

20M

20M

0.25

0.0025

0.0148 T 1

500

P9

Bot

20M

20M

0.25

0.0025

0.0148 B 1

500

P10

Top

14d

14d

0.25

0.0025

0.011 T 1

375

P10

Bot

14d

14d

0.25

0.0025

0.011 B 1

375

P11

Top

20M

20M

0.25

0.0025

0.0092 T 1

750

P11

Bot

20M

20M

0.25

0.0025

0.0127 B 1

750

P11

Top

14d

14d

0.25

0.0025

0.0065 T 1

750

P11

Bot

14d

14d

0.25

0.0025

0.0065 B 1

750

P12

Top

20M

20M

0.25

0.0025

0.0087 T 1

750

P12

Bot

20M

20M

0.25

0.0025

0.0087 B 1

750

P7A

Top

12d

12d

0.25

0.0139

0.0035 T 1

875

P7A

Bot

12d

12d

0.25

0.0025

0.0035 B 1

875

P7A

Top

10M

10M

0.25

0.0025

0.0031 T 1

750

P7A

Bot

10M

10M

0.25

0.0025

0.0031 B 1

750

P7A

Top

10M

10M

0.25

0.0025

0.0031 T 1

750

P7A

Bot

10M

10M

0.25

0.0025

0.0031 B 1

750

P7A

Top

10M

10M

0.25

0.0025

0.0031 T 1

750

P7A
P7A
P7A

Bot
Top
Bot

10M
10M
10M

10M
10M
10M

0.25
0.25
0.25

0.0025
0.0025
0.0025

0.0031 B 1
0.0031 T 1
0.0031 B 1

750
750
750

7.0 FOUNDATION DESIGN


7.1 Analysis and Design
The design of the foundation is based on the soil investigation report prepared by by M/s Technical
Laboratory for soil & building material testing.. The groundwater table encountered during investigation
Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Project No: 1563

was at about 2.0-3.0m below existing ground level. A 3-D model is made in ETABS and analysis carried
out with all the relevant load cases for strength and serviceability requirements. The support reactions for
various load cases, is exported to finite element software SAFE for further analysis of the foundation.
7.2 Analysis Result
Soil Pressure

Punching Shear

Poi
nt
Text
253
254
255
256
257
258
259
260
284
291

TABLE: Concrete Slab Design 02 - Punching Shear Data


Glob
ReinfT Stat
Com
ShrStr
ShrStr Dep
alY
ype
us
Ratio
bo
Max
Cap
th
Unitle
m
m
Text
Text
ss
Text
N/mm2 N/mm2 mm
14.72
UDL0
57
2 None
OK
0.19 1
0.27
1.36
367
15.37
57
2 None
OK
0.20 UE65
0.27
1.36
367
18.27
57
2 None
OK
0.13 UE66
0.18
1.36
367
18.92
57
2 None
OK
0.13 UE65
0.18
1.36
367
21.82
57
2 None
OK
0.13 UE66
0.18
1.36
367
22.47
57
2 None
OK
0.13 UE65
0.18
1.36
367
25.37
57
2 None
OK
0.20 UE58
0.28
1.36
367
26.02
UDL0
57
2 None
OK
0.19 1
0.26
1.36
367
14.21
UDL0
40.45
9 None
OK
0.16 1
0.21
1.36
367
32.42 16.54 None
OK
0.24 UE59
0.32
1.32
467

Glob
alX

Arif & Bintoak Consulting Architects and Engineers, Dubai

Perime
ter
mm
3047
3047
3047
3047
3047
3047
3047
3047
2317
3317

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

296

40.45

11.24 None

OK

301
316
318
370

40.45
16.9
23.85
12.05

9.11
29.84
29.84
2

None
None
None
None

OK
OK
OK
OK

378

8 None

OK

379
382
569

8.325
2
40.45

8 None
21.7 None
17.4 None

OK
OK
OK

574

8.325

28.09 None

OK

575

28.09 None

OK

28.09 None

OK

577

32.42
25.67
5
15.07
5

28.09 None

OK

578

16.9

28.09 None

OK

579
300
9
301
0
301
1
301
2
301
3
301
4
301
5
301
7
301
8
301
9
302
0
302
3
302
4
302
5
305
7
306

