Sie sind auf Seite 1von 275

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

AVANCE A JUNIO 2015


Contrato original incluido IGV
tem

Descripcin

1.00
2.00
3.00
4.00

Contrato Principal
Presupuesto Adicional N 01
Presupuesto Adicional N 02
Presupuesto Adicional N 03
Total

127,124,273.10
Monto aprobado incl
IGV
(S/.)
127,124,273.10
12,382,600.23
5,658,122.21
11,329,882.10
156,494,877.64

RESUMEN DE VALORIZACIONES
Monto val incl IGV
Mes
(S/.)
May-2014
Jun-2014
Jul-2014
Aug-2014
Sep-2014
Oct-2014
Nov-2014
Dec-2014
Jan-2015
Feb-2015
Mar-2015
Apr-2015
May-2015
Jun-2015
Jul-2015
Aug-2015
Sep-2015
Oct-2015
Nov-2015
Total

539,235.98
434,896.53
937,409.18
10,993,555.53
3,668,355.34
5,229,004.36
1,286,111.78
2,314,859.82
2,773,388.96
1,157,422.69
282,232.39
34,361.60
178,809.18
1,344,400.64

29,650,834.16

Monto val anterior


Monto val Mes incl Monto val acum incl
incl IGV
IGV
IGV
(S/.)
(S/.)
(S/.)
30,326,739.07
335,184.95
30,661,924.01
421,858.96
421,858.96
5,658,122.21
5,658,122.21
1,009,215.69
1,009,215.69
36,406,720.24
1,344,400.64
37,751,120.87
23.26%
0.86%
24.12%
SALDO POR VALORIZAR
Valorizado en CD
Descripcin
(S/.)
Obras preliminares
1,289,380.80
Movimiento de tierras
1,940,442.77
Sub bases y base
438,524.14
Pavimento asfltico
25,898.04
Obras de Arte y Drenaje
4,548,443.61
Transporte
14,116,157.89
Sealizacin y Segurida
0.00
Proteccin ambiental
174,092.07
Puentes peatonales
1,718,885.01
Total Costo Directo
24,251,824.33
Total incl IGV
37,751,120.87

Saldo x valorizar
incl IGV
(S/.)
96,462,349.09
11,960,741.27
10,320,666.40
118,743,756.76
75.88%

Saldo x val en CD
(S/.)

% Avance
24.12%
3.41%
100.00%
8.91%
24.12%

% Avance

619,774.60
2,866,158.15
2,687,472.37
11,641,768.13
14,403,507.95
26,460,330.91
9,817,959.74
408,942.66
1,984,227.74

67.54%
40.37%
14.03%
0.22%
24.00%
34.79%
0.00%
29.86%
46.42%

70,890,142.25
118,743,756.76

24.12%

Plazo de ejecucin = 501 dc (Del 01/05/14 al 13/09/15)

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

0%
MES DE
item
100
101.A
102.A
103.A
200
201.B
202.B
202.EE
205.C
205.EE
210.A
220.B
220.EE
300
303.A
305.A
400
401.A
402.A
410.A
420.B
421.A
422.A
423.A
424.A
600
601.C
602.EE
603.EE
605.A
605.B
605.EE
610.D
610.G
612.A
615.A
625.B
625.EE
624.A
624.B
625.C
630.A
635.G
635.F
635.B
635.H
635.I
635.J
638.A
638.B
639.A
639.EE-01
639.EE-02
640.A
640.B
645.A
650.H
655.B
695.A
900.A
700
700.A

Descripcin
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
MOVIMIENTO DE TIERRAS
DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS
DEMOLICION DE ESTRUCTURAS
REMOCION DE CARPETA ASFALTICA
EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
PERFILADO Y COMPACTACION EN ZONAS DE CORTE
TERRAPLENES
MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE
MATERIAL DE CANTERA PARA RELLENO
SUB BASES Y BASE
SUB BASE GRANULAR
BASE GRANULAR
PAVIMENTO ASFALTICO
IMPRIMACION ASFALTICA
RIEGO DE LIGA
PAVIMENTO DE CONCRETO ASFALTICO CALIENTE (MAC)
CEMENTO ASFALTICO PEN 40/50
EMULSION ASFALTICA
ASFALTO DILUIDO TIPO MC-30
FILLER MINERAL
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN
LIMPIEZA Y ENCAUZAMIENTO DE ALCANTARILLAS
PREPARACIN DE SUPERFICIE DE CONCRETO
RELLENO PARA ESTRUCTURAS
MATERIAL FILTRANTE
REFUERZO DE CIMENTACION H=0.60m
CONCRETO CLASE D (F'C=210 KG/CM2)
CONCRETO CLASE G (F'C=100 KG/CM2)
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO FY=4200 KG/CM2
SUBDREN
TUBERIA DE VENTILACION PARA SUBDREN
TUBERIA DE PVC 2"
TUBERIA DE PVC 3"
TUBERIA PERFORADA D=6" P/SUBDREN
GEODREN
CUNETA RECTANGULAR URBANA TIPO I
CUNETA RECTANGULAR URBANA TIPO II
CUNETA TRIANGULAR REVESTIDA TIPO III
CUNETA RECTANGULAR URBANA TIPO IV
CUNETA RECTANGULAR DE ENCAUZAMIENTO
CUNETA DE TIERRA DE ENCAUZAMIENTO
SARDINEL PERALTADO
SARDINEL EN PARADERO
PISO ADOQUINADO
ALCANTARILLA DE PASO TIPO 1 (CRUCE DE CALLES)
ALCANTARILLA DE PASO TIPO 2 (CRUCE DE VIA AUXILIAR)
MODULO DE PARADERO TIPO I
MODULO DE PARADERO TIPO II
VEREDA DE CONCRETO DE 4"
GEOTEXTIL NO TEJIDO CLASE 2
JUNTA PARA MUROS
NVIELACION DE BUZONES
REVEGETACION DE TALUDES
TRANSPORTE
TRANSPORTE DE MATERIAL GRANULAR D<= 1 KM

Unid.

Precio
Unitario
S/.

Presupuesto
C. Principal
Metrado

GLB
KM
mes

1,185,200.00
5,180.00
56,000.00

1.00
10.03
12.00

HA
m3
m3
m3
m2
m3
m3
m3

2,135.00
75.20
15.10
5.60
2.10
10.50
15.40
8.50

7.22
2,842.07
439.42
40,693.30
92,175.41
122,782.65
45,772.35
180,307.84

m3
m3

39.80
52.10

34,435.63
33,694.02

m2
m2
m3
kg
L
L
kg
kg

2.10
1.05
180.00
2.85
2.05
2.70
1.36
15.10

185,494.64
113,734.44
16,538.14
2,187,995.39
79,614.11
241,143.03
710,709.85
10,939.98

m3
m3
m2
m3
m3
m2
m3
m3
m2
kg
m3
m
m
m
m
m2
m
m
m
m
m
m
m
m
m2
m
m
u
u
m2
m2
m2
u
ha

15.20
8.10
26.10
31.40
136.00
65.10
395.00
300.00
52.15
4.10
186.15
25.50
6.80
12.15
25.10
25.16
348.90
562.96
172.15
542.10
195.05
25.16
69.70
145.18
56.80
1,025.16
1,001.00
12,001.00
11,120.00
100.10
5.10
25.16
1,205.00
4,100.00

16,928.21
64.14
28.56
9,247.26
491.75
1,433.46
7,769.39
877.46
26,792.53
405,907.48
712.38
108.50
44.19
2,925.56
2,666.00
6,129.77
6,573.85
4,674.00
500.00
1,323.00
169.65
330.00
4,642.51
2,408.94
2,629.17
2,875.90
261.70
26.00
11.00
11,261.96
6,262.00
858.80
9.00
6.92

7.25

233,467.84

M3K

Monto S/.
1,909,155.40
1,185,200.00
51,955.40
672,000.00
4,183,953.10
15,414.70
213,723.66
6,635.24
227,882.48
193,568.36
1,289,217.83
704,894.19
1,532,616.64
3,125,996.51
1,370,538.07
1,755,458.44
11,667,666.17
389,538.74
119,421.16
2,976,865.20
6,235,786.86
163,208.93
651,086.18
966,565.40
165,193.70
18,951,951.56
257,308.79
519.53
745.42
290,363.96
66,878.00
93,318.25
3,068,909.05
263,238.00
1,397,230.44
1,664,220.67
132,609.54
2,766.75
300.49
35,545.55
66,916.60
154,225.01
2,293,616.27
2,631,275.04
86,075.00
717,198.30
33,090.23
8,302.80
323,582.95
349,729.91
149,336.86
2,948,257.64
261,961.70
312,026.00
122,320.00
1,127,322.20
31,936.20
21,607.41
10,845.00
28,372.00
29,317,903.87
1,692,641.84

VALORIZACION N
December-1899
Acumulado
Mes Anterior
Metrado
Monto S/.
1,289,380.80
0.48
568,896.00
9.36
48,484.80
12.00
672,000.00
1,311,639.52
2.14
4,568.90
22.46
1,688.99
0.00
18,560.16
103,936.90
0.00
40,113.23
421,188.92
15,752.25
242,584.65
63,255.43
537,671.16
393,663.28
6,780.55
269,865.89
2,376.15
123,797.39
12,827.43
6,108.30
12,827.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,537,818.26
11,183.56
169,990.11
0.00
9.56
249.52
6,106.74
191,751.64
0.00
1,101.65
71,717.42
5,060.20
1,998,779.00
592.96
177,888.00
17,533.64
914,379.33
209,860.77
860,429.16
0.00
0.00
0.00
2,032.86
24,699.25
0.00
4,550.68
114,495.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
534.17
13,439.72
0.00
0.00
10,669,098.12
71,456.68
518,060.93

0016

CONTRATO PRINCIPAL

Presente Valorizacin
Metrado
251.45
268.60
774.16
269.66
6,224.10
2.31
17.15
24.67
9.53
1.23
54.55
357.95
1,013.41

Monto S/.
0.00
0.00
0.00
0.00
6,155.43
0.00
0.00
0.00
0.00
0.00
0.00
3,872.33
2,283.10
44,860.86
30,811.57
14,049.29
13,070.61
13,070.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10,625.35
35.11
0.00
0.00
538.51
0.00
1,606.01
3,764.35
369.00
2,844.78
1,467.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
143,227.63
7,347.22

Acumulado

Saldo por

Actual

Valorizar

de

Metrado
0.48
9.36
12.00
2.14
22.46
18,560.16
40,113.23
16,003.70
63,524.03
7,554.71
2,645.81
12,332.40
11,185.87
9.56
6,123.89
1,126.32
5,069.73
594.19
17,588.19
210,218.72
2,032.86
4,550.68
534.17
72,470.09

Monto S/.
1,289,380.80
568,896.00
48,484.80
672,000.00
1,317,794.95
4,568.90
1,688.99
0.00
103,936.90
0.00
421,188.92
246,456.98
539,954.26
438,524.14
300,677.46
137,846.68
25,898.04
25,898.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,548,443.61
170,025.22
0.00
249.52
192,290.15
0.00
73,323.43
2,002,543.35
178,257.00
917,224.11
861,896.75
0.00
0.00
0.00
24,699.25
0.00
114,495.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13,439.72
0.00
0.00
10,812,325.75
525,408.15

Metrado
0.52
0.67
0.00
5.08
2,819.61
439.42
22,133.14
92,175.41
82,669.42
29,768.65
116,783.81
26,880.92
31,048.21
173,162.24
113,734.44
16,538.14
2,187,995.39
79,614.11
241,143.03
710,709.85
10,939.98
5,742.34
64.14
19.00
3,123.37
491.75
307.14
2,699.66
283.27
9,204.34
195,688.76
712.38
108.50
44.19
892.70
2,666.00
1,579.09
6,573.85
4,674.00
500.00
1,323.00
169.65
330.00
4,642.51
2,408.94
2,629.17
2,875.90
261.70
26.00
11.00
11,261.96
6,262.00
324.63
9.00
6.92
160,997.75

Monto S/.
Avance
619,774.60 67.54%
616,304.00
48.00%
3,470.60
93.32%
0.00 100.00%
2,866,158.15 31.50%
10,845.80
29.64%
212,034.67
0.79%
6,635.24
0.00%
123,945.58
45.61%
193,568.36
0.00%
868,028.91
32.67%
458,437.21
34.96%
992,662.38
35.23%
2,687,472.37 14.03%
1,069,860.61
21.94%
1,617,611.76
7.85%
11,641,768.13
0.22%
363,640.70
6.65%
119,421.16
0.00%
2,976,865.20
0.00%
6,235,786.86
0.00%
163,208.93
0.00%
651,086.18
0.00%
966,565.40
0.00%
165,193.70
0.00%
14,403,507.95 24.00%
87,283.57
66.08%
519.53
0.00%
495.90
33.47%
98,073.81
66.22%
66,878.00
0.00%
19,994.82
78.57%
1,066,365.70
65.25%
84,981.00
67.72%
480,006.33
65.65%
802,323.92
51.79%
132,609.54
0.00%
2,766.75
0.00%
300.49
0.00%
10,846.30
69.49%
66,916.60
0.00%
39,729.90
74.24%
2,293,616.27
0.00%
2,631,275.04
0.00%
86,075.00
0.00%
717,198.30
0.00%
33,090.23
0.00%
8,302.80
0.00%
323,582.95
0.00%
349,729.91
0.00%
149,336.86
0.00%
2,948,257.64
0.00%
261,961.70
0.00%
312,026.00
0.00%
122,320.00
0.00%
1,127,322.20
0.00%
31,936.20
0.00%
8,167.69
62.20%
10,845.00
0.00%
28,372.00
0.00%
18,505,578.12 36.88%
1,167,233.69
31.04%

700.B
700.C
700.D
700.E
700.F
800
801.A
802.I
802.D
803.C
804.A
804.B
805.B
810.A
820.D
820.E
820.F
830.A
855.A
900
900
906.A
900.F
907.A
907.B
900
970.B
970.C
900
911.A
912.A
1100
601.C
605.A
220.EE
610.D
610.G
612.A
612.B
615.A
690.A
601.C
605.A
220.EE
610.C
610.D
610.G
612.A
612.B
615.A
680
1006.B
1110.B
612.C
700.A
700.B
700.E
700.F

TRANSPORTE DE MATERIAL GRANULAR D> 1 KM


TRANSPORTE DE MEZCLA ASFALTICA D<= 1 KM
TRANSPORTE DE MEZCLA ASFALTICA D> 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE D<= 1KM
TRANSPORTE DE MATERIAL EXCEDENTE D> 1KM
SEALIZACION Y SEGURIDAD VIAL
SEAL PREVENTIVA DE 0.75x0.75
SEALES REGLAMENTARIAS (0.80m x 1.20m)
SEAL REGLAMENTARIA OCTOGONAL (0.75mx0.75m)
SEAL INFORMATIVA
POSTES DE SOPORTE DE SEALES
ESTRUCTURA DE SOPORTE DE SEALES
TACHAS RETROREFLECTIVAS
MARCAS EN EL PAVIMENTO
BARRERA DE PROTECCION LATERAL TIPO H2 W3 (P3)
BARRERA DE PROTECCION P/PUENTES TIPO N2 W2 (P2)
BARRERA DE PROTECCION CENTRAL TIPO H2 W5 (P3)
POSTES KILOMETRICOS
GIBA O RESALTO
PROTECCION AMBIENTAL
PROGRAMA DE CIERRE DE OBRA
DEPOSITO DE DESECHOS
REVEGETACION DE AREAS AFECTADAS
READECUACION AMBIENTAL DE CANTERAS FLUVIALES
READECUACION AMBIENTAL DE INSTALACIONES AUXILIARES
PROGRAMA DE SEGUIMIENTO Y CONTROL
MONITOREO DE LA CALIDAD DEL AIRE
MONITOREO DE LA CALIDAD DE RUIDO AMBIENTAL (INC. PERSONA
SUBPROGRAMA DE SEALIZACION AMBIENTAL Y DE SEGURIDAD
SEAL INFORMATIVA AMBIENTAL (1.22x2.40)
ESTRUCTURA DE SOPORTE DE SEALES TIPO E-1
PUENTES PEATONALES (05 und)
RAMPAS
EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN
RELLENO PARA ESTRUCTURAS
MATERIAL DE CANTERA PARA RELLENO
CONCRETO CLASE D (F'C=210 KG/CM2)
CONCRETO CLASE G (F'C=100 KG/CM2)
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ACERO DE REFUERZO FY=4200 KG/CM2
BARANDAS METALICAS
PUENTES
EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN
RELLENO PARA ESTRUCTURAS
MATERIAL DE CANTERA PARA RELLENO
CONCRETO CLASE C (F'C=280 KG/CM2)
CONCRETO CLASE D (F'C=210 KG/CM2)
CONCRETO CLASE G (F'C=100 KG/CM2)
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ACERO DE REFUERZO FY=4200 KG/CM2
CUBIERTA DE PUENTE PEATONAL INC. ESTRUCTURAS
JUNTA DE DILATACION P/PUENTE PEATONAL
APOYO DE NEOPRENE P/PUENTES PEATONALES
ENCOFRADO METALICO EN ALTURA
TRANSPORTE DE MATERIAL GRANULAR D<= 1 KM
TRANSPORTE DE MATERIAL GRANULAR D> 1 KM
TRANSPORTE DE DESECHOS Y EXCAVACION A DME D<= 1KM
TRANSPORTE DE DESECHOS Y EXCAVACION A DME D> 1KM
COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL
I.G.V.
TOTAL
% DE AVANCE

M3K
M3
M3K
M3K
M3K

1.45
7.95
1.45
8.15
1.60

15,105,495.80
19,049.20
1,560,093.30
94,570.45
1,586,229.70

u
u
u
m2
u
u
u
m2
m
m
m
u
m

325.00
610.00
301.00
710.00
298.10
2,518.00
14.20
5.70
273.00
302.40
612.00
146.00
1,020.00

7.00
45.00
50.00
42.57
144.00
1.00
2,505.00
6,970.71
13,977.59
392.30
9,262.00
11.00
17.40

m3
ha
ha
ha

2.10
8,150.00
8,150.00
8,150.00

112,799.32
5.95
17.50
0.65

u
u

1,180.00
520.00

20.00
40.00

m2
u

712.00
2,518.00

32.21
11.00

m3
m3
m3
m3
m3
m2
m2
kg
m

15.20
31.40
8.50
395.00
280.00
56.15
72.10
4.40
286.10

826.32
477.27
477.27
1,068.95
24.40
366.00
4,328.91
103,025.77
2,030.89

15.20
31.40
8.50
436.00
395.00
280.00
56.15
72.10
4.40
42,160.00
215.10
425.12
108.15
7.25
1.45
8.15
1.60

789.47
472.78
472.78
215.37
512.97
16.63
244.50
1,008.05
161,823.28
5.00
15.00
40.00
306.00
836.04
52,510.90
1,406.46
32,649.60

m3
m3
m3
m3
m3
m3
m2
m2
kg
u
m
u
m2
M3K
M3K
M3K
M3K
1.70%
18.30%
10.00%
18.00%

21,902,968.91
151,441.14
2,262,135.29
770,749.17
2,537,967.52
9,817,959.74
2,275.00
27,450.00
15,050.00
30,224.70
42,926.40
2,518.00
35,571.00
39,733.05
3,815,882.07
118,631.52
5,668,344.00
1,606.00
17,748.00
528,325.09
433,293.57
236,878.57
48,492.50
142,625.00
5,297.50
44,400.00
23,600.00
20,800.00
50,631.52
22,933.52
27,698.00
3,368,192.28
1,827,686.72
12,560.06
14,986.28
4,056.80
422,235.25
6,832.00
20,550.90
312,114.41
453,313.39
581,037.63
1,540,505.56
11,999.94
14,845.29
4,018.63
93,901.32
202,623.15
4,656.40
13,728.68
72,680.41
712,022.43
210,800.00
3,226.50
17,004.80
33,093.90
6,061.29
76,140.81
11,462.65
52,239.36
82,871,103.72
1,408,808.76
15,165,411.98
8,287,110.37
107,732,434.83
19,391,838.27
127,124,273.10
100.00%

6,329,577.58
40,564.06
401,595.38
-

48,484.97
10.00
10.00
-

623.18
344.52
344.52
857.07
19.44
292.80
3,450.55
79,317.49
614.21
375.16
375.16
379.61
13.32
195.60
785.62
24,414.24
836.04
52,510.90
1,088.90
6,833.73

9,177,887.49
0.00
0.00
330,597.09
642,552.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
118,818.44
101,818.44
101,818.44
0.00
0.00
0.00
17,000.00
11,800.00
5,200.00
0.00
0.00
0.00
1,436,466.71
981,426.88
9,472.34
10,817.93
2,928.42
338,542.65
5,443.20
16,440.72
248,784.66
348,996.96
0.00
455,039.83
9,335.99
11,780.02
3,188.86
0.00
149,945.95
3,729.60
10,982.94
56,643.20
107,422.66
0.00
0.00
0.00
0.00
6,061.29
76,140.81
8,874.54
10,933.97
19,769,712.56
336,085.11
3,617,857.40
1,976,971.26
25,700,626.33
4,626,112.74
30,326,739.07
23.86%

92,486.47
27.09
971.41
268.57
-

134,105.38
0.00
0.00
220.78
1,554.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
563.99
563.99
563.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
218,503.87
3,714.57
39,986.21
21,850.39
284,055.04
51,129.91
335,184.95
0.26%

6,422,064.05
40,591.15
402,566.79
-

48,753.54
10.00
10.00
-

623.18
344.52
344.52
857.07
19.44
292.80
3,450.55
79,317.49
614.21
375.16
375.16
379.61
13.32
195.60
785.62
24,414.24
836.04
52,510.90
1,088.90
6,833.73

9,311,992.87
0.00
0.00
330,817.87
644,106.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
119,382.43
102,382.43
102,382.43
0.00
0.00
0.00
17,000.00
11,800.00
5,200.00
0.00
0.00
0.00
1,436,466.71
981,426.88
9,472.34
10,817.93
2,928.42
338,542.65
5,443.20
16,440.72
248,784.66
348,996.96
0.00
455,039.83
9,335.99
11,780.02
3,188.86
0.00
149,945.95
3,729.60
10,982.94
56,643.20
107,422.66
0.00
0.00
0.00
0.00
6,061.29
76,140.81
8,874.54
10,933.97
19,988,216.43
339,799.68
3,657,843.61
1,998,821.64
25,984,681.36
4,677,242.65
30,661,924.01
24.12%

8,683,431.75
19,049.20
1,560,093.30
53,979.30
1,183,662.91
7.00
45.00
50.00
42.57
144.00
1.00
2,505.00
6,970.71
13,977.59
392.30
9,262.00
11.00
17.40

64,045.78
5.95
17.50
0.65
10.00
30.00
32.21
11.00

203.14
132.75
132.75
211.88
4.96
73.20
878.36
23,708.28
2,030.89
175.26
97.62
97.62
215.37
133.36
3.31
48.90
222.43
137,409.04
5.00
15.00
40.00
306.00
0.00
0.00
317.56
25,815.87

12,590,976.04
42.51%
151,441.14
0.00%
2,262,135.29
0.00%
439,931.30
42.92%
1,893,860.66
25.38%
9,817,959.74
0.00%
2,275.00
0.00%
27,450.00
0.00%
15,050.00
0.00%
30,224.70
0.00%
42,926.40
0.00%
2,518.00
0.00%
35,571.00
0.00%
39,733.05
0.00%
3,815,882.07
0.00%
118,631.52
0.00%
5,668,344.00
0.00%
1,606.00
0.00%
17,748.00
0.00%
408,942.66 22.60%
330,911.14
134,496.14
43.22%
48,492.50
0.00%
142,625.00
0.00%
5,297.50
0.00%
27,400.00
11,800.00
50.00%
15,600.00
25.00%
50,631.52
22,933.52
0.00%
27,698.00
0.00%
1,931,725.57 42.65%
846,259.84
3,087.72
75.42%
4,168.35
72.19%
1,128.38
72.19%
83,692.60
80.18%
1,388.80
79.67%
4,110.18
80.00%
63,329.75
79.71%
104,316.43
76.99%
581,037.63
0.00%
1,085,465.73
2,663.95
77.80%
3,065.27
79.35%
829.77
79.35%
93,901.32
0.00%
52,677.20
74.00%
926.80
80.10%
2,745.74
80.00%
16,037.21
77.93%
604,599.77
15.09%
210,800.00
0.00%
3,226.50
0.00%
17,004.80
0.00%
33,093.90
0.00%
0.00 100.00%
0.00 100.00%
2,588.11
77.42%
41,305.39
20.93%
62,882,887.29
1,069,009.08
11,507,568.37
6,288,288.73
81,747,753.47
14,714,595.62
96,462,349.09
75.88%

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

MES DE
item

Descripcin

700
700.A
700.B
1100
700.A
700.B

TRANSPORTE
TRANSPORTE DE MATERIAL GRANULAR D<= 1 KM
TRANSPORTE DE MATERIAL GRANULAR D> 1 KM
PUENTES PEATONALES (05 und)
TRANSPORTE DE MATERIAL GRANULAR D<= 1 KM
TRANSPORTE DE MATERIAL GRANULAR D> 1 KM
COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL
I.G.V.
TOTAL
% DE AVANCE

Unid.

Precio
Unitario
S/.

Presupuesto
Adicional N 01
Metrado

M3K
M3K

7.25
1.45

39,914.54
5,286,463.70

M3K
M3K

7.25
1.45

2,022.17
220,868.80

0.00%
16.59%
10.00%
18.00%

Monto S/.
7,954,752.79
289,380.42
7,665,372.37
334,920.47
14,660.71
320,259.76
8,289,673.26
1,375,088.42
828,967.33
10,493,729.01
1,888,871.22
12,382,600.23
100.00%

VALORIZACION N
March-2015
Acumulado
Mes Anterior
Metrado
Monto S/.
1,941.73
185,062.60

0.00
0.00
0.00
282,418.30
14,077.53
268,340.77
282,418.30
0.00
46,847.46
28,241.83
357,507.59
64,351.37
421,858.96
3.41%

003

ADICIONAL DE OBRA N 01
Acumulado
Actual

Presente Valorizacin
Metrado

Monto S/.

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%

Monto S/.
-

1,941.73
185,062.60

0.00
0.00
0.00
282,418.30
14,077.53
268,340.77
282,418.30
0.00
46,847.46
28,241.83
357,507.59
64,351.37
421,858.96
3.41%

Saldo por
Valorizar
Metrado
39,914.54
5,286,463.70
80.44
35,806.20

Monto S/.
7,954,752.79
289,380.42
7,665,372.37
52,502.17
583.18
51,918.99
8,007,254.96
0.00
1,328,240.96
800,725.50
10,136,221.42
1,824,519.85
11,960,741.27
96.59%

%
de
Avance
0.00%
0.00%
0.00%
84.32%
96.02%
83.79%

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

MES DE
item
200
220.B
220.EE
700
700.A
700.B
700.E
700.F
900
906.A

Descripcin
MOVIMIENTO DE TIERRAS
MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE
MATERIAL DE CANTERA PARA RELLENO
TRANSPORTE
TRANSPORTE DE MATERIAL GRANULAR D<= 1 KM
TRANSPORTE DE MATERIAL GRANULAR D> 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE D<= 1 KM
TRANSPORTE DE MATERIAL EXCEDENTE D> 1 KM
PROTECCION AMBIENTAL
DEPOSITO DE DESECHOS
COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL
I.G.V.
TOTAL
% DE AVANCE

Unid.

Precio
Unitario
S/.

Presupuesto
Adicional N 02
Metrado

M3
M3

15.40
8.50

26,052.21
26,052.21

M3K
M3K
M3K
M3K

7.25
1.45
8.15
1.60

22,925.94
1,965,054.64
22,925.94
63,402.10

M3

2.10

26,052.21

0.00%
10.44%
10.00%
18.00%

Monto S/.
622,647.82
401,204.03
221,443.79
3,303,832.14
166,213.10
2,849,329.23
186,846.45
101,443.36
54,709.64
54,709.64
3,981,189.60
415,710.26
398,118.96
4,795,018.82
863,103.39
5,658,122.21
100.00%

VALORIZACION N
January-2015
Acumulado
Mes Anterior
Metrado
Monto S/.
622,647.82
26,052.21
401,204.03
26,052.21
221,443.79
3,303,832.14
22,925.94
166,213.10
1,965,054.64
2,849,329.23
22,925.94
186,846.45
63,402.10
101,443.36
54,709.64
26,052.21
54,709.64
3,981,189.60
0.00
415,710.26
398,118.96
4,795,018.82
863,103.39
5,658,122.21
100.00%

003

ADICIONAL DE OBRA N 02
Acumulado
Actual

Presente Valorizacin
Metrado

Monto S/.

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%

26,052.21
26,052.21
22,925.94
1,965,054.64
22,925.94
63,402.10
26,052.21

Monto S/.
622,647.82
401,204.03
221,443.79
3,303,832.14
166,213.10
2,849,329.23
186,846.45
101,443.36
54,709.64
54,709.64
3,981,189.60
0.00
415,710.26
398,118.96
4,795,018.82
863,103.39
5,658,122.21
100.00%

Saldo por
Valorizar
Metrado

%
de

Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%

Avance
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
100 OBRAS PRELIMINARES
PROGRESIVA
INICIO

FIN

101.A
Movilizacin y
Desmovilizacin de
Equipos

Km
Km
Glb
MOVILIZACION Y DESMOVILIZACION
MOVILIZACION
TRAZO Y REPLANTEO
MAYO 2014 (Replanteo=Km.0+000-4+300)
JUNIO 2014 (Replanteo=Km.6+000-10+025.82)
JULIO 2014 (Replanteo=Km.4+300-6+000)
AGOSTO 2014 (31/264 * 80% * 10.03)
SETIEMBRE 2014 (30/264 * 80% * 10.03)
OCTUBRE 2014 (31/264 * 80% * 10.03)
NOVIEMBRE 2014 (30/264 * 80% * 10.03)
DICIEMBRE 2014 (31/264 * 80% * 10.03)
ENERO 2015 (31/264 * 80% * 10.03)
FEBRERO 2015 (28/264 * 80% * 10.03)
MARZO 2015 (31/264 * 80% * 10.03)
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
MAYO 2014 (Del 01.05 al 31.05)
JUNIO 2014 (Del 01.06 al 30.06)
JULIO 2014 (Del 01.07 al 31.07)
AGOSTO 2014 (Del 01.08 al 31.08)
SETIEMBRE 2014 (Del 01.09 al 30.09)
OCTUBRE 2014 (Del 01.10 al 31.10)
NOVIEMBRE 2014 (Del 01.11 al 30.11)
DICIEMBRE 2014 (Del 01.12 al 31.12)
ENERO 2015 (Del 01.01 al 31.01)
FEBRERO 2015 (Del 01.02 al 28.02)
MARZO 2015 (Del 01.03 al 31.03)
ABRIL 2015 (Del 01.04 al 25.04)
MAYO 2015 (Del 01.05 al 31.05)
ACUMULADO MES ACTUAL
C.P.

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

102.A
Trazo y Replanteo
Km

0.48
0.86
0.81
0.34
0.94
0.91
0.94
0.91
0.91
0.94
0.85
0.94

0.48

9.36

1.00
0.48
0.48
-

10.03
9.36
9.36
-

MPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

PLANILLA DE METRADOS
103.A
Mantenimiento de
Trnsito y seguridad
vial
mes

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.40
0.60
12.00
12.00
12.00
12.00
-

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

101.A MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


A.- MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO TRANSPORTADO
PESO (TON)
UND

EQUIPO

CARGADOR S/LLANTAS 125-155 Hp 3,00 Yd3


CARGADOR S/LLANTAS 200-250 Hp 4 - 4.11 Yd3
CHANCADORA PRI-SEC INC.5 FAJAS 46-70 Ton/Hr
EXCAVADORA SOBRE ORUGA 115-165 HP 0.75-1.6 Y3
EXCAVADORA SOBRE ORUGA 170-250 HP 1.1-2.75 Y3
MINICARGADOR 70 HP
MOTONIVELADORA 145 - 150 Hp
PAVIMENTADORA SOBRE LLANTAS 105 HP
PLANTA ASFALTO EN CALIENTE 60-115 ton/h (*)
RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 YD3
RODILLO LISO VIBRATORIO AUTOP.101-135 Hp, 10-12 Ton
RODILLO PATA CABRA V.AUT100-135HP 11-13T
RODILLO NEUMATICO AUTOP. 135 Hp, 9-26 Ton
RODILLO TANDEM VIBRATORO AUTOPROPULSADO 111-130 HP 9-11 Ton.
TRACTOR SOBRE ORUGAS 140-160 HP
TRACTOR SOBRE ORUGAS 190-240 HP
ZARANDA VIBRATORIA 4" x 6" x 15'

16.59
20.83
39.00
23.40
33.80
12.30
13.54
12.00
60.00
9.00
11.10
11.30
9.00
11.00
14.90
20.52
7.00

Total de viajes
Duracin del viaje IDA (HM)
FRV : Factor de Retorno Vaco
Costo de alquiler de Equipo (S/. / HM)

MOVILIZACIN DE EQUIPO TRANSP


DESMOVILIZACIN DE EQUIPO TRA
SEGUROS

MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO TRANSP


(*) D.S N 010-2006/MTC del 26.03.06

Origen / Destino

Distancia
(Km.)

Lima - Pto. Salaverry


TOTAL

1041.32
1041.32

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

101.A MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


B.- MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO AUTOTRANSPORTADO
EQUIPO AUTOTRANSPORTADO

CANTIDAD

CAMION VOLQUETE 15 m3
CAMION IMPRIMADOR 1800 gl
CAMION CISTERNA 4X2 (AGUA) 145-165 HP 2000 gl
CAMION BARANDA 3 ton

40
1
1
1

MOVILIZACIN

C.- MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO


CANTIDAD
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
PEON
MATERIALES
SOLDADURA
EQUIPO
HERRAMIENTAS MANUALES
GRUA HIDRAULICA AUTOPROPULSADA 127 HP 18 ton 9 m
CARGADOR SOBRE LLANTAS 125-155 HP 3.00 yd3
GRUPO ELECTROGENO 116 HP 75 KW
SOLDADORA ELECTRICA TRIFASICA 400 A
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO

1
2
2
4
100.00
5%
1
1
1
1
8
480
33.6

MONTAJE DE PLANTAS DE
DESMONTAJE DE PLANTAS

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

101.A MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS

NRO. DE UBICACIONES DE LAS PLANTAS


MONTAJE Y DESMONTAJE DE PLANTAS DE

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

101.A MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


D.- MONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS
CANTIDAD
MANO DE OBRA
CAPATAZ
OPERARIO
PEON
EQUIPO
HERRAMIENTAS MANUALES
CARGADOR SOBRE LLANTAS 125-155 HP 3.00 yd3
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO

1
2
4
5%
1
4
240
16.8

MONTAJE DE PLANTAS CHANC


DESMONTAJE DE PLANTAS CH
NRO. DE UBICACIONES DE LAS PLANTA

MONTAJE Y DESMONTAJE DE PLANTAS CHANC

E.- MONTAJE Y DESMONTAJE DE ZARANDAS VIBRATORIAS


CANTIDAD
MANO DE OBRA
CAPATAZ
OPERARIO
PEON
EQUIPO
HERRAMIENTAS MANUALES
CARGADOR SOBRE LLANTAS 125-155 HP 3.00 yd3
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO

1
2
4
5%
1
4
240
16.8

MONTAJE DE ZARANDAS VIBR


DESMONTAJE DE ZARANDAS V
NRO. DE UBICACIONES DE LAS ZARAND

MONTAJE Y DESMONTAJE DE ZARANDAS VIBR

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

101.A MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO AUTOTRANSPORTADO (S/.)
MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO (S/.)
MONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS (S/.)
MONTAJE Y DESMONTAJE DE ZARANDAS VIBRATORIAS (S/.)

COSTO TOTAL DE LA PARTIDA

METRADO ACUMULADO ACTUAL :


METRADO ACUMULADO ANTERIOR :
METRADO ACTUAL :

S/.

0.48
0.48
0.00

A CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

N DEL BUEN RECUERDO

EQUIPOS

ANSPORTADO
N VIAJES
CANTIDAD

PESO
TOTAL

Cama
Baja
25 Ton.

2
2
2
1
2
1
2
0
1
1
2
0
0
0
1
1
2

33.17
41.66
78.00
23.40
67.60
12.30
27.08
0.00
60.00
9.00
22.20
0.00
0.00
0.00
14.90
20.52
14.00

2
2
6
1
2

MOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)


DESMOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)
SEGUROS DE TRANSPORTE

N Y DESMOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)

Velocidad
(Km./h)
45.00
45.00

Tiempo
(Horas)
23.10
23.10

Cama
Baja
18 Ton.

Camion
Plataforma
19 Ton.

2
1

2
0
3
1
2
0
0
0

1
1
2

1
2

19.00
23.10
1.40
170.02
104,472.57

14.00
23.10
1.40
165.68
75,015.43

2.00
23.10
1.40
175.16
11,329.57

5,223.63

3,750.77

566.48

206,104.99

A CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

N DEL BUEN RECUERDO

EQUIPOS

TOTRANSPORTADO
HM (S/.)

Distancia
(Km.)

Velocidad
(Km./h)

HORAS

258.04
112.64
128.96
51.07

1,041
1,041
1,041
1,041

45.0
45.0
45.0
50.0

23.1
23.1
23.1
20.8

PARCIAL (S/.)
238,428.96
2,601.98
2,978.98
1,062.26

MOVILIZACIN DE EQUIPO AUTOTRANSPORTADO (S/.)


DESMOVILIZACIN DE EQUIPO AUTOTRANSPORTADO (S/.)
SEGUROS DE TRANSPORTE

245,072.18

MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO AUTOTRANSPORTADO (S/.)