23.85

28.09 None

28.7

576

Project No: 1563

0.31

1.21

367

2417

0.57
0.36
0.37
0.06

1.21
1.32
1.32
1.36

367
767
767
367

2905
5542
5542
3993

0.34

1.21

367

2417

0.55
0.25
0.57

1.21
1.32
1.21

367
767
367

2817
6917
2780

0.34

1.36

367

2967

0.51

1.36

367

2967

0.59

1.49

767

5817

0.58

1.49

767

5817

0.52

1.49

767

6367

OK

0.26 UE58
UDL0
0.48 1
0.27 UE71
0.28 UE69
0.04 UE57
UDL0
0.28 1
UDL0
0.46 1
0.19 UE67
0.48 UE56
UDL0
0.25 1
UDL0
0.38 1
UDL0
0.40 1
UDL0
0.39 1
UDL0
0.35 1
UDL0
0.36 1

0.53

1.49

767

6367

2 None

OK

0.24 UE69

0.32

1.36

367

2761

28.7

3.06 None

OK

0.58 UE69

0.70

1.21

367

2966

34.77

3.06 None

OK

0.74

1.21

367

3017

40.45

3.06 None

OK

0.61 UE58
UDL0
0.33 1

0.40

1.21

367

2817

8.325

3.94 None

OK

0.25

1.21

367

2417

12.05

3.94 None

OK

0.74

1.21

367

3039

28.7

7.41 None

OK

0.54

1.21

367

2817

8.325

12.74 None

OK

0.21 UE66
UDL0
0.61 1
UDL0
0.45 1
UDL0
0.97 1

1.23

1.27

367

4267

32.42
15.07
5
25.67
5

12.74 None

OK

0.52

1.49

467

3467

12.74 None

OK

1.15

1.39

467

5467

12.74 None

OK

1.16

1.39

467

5467

12.74 None

OK

0.59

1.21

367

2817

12.05

12.74 None

OK

0.51

1.21

367

2867

28.7

12.74 None

OK

0.36

1.21

367

2867

2
8.325

17 None
20.41 None

OK
OK

0.35 UE54
UDL0
0.83 1
UDL0
0.84 1
UDL0
0.49 1
UDL0
0.42 1
UDL0
0.30 1
UDL0
0.40 1
0.17 UE71

0.49
0.26

1.21
1.49

367
767

2817
3952

Arif & Bintoak Consulting Architects and Engineers, Dubai

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

3
306
4
306
5
306
6
310
5
310
6
314
3
314
6
316
7
316
8
316
9

32.42
15.07
5
25.67
5

20.41 None

OK

20.41 None

OK

20.41 None

OK

32.42

23.91 None

OK

40.45

23.91 None

OK

19.17

12.74 None

OK

21.57

12.74 None

OK

42.15

11.24 None

OK

42.15

17.4 None

OK

42.15

9.11 None

OK

Project No: 1563

UDL0
0.93 1
UDL0
0.32 1
UDL0
0.32 1
UDL0
0.37 1
UDL0
0.41 1
UDL0
0.46 1
UDL0
0.47 1
0.17 UE57
UDL0
0.12 1
UDL0
0.09 1

Reinforcement

X-direction Top R/f

Arif & Bintoak Consulting Architects and Engineers, Dubai

1.18

1.27

367

4267

0.44

1.36

367

2267

0.43

1.36

367

2267

0.45

1.21

367

2817

0.50

1.21

367

2817

0.63

1.36

367

3017

0.63

1.36

367

3017

0.23

1.36

367

2317

0.16

1.36

367

2680

0.13

1.36

367

2705

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Y-direction Top R/f

X-direction bot R/f

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Mosque, on Plot no-NS-R-C-01 NAD AL SHIBA THIRD, DUBAI

Y-direction bot R/f

Arif & Bintoak Consulting Architects and Engineers, Dubai

Project No: 1563

Das könnte Ihnen auch gefallen