257,325.79

PRECIO (S/.)

HORAS

19.18
14.75
12.83
11.58

240.00
240.00
240.00
240.00

13.25
28,958.40
175.20
170.08
139.38
10.77

PARCIAL (S/.)

4,603.20
7,080.00
6,158.40
11,116.80
1,325.00

120.00
120.00
120.00
120.00

395.00
4.10
52.15
MONTAJE DE PLANTAS DE ASFALTO (S/.)
DESMONTAJE DE PLANTAS DE ASFALTO (S/.)

1,447.92
21,024.00
20,409.60
16,725.60
1,292.40
3,160.00
1,968.00
1,752.24
49,031.58

12,253.61

A CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

N DEL BUEN RECUERDO

EQUIPOS
NRO. DE UBICACIONES DE LAS PLANTAS DE ASFALTO

1.00

MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO (S/.)

49,031.58

A CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

N DEL BUEN RECUERDO

EQUIPOS
PRECIO (S/.)

HORAS

19.18
14.75
11.58

160.00
160.00
160.00

3,068.80
4,720.00
7,411.20

80.00

760.00
13,606.40

15,200.00
170.08
395.00
4.10
52.15

PARCIAL (S/.)

1,580.00
984.00
876.12

MONTAJE DE PLANTAS CHANCADORAS (S/.)


DESMONTAJE DE PLANTAS CHANCADORAS (S/.)
NRO. DE UBICACIONES DE LAS PLANTAS CHANCADORAS

ONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS (S/.)

16,503.26
2.00

33,006.52

PRECIO (S/.)

HORAS

19.18
14.75
11.58

80.00
80.00
80.00

1,534.40
2,360.00
3,705.60

40.00

380.00
6,803.20

7,600.00
170.08
395.00
4.10
52.15

MONTAJE DE ZARANDAS VIBRATORIAS (S/.)


DESMONTAJE DE ZARANDAS VIBRATORIAS (S/.)
NRO. DE UBICACIONES DE LAS ZARANDAS VIBRATORIAS

ONTAJE Y DESMONTAJE DE ZARANDAS VIBRATORIAS (S/.)

PARCIAL (S/.)

1,580.00
984.00
876.12
9,111.66
2.00

18,223.32

A CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

N DEL BUEN RECUERDO

EQUIPOS

MOVILIZACIN DE EQUIPOS
(SOLO MOVILIZACION)

206,104.99

(SOLO MOVILIZACION)

257,325.79

(SOLO MONTAJE)

49,031.58

(SOLO MONTAJE)

33,006.52

(SOLO MONTAJE)

18,223.32

TOTAL (S/.)

1,185,200.00

GLB
GLB
GLB

563,692.20

N VIAJES
SemiTrailer
35 Ton.

1.00
23.10
1.40
169.23
5,472.89
273.64

206,104.99

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

RELACION DE EQUIPO CONSIDERADO PARA EL PAGO DE LA PARTIDA DE MOVILIZACIN DE EQUIP

DESCRIPCION

MARCA

CARGADOR S/LLANTAS 125-155 Hp 3,00 Yd3


CARGADORA
DOOSAN
CARGADORA
DOOSAN
TOTAL
CARGADOR S/LLANTAS 200-250 Hp 4 - 4.11 Yd3
EXCAVADORA (equivalente)
DOOSAN
EXCAVADORA (equivalente)
DOOSAN
TOTAL
CHANCADORA PRI-SEC INC.5 FAJAS 46-70 Ton/Hr
CHANCADORA SECUNDARIA
PECSON
CHANCADORA TERCIARIA
ROADRUNER
TOTAL
EXCAVADORA SOBRE ORUGA 115-165 HP 0.75-1.6 Y3
EXCAVADORA
DOOSAN
TOTAL
EXCAVADORA SOBRE ORUGA 170-250 HP 1.1-2.75 Y3
EXCAVADORA
DOOSAN
EXCAVADORA
DOOSAN
TOTAL
MINICARGADOR 70 HP
TOTAL
MOTONIVELADORA 145 - 150 Hp
MOTONIVELADORA
CASE
MOTONIVELADORA
CASE
TOTAL
PAVIMENTADORA SOBRE LLANTAS 105 HP

MODELO

SERIE

DL300A
DL300A

0381
0382

DX340LC-A
DX340LC-A

5512
5456

8535500-A2
70VSI

DX340LC-A

5135

DX340LC-A
DX340LC-A

5527
5529

845
865

3601
48AF04502

VM132
ASC150/D

1200
0781

TOTAL
PLANTA ASFALTO EN CALIENTE 60-115 ton/h (*)
TOTAL
RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 YD3
TOTAL
RODILLO LISO VIBRATORIO AUTOP.101-135 Hp, 10-12 Ton
RODILLO LISO
JCB
RODILLO LISO
AMMANN
TOTAL
RODILLO PATA CABRA V.AUT100-135HP 11-13T
TOTAL
RODILLO NEUMATICO AUTOP. 135 Hp, 9-26 Ton

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

RELACION DE EQUIPO CONSIDERADO PARA EL PAGO DE LA PARTIDA DE MOVILIZACIN DE EQUIP

DESCRIPCION

MARCA

MODELO

SERIE

TOTAL
RODILLO TANDEM VIBRATORO AUTOPROPULSADO 111-130 HP 9-11 Ton.
TOTAL
TRACTOR SOBRE ORUGAS 140-160 HP
TRACTOR DE ORUGAS
KOMATSU
TOTAL
TRACTOR SOBRE ORUGAS 190-240 HP
EXCAVADORA (equivalente)
DOOSAN
TOTAL
ZARANDA VIBRATORIA 4" x 6" x 15'
ZARANDA VIBRATORIA
ROADRUNER
TOTAL
CAMION VOLQUETE 15 m3
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE
VOLQUETE

MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
MERCEDES BENZ
FREIGHTLINER
FREIGHTLINER
FREIGHTLINER
FREIGHTLINER
FREIGHTLINER
FREIGHTLINER
FREIGHTLINER
FREIGHTLINER

D65-EX15EO

1084

DX340LC-A

5514

6X20

3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
3344K
FLD120
FLD120
FLD120
FLD120
FLD120
FLD120
FLD120
FLD120

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

RELACION DE EQUIPO CONSIDERADO PARA EL PAGO DE LA PARTIDA DE MOVILIZACIN DE EQUIP

DESCRIPCION

MARCA

VOLQUETE
FREIGHTLINER
VOLQUETE
FREIGHTLINER
VOLQUETE
FREIGHTLINER
VOLQUETE
FREIGHTLINER
VOLQUETE
FREIGHTLINER
VOLQUETE
FREIGHTLINER
TOTAL
CAMION IMPRIMADOR 1800 gl
CAMION IMPRIMADOR 1950 gl
FREIGHTLINER
TOTAL
CAMION CISTERNA 4X2 (AGUA) 145-165 HP 2000 gl
CISTERNA
FREIGHTLINER

TOTAL
CAMION BARANDA 3 TON
CAMION BARANDA
TOTAL

HINO

MODELO
FLD120
FLD120
FLD120
FLD120
FLD120
FLD120

FLD120

DETRU DSL

SERIE

CION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

UERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

ADO PARA EL PAGO DE LA PARTIDA DE MOVILIZACIN DE EQUIPO

PLACA

CANT.

1
1
2
1
1
2
1
1
2
1
1
1
1
2
1
1
1
1

0
1
1
1
1
2

CION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

UERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

ADO PARA EL PAGO DE LA PARTIDA DE MOVILIZACIN DE EQUIPO

PLACA

CANT.

0
1
1
1
1
1
1
2
D7V-762
D8C-850
A6N-941
A6O-853
A6P-821
D4I-720
F9V-719
F9V-723
F9V-843
F9V-849
F9W-773
F9W-775
F9W-788
F9W-790
F9W-791
F9W-832
F9W-857
F9W-865
F9W-869
F2M-744
F2M-767
F2M-735
F2M-743
F2M-742
F2M-773
F2M-762
F2M-765

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

CION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

UERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

ADO PARA EL PAGO DE LA PARTIDA DE MOVILIZACIN DE EQUIPO

PLACA

CANT.

F2M-731
F2M-720
F2M-740
F2M-753
F2M-712
C3Y-986

1.5
1.5
1.5
1.5
1.5
1.5
40

F2J -745
0
YI-9721

1
W3J-790

1
1

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
2.00 MOVIMIENTO DE TIERRAS
PROGRESIVA
Desde

(V. A.)

(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)

Hasta

201.B

202.B

202.EE

Desbroce y
limpieza en
zonas no
boscosas

Demolicin de
estructuras

Remocin de
carpeta asfltica

m3

m3

Km
Km
HA
VIA PRINCIPAL
0+000.00
1+000.00
1+000.00
2+000.00
2+000.00
3+000.00
3+000.00
4+000.00
4+000.00
5+000.00
5+000.00
6+000.00
6+000.00
7+000.00
7+000.00
8+000.00
8+000.00
9+000.00
9+000.00
10+000.00
10+000.00
10+025.82
MATERIAL DE CANTERA PARA RELLENO
MEJORAMIENTO DE SUBRASANTE
MUROS DE CONTENCION
ALCANTARILLAS
SUBDRENAJE
DEMOLICION DE ESTRUCTURAS
ALCANTARILLAS
ALCANTARILLAS LONGITUDINALES
CUNETAS
MUROS DE CONTENCION

0.43
0.09
0.40
0.40
0.40
0.40
0.01

205.C

18.30
4.16
-

Excavacin en
Perfilado y
explanaciones
compactacin en
en material
zona de corte
comn
m3

205.EE

9,199.70
1,181.40
1,027.00
1,833.55
4,272.05
1,012.20
34.26

m2
-

210.A

220.B

Terraplenes

Mejoramiento del
suelo a nivel de
subrasante

m3

m3

10,411.70
11,221.50
925.80
1,731.50
8,914.30
6,758.70
149.73

7,228.80
2,627.05
485.20
1,583.20
2,730.90
1,335.80
12.75

PONTON
VEREDAS
DADOS DE CONCRETO
TANQUE

C.P.

ACUMULADO MES ACTUAL

2.14

22.46

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

7.22
2.14
2.14
-

2,842.07
22.46
22.46
-

439.42
-

18,560.16
40,693.30
18,560.16
18,560.16
-

Los metrados se tiene como techo los contractuales, los cuales se estan considerando

92,175.41
-

40,113.23

16,003.70

122,782.65
40,113.23
40,113.23
-

45,772.35
16,003.70
15,752.25
251.45

PLANILLA DE METRADOS
220.EE
Material de
Cantera para
relleno
m3
17,640.50
13,848.55
1,411.00
3,314.70
11,645.20
8,094.50
162.48
1,283.21
6,123.89

63,524.03
180,307.84
63,524.03
63,255.43
268.60

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
201.B DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS
PROGRESIVA
DISTANC.
INICIO

FINAL

(Km)
0+000
1+000
1+270
1+410
1+495
1+610
1+730
1+785
1+850
1+850
1+910
2+000
2+110
2+310
3+000
4+000
5+000
6+000
7+000
8+000
9+000

(Km)
1+000
1+410
1+360
1+750
1+610
1+730
1+830
1+830
1+910
1+975
2+000
2+030
2+310
3+000
4+000
5+000
6+000
7+000
8+000
9+000
10+000

201.B: DESBROCE Y LIMPIEZA EN


ZONAS NO BOSCOSAS
ANCHO (m)

(m)

90.00
340.00
115.00
120.00
100.00
45.00
60.00
125.00
90.00
30.00
200.00

1,000.00
1,000.00
1,000.00
1,000.00

IZQ.

DER.

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00

4.00
4.00
4.00
4.00

AREA A
VALORIZAR
(Ha)
0.04
0.14
0.05
0.05
0.04
0.02
0.02
0.05
0.04
0.01
0.08
0.40
0.40
0.40
0.40

Volumen
Desbroce
eliminado

D.M.E

Ubicacin
(m3)
0.00
0.00
18.00
68.00
23.00
24.00
20.00
9.00
12.00
25.00
18.00
6.00
40.00
0.00
0.00
0.00
0.00
200.00
200.00
200.00
200.00

05+300.00
05+300.00
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
05+300.00
05+300.00
05+300.00
05+300.00
10+025.82
10+025.82
10+025.82
10+025.82

DT

Acceso

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

9.147
9.147
9.147
9.147

Km
4.800
4.095
17.858
17.593
17.620
17.503
17.393
17.365
17.293
17.260
17.218
17.158
16.963
2.645
1.800
0.800
0.200
12.673
11.673
10.673
9.673

10+000

10+026

ACUMULADO MES ACTUAL

25.82

4.00

0.01

5.16

2.14

1,068.16

10+025.82

9.147

9.160

700.E:
700.F:
Transporte Transporte
de mat
de mat
excedente excedente
D <= 1 Km
m3.km
0.00
0.00
15.84
59.84
20.24
21.12
17.60
7.92
10.56
22.00
15.84
5.28
35.20
0.00
0.00
0.00
0.00
176.00
176.00
176.00
176.00

D > 1 Km
m3.km
0.00
0.00
303.44
1,128.31
382.27
396.07
327.86
147.29
195.51
406.51
291.92
96.95
638.51
0.00
0.00
0.00
0.00
2,334.56
2,134.56
1,934.56
1,734.56

4.54

42.14

939.98

12,495.03

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA: CONSORCIO PUCALLPA


SUPERVISOR : CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.B DEMOLICION DE ESTRUCTURAS
a) ALCANTARILLAS
N

PROGRESIVA
INICIO

PROGRESIVA
FINAL

CONDICION

1
0+070
0+070
AMPLIACION
2
0+355
0+355
DEMOL./REEMPLAZO
3
1+838
1+838
AMPLIACION
4
2+416
2+416
AMPLIACION
5
2+781
2+781
AMPLIACION
6
3+102
3+102
DEMOL./REEMPLAZO
7
4+914
4+914
DEMOL./REEMPLAZO
8
5+280
5+280
DEMOL./REEMPLAZO
9
5+580
5+580
DEMOL./REEMPLAZO
10
6+204
6+204
AMPLIACION
11
6+499
6+499
AMPLIACION
12
6+734
6+734
AMPLIACION
13
7+234
7+234
AMPLIACION
14
7+943
7+943
DEMOL./REEMPLAZO
15
8+469
8+469
AMPLIACION
16
8+715
8+715
DEMOL./REEMPLAZO
17
9+094
9+094
DEMOL./REEMPLAZO
18
9+370
9+370
AMPLIACION
19
9+708
9+708
AMPLIACION
Parcial
b) ALCANTARILLAS LONGITUDINALES

TIPO
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC
AMC

ESTRUCTURA EXISTENTE ALCANTARILLAS


LONGITUDINALES
DIMENSIONES
LONG.
LUZ
ALTURA
19.36
1.00
1.00
14.40
1.20
0.60
15.40
4.00
2.00
12.00
1.00
1.00
11.50
1.50
1.50
12.88
1.50
1.50
13.75
1.15
0.90
13.75
1.20
1.20
13.75
1.00
1.00
10.84
1.00
1.00
15.15
1.00
1.00
14.47
1.00
1.00
14.05
1.50
1.50
16.30
1.00
1.00
13.50
1.00
1.00
16.27
1.00
1.00
9.30
2.40
2.00
17.14
1.00
1.00
11.40
1.00
1.00

202.B:
DEMOLICION DE
ESTRUCTURA
(m3)

9.15
9.15
18.30

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA: CONSORCIO PUCALLPA


SUPERVISOR : CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.B DEMOLICION DE ESTRUCTURAS

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

PROGRESIVA
INICIO
0+136
0+165
0+407
0+441
0+407
1+384
1+422
1+451
1+598
1+422
1+704
1+808
1+834
2+540
2+942
2+942
2+964
2+994
3+333
3+336

PROGRESIVA
FINAL
0+165
0+170
0+415
0+457
0+415
1+407
1+436
1+463
1+611
1+436
1+714
1+813
1+839
2+550
2+947
2+947
2+964
3+003
3+339
3+347

CONDICION

ESTRUCTURA EXISTENTE ALCANTARILLAS


LONGITUDINALES

VIA

LADO
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION

VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL

IZQ.
IZQ.
DER.
IZQ.
IZQ.
IZQ.
IZQ.
IZQ.
IZQ.
IZQ.
DER.
DER.
DER.
IZQ.
IZQ.
IZQ.
IZQ.
IZQ.
IZQ.
DER.

CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL DER. . LD
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL DER. . LD

DIMENSIONES
AREA
ESPESOR
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

202.B:
DEMOLICION DE
ESTRUCTURA
(m3)

4.16

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA: CONSORCIO PUCALLPA


SUPERVISOR : CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.B DEMOLICION DE ESTRUCTURAS
21
4+137
4+148
22
4+182
4+192
23
4+207
4+215
24
4+726
4+748
25
4+983
4+990
26
5+105
5+117
27
5+293
5+354
28
6+150
6+162
29
6+250
6+254
30
6+440
6+440
31
6+604
6+620
32
6+604
6+620
33
7+195
7+180
34
7+236
7+253
35
7+341
7+351
36
7+388
7+400
37
7+390
7+398
38
7+692
7+702
39
7+940
7+940
40
8+473
8+475
41
9+306
9+308
Parcial
c) CUNETAS

PROGRESIVA
INICIO

PROGRESIVA
FINAL

DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION

VIA.AUXIL DER.
AMP. DERECHA
AMP. IZQUIERDA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. IZQUIERDA
AMP.DERECHO
AMP.DERECHO
AMP.IZQUIERDO
AMP.IZQUIERDO
AMP.IZQUIERDO
AMP.IZQUIERDO
AMP. DERECHA
AMP. DERECHA
AMP.IZQUIERDO
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP.IZQUIERDO

CARRIL DER. . LD
L DER
L IZQ
L DER
L DER
L DER
L DER
L DER
L DER
L DER
L IZQ
L IZQ
L IZQ
L IZQ
L DER
L DER
L IZQ
L DER
L DER
L DER
L IZQ

.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

4.16

ESTRUCTURA EXISTENTE CUNETAS


CONDICION

VIA

202.B:
DEMOLICION DE
ESTRUCTURA

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA: CONSORCIO PUCALLPA


SUPERVISOR : CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
PROGRESIVA
PROGRESIVA
202.B DEMOLICION DE ESTRUCTURAS
N
INICIO
FINAL
1
456.00
778.00
2
825.21
892.75
3
900.00
940.37
4
2,328.00
2,446.67
5
4,690.47
4,715.85
6
4,875.00
4,880.81
7
4,991.00
5,009.59
8
9,880.00
9,996.33
9
9,994.00
10,015.66
Parcial
d) MUROS DE CONTENCION

1
2
3
4
5
6
7
Parcial

CONDICION

VIA
LADO

DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION

VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL
VIA.AUXIL

IZQ.
IZQ.
IZQ.
IZQ.
DER.
DER.
DER.
DER.
DER.

CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD

DIMENSIONES
AREA
ESPESOR
.
.
.
.
.
.
.
.
.

202.B:
DEMOLICION DE
ESTRUCTURA
(m3)

0.00

PROGRESIVA
INICIO

PROGRESIVA
FINAL

CONDICION

2,160.00
5,476.00
6,100.00
7,073.00
7,092.00
7,142.00
7,164.00

2,160.00
5,529.00
6,105.00
7,085.73
7,152.50
7,152.00
7,598.00

DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION

ESTRUCTURA EXISTENTES : MUROS DE


CONTENCION

VIA

LADO
AMP.IZQUIERDO
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA

L
L
L
L
L
L
L

IZQ
DER
DER
DER
DER
DER
DER

DIMENSIONES
AREA
ESPESOR
.
.
.
.
.
.
.

202.B:
DEMOLICION DE
ESTRUCTURA
(m3)

0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA: CONSORCIO PUCALLPA


SUPERVISOR : CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.B DEMOLICION DE ESTRUCTURAS
e) PONTON

PROGRESIVA
INICIO

1
1+662.0
Parcial
f) VEREDAS

1
2
3
4
5
6
7
8
9
10
11
12

ESTRUCTURA EXISTENTES. PONTON

PROGRESIVA
FINAL

CONDICION

1+674.0

DEMOLICION

VIA
LADO

DIMENSIONES
AREA
ESPESOR

202.B:
DEMOLICION DE
ESTRUCTURA
(m3)
0.00

ESTRUCTURA EXISTENTE VEREDAS

PROGRESIVA
INICIO

PROGRESIVA
FINAL

CONDICION

0+000
0+005
0+000
0+000
0+023
0+031
0+034
0+034
0+162
0+292
0+524
0+552

0+053
0+030
0+120
0+030
0+031
0+034
0+043
0+100
0+163
0+316
0+530
0+603

DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION

VIA
LADO
VIA.PRINCIP
VIA.PRINCIP
VIA.PRINCIP
VIA.AUXIL IZQ.
VIA.AUXIL IZQ.
VIA.AUXIL IZQ.
VIA.AUXIL IZQ.
VIA.PRINCIP
VIA.AUXIL IZQ.
VIA.AUXIL IZQ.
VIA.AUXIL IZQ.
VIA.PRINCIP

AMP.DER. LD
CENTRO.
CENTRO.
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
AMP.IZQ.. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
AMP.DER. LD

DIMENSIONES
AREA
ESPESOR
117.3
0.3
24.0
0.3
232.1
0.3
159.5
0.3
17.2
0.3
9.2
0.3
10.2
0.3
107.3
0.3
1.7
0.3
23.6
0.3
11.9
0.3
87.7
0.3

202.B:
DEMOLICION DE
ESTRUCTURA
(m3)

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA: CONSORCIO PUCALLPA


SUPERVISOR : CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.B DEMOLICION DE ESTRUCTURAS
13
0+569
0+598
14
0+571
0+579
15
0+755
0+806
16
0+800
0+851
17
0+800
0+816
18
0+816
0+824
19
0+824
0+918
20
0+900
0+901
21
0+995
1+012
22
1+023
1+029
23
1+100
1+107
24
1+107
1+112
25
1+121
1+161
26
1+253
1+259
27
1+350
1+368
28
1+489
1+490
29
1+497
1+527
30
1+532
1+540
31
2+100
2+111
32
2+186
2+198
33
2+425
2+429
34
2+440
2+459
35
2+613
2+629
36
2+768
2+802
37
3+001
3+005
38
3+085
3+100

DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION

VIA.PRINCIP
VIA.AUXIL IZQ.
VIA.PRINCIP
VIA.AUXIL DER.
VIA.AUXIL IZQ.
VIA.AUXIL IZQ.
VIA.PRINCIP
VIA.AUXIL IZQ.
VIA.AUXIL DER.
VIA.AUXIL IZQ.
VIA.AUXIL IZQ.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL IZQ.
VIA.AUXIL IZQ.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL IZQ.
VIA.AUXIL DER.

AMP.IZQ.
LI
CARRIL. IZQ. LI
AMP.IZQ.. LI
CARRIL DER. . LI
CARRIL. IZQ. LI
CARRIL. IZQ. LI
AMP.IZQ.
LI
CARRIL. IZQ. LI
CARRIL DER. . LD
CARRIL. IZQ. LI
CARRIL. IZQ. LI
CARRIL DER. . LD
CARRIL DER.
CARRIL DER. . LD
CARRIL. IZQ. LI
CARRIL. IZQ.
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL. IZQ.
CARRIL DER. . LD

83.0
18.1
86.6
57.4
161.6
122.0
294.0
47.5
63.6
21.5
12.6
15.6
341.8
7.4
35.2
14.8
68.3
27.4
155.0
64.4
6.4
39.5
242.4
60.8
60.8
32.5

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA: CONSORCIO PUCALLPA


SUPERVISOR : CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.B DEMOLICION DE ESTRUCTURAS
39
3+723
3+727
40
3+740
3+782
41
3+790
3+795
42
4+517
4+533
43
4+548
4+636
44
4+645
4+670
45
4+904
4+905
46
5+355
5+415
47
6+111
6+157
48
6+163
6+168
49
6+434
6+436
50
6+821
6+871
51
7+153
7+191
52
7+976
8+018
53
8+165
8+166
54
8+247
8+248
55
8+307
8+308
Parcial
g) DADOS DE CONCRETO

1
2

DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION
DEMOLICION

VIA.AUXIL DER.
VIA.AUXIL DER.
VIA.AUXIL DER.
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. DERECHA
AMP. IZQUIERDA
AMP. DERECHA
AMP. IZQUIERDA

CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER.
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL DER. . LD
CARRIL. IZQ. LI
CARRIL DER.
CARRIL. IZQ. LI

10.5
90.8
11.5
33.7
162.0
43.2
5.8
141.2
468.8
7.1
21.3
92.0
40.0
48.4
89.5
90.5
2.5

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.00

PROGRESIVA
INICIO

PROGRESIVA
FINAL

CONDICION

8,026.00
8,140.00

8,124.24
8,191.00

DEMOLICION
DEMOLICION

VIA

ESTRUCTURA EXISTENTES DADOS DE


CONCRETO
LADO

VIA.AUXIL IZQ.
VIA.AUXIL IZQ.

CARRIL. IZQ. LI
CARRIL. IZQ. LI

DIMENSIONES
AREA
ESPESOR
.
.

202.B:
DEMOLICION DE
ESTRUCTURA
(m3)

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA: CONSORCIO PUCALLPA


SUPERVISOR : CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.B DEMOLICION DE ESTRUCTURAS
3
8,091.00
8,142.00
Parcial
h) TANQUE

1
Parcial
TOTAL

DEMOLICION

VIA.AUXIL IZQ.

CARRIL. IZQ. LI

.
0.00

ESTRUCTURA EXISTENTES. TANQUE

PROGRESIVA
INICIO

PROGRESIVA
FINAL

CONDICION

0+493.5

0+496.7

DEMOLICION

VIA
LADO
VIA.AUXIL IZQ.

CARRIL. IZQ. LI

DIMENSIONES
AREA
ESPESOR
.

202.B:
DEMOLICION DE
ESTRUCTURA
(m3)
0.00
22.46

D.M.E
Ubicacin
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
10+025.82
10+025.82

DT
Acceso

9.147
9.147

Km
5.230
4.945
3.462
2.884
2.519
2.198
0.386
0.020
0.280
0.904
1.199
1.434
1.934
2.643
3.169
3.415
3.794
9.803
9.465

700.F:
700.E:
Transporte de
Transporte de
mat
mat excedente
excedente
D <= 1 Km
D > 1 Km
m3.km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.05
80.55
8.05
77.46
16.10
158.00

D.M.E
Ubicacin
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
10+025.82
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

DT
Acceso

9.147

Km
5.149
5.132
4.889
4.851
4.889
17.777
3.871
3.843
3.696
3.871
3.591
3.490
3.464
2.755
2.355
2.355
2.336
2.302
1.964
1.959

700.F:
700.E:
Transporte de
Transporte de
mat
mat excedente
excedente
D <= 1 Km
D > 1 Km
m3.km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.66
69.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

1.158
1.114
1.089
0.563
0.314
0.189
0.024
0.856
0.952
1.140
1.312
1.312
1.888
1.945
2.046
2.094
2.094
2.397
2.640
3.174
4.007

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.66

D.M.E

DT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
69.79

700.F:
700.E:
Transporte de
Transporte de
mat
mat excedente
excedente

Ubicacin

Acceso
Km
4.683
4.441
4.380
2.913
0.597
0.422
0.300
4.638
4.705

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

D.M.E
Ubicacin
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

DT
Acceso
Km
3.140
0.203
0.803
1.779
1.822
1.847
2.081

D <= 1 Km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D > 1 Km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
700.E:
Transporte de
Transporte de
mat
mat excedente
excedente
D <= 1 Km
D > 1 Km
m3.km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D.M.E
Ubicacin

Acceso

05+300.00

D.M.E
Ubicacin
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

700.F:
700.E:
Transporte de
DT
Transporte de
mat
mat excedente
excedente
D <= 1 Km
D > 1 Km
Km
m3.km
m3.km
3.632
0.00
0.00
0.00
0.00

DT
Acceso
Km
5.274
5.283
5.240
5.285
5.273
5.267
5.262
5.233
5.137
4.996
4.774
4.722

700.F:
700.E:
Transporte de
Transporte de
mat
mat excedente
excedente
D <= 1 Km
D > 1 Km
m3.km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

4.716
4.725
4.519
4.475
4.492
4.480
4.429
4.399
4.296
4.274
4.197
4.190
4.159
4.044
3.941
3.811
3.788
3.764
3.195
3.108
2.873
2.851
2.679
2.515
2.297
2.207

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

1.575
1.539
1.508
0.775
0.708
0.643
0.395
0.085
0.834
0.866
1.135
1.546
1.872
2.697
2.866
2.948
3.008

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D.M.E
Ubicacin
05+300.00
05+300.00

Acceso

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
700.E:
Transporte de
DT
Transporte de
mat
mat excedente
excedente
D <= 1 Km
D > 1 Km
Km
m3.km
m3.km
2.775
0.00
0.00
2.866
0.00
0.00

05+300.00

2.817

0.00
0.00

D.M.E
Ubicacin
05+300.00

Acceso

0.00
0.00

700.F:
700.E:
Transporte de
DT
Transporte de
mat
mat excedente
excedente
D <= 1 Km
D > 1 Km
Km
m3.km
m3.km
4.805
0.00
0.00
0.00
0.00
19.76

227.80

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

0+000.00
0+020.00
0+040.00
0+060.00
0+080.00
0+100.00
0+120.00
0+140.00
0+160.00
0+180.00
0+200.00
0+220.00
0+240.00
0+260.00
0+280.00
0+300.00
0+320.00
0+340.00
0+360.00
0+380.00
0+400.00
0+420.00
0+440.00
0+460.00
0+480.00
0+500.00
0+520.00
0+540.00
0+560.00
0+580.00
0+600.00
0+620.00
0+640.00
0+660.00
0+680.00
0+700.00
0+720.00
0+740.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin
-

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

19.163
19.143
19.123
19.103
19.083
19.063
19.043
19.023
19.003
18.983
18.963
18.943
18.923
18.903
18.883
18.863
18.843
18.823
18.803
18.783
18.763
18.743
18.723
18.703
18.683
18.663
18.643
18.623
18.603
18.583
18.563
18.543
18.523
18.503
18.483
18.463
18.443

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

0+760.00
0+780.00
0+800.00
0+820.00
0+840.00
0+860.00
0+880.00
0+900.00
0+920.00
0+940.00
0+960.00
0+980.00
1+000.00
Parcial
1+000.00
1+020.00
1+040.00
1+060.00
1+080.00
1+100.00
1+120.00
1+140.00
1+160.00
1+180.00
1+200.00
1+220.00
1+240.00
1+260.00
1+280.00
1+300.00
1+320.00
1+340.00
1+360.00
1+380.00
1+400.00
1+420.00
1+440.00
1+460.00
1+480.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin

Acceso

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

18.423
18.403
18.383
18.363
18.343
18.323
18.303
18.283
18.263
18.243
18.223
18.203
18.183

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

18.163
18.143
18.123
18.103
18.083
18.063
18.043
18.023
18.003
17.983
17.963
17.943
17.923
17.903
17.883
17.863
17.843
17.823
17.803
17.783
17.763
17.743
17.723
17.703

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

1+500.00
1+520.00
1+540.00
1+560.00
1+580.00
1+600.00
1+620.00
1+640.00
1+660.00
1+680.00
1+700.00
1+720.00
1+740.00
1+760.00
1+780.00
1+800.00
1+820.00
1+840.00
1+860.00
1+880.00
1+900.00
1+920.00
1+940.00
1+960.00
1+980.00
2+000.00
Parcial
2+000.00
2+020.00
2+040.00
2+060.00
2+080.00
2+100.00
2+120.00
2+140.00
2+160.00
2+180.00
2+200.00
2+220.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin

Acceso

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

17.683
17.663
17.643
17.623
17.603
17.583
17.563
17.543
17.523
17.503
17.483
17.463
17.443
17.423
17.403
17.383
17.363
17.343
17.323
17.303
17.283
17.263
17.243
17.223
17.203
17.183

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

17.163
17.143
17.123
17.103
17.083
17.063
17.043
17.023
17.003
16.983
16.963

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

2+240.00
2+260.00
2+280.00
2+300.00
2+320.00
2+340.00
2+360.00
2+380.00
2+400.00
2+420.00
2+440.00
2+460.00
2+480.00
2+500.00
2+520.00
2+540.00
2+560.00
2+580.00
2+600.00
2+620.00
2+640.00
2+660.00
2+680.00
2+700.00
2+720.00
2+740.00
2+760.00
2+780.00
2+800.00
2+820.00
2+840.00
2+860.00
2+880.00
2+900.00
2+920.00
2+940.00
2+960.00
2+980.00
3+000.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin
-

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

16.943
16.923
16.903
16.883
16.863
16.843
16.823
16.803
16.783
16.763
16.743
16.723
16.703
16.683
16.663
16.643
16.623
16.603
16.583
16.563
16.543
16.523
16.503
16.483
16.463
16.443
16.423
16.403
16.383
16.363
16.343
16.323
16.303
16.283
16.263
16.243
16.223
16.203
16.183

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

Parcial
3+000.00
3+020.00
3+040.00
3+060.00
3+080.00
3+100.00
3+120.00
3+140.00
3+160.00
3+180.00
3+200.00
3+220.00
3+240.00
3+260.00
3+280.00
3+300.00
3+320.00
3+340.00
3+360.00
3+380.00
3+400.00
3+420.00
3+440.00
3+460.00
3+480.00
3+500.00
3+520.00
3+540.00
3+560.00
3+580.00
3+600.00
3+620.00
3+640.00
3+660.00
3+680.00
3+700.00
3+720.00
3+740.00

Ubicacin

Acceso

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00
-

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

16.163
16.143
16.123
16.103
16.083
16.063
16.043
16.023
16.003
15.983
15.963
15.943
15.923
15.903
15.883
15.863
15.843
15.823
15.803
15.783
15.763
15.743
15.723
15.703
15.683
15.663
15.643
15.623
15.603
15.583
15.563
15.543
15.523
15.503
15.483
15.463
15.443

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

3+760.00
3+780.00
3+800.00
3+820.00
3+840.00
3+860.00
3+880.00
3+900.00
3+920.00
3+940.00
3+960.00
3+980.00
4+000.00
Parcial
4+000.00
4+020.00
4+040.00
4+060.00
4+080.00
4+100.00
4+120.00
4+140.00
4+150.00
4+160.00
4+180.00
4+200.00
4+220.00
4+240.00
4+260.00
4+280.00
4+300.00
4+320.00
4+340.00
4+360.00
4+380.00
4+400.00
4+420.00
4+440.00
4+460.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin

Acceso

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

15.423
15.403
15.383
15.363
15.343
15.323
15.303
15.283
15.263
15.243
15.223
15.203
15.183

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

15.163
15.143
15.123
15.103
15.083
15.063
15.043
15.028
15.018
15.003
14.983
14.963
14.943
14.923
14.903
14.883
14.863
14.843
14.823
14.803
14.783
14.763
14.743
14.723

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

4+480.00
4+500.00
4+520.00
4+540.00
4+560.00
4+580.00
4+600.00
4+620.00
4+640.00
4+660.00
4+680.00
4+700.00
4+720.00
4+740.00
4+760.00
4+780.00
4+800.00
4+820.00
4+840.00
4+860.00
4+880.00
4+900.00
4+920.00
4+940.00
4+960.00
4+980.00
5+000.00
Parcial
5+000.00
5+020.00
5+040.00
5+060.00
5+080.00
5+100.00
5+120.00
5+140.00
5+160.00
5+180.00
5+200.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin

Acceso

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

14.703
14.683
14.663
14.643
14.623
14.603
14.583
14.563
14.543
14.523
14.503
14.483
14.463
14.443
14.423
14.403
14.383
14.363
14.343
14.323
14.303
14.283
14.263
14.243
14.223
14.203
14.183

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

14.163
14.143
14.123
14.103
14.083
14.063
14.043
14.023
14.003
13.983

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

5+220.00
5+240.00
5+260.00
5+280.00
5+300.00
5+320.00
5+340.00
5+360.00
5+380.00
5+400.00
5+420.00
5+440.00
5+460.00
5+480.00
5+500.00
5+520.00
5+540.00
5+560.00
5+580.00
5+600.00
5+620.00
5+640.00
5+660.00
5+680.00
5+700.00
5+720.00
5+740.00
5+760.00
5+780.00
5+800.00
5+820.00
5+840.00
5+860.00
5+880.00
5+900.00
5+920.00
5+940.00
5+960.00
5+980.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin
-

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

13.963
13.943
13.923
13.903
13.883
13.863
13.843
13.823
13.803
13.783
13.763
13.743
13.723
13.703
13.683
13.663
13.643
13.623
13.603
13.583
13.563
13.543
13.523
13.503
13.483
13.463
13.443
13.423
13.403
13.383
13.363
13.343
13.323
13.303
13.283
13.263
13.243
13.223
13.203

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

6+000.00
Parcial
6+000.00
6+020.00
6+040.00
6+060.00
6+080.00
6+100.00
6+120.00
6+140.00
6+160.00
6+180.00
6+200.00
6+220.00
6+240.00
6+260.00
6+280.00
6+300.00
6+320.00
6+340.00
6+360.00
6+380.00
6+400.00
6+420.00
6+440.00
6+460.00
6+480.00
6+500.00
6+520.00
6+540.00
6+560.00
6+580.00
6+600.00
6+620.00
6+640.00
6+660.00
6+680.00
6+700.00
6+720.00

20.00

Ubicacin

Acceso

10+025.82

9.147

13.183

0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

13.163
13.143
13.123
13.103
13.083
13.063
13.043
13.023
13.003
12.983
12.963
12.943
12.923
12.903
12.883
12.863
12.843
12.823
12.803
12.783
12.763
12.743
12.723
12.703
12.683
12.663
12.643
12.623
12.603
12.583
12.563
12.543
12.523
12.503
12.483
12.463

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

6+740.00
6+760.00
6+780.00
6+800.00
6+820.00
6+840.00
6+860.00
6+880.00
6+900.00
6+920.00
6+940.00
6+960.00
6+980.00
7+000.00
Parcial
7+000.00
7+020.00
7+040.00
7+060.00
7+080.00
7+100.00
7+120.00
7+140.00
7+160.00
7+180.00
7+200.00
7+220.00
7+240.00
7+260.00
7+280.00
7+300.00
7+320.00
7+340.00
7+360.00
7+380.00
7+400.00
7+420.00
7+440.00
7+460.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin

Acceso

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

12.443
12.423
12.403
12.383
12.363
12.343
12.323
12.303
12.283
12.263
12.243
12.223
12.203
12.183

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

12.163
12.143
12.123
12.103
12.083
12.063
12.043
12.023
12.003
11.983
11.963
11.943
11.923
11.903
11.883
11.863
11.843
11.823
11.803
11.783
11.763
11.743
11.723

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

7+480.00
7+500.00
7+520.00
7+540.00
7+560.00
7+580.00
7+600.00
7+620.00
7+640.00
7+660.00
7+680.00
7+700.00
7+720.00
7+740.00
7+760.00
7+780.00
7+800.00
7+820.00
7+840.00
7+860.00
7+880.00
7+900.00
7+920.00
7+940.00
7+960.00
7+980.00
8+000.00
Parcial
8+000.00
8+020.00
8+040.00
8+060.00
8+080.00
8+100.00
8+120.00
8+140.00
8+160.00
8+180.00
8+200.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin

Acceso

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

11.703
11.683
11.663
11.643
11.623
11.603
11.583
11.563
11.543
11.523
11.503
11.483
11.463
11.443
11.423
11.403
11.383
11.363
11.343
11.323
11.303
11.283
11.263
11.243
11.223
11.203
11.183

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

11.163
11.143
11.123
11.103
11.083
11.063
11.043
11.023
11.003
10.983

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

8+220.00
8+240.00
8+260.00
8+280.00
8+300.00
8+320.00
8+340.00
8+360.00
8+380.00
8+400.00
8+420.00
8+440.00
8+460.00
8+480.00
8+500.00
8+520.00
8+540.00
8+560.00
8+580.00
8+600.00
8+620.00
8+640.00
8+660.00
8+680.00
8+700.00
8+720.00
8+740.00
8+760.00
8+780.00
8+800.00
8+820.00
8+840.00
8+860.00
8+880.00
8+900.00
8+920.00
8+940.00
8+960.00
8+980.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin
-

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

10.963
10.943
10.923
10.903
10.883
10.863
10.843
10.823
10.803
10.783
10.763
10.743
10.723
10.703
10.683
10.663
10.643
10.623
10.603
10.583
10.563
10.543
10.523
10.503
10.483
10.463
10.443
10.423
10.403
10.383
10.363
10.343
10.323
10.303
10.283
10.263
10.243
10.223
10.203

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

9+000.00
Parcial
9+000.00
9+020.00
9+040.00
9+060.00
9+080.00
9+100.00
9+120.00
9+140.00
9+160.00
9+180.00
9+200.00
9+220.00
9+240.00
9+260.00
9+280.00
9+300.00
9+320.00
9+340.00
9+360.00
9+380.00
9+400.00
9+420.00
9+440.00
9+460.00
9+480.00
9+500.00
9+520.00
9+540.00
9+560.00
9+580.00
9+600.00
9+620.00
9+640.00
9+660.00
9+680.00
9+700.00
9+720.00

20.00

Ubicacin

Acceso

10+025.82

9.147

10.183

0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

10.163
10.143
10.123
10.103
10.083
10.063
10.043
10.023
10.003
9.983
9.963
9.943
9.923
9.903
9.883
9.863
9.843
9.823
9.803
9.783
9.763
9.743
9.723
9.703
9.683
9.663
9.643
9.623
9.603
9.583
9.563
9.543
9.523
9.503
9.483
9.463

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
202.EE REMOCION DE CARPETA ASFALTICA

Longitud

Area

Volumen

m2

m3

D.M.E

DT

700.E:
Transporte
de mat
excedente
D < 1 km

Km

m3.km

Progresiva

9+740.00
9+760.00
9+780.00
9+800.00
9+820.00
9+840.00
9+860.00
9+880.00
9+900.00
9+920.00
9+940.00
9+960.00
9+980.00
10+000.00
Parcial
10+000.00
10+020.00
10+025.82
Parcial
TOTAL

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ubicacin

Acceso

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

9.443
9.423
9.403
9.383
9.363
9.343
9.323
9.303
9.283
9.263
9.243
9.223
9.203
9.183

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10+025.82
10+025.82
10+025.82

9.147
9.147
9.147

9.163
9.150

0.00
0.00
0.00
0.00

0.00
20.00
5.82
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

700.F:
Transporte
de mat
excedente
D>< 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
1+000.00
1+020.00
1+040.00
1+060.00
1+080.00
1+100.00
1+120.00
1+140.00
1+160.00
1+180.00
1+200.00
1+220.00
1+240.00
1+260.00
1+280.00
1+300.00
1+320.00
1+340.00
1+360.00
1+380.00
1+400.00
1+420.00
1+440.00
1+460.00
1+480.00
1+500.00
1+520.00
1+540.00
1+560.00
1+580.00
1+600.00
1+620.00
1+640.00
1+660.00
1+680.00
1+700.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
7.04
20.64
12.15
4.82
8.26
20.73
29.42
24.50
19.07
20.17
15.58
26.01
23.36
20.03
15.04
14.45
9.69
7.65
4.19
1.97
1.34
7.81
7.18
2.93
8.39
12.08
1.53
4.89
1.95
3.36
9.77
3.97
11.35
7.87
1.65
3.61

Relleno
2.77
0.59
0.71
6.94
1.24
0.50
0.57
0.59
0.91
0.57
0.81
0.71
2.90
0.71
4.39
6.08
9.24
10.55
21.86
7.36
25.88
17.58
12.24
15.13
5.24
1.62
26.43
9.54
20.32
18.76
9.14
9.75
11.14
11.74
15.19
5.18

205.C:
Corte
276.80
327.90
169.70
130.80
289.90
501.50
539.20
435.70
392.40
357.50
415.90
493.70
433.90
350.70
294.90
241.40
173.40
118.40
61.60
33.10
91.50
149.90
101.10
113.20
204.70
136.10
64.20
68.40
53.10
131.30
137.40
153.20
192.20
95.20
52.60

210.A:
Relleno
33.60
13.00
76.50
81.80
17.40
10.70
11.60
15.00
14.80
13.80
15.20
36.10
36.10
51.00
104.70
153.20
197.90
324.10
292.20
332.40
434.60
298.20
273.70
203.70
68.60
280.50
359.70
298.60
390.80
279.00
188.90
208.90
228.80
269.30
203.70

Ubicacin

Acceso

Ubicacin

Acceso

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
05+300.00
05+300.00
05+300.00
05+300.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

9.147
9.147

m3.km

80.52
131.91
88.97
99.62
180.14
119.77
56.50
60.19

17.583

115.54

83.78
46.29

m3.km

243.58
288.55
149.34
115.10
255.11
441.32
474.50
383.42
345.31

910.67
1,072.23
551.53
422.48
930.58
1,599.79
1,709.26
1,372.46
1,228.21

152.59
104.19
54.21
29.13

515.00
349.28
180.49
96.32

46.73

144.96

120.91
134.82
169.14

369.61
409.04
509.33

1,533.80
2,509.75
1,690.68
1,890.76
3,414.97
2,267.81
1,068.47
1,137.00
2,177.32

3.690
3.670
3.650
17.503
17.483

m3.km

6,071.36
7,054.84
8,364.67
7,342.81
5,927.82
4,978.74
4,070.68

3.730

05+300.00
05+300.00
05+300.00
10+025.82
10+025.82

314.60
365.99
434.46
381.83
308.62
259.51
212.43

17.763
17.743
17.723
17.703
17.683
17.663
17.643
17.623

9.147

m3.km

3.970
3.950
3.930
3.910

05+300.00
10+025.82

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km

4.290
4.270
4.250
4.230
4.210
4.190
4.170
4.150
4.130
17.983
17.963
17.943
17.923
17.903
17.883
17.863

DME - 5+300

1,571.07
867.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
1+720.00
1+740.00
1+760.00
1+780.00
1+800.00
1+820.00
1+840.00
1+860.00
1+880.00
1+900.00
1+920.00
1+940.00
1+960.00
1+980.00
2+000.00
Parcial

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
1.30
1.15
0.98
1.17
0.95
0.44
0.64
0.82
0.95
1.10
17.86
20.75
11.31
6.51
6.25

Relleno
24.60
32.78
19.47
35.05
40.86
17.01
28.22
13.25
8.47
6.20
1.82
2.73

205.C:
Corte
49.10
24.50
21.30
21.50
21.20
13.90
10.80
14.60
17.70
20.50
189.60
386.10
320.60
178.20
127.60
9,199.70

210.A:
Relleno
297.80
573.80
522.50
545.20
759.10
578.70
452.30
414.70
217.20
146.70
31.00
9.10
45.50
10,411.70

Ubicacin

Acceso

Ubicacin

Acceso

05+300.00
05+300.00
10+025.82

9.147

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km

m3.km

3.590
3.570
17.423

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

18.74

15.58
18.04
166.85
339.77
282.13
156.82
112.29
4,450.86

m3.km

m3.km

43.21
21.56

127.17
62.97

18.92
18.66
12.23
9.50
12.85

54.40
53.21
34.61
26.68
35.77

349.81

3.530
3.510
3.490
3.470
3.450
17.303
17.283
17.263
17.243
17.223
17.203
17.183

DME - 5+300

288.56
333.80
3,083.43
6,271.35
5,201.04
2,887.34
2,064.93
84,419.80

3,644.87

12,766.04

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
2+000.00
2+020.00
2+040.00
2+060.00
2+080.00
2+100.00
2+120.00
2+140.00
2+160.00
2+180.00
2+200.00
2+220.00
2+240.00
2+260.00
2+280.00
2+300.00
2+320.00
2+340.00
2+360.00
2+380.00
2+400.00
2+420.00
2+440.00
2+460.00
2+480.00
2+500.00
2+520.00
2+540.00
2+560.00
2+580.00
2+600.00
2+620.00
2+640.00
2+660.00
2+680.00
2+700.00
2+720.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
6.25
4.32
0.97
1.33
0.79
0.78
1.51
0.67
0.81
1.33
0.77
0.90
0.65
2.27
0.62
0.77
0.70
0.71
0.99
0.72
1.17
0.36
0.76
0.63
0.74
0.73
0.68
0.82
0.65
0.86
0.45
3.78
0.81
0.68
0.73
1.13
0.93

Relleno
2.73
2.57
4.86
6.29
10.22
12.62
6.82
7.49
4.84
3.95
6.66
4.92
5.86
0.14
4.68
2.24
6.85
2.86
10.71
13.36
14.80
15.10
14.62
18.66
19.18
17.00
19.54
15.52
17.20
16.59
16.53
0.92
18.19
5.10
3.21
5.17
9.01

205.C:
Corte
105.70
52.90
23.00
21.20
15.70
22.90
21.80
14.80
21.40
21.00
16.70
15.50
29.20
28.90
13.90
14.70
14.10
17.00
17.10
18.90
15.30
11.20
13.90
13.70
14.70
14.10
15.00
14.70
15.10
13.10
42.30
45.90
14.90
14.10
18.60
20.60

210.A:
Relleno
53.00
74.30
111.50
165.10
228.40
194.40
143.10
123.30
87.90
106.10
115.80
107.80
60.00
48.20
69.20
90.90
97.10
135.70
240.70
281.60
299.00
297.20
332.80
378.40
361.80
365.40
350.60
327.20
337.90
331.20
174.50
191.10
232.90
83.10
83.80
141.80

Ubicacin
10+025.82
10+025.82

Acceso

Ubicacin

9.147
9.147

Acceso

17.163
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

9.147

19.18
13.02
18.83
18.48
14.70
13.64
25.70
25.43

m3.km

12.41
2.610
2.590

m3.km

m3.km

1,708.41
46.55
20.24
18.66
13.82
20.15

120.08
51.75
47.28
34.70
50.15

12.23
12.94
12.41
14.96
15.05
16.63
13.46
9.86
12.23
12.06
12.94
12.41
13.20
12.94
13.29
11.53
37.22
40.39
13.11

27.94
29.25
27.78
33.15
33.00
36.10
28.92
20.94
25.72
25.07
26.61
25.24
26.55
25.73
26.12
22.40
71.49
76.65
24.59

16.37
18.13

29.95
32.75

349.73
237.14
342.46
335.64
266.58
247.11
464.95
459.59

3.010
2.990
2.970
2.950
2.930
2.910
2.890
2.870
2.850
2.830
2.810
2.790
2.770
2.750
2.730
2.710
2.690
2.670
2.650
16.503

05+300.00
05+300.00

m3.km

3.270
3.250
3.230
3.210
3.190

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
10+025.82

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km

93.02

17.043
17.023
17.003
16.983
16.963
16.943
16.923
16.903

DME - 5+300

218.59

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
2+740.00
2+760.00
2+780.00
2+800.00
2+820.00
2+840.00
2+860.00
2+880.00
2+900.00
2+920.00
2+940.00
2+960.00
2+980.00
3+000.00
Parcial

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
0.77
5.46
0.30
0.45
0.88
0.70
0.79
1.96
3.08
0.94
0.67
0.67
0.67
2.17

Relleno
22.22
0.54
31.75
19.42
18.72
14.59
3.85
16.37
14.66
17.45
16.39
18.45
17.23
7.58

205.C:
Corte
17.00
62.30
57.60
7.50
13.30
15.80
14.90
27.50
50.40
40.20
16.10
13.40
13.40
28.40
1,181.40

210.A:
Relleno
312.30
227.60
322.90
511.70
381.40
333.10
184.40
202.20
310.30
321.10
338.40
348.40
356.80
248.10
11,221.50

Ubicacin

Acceso

Ubicacin
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

Acceso

DME - 5+300

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km

m3.km

2.570
2.550
2.530
2.510
2.490
2.470
2.450
2.430
2.410
2.390
2.370
2.350
2.330
2.310
254.41

4,630.20

m3.km
14.96
54.82
50.69
6.60
11.70
13.90
13.11
24.20
44.35
35.38
14.17
11.79
11.79
24.99
785.22

m3.km
26.69
96.57
88.13
11.33
19.82
23.23
21.61
39.33
71.06
55.88
22.06
18.09
17.82
37.20
1,528.69

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
6+000.00
6+020.00
6+040.00
6+060.00
6+080.00
6+100.00
6+120.00
6+140.00
6+160.00
6+180.00
6+200.00
6+220.00
6+240.00
6+260.00
6+280.00
6+300.00
6+320.00
6+340.00
6+360.00
6+380.00
6+400.00
6+420.00
6+440.00
6+460.00
6+480.00
6+500.00
6+520.00
6+540.00
6+560.00
6+580.00
6+600.00
6+620.00
6+640.00
6+660.00
6+680.00
6+700.00
6+720.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte

3.28
5.97
4.14
1.44
1.14
1.79
1.01
6.49
3.78
2.36
1.84
1.32
1.42
1.39
2.08
3.42
3.07
2.67

1.82
0.92
1.06
1.00
1.36
1.40

Relleno

0.34

2.09
3.49
2.20
2.18
0.01
4.53
1.99
1.19
2.19
1.19
1.36
0.93
0.03
1.94
2.71

3.72
4.46
5.31
3.35
1.94
1.92

205.C:
Corte
16.40
92.50
29.85
20.70
55.80
25.80
29.30
28.00
75.00
102.70
61.40
42.00
31.60
27.40
28.10
34.70
55.00
64.90
57.40
13.35
9.10
27.40
19.80
20.60
23.60
27.60

210.A:
Relleno
1.70
1.70
10.45
55.80
56.90
43.80
21.90
45.40
65.20
31.80
33.80
33.80
25.50
22.90
9.60
19.70
46.50
13.55
18.60
81.80
97.70
86.60
52.90
38.60

Ubicacin

Acceso

Ubicacin

Acceso

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km

m3.km

0.710
0.730
0.750
0.770
0.790

10+025.82
10+025.82

9.147
9.147

13.063
13.043

14.43
81.40

197.83
1,113.96

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

13.003
12.983
12.963
12.943
12.923
12.903
12.883
12.863
12.843
12.823
12.803
12.783
12.763
12.743
12.723
12.703
12.683

18.22
49.10
22.70
25.78
24.64
66.00
90.38
54.03
36.96
27.81
24.11
24.73
30.54
48.40
57.11
50.51
11.75

248.46
668.64
308.64
349.92
333.84
892.71
1,220.37
728.38
497.40
373.60
323.40
331.10
408.17
645.86
760.81
671.74
155.97

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147

1.210
1.230
1.250
1.270
1.290
12.563
12.543
12.523
12.503
12.483
12.463

DME - 5+300

8.01
24.11
17.42
18.13
20.77
24.29

105.22
316.27
228.15
236.96
270.99
316.37

m3.km

m3.km

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
6+740.00
6+760.00
6+780.00
6+800.00
6+820.00
6+840.00
6+860.00
6+880.00
6+900.00
6+920.00
6+940.00
6+960.00
6+980.00
7+000.00
Parcial

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte

Relleno

205.C:
Corte
7.00
1,027.00

210.A:
Ubicacin
Relleno
9.60 10+025.82
925.80

Acceso

Ubicacin

9.147

Acceso

12.443
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00

DME - 5+300

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km
6.16

m3.km

m3.km

80.10

1.450
1.470
1.490
1.510
1.530
1.550
1.570
1.590
1.610
1.630
1.650
1.670
1.690
877.49

m3.km

11,784.86

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
7+000.00
7+020.00
7+040.00
7+060.00
7+080.00
7+100.00
7+120.00
7+140.00
7+160.00
7+180.00
7+200.00
7+220.00
7+240.00
7+260.00
7+280.00
7+300.00
7+320.00
7+340.00
7+360.00
7+380.00
7+400.00
7+420.00
7+440.00
7+460.00
7+480.00
7+500.00
7+520.00
7+540.00
7+560.00
7+580.00
7+600.00
7+620.00
7+640.00
7+660.00
7+680.00
7+700.00
7+720.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte

2.59
0.07
0.68
1.15
0.76
1.48
0.93
0.86
2.35
1.35
0.99
3.26
3.12
1.81
3.43
1.66
1.09
0.77
0.97

1.41
0.94
1.06
1.85
0.82
1.67
1.38

Relleno

2.51
2.45
3.69
0.55
-

4.87
10.35
6.74
8.79
9.42
5.67
6.28

205.C:
Corte
12.95
26.60
7.50
18.30
19.10
22.40
24.10
17.90
32.10
37.00
23.40
42.50
63.80
49.30
52.40
50.90
27.50
18.60
17.40
4.85
7.05
23.50
20.00
29.10
26.70
24.90
30.50

210.A:
Relleno
12.55
49.60
61.40
42.40
2.75
24.35
152.20
170.90
155.30
182.10
150.90
119.50

Ubicacin

Acceso

Ubicacin

Acceso

05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
05+300.00
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km

m3.km

1.710
1.730
1.750
1.770
1.790
1.810
1.830
1.850
12.003
11.983
11.963
11.943
11.923
11.903
11.883
11.863
11.843
11.823
11.803
11.783
11.763
11.743
11.723
11.703
11.683
11.663
11.643
11.623
11.603
11.583
11.563
11.543
11.523
11.503
11.483
11.463

DME - 5+300

m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11.40
23.41
6.60
16.10
16.81
19.71
21.21
15.75
28.25
32.56
20.59
37.40
56.14
43.38
46.11
44.79
24.20
16.37
15.31
4.27
0.00
6.20
20.68
17.60
25.61
23.50
21.91
26.84

142.49
292.14
82.22
200.25
208.63
244.22
262.28
194.44
348.05
400.44
252.79
458.27
686.67
529.62
561.88
544.77
293.78
198.33
185.19
51.52
0.00
74.61
248.23
210.86
306.21
280.43
261.02
319.12

m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
7+740.00
7+760.00
7+780.00
7+800.00
7+820.00
7+840.00
7+860.00
7+880.00
7+900.00
7+920.00
7+940.00
7+960.00
7+980.00
8+000.00
Parcial

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
2.16
1.65
1.47
1.34
2.90
6.09
5.03
5.62
5.92
3.99
4.34
5.38
5.98
5.20

Relleno
4.20
3.24
2.77
3.34
0.87
1.44
1.22
2.06
3.11
7.42
-

205.C:
Corte
35.40
38.10
31.20
28.10
42.40
89.90
111.20
106.50
115.40
99.10
83.30
97.20
113.60
111.80
1,833.55

210.A:
Relleno
104.80
74.40
60.10
61.10
42.10
4.35
7.20
26.60
32.80
51.70
105.30
37.10
1,731.50

Ubicacin
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

Ubicacin

Acceso

11.443
11.423
11.403
11.383
11.363
11.343
11.323
11.303
11.283
11.263
11.243
11.223
11.203
11.183

DME - 5+300

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km

m3.km

m3.km

m3.km

31.15
33.53
27.46
24.73
37.31
79.11
97.86
93.72
101.55
87.21
73.30
85.54
99.97
98.38
1,613.52

369.68
397.11
324.57
291.76
439.38
929.82
1,147.90
1,097.25
1,186.64
1,017.05
853.23
993.66
1,159.04
1,138.44
19,183.96

0.00

0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
8+000.00
8+020.00
8+040.00
8+060.00
8+080.00
8+100.00
8+120.00
8+140.00
8+160.00
8+180.00
8+200.00
8+220.00
8+240.00
8+260.00
8+280.00
8+300.00
8+320.00
8+340.00
8+360.00
8+380.00
8+400.00
8+420.00
8+440.00
8+460.00
8+480.00
8+500.00
8+520.00
8+540.00
8+560.00
8+580.00
8+600.00
8+620.00
8+640.00
8+660.00
8+680.00
8+700.00
8+720.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
5.20
1.45
2.71
6.61
6.68
7.17
6.24
13.62
11.45
11.79
13.36
15.89
9.98
6.42
3.65
12.33
0.18
0.44
0.87
1.98
6.18
3.65
2.57
4.65
4.83
4.16
8.53
0.71
6.07
4.56
3.89
3.63
0.38

Relleno
6.22
5.88
0.12
7.28
5.96
15.71
22.91
42.09
55.16
63.54
58.65
43.22
34.66
22.91
5.68
2.48
5.88
0.84
3.70
0.02
0.26
0.13
2.77

205.C:
Corte
66.50
41.60
93.20
132.90
138.50
134.10
198.60
250.70
232.40
251.50
292.50
258.70
164.00
100.70
159.80
61.65
0.90
0.90
2.20
13.10
28.50
81.60
98.30
62.20
72.20
94.80
89.90
126.90
92.40
67.80
106.30
84.50
75.20
40.10

210.A:
Relleno
31.10
121.00
29.40
0.60
74.00
132.40
216.70
386.20
650.00
972.50
1,187.00
1,221.90
1,018.70
778.80
575.70
285.90
81.60
83.60
29.40
4.20
4.20
18.50
37.20
0.10
1.30
3.90
29.00

Ubicacin
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso

Ubicacin

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

Acceso

11.163
11.143
11.123
11.103
11.083
11.063
11.043
11.023
11.003
10.983
10.963
10.943
10.923
10.903
10.883
10.863
10.843
10.823
05+300.00
05+300.00
05+300.00

10+025.82

9.147

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km
58.52
36.61
82.02
116.95
121.88
118.01
174.77
220.62
204.51
221.32
257.40
227.66
144.32
88.62
140.62
54.25
0.79
0.79

m3.km

10.743

11.53

86.50
54.74
63.54
83.42
79.11
111.67
81.31
59.66
93.54
74.36
66.18
35.29

m3.km

0.00
0.00
1.94

0.00
0.00
4.64

25.08
71.81

61.28
177.07

127.63

3.150
3.170
10.683
10.663
10.643
10.623
10.603
10.583
10.563
10.543
10.523
10.503
10.483
10.463

m3.km

675.83
421.94
943.45
1,342.66
1,396.47
1,349.42
1,994.50
2,512.72
2,324.66
2,510.68
2,914.12
2,572.21
1,627.34
997.21
1,579.27
608.04
8.86
8.84

3.070
3.090
3.110

05+300.00
05+300.00

DME - 5+300

951.82
601.03
696.21
912.24
863.29
1,216.06
883.60
647.00
1,012.28
802.99
713.11
379.46

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
8+740.00
8+760.00
8+780.00
8+800.00
8+820.00
8+840.00
8+860.00
8+880.00
8+900.00
8+920.00
8+940.00
8+960.00
8+980.00
9+000.00
Parcial

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
4.47
4.17
1.89
0.54
1.34
0.69
0.67
1.01
0.93
3.59
1.18
3.50
3.53
0.29

Relleno
0.32
0.25
4.05
5.41
1.91
8.11
8.46
4.37
4.18
1.08
3.25
0.32
0.38
6.99

205.C:
Corte
48.50
86.40
60.60
24.30
18.80
20.30
13.60
16.80
19.40
45.20
47.70
46.80
70.30
38.20
4,272.05

210.A:
Relleno
30.90
5.70
43.00
94.60
73.20
100.20
165.70
128.30
85.50
52.60
43.30
35.70
7.00
73.70
8,914.30

Ubicacin
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

Ubicacin

Acceso

10.443
10.423
10.403
10.383
10.363
10.343
10.323
10.303
10.283
10.263
10.243
10.223
10.203
10.183

DME - 5+300

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km

m3.km

m3.km

m3.km

42.68
76.03
53.33
21.38
16.54
17.86
11.97
14.78
17.07
39.78
41.98
41.18
61.86
33.62
3,660.58

457.98
814.13
569.81
228.00
176.02
189.66
126.79
156.29
180.09
418.68
440.88
431.63
646.96
350.78
40,782.67

98.82

242.99

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
9+000.00
9+020.00
9+040.00
9+060.00
9+080.00
9+100.00
9+120.00
9+140.00
9+160.00
9+180.00
9+200.00
9+220.00
9+240.00
9+260.00
9+280.00
9+300.00
9+320.00
9+340.00
9+360.00
9+380.00
9+400.00
9+420.00
9+440.00
9+460.00
9+480.00
9+500.00
9+520.00
9+540.00
9+560.00
9+580.00
9+600.00
9+620.00
9+640.00
9+660.00
9+680.00
9+700.00
9+720.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
0.29
1.00
3.15
0.94
0.88
0.54
1.35
0.97
0.36
0.44
0.35
0.58
0.81
3.77
0.86
0.79
0.69
3.12
1.15
1.41
0.73
0.49
3.00
0.68
0.46
0.45
1.36
0.69
0.47
0.42
0.58
1.07
1.04
0.82
1.02
0.52
0.52

Relleno
6.99
4.30
3.21
4.07
3.89
13.54
1.41
3.21
5.58
7.44
10.03
9.75
6.05
2.84
4.95
4.29
6.92
1.06
1.62
1.13
7.18
4.46
0.71
7.30
7.39
13.94
10.48
11.70
13.90
14.06
5.70
4.20
5.05
8.07
5.59
9.60
7.62

205.C:
Corte
12.90
41.50
40.90
18.20
14.20
18.90
23.20
13.30
8.00
7.90
9.30
13.90
45.80
46.30
16.50
14.80
38.10
42.70
25.60
21.40
12.20
34.90
36.80
11.40
9.10
18.10
20.50
11.60
8.90
10.00
16.50
21.10
18.60
18.40
15.40
10.40

210.A:
Relleno
112.90
75.10
72.80
79.60
174.30
149.50
46.20
87.90
130.20
174.70
197.80
158.00
88.90
77.90
92.40
112.10
79.80
26.80
27.50
83.10
116.40
51.70
80.10
146.90
213.30
244.20
221.80
256.00
279.60
197.60
99.00
92.50
131.20
136.60
151.90
172.20

Ubicacin
10+025.82
10+025.82
10+025.82
10+025.82

Acceso

Ubicacin

9.147
9.147
9.147
9.147

Acceso

10.163
10.143
10.123
05+300.00
05+300.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km
11.35
36.52
35.99

m3.km

m3.km

16.02
12.50
16.63
20.42
11.70
7.04
6.95
8.18
12.23
40.30
40.74
14.52
13.02
33.53
37.58
22.53
18.83
10.74
30.71
32.38
10.03
8.01
15.93
18.04
10.21
7.83
8.80
14.52
18.57
16.37
16.19
13.55
9.15

m3.km

118.20
379.43
373.12

3.770
3.790
10.063
10.043
10.023
10.003
9.983
9.963
9.943
9.923
9.903
9.883
9.863
9.843
9.823
9.803
9.783
9.763
9.743
9.723
9.703
9.683
9.663
9.643
9.623
9.603
9.583
9.563
9.543
9.523
9.503
9.483
9.463

DME - 5+300

171.29
209.79
120.00
72.02
70.96
83.35
124.31
408.67
412.20
146.57
131.17
336.91
376.73
225.35
187.95
106.91
305.12
321.00
99.21
79.01
156.80
177.18
100.02
76.57
85.83
141.29
180.25
158.52
156.45
130.64
88.01

50.41
39.62

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
9+740.00
9+760.00
9+780.00
9+800.00
9+820.00
9+840.00
9+860.00
9+880.00
9+900.00
9+920.00
9+940.00
9+960.00
9+980.00
10+000.00
Parcial

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Corte
0.50
0.88
1.47
1.27
0.67
1.17
1.29
0.95
1.79
0.49
0.72
0.43
0.71
1.29

Relleno
7.53
4.95
1.32
5.22
7.38
5.61
4.29
1.70
1.80
9.14
8.78
10.52
26.55
14.82

205.C:
Corte
10.20
13.80
23.50
27.40
19.40
18.40
24.60
22.40
27.40
22.80
12.10
11.50
11.40
20.00
1,012.20

210.A:
Relleno
151.50
124.80
62.70
65.40
126.00
129.90
99.00
59.90
35.00
109.40
179.20
193.00
370.70
413.70
6,758.70

Ubicacin
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

Ubicacin

Acceso

9.443
9.423
9.403
9.383
9.363
9.343
9.323
9.303
9.283
9.263
9.243
9.223
9.203
9.183

DME - 5+300

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km
8.98
12.14
20.68
24.11
17.07
16.19
21.65
19.71
24.11
20.06
10.65
10.12
10.03
17.60
862.22

m3.km

m3.km

m3.km

86.12
116.23
197.47
229.69
162.24
153.51
204.74
185.98
226.95
188.39
99.74
94.56
93.51
163.66
8,513.64

28.51

90.03

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN
210.A TERRAPLENES

DME - PROYECTO
Longitud

AREA (m2)

VOLUMEN (m3)

D.M.E PROYECTO

D.M.E - 5+300

DT

DT

Km

Km

Progresiva
m
10+000.00
10+020.00
10+025.82
Parcial
TOTAL

5+300
PROYECTO

20.00
5.82

Corte
1.29
1.51
0.64

Relleno
14.82
0.01
0.48

205.C:
Corte
28.00
6.26
34.26
18,560.16

210.A:
Relleno

Ubicacin

- 10+025.82
148.30 10+025.82
1.43 10+025.82
149.73
40,113.23

5,178.90
###

Los metrados se tiene como techo los contractuales, los cuales se estan considerando

Acceso
9.147
9.147
9.147

Ubicacin

Acceso

9.163
9.150

DME - 5+300

700.E:
700.F:
700.E:
700.F:
Transporte Transporte Transporte Transporte
de mat
de mat
de mat
de mat
excedente excedente excedente excedente
D < 1 km
D>< 1 km
D < 1 km D>< 1 km
m3.km

m3.km

24.64
228.56
5.51
51.02
30.15
279.58
11,749.24 169,594.70

###
###

###
###

m3.km

m3.km

0.00
4,557.43

0.00
14,627.75

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
0+000.00
0+020.00
0+040.00
0+060.00
0+080.00
0+100.00
0+120.00
0+140.00
0+160.00
0+180.00
0+200.00
0+220.00
0+240.00
0+260.00
0+280.00
0+300.00
0+320.00
0+340.00
0+360.00
0+380.00
0+400.00
0+420.00
0+440.00
0+460.00
0+480.00
0+500.00
0+520.00
0+540.00
0+560.00
0+580.00
0+600.00
0+620.00
0+640.00
0+660.00
0+680.00
0+700.00
0+720.00
0+740.00
0+760.00
0+780.00
0+800.00
0+820.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
0+840.00
0+860.00
0+880.00
0+900.00
0+920.00
0+940.00
0+960.00
0+980.00
1+000.00
Parcial
1+000.00
1+020.00
1+040.00
1+060.00
1+080.00
1+100.00
1+120.00
1+140.00
1+160.00
1+180.00
1+200.00
1+220.00
1+240.00
1+260.00
1+280.00
1+300.00
1+320.00
1+340.00
1+360.00
1+380.00
1+400.00
1+420.00
1+440.00
1+460.00
1+480.00
1+500.00
1+520.00
1+540.00
1+560.00
1+580.00
1+600.00
1+620.00
1+640.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
1+660.00
1+680.00
1+700.00
1+720.00
1+740.00
1+760.00
1+780.00
1+800.00
1+820.00
1+840.00
1+860.00
1+880.00
1+900.00
1+920.00
1+940.00
1+960.00
1+980.00
2+000.00
Parcial
2+000.00
2+020.00
2+040.00
2+060.00
2+080.00
2+100.00
2+120.00
2+140.00
2+160.00
2+180.00
2+200.00
2+220.00
2+240.00
2+260.00
2+280.00
2+300.00
2+320.00
2+340.00
2+360.00
2+380.00
2+400.00
2+420.00
2+440.00
2+460.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
2+480.00
2+500.00
2+520.00
2+540.00
2+560.00
2+580.00
2+600.00
2+620.00
2+640.00
2+660.00
2+680.00
2+700.00
2+720.00
2+740.00
2+760.00
2+780.00
2+800.00
2+820.00
2+840.00
2+860.00
2+880.00
2+900.00
2+920.00
2+940.00
2+960.00
2+980.00
3+000.00
Parcial
3+000.00
3+020.00
3+040.00
3+060.00
3+080.00
3+100.00
3+120.00
3+140.00
3+160.00
3+180.00
3+200.00
3+220.00
3+240.00
3+260.00
3+280.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
3+300.00
3+320.00
3+340.00
3+360.00
3+380.00
3+400.00
3+420.00
3+440.00
3+460.00
3+480.00
3+500.00
3+520.00
3+540.00
3+560.00
3+580.00
3+600.00
3+620.00
3+640.00
3+660.00
3+680.00
3+700.00
3+720.00
3+740.00
3+760.00
3+780.00
3+800.00
3+820.00
3+840.00
3+860.00
3+880.00
3+900.00
3+920.00
3+940.00
3+960.00
3+980.00
4+000.00
Parcial
4+000.00
4+020.00
4+040.00
4+060.00
4+080.00
4+100.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00

20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
4+120.00
4+140.00
4+150.00
4+160.00
4+180.00
4+200.00
4+220.00
4+240.00
4+260.00
4+280.00
4+300.00
4+320.00
4+340.00
4+360.00
4+380.00
4+400.00
4+420.00
4+440.00
4+460.00
4+480.00
4+500.00
4+520.00
4+540.00
4+560.00
4+580.00
4+600.00
4+620.00
4+640.00
4+660.00
4+680.00
4+700.00
4+720.00
4+740.00
4+760.00
4+780.00
4+800.00
4+820.00
4+840.00
4+860.00
4+880.00
4+900.00
4+920.00
4+940.00

20.00
20.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
4+960.00
4+980.00
5+000.00
Parcial
5+000.00
5+020.00
5+040.00
5+060.00
5+080.00
5+100.00
5+120.00
5+140.00
5+160.00
5+180.00
5+200.00
5+220.00
5+240.00
5+260.00
5+280.00
5+300.00
5+320.00
5+340.00
5+360.00
5+380.00
5+400.00
5+420.00
5+440.00
5+460.00
5+480.00
5+500.00
5+520.00
5+540.00
5+560.00
5+580.00
5+600.00
5+620.00
5+640.00
5+660.00
5+680.00
5+700.00
5+720.00
5+740.00
5+760.00

20.00
20.00
20.00

0.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
5+780.00
5+800.00
5+820.00
5+840.00
5+860.00
5+880.00
5+900.00
5+920.00
5+940.00
5+960.00
5+980.00
6+000.00
Parcial
6+000.00
6+020.00
6+040.00
6+060.00
6+080.00
6+100.00
6+120.00
6+140.00
6+160.00
6+180.00
6+200.00
6+220.00
6+240.00
6+260.00
6+280.00
6+300.00
6+320.00
6+340.00
6+360.00
6+380.00
6+400.00
6+420.00
6+440.00
6+460.00
6+480.00
6+500.00
6+520.00
6+540.00
6+560.00
6+580.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
6+600.00
6+620.00
6+640.00
6+660.00
6+680.00
6+700.00
6+720.00
6+740.00
6+760.00
6+780.00
6+800.00
6+820.00
6+840.00
6+860.00
6+880.00
6+900.00
6+920.00
6+940.00
6+960.00
6+980.00
7+000.00
Parcial
7+000.00
7+020.00
7+040.00
7+060.00
7+080.00
7+100.00
7+120.00
7+140.00
7+160.00
7+180.00
7+200.00
7+220.00
7+240.00
7+260.00
7+280.00
7+300.00
7+320.00
7+340.00
7+360.00
7+380.00
7+400.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
7+420.00
7+440.00
7+460.00
7+480.00
7+500.00
7+520.00
7+540.00
7+560.00
7+580.00
7+600.00
7+620.00
7+640.00
7+660.00
7+680.00
7+700.00
7+720.00
7+740.00
7+760.00
7+780.00
7+800.00
7+820.00
7+840.00
7+860.00
7+880.00
7+900.00
7+920.00
7+940.00
7+960.00
7+980.00
8+000.00
Parcial
8+000.00
8+020.00
8+040.00
8+060.00
8+080.00
8+100.00
8+120.00
8+140.00
8+160.00
8+180.00
8+200.00
8+220.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
8+240.00
8+260.00
8+280.00
8+300.00
8+320.00
8+340.00
8+360.00
8+380.00
8+400.00
8+420.00
8+440.00
8+460.00
8+480.00
8+500.00
8+520.00
8+540.00
8+560.00
8+580.00
8+600.00
8+620.00
8+640.00
8+660.00
8+680.00
8+700.00
8+720.00
8+740.00
8+760.00
8+780.00
8+800.00
8+820.00
8+840.00
8+860.00
8+880.00
8+900.00
8+920.00
8+940.00
8+960.00
8+980.00
9+000.00
Parcial
9+000.00
9+020.00
9+040.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

0.00

20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
9+060.00
9+080.00
9+100.00
9+120.00
9+140.00
9+160.00
9+180.00
9+200.00
9+220.00
9+240.00
9+260.00
9+280.00
9+300.00
9+320.00
9+340.00
9+360.00
9+380.00
9+400.00
9+420.00
9+440.00
9+460.00
9+480.00
9+500.00
9+520.00
9+540.00
9+560.00
9+580.00
9+600.00
9+620.00
9+640.00
9+660.00
9+680.00
9+700.00
9+720.00
9+740.00
9+760.00
9+780.00
9+800.00
9+820.00
9+840.00
9+860.00
9+880.00
9+900.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
200 MOVIMIENTO DE TIERRAS
205.EE PERFILADO Y COMPACTACION EN ZONA DE CORTE
Longitud
Ancho
Aea
Progresiva
m
m
m2
9+920.00
9+940.00
9+960.00
9+980.00
10+000.00
Parcial
10+000.00
10+020.00
10+025.82
Parcial
TOTAL

20.00
20.00
20.00
20.00
20.00

0.00
-

20.00
5.82
0.00
0.00

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
600 OBRAS DE ARTE Y DRENAJE
PROGRESIVA

Del

Al

601.C

TIPO

LADO

Km
Km
ALCANTARILLAS AMC
00+070.25
00+354.65
01+838.20
02+415.90
02+780.55
(V. A.)
03+102.40
ejecutado el 100%
04+640.00
(V. A.)
04+914.40
(V. A.)
05+280.20
(V. A.)
05+579.55
(V. A.)
06+204.40
(V. A.)
06+499.40
(V. A.)
06+733.70
(V. A.)
07+233.65
(V. A.)
07+942.55
(V. A.)
08+468.75
(V. A.)
08+714.50
(V. A.)
09+094.30
(V. A.)
09+369.75
09+707.60
MUROS PARA PROTECCION DE TALUDES
VIA AUXILIAR DERECHA
(V. A.)
I
D
01+270.00
01+360.00
(V. A.)
II
D
01+495.00
01+610.00
(V. A.)
I
D
01+610.00
01+730.00
(V. A.)
II
D
01+730.00
01+830.00
(V. A.)
IV
D
01+830.00
01+850.00
(V. A.)
III
D
01+850.00
01+975.00
(V. A.)
II
D
02+295.00
02+590.00
III
D
02+590.00
02+610.00
I
D
02+610.00
02+670.00
IV
D
02+670.00
02+691.79
(V. A.)
II
D
03+310.00
03+610.00
VIA AUXILIAR IZQUIERDA
(V. A.)
II
I
01+410.00
01+790.00
(V. A.)
III
I
01+790.00
01+830.00
(V. A.)
IV
I
01+830.00
01+850.00
(V. A.)
III
I
01+850.00
01+910.00
(V. A.)
II
I
01+910.00
02+030.00
(V. A.)
I
I
02+110.00
02+310.00
MUROS EN RAMPAS, DESVIOS E INTERSECCIONES
LADO DERECHO DE LA VIA
DERECHO
(50%)
II
D
02+010.00
02+072.00
III
D
02+171.45
02+260.00
II
D
02+941.95
03+010.00
III
D
03+611.40
03+700.00
IZQUIERDO
III
D
01+430.00
01+495.00
II
D
01+975.00
02+010.00
IV
D
02+010.00
02+040.00
III
D
02+240.00
02+295.00
II
D
03+000.00
03+045.00
III
D
03+680.00
03+735.00
LADO IZQUIERDO DE LA VIA
DERECHO
III
I
03+388.53
03+300.00
IZQUIERDO
III
I
03+320.00
03+265.00
MUROS PARA VEREDA
II
D
01+410.00
01+430.00
II
D
01+756.00
01+770.00
II
D
02+310.00
02+330.00
(V. A.)
II
D
02+470.00
02+489.00
(V. A.)
II
D
02+630.00
02+650.00
II
D
03+370.00
03+430.00
(V. A.)
I
D
03+450.00
03+470.00
(V. A.)
III
D
03+930.00
03+984.50
II
I
01+250.00
01+290.00
(V. A.)
III
I
01+790.00
01+810.00
III
I
01+810.00
01+830.00
(V. A.)
III
I
03+090.00
03+130.00
(V. A.)
(V. A.)
(V. A.)
(V. A.)

C.P.

602.EE

Excavacin para
Limpieza y
Estructuras en encauzamiento
mat comn
de alcantarillas
m3

m3
72.38
105.46
36.30
38.02

603.EE

605.A

605.EE

610.D

610.G

612.A

615.A

624.B

630.A

655.B

Preparacin de
superficie de
concreto

Relleno para
estructuras

Refuerzo de
cimentacin
H=0.60m

Concreto Clase D
(f'c = 210 kg/cm2)

Concreto Clase
G (f'c = 100
kg/cm2)

Encofrado y
desencofrado

Acero de Refuerzo
fy=4200 kg/cm2

Tubera de PVC
3"

Geodren

Junta para
muros

m2

m3

m2

m3

m3

m2

kg

m2

m2

2.86
10.74

175.57
42.16
106.46
125.82
105.57
13.53
3.41
15.31
12.99
128.30
11.37
35.12
38.04
4.84

1.15
1.15
2.10
1.15

1.15

41.55
71.78
31.19
22.87

63.93
22.54
167.65
87.31

29.86
54.14
102.55
41.56

1.94
3.89
6.24
2.28

177.49
297.09
496.84
213.38

1,239.91
2,599.49
4,832.28
1,813.46

134.55
17.15
46.74
75.56
52.05
21.53
2.37
23.44
8.18
74.36
7.74
41.80
52.85
3.98

141.83
49.37
56.03
64.11
62.87
28.13
22.91
18.62
26.66
63.52
30.21
55.36
150.15
15.13

93.31
26.99
40.66
50.26
45.73
19.45
18.26
17.84
28.77
47.92
21.01
37.06
162.89
15.12

6.22
3.16
3.08
3.28
3.03
1.04
2.06
1.84
3.14
1.87
2.47
8.67
1.38

440.31
143.14
184.68
232.60
224.21
100.11
94.72
85.87
130.54
231.00
109.51
174.52
573.04
73.95

3,649.87
1,060.48
1,719.11
2,166.50
2,125.45
943.66
893.12
790.15
1,408.20
2,026.51
958.38
1,556.69
6,460.18
739.61

349.22
460.11
500.06
398.49
149.97
722.34
1,337.15

210.95
261.21
311.56
226.01
92.59
366.02
811.31

135.00
212.75
180.00
185.00
75.80
377.03
529.36

18.00
28.18
24.00
24.50
7.60
40.00
71.88

453.15
690.00
598.73
624.67
214.11
1,136.80
1,707.30

6,063.89
10,118.83
8,172.23
10,245.93
3,467.47
7,996.40
18,473.52

90.00
115.00
120.00
100.00
20.00
125.00
295.00

154.58
270.61
203.37
262.20
94.64
468.33
636.36

18.00
28.37
24.00
24.67
10.11
50.58
72.77

1,373.22

837.08

531.19

71.25

1,741.58

19,030.79

150.00

338.12

54.89

1,626.31
266.75
67.27
424.38
565.28
805.03

958.73
169.19
30.52
275.37
349.25
494.41

623.44
121.40
75.80
182.10
222.00
295.45

82.80
12.80
7.60
19.20
29.40
40.00

2,017.25
384.19
214.11
576.28
749.60
965.27

29,786.12
5,117.70
2,876.48
7,667.75
12,295.12
13,276.17

456.00
51.20
15.00
60.00
120.00
200.00

1,064.00
83.25
68.63
249.41
336.00
321.18

93.73
14.99
7.84
24.28
29.60
39.80

177.28

47.45

11.20

187.52

1,830.38

55.48
87.00

34.68
36.50

4.65
4.90

113.90
120.03

1,296.03
1,394.18

12.67
13.33

4.62
4.87

45.60
350.67

28.00
153.91

4.00
17.44

100.18
435.92

1,115.04
5,221.24

13.33
36.33

4.20
20.53

137.20

56.50

6.40

191.53

2,824.68

13.33

216.40

113.00

12.80

383.07

4,965.72

26.67

6.33

ACUMULADO MES ACTUAL

11,185.87

10.74

9.56

6,123.89

1,126.32

5,069.73

594.19

17,588.19

210,218.72

2,032.86

4,550.68

534.17

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

16,928.21
11,185.87
11,183.56
2.31

64.14
10.74
10.74
-

28.56
9.56
9.56
-

9,247.26
6,123.89
6,106.74
17.15

1,433.46
1,126.32
1,101.65
24.67

7,769.39
5,069.73
5,060.20
9.53

877.46
594.19
592.96
1.23

26,792.53
17,588.19
17,533.64
54.55

405,907.48
210,218.72
209,860.77
357.95

2,925.56
2,032.86
2,032.86
-

6,129.77
4,550.68
4,550.68
-

858.80
534.17
534.17
-

(V. A.)
(50%)

Estas partidas ya han sido valorizadas anteriormente por eso ya no se coloca los sustentos y dichas partidas estan valorizadas al 100% en todas las sub partidas
Esta partida esta valorizada el un 50% lo que es concreto, fierro y encofrado
Los metrados se tiene como techo los contractuales, los cuales se estan considerando

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

RESUMEN DE METRADOS
DME - PROYECTO

700 TRANSPORTE
Descripcin
(V. A.)
(V. A.)
++

(V. A.)

(V. A.)

DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS


CORTE
MEJORAMIENTO DE SUBRASANTE
TERRAPLENES CON MATERIAL DE CANTERA
SUB BASE GRANULAR
BASE GRANULAR
DEMOLICION DE ESTRUCTURAS
AGREGADOS PARA CONCRETO OBRAS ARTE
EXCAVACION PARA ESTRUCTURAS
RELLENOS PARA ESTRUCTURAS OBRAS DE ARTE
MATERIAL FILTRANTE OBRAS DE ARTE
ACUMULADO MES ACTUAL

C.P.

(V. A.)
++

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

700.A
m3.Km

14,083.26
35,299.64
9,139.55
2,328.31

700.B
m3.Km

700.C
m3.Km

700.D
m3.Km

700.E
m3.Km
939.98
11,749.24

700.F
m3.Km
12,495.03
169,594.70

19.76

227.80

9,382.85

166,356.52

844.84

2,157.81

22,091.84

348,674.05

18,499.31

53,892.74

94,570.45
22,091.84
22,028.67
63.17

1,586,229.70
348,674.05
347,702.64
971.41

18,499.31
18,535.39
-36.08

53,892.74
53,892.74
-

1,218,993.00
3,022,386.90
870,762.10
224,429.40

6,230.31

607,922.48

5,389.02
-

477,570.17
-

72,470.09

6,422,064.05

233,467.84
72,470.09
71,456.68
1,013.41

15,105,495.80
6,422,064.05
6,329,577.58
92,486.47

19,049.20
-

Estas partidas ya han sido valorizadas anteriormente por eso ya no se coloca los sustentos
Es la suma de transporte de material granular de mejoramiento de subrasante

1,560,093.30
-

DME - 5+300
700.E
m3.Km

700.F
m3.Km

4,557.43
13,097.04

14,627.75
37,107.18

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

METRADOS DE TRANSPORTE DE MATERIAL GRANULAR


MATERIAL GRANULAR

Volumen de
Transporte de
Material Granular

ACOPIO

Ubicacin

Material Granular para Rellenos

Acceso

05+300.00

(m3)

1,283.21

CANTERA

Ubicacin

10+025.82

DT

Acceso

Km

71.410

76.136

700.A:
Transporte 700.B: Transporte
de mat
de mat granular D><
granular D <
1 km
1 km
m3.km

1,129.22

m3.km

99,247.44

1,283.21
Cuadro para el columen de material de cantera

TRANSPORTE DE MATERIAL PARA MEJORAMIENTO DE SUBRASANTE Y MATERIAL EXCEDENTE DE CORTE

METRADOS DE MEJORAMIENTO Y TRANSPORTE (Del Contrato Principal, correspondiente a las progresivas del Ad
220.B: Mejoram
de suelo a NSR

UBICACIN

Inicio

Final

Lado

C.G.

m3

CANTERA

Ubicacin

Acceso

DT

700.A: Transporte
de mat granular D <
1 km

Km

m3.km

10.02582 71.410
3,554.10
79.936
3,127.61
10.02582 71.410
2,627.05
78.936
2,311.80
10.02582 71.410
3,674.70
80.036
3,233.74
10.02582 71.410
947.70
73.616
833.98
10.02582 71.410
2,730.90
72.936
2,403.19
10.02582 71.410
1,335.80
71.936
1,175.50
10.02582 71.410
12.75
71.423
11.22
14,883.00
13,097.04
LA UBICACIN DEL DME EN LOS TRAMOS TRABAJADOS EN EL ADICIONAL N02 YA FUE SUSTENTADO ANTERIORMENTE (Km. 5+300), POR LO QUE NO DEBER
DEL DME PARA LOS TRAMOS YA TRABAJADOS, YA QUE LOS MATERIALES DE CORTE EN LAS SECCIONES VALORIZADAS NO SE BOTARON EN EL DME CONSI
01+000
02+000
01+000
07+640
08+000
09+000
10+000

02+000
03+000
01+800
08+000
09+000
10+000
10+026

LI
LI
LD
LI Y LD
LI Y LD
LI Y LD
LI Y LD

1.50
2.50
1.40
7.82
8.50
9.50
10.01

LA UBICACIN DEL DME EN LOS TRAMOS TRABAJADOS EN EL ADICIONAL N02 YA FUE SUSTENTADO ANTERIORMENTE (Km. 5+300), POR LO QUE NO DEBER
DEL DME PARA LOS TRAMOS YA TRABAJADOS, YA QUE LOS MATERIALES DE CORTE EN LAS SECCIONES VALORIZADAS NO SE BOTARON EN EL DME CONSI

METRADOS DE MEJORAMIENTO Y TRANSPORTE (Del Contrato Principal, correspondiente a las progresivas del Ad
UBICACIN

220.B: Mejoram
de suelo a NSR

CANTERA

Ubicacin

Inicio

Final

Lado

C.G.

m3

00+000
01+800
02+000
03+000
04+000
05+000
06+000
07+000

01+000
02+000
03+000
04+000
05+000
06+000
07+000
07+600

LD Y LI
LD
LD
LD Y LI
LD Y LI
LD Y LI
LD Y LI
LD Y LI

0.50
1.90
2.50
3.50
4.50
5.50
6.50
7.30

485.20
635.50
1,120.70

10.02582
10.02582
10.02582
10.02582
10.02582
10.02582
10.02582
10.02582

Acceso

71.410
71.410
71.410
71.410
71.410
71.410
71.410
71.410

DT

700.A: Transporte
de mat granular D <
1 km

Km

m3.km

80.936
79.536
78.936
77.936
76.936
75.936
74.936
74.136

0.00
0.00
0.00
0.00
0.00
0.00
426.98
559.24
986.22

TE Y MATERIAL EXCEDENTE DE CORTE

cipal, correspondiente a las progresivas del Adicional No.2)


700.B:
Transporte de
mat granular
D>< 1 km
m3.km

D.M.E

Ubicacin

DT

Acceso

Km

700.E:
700.F:
Transporte de Transporte de
mat excedente mat excedente
D < 1 km
D>< 1 km
m3.km

m3.km

5.30000
280,545.80
3.800
3,127.61
9,951.48
5.30000
204,741.30
2.800
2,311.80
4,728.69
5.30000
290,432.93
3.900
3,233.74
10,656.63
5.30000
68,818.01
2.520
833.98
1,440.50
5.30000
196,449.53
3.200
2,403.19
6,007.98
5.30000
94,756.07
4.200
1,175.50
4,274.56
5.30000
897.89
4.713
11.22
47.34
1,136,641.53
13,097.04
37,107.18
ENTADO ANTERIORMENTE (Km. 5+300), POR LO QUE NO DEBERIA MODIFICARSE TANTO LA UBICACIN COMO EL ACCESO
SECCIONES VALORIZADAS NO SE BOTARON EN EL DME CONSIDERADO EN EL EXPEDIENTE

cipal, correspondiente a las progresivas del Adicional No. 3)


700.B:
Transporte de
mat granular
D>< 1 km

D.M.E

m3.km

Ubicacin

0.00
0.00
0.00
0.00
0.00
0.00
35,873.66
46,477.81
82,351.47

10.02582
10.02582
10.02582
10.02582
10.02582
10.02582
10.02582
10.02582

DT

Acceso

9.147
9.147
9.147
9.147
9.147
9.147
9.147
9.147

Km

18.673
17.273
16.673
15.673
14.673
13.673
12.673
11.873

700.E:
700.F:
Transporte de Transporte de
mat excedente mat excedente
D < 1 km
D>< 1 km
m3.km

0.00
0.00
0.00
0.00
0.00
0.00
426.98
559.24
986.22

m3.km

0.00
0.00
0.00
0.00
0.00
0.00
5,663.65
6,909.68
12,573.33

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (TERRAPLENES)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (TERRAPLENES)

METRADOS DE TRANSPORTE DE MATERIAL GRANULAR P/ RELLENOS


CANTERA vaca
UBICACIN

MATERIAL PARA RELLENO

INICIO

FINAL

LONG.

C.G.

PLATAFORMA

00+000
01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000

01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
10+026

1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
26

0.50
1.50
2.50
3.50
4.50
5.50
6.50
7.50
8.50
9.50
10.01

0.00
10411.70
11221.50

CANTERA

CANTERA vaca
TOTAL

925.80
1731.50
8914.30
6758.70
149.73
40,113.23

MATERIAL TRANSPORTADO

40,113.23
40,113.23

VOLUMEN
TOTAL
0.00
10411.70
11221.50
0.00
0.00
0.00
925.80
1731.50
8914.30
6758.70
149.73
40,113.23

DISTANCIA
TRANSP.

UBICACIN (KM)
ACCESO (KM)

80.94
79.94
78.94
77.94
76.94
75.94
74.94
73.94
72.94
71.94
71.42 100%

TRANSPORTE DE
MATERIAL
D <= 1 KM
D > 1 KM

35,299.64
35,299.64

3,022,386.90
3,022,386.90

MATERIAL

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.00
10411.70
11221.50
0.00
0.00
0.00
925.80
1731.50
8914.30
6758.70
149.73
40,113.23

DISTANCIA MEDIA
KM

76.35
76.35

SPORTE DE MATERIAL GRANULAR P/ RELLENOS


CANTERA vaca
10.03
71.410
MOMENTO
TRANSPORTE
0.00
831018.37
884431.72
0.00
0.00
0.00
69264.49
127812.09
649102.06
485381.58
10676.18
3,057,686.51

TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

0.00
9162.30
9874.92
0.00
0.00
0.00
814.70
1523.72
7844.58
5947.66
131.76
35,299.64

0.00
821856.10
874556.80
0.00
0.00
0.00
68449.80
126288.40
641257.50
479433.90
10544.40
3,022,386.90

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (AGREGADOS PARA CONCRETO)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (AGREGADOS PARA CONCRETO)
PROGRESIVA
Inicio (Km)
Fin (Km)
ALCANTARILLAS AMC
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)

(V. A.)

CG (Km)

VOLUMEN (m3)
Concreto
Concreto
Agregados
100
210
p/C

0+070.25
0+354.65
1+838.20
2+415.90
2+780.55
3+102.40
4+640.00
4+914.40
5+280.20
5+579.55
6+204.40
6+499.40
6+733.70
7+233.65
7+942.55
8+468.75
8+714.50
9+094.30
9+369.75
9+707.60
MUROS PARA PROTECCION DE TALUDES
VIA AUXILIAR DERECHA
1+270.00
1+360.00
1+315.00

1.94
3.89
6.24
2.28
6.22
3.16
3.08
3.28
3.03
1.04

CANTERA
Ubicacin

Distancia

Acceso

Km

2.06
1.84
3.14
1.87
2.47
8.67
1.38
-

29.86
54.14
102.55
41.56
93.31
26.99
40.66
50.26
45.73
19.45
18.26
17.84
28.77
47.92
21.01
37.06
162.89
15.12
-

39.75
72.54
135.99
54.80
124.41
37.69
54.68
66.93
60.95
25.61
22.83
24.87
38.26
63.83
28.60
49.41
214.45
20.63
-

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50

89.456
89.171
87.688
87.110
86.745
86.423
84.886
84.611
84.246
83.946
83.321
83.026
82.792
82.292
81.583
81.057
80.811
80.432
80.156
79.818

18.00

135.00

191.25

10+025.82

79.50

88.211

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (AGREGADOS PARA CONCRETO)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (AGREGADOS PARA CONCRETO)
PROGRESIVA
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)

(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)

Inicio (Km)
1+495.00
1+610.00
1+730.00
1+830.00
1+850.00
2+295.00
2+590.00
2+610.00
2+670.00
3+310.00
VIA AUXILIAR
1+410.00
1+790.00
1+830.00
1+850.00
1+910.00
2+110.00

Fin (Km)
1+610.00
1+730.00
1+830.00
1+850.00
1+975.00
2+590.00
2+610.00
2+670.00
2+691.79
3+610.00
IZQUIERDA
1+790.00
1+830.00
1+850.00
1+910.00
2+030.00
2+310.00

CG (Km)
1+552.50
1+670.00
1+780.00
1+840.00
1+912.50
2+442.50
2+600.00
2+640.00
2+680.90
3+460.00
1+600.00
1+810.00
1+840.00
1+880.00
1+970.00
2+210.00

Concreto
100
28.18
24.00
24.50
7.60
40.00
71.88
71.25
82.80
12.80
7.60
19.20
29.40
40.00

VOLUMEN (m3)
Concreto
Agregados
210
p/C
212.75
301.16
180.00
255.00
185.00
261.88
75.80
104.25
377.03
521.29
529.36
751.55
531.19
753.05
623.44
882.80
121.40
167.75
75.80
104.25
182.10
251.63
222.00
314.25
295.45
419.31

CANTERA

Distancia

Ubicacin
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50

Km
87.973
87.856
87.746
87.686
87.613
87.083
86.926
86.886
86.845
86.066

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

79.50
79.50
79.50
79.50
79.50
79.50

87.926
87.716
87.686
87.646
87.556
87.316

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (AGREGADOS PARA CONCRETO)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (AGREGADOS PARA CONCRETO)
PROGRESIVA

(V. A.)

VOLUMEN (m3)
Concreto
Concreto
Agregados
Inicio (Km)
Fin (Km)
CG (Km)
100
210
p/C
MUROS EN RAMPAS, DESVIOS E INTERSECCIONES
LADO DERECHO DE LA VIA
DERECHO
1+361.45
1+430.00
1+395.73
1+430.00
1+460.00
1+445.00
2+010.00
2+072.00
2+041.00
11.20
47.45
73.31
2+171.45
2+260.00
2+215.73
2+941.95
3+010.00
2+975.98
3+611.40
3+700.00
3+655.70
IZQUIERDO
1+430.00
1+495.00
1+462.50
1+975.00
2+010.00
1+992.50
2+010.00
2+040.00
2+025.00
2+240.00
2+295.00
2+267.50
3+000.00
3+045.00
3+022.50
3+680.00
3+735.00
3+707.50
LADO IZQUIERDO DE LA VIA
DERECHO
3+388.53
3+300.00
3+344.27
IZQUIERDO
3+320.00
3+265.00
3+292.50
MUROS PARA VEREDA
1+410.00
1+430.00
1+420.00
1+756.00
1+770.00
1+763.00
-

CANTERA
Ubicacin

Distancia

Acceso

Km

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

79.50
79.50
79.50
79.50
79.50
79.50

88.130
88.081
87.485
87.310
86.550
85.870

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

79.50
79.50
79.50
79.50
79.50
79.50

88.063
87.533
87.501
87.258
86.503
85.818

10+025.82

79.50

86.182

10+025.82

79.50

86.233

10+025.82
10+025.82

79.50
79.50

88.106
87.763

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (AGREGADOS PARA CONCRETO)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (AGREGADOS PARA CONCRETO)
PROGRESIVA

(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)

(V. A.)

VOLUMEN (m3)
CANTERA
Distancia
Concreto
Concreto
Agregados
Inicio (Km)
Fin (Km)
CG (Km)
Ubicacin
Acceso
Km
100
210
p/C
2+310.00
2+330.00
2+320.00
4.65
34.68
49.16 10+025.82
79.50
87.206
2+470.00
2+489.00
2+479.50
4.90
36.50
51.75 10+025.82
79.50
87.046
2+630.00
2+650.00
2+640.00
10+025.82
79.50
86.886
3+370.00
3+430.00
3+400.00
4.00
28.00
40.00 10+025.82
79.50
86.126
3+450.00
3+470.00
3+460.00
17.44
153.91
214.19 10+025.82
79.50
86.066
3+930.00
3+984.50
3+957.25
10+025.82
79.50
85.569
1+250.00
1+290.00
1+270.00
6.40
56.50
78.63 10+025.82
79.50
88.256
1+790.00
1+810.00
1+800.00
10+025.82
79.50
87.726
1+810.00
1+830.00
1+820.00
12.80
113.00
157.25 10+025.82
79.50
87.706
3+090.00
3+130.00
3+110.00
10+025.82
79.50
86.416
TOTAL
594.19
5,069.73
7,079.90
Los metrados se tiene como techo los contractuales, los cuales se estan considerando
Estas partidas ya han sido valorizadas anteriormente por eso ya no se coloca los sustentos
Para el transporte de material granular se esta considerando un factor de esponjamiento 1.25 de los materiales granulares

PLANILLA DE METRADOS

D < 1 km

D > 1 km

m3.km

m3.km

34.98
63.83
119.67
48.22
0.00
109.48
33.17
48.11
58.89
53.64
22.54
20.09
21.88
33.67
56.17
25.17
43.48
188.72
18.15
0.00

3,516.11
6,395.72
11,788.43
4,718.82
0.00
10,627.74
3,161.45
4,571.45
5,571.21
5,055.58
2,108.46
1,872.25
2,033.85
3,110.44
5,143.23
2,289.63
3,943.68
17,034.37
1,632.59
0.00

168.30

16,679.07

PLANILLA DE METRADOS

D < 1 km

D > 1 km

m3.km
265.02
224.40
230.45
91.74
458.73
661.36
0.00
0.00
0.00
662.68

m3.km
26,193.10
22,148.23
22,716.56
9,037.00
45,150.44
64,695.92
0.00
0.00
0.00
64,058.82

776.86
147.62
91.74
221.43
276.54
369.00

76,738.11
14,546.58
9,037.00
21,802.25
27,200.17
36,193.30

PLANILLA DE METRADOS

D < 1 km

D > 1 km

m3.km

m3.km

0.00
0.00
64.51
0.00
0.00
0.00

0.00
0.00
6,339.88
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

PLANILLA DE METRADOS

D < 1 km
m3.km
43.26
45.54
0.00
35.20
188.49
0.00
69.19
0.00
138.38
0.00
6,230.31

D > 1 km
m3.km
4,238.09
4,452.90
0.00
3,405.03
18,220.04
0.00
6,860.49
0.00
13,634.49
0.00
607,922.48

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

METRADOS DE TRANSPORTE DE MATERIAL DE SUB-BASE GRANULAR

CANTERA ISLA GUINE


UBICACIN

MATERIAL PARA SUB BASE

INICIO

FINAL

LONG.

C.G.

PLATAFORMA

ACCESOS

00+000
01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000

01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
10+026

1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
26

0.50
1.50
2.50
3.50
4.50
5.50
6.50
7.50
8.50
9.50
10.01

0.00
1813.39
2506.75
0.00
0.00
0.00
0.00
817.44
2942.57
2271.26
34.44

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VOLUMEN
TOTAL
0.00
1813.39
2506.75
0.00
0.00
0.00
0.00
817.44
2942.57
2271.26
34.44

10,385.85

0.00

10385.85

CANTERA

CANTERA ISLA GUINEAL


TOTAL

MATERIAL TRANSPORTADO

10,385.85
10,385.85

TRANSPORTE DE
MATERIAL

UBICACIN (KM)
ACCESO (KM)
DISTANCIA
TRANSP.

MATERIAL

90.32
89.32
88.32
87.32
86.32
85.32
84.32
83.32
82.32
81.32
80.80

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.00
1813.39
2506.75
0.00
0.00
0.00
0.00
817.44
2942.57
2271.26
34.44

10,385.85
DISTANCIA MEDIA

D <= 1 KM

D > 1 KM

KM

9,139.55
9,139.55

870,762.10
870,762.10

84.84
84.84

ASE GRANULAR

CANTERA ISLA GUINEAL


10.026
80.790
MOMENTO
TRANSPORTE
0.00
161746.38
221084.61
0.00
0.00
0.00
0.00
68007.57
241867.22
184417.11
2778.71

TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

0.00
1595.78
2205.94
0.00
0.00
0.00
0.00
719.35
2589.46
1998.71
30.31

0.00
160150.60
218878.70
0.00
0.00
0.00
0.00
67288.20
239277.80
182418.40
2748.40

9,139.55

870,762.10

TRANSPORTES
ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADOS DE TRANSPORTE DE MATERIAL DE BASE GRANULAR DE PLANTA CHANCADO

PLANTA CHANC
UBICACIN

MATERIAL PARA BASE

UBICACIN (KM)
ACCESO (KM)

INICIO

FINAL

LONG.

C.G.

PLATAFORMA

VOLUMEN
TOTAL

DISTANCIA
TRANSP.

00+000
01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000

01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+026

1000
1000
1000
1000
1000
1000
1000
1000
1000
1026

0.50
1.50
2.50
3.50
4.50
5.50
6.50
7.50
8.50
9.51

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
970.64
1675.17

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
970.64
1675.17

94.47
93.47
92.47
91.47
90.47
89.47
88.47
87.47
86.47
85.45

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

2645.81

2645.81

CANTERA

MATERIAL TRANSPORTADO

TRANSPORTE DE
MATERIAL

DISTANCIA
MEDIA

D <= 1 KM

D > 1 KM

KM

PLANTA CHANCADORA

2,645.81

2,328.31

224,429.40

85.82

TOTAL

2,645.81

2,328.31

224,429.40

85.82

(*) No se considera transporte de cantera Curimana a Planta Chancadora porque estan ubicadas en lugares cercanos este transporte es considerado como transporte intern

AYTA PUCALLPA

DE PLANTA CHANCADORA A OBRA


PLANTA CHANCADORA

ACIN (KM)
CESO (KM)

10.03
84.94
MATERIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
970.64
1675.17
2,645.81

MOMENTO
TRANSPORTE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83810.62
142947.05

TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
854.16
1474.15

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82956.50
141472.90

2,328.31

224,429.40

considerado como transporte interno

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (RELLENO PARA ESTRUCTURAS)

(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)

(V. A.)

700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (RELLENO PARA ESTRUCTURAS)


Relleno
PROGRESIVA
CANTERA
p/estructuras
Inicio (Km)
Fin (Km)
CG (Km)
m3
Ubicacin
Acceso
ALCANTARILLAS AMC
0+070.25
41.55 10+025.82
71.41
0+354.65
71.78 10+025.82
71.41
1+838.20
31.19 10+025.82
71.41
2+415.90
22.87 10+025.82
71.41
2+780.55
10+025.82
71.41
3+102.40
134.55 10+025.82
71.41
4+640.00
17.15 10+025.82
71.41
4+914.40
46.74 10+025.82
71.41
5+280.20
75.56 10+025.82
71.41
5+579.55
52.05 10+025.82
71.41
6+204.40
21.53 10+025.82
71.41
6+499.40
2.37 10+025.82
71.41
6+733.70
23.44 10+025.82
71.41
7+233.65
8.18 10+025.82
71.41
7+942.55
74.36 10+025.82
71.41
8+468.75
7.74 10+025.82
71.41
8+714.50
41.80 10+025.82
71.41
9+094.30
52.85 10+025.82
71.41
9+369.75
3.98 10+025.82
71.41
9+707.60
10+025.82
71.41
MUROS PARA PROTECCION DE TALUDES
VIA AUXILIAR DERECHA
1+270.00
1+360.00
1+315.00
210.95 10+025.82
71.41

Distancia

D < 1 km

D > 1 km

Km

m3.km

m3.km

81.366
81.081
79.598
79.020
78.655
78.333
76.796
76.521
76.156
75.856
75.231
74.936
74.702
74.202
73.493
72.967
72.721
72.342
72.066
71.728

36.56
63.17
27.45
20.13
0.00
118.40
15.09
41.13
66.49
45.80
18.95
2.09
20.63
7.20
65.44
6.81
36.78
46.51
3.50
0.00

3,339.19
5,748.23
2,451.46
1,784.32
0.00
10,405.21
1,299.90
3,529.87
5,678.76
3,896.27
1,598.20
175.23
1,727.58
598.79
5,390.60
557.03
2,997.95
3,770.40
282.84
0.00

80.121

185.64

16,690.54

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (RELLENO PARA ESTRUCTURAS)

(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)

(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)
(V. A.)

700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (RELLENO PARA ESTRUCTURAS)


Relleno
PROGRESIVA
CANTERA
Distancia
p/estructuras
Inicio (Km)
Fin (Km)
CG (Km)
m3
Ubicacin
Acceso
Km
1+495.00
1+610.00
1+552.50
261.21 10+025.82
71.41
79.883
1+610.00
1+730.00
1+670.00
311.56 10+025.82
71.41
79.766
1+730.00
1+830.00
1+780.00
226.01 10+025.82
71.41
79.656
1+830.00
1+850.00
1+840.00
92.59 10+025.82
71.41
79.596
1+850.00
1+975.00
1+912.50
366.02 10+025.82
71.41
79.523
2+295.00
2+590.00
2+442.50
811.31 10+025.82
71.41
78.993
2+590.00
2+610.00
2+600.00
10+025.82
71.41
78.836
2+610.00
2+670.00
2+640.00
10+025.82
71.41
78.796
2+670.00
2+691.79
2+680.90
10+025.82
71.41
78.755
3+310.00
3+610.00
3+460.00
837.08 10+025.82
71.41
77.976
VIA AUXILIAR IZQUIERDA
1+410.00
1+790.00
1+600.00
958.73 10+025.82
71.41
79.836
1+790.00
1+830.00
1+810.00
169.19 10+025.82
71.41
79.626
1+830.00
1+850.00
1+840.00
30.52 10+025.82
71.41
79.596
1+850.00
1+910.00
1+880.00
275.37 10+025.82
71.41
79.556
1+910.00
2+030.00
1+970.00
349.25 10+025.82
71.41
79.466
2+110.00
2+310.00
2+210.00
494.41 10+025.82
71.41
79.226
TOTAL
6,123.89
Estas partidas ya han sido valorizadas anteriormente por eso ya no se coloca los sustentos

D < 1 km

D > 1 km

m3.km
229.86
274.17
198.89
81.48
322.10
713.95
0.00
0.00
0.00
736.63

m3.km
20,605.11
24,540.28
17,777.00
7,277.19
28,741.11
63,276.76
0.00
0.00
0.00
64,434.92

843.68
148.89
26.86
242.33
307.34
435.08
5,389.02

75,582.27
13,302.70
2,398.74
21,631.92
27,404.19
38,675.63
477,570.17

OBRA
TRAMO
CONTRATISTA
SUPERVISOR

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO
: CONSORCIO PUCALLPA
: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
300 SUB BASES, BASES
PROGRESIVA
Desde
Hasta
Km
Km
VIA PRINCIPAL
0+000.00
1+000.00
1+000.00
2+000.00
2+000.00
3+000.00
3+000.00
4+000.00
4+000.00
5+000.00
5+000.00
6+000.00
6+000.00
7+000.00
7+000.00
8+000.00
8+000.00
9+000.00
9+000.00
10+000.00
10+000.00
10+025.82
ACCESOS Y PLAZOLETAS
ACCESOS
PLAZOLETAS
ACUMULADO MES ACTUAL
C.P.

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

300 A
Sub Base Granular
m3
0.00
906.69
710.22
0.00
0.00
0.00
0.00
817.44
2,814.65
2,271.26
34.44

305 A
Base Granular
m3
-

7,554.71

970.64
1,622.96
52.21
2,645.81

34,435.63
7,554.71
6,780.55
774.16

33,694.02
2,645.81
2,376.15
269.66

RIA-AGUAYTIA-PUCALLPA

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
900 PROTECCION AMBIENTAL
PROGRESIVA

906.A

900.F

907.A

907.B

970.B

970.C

911.A

912.A

Depsito de
desechos

Revegetacin de
reas afectadas

Readecuacin
ambiental de
canteras fluviales

Readecuacin
ambiental de
instalaciones
auxiliares

Monitoreo de la
calidad del aire

Monitoreo de la
calidad de ruido
ambiental

Seal informativa
ambiental
(1.22x2.40)

Estructura de
soporte de
seales tipo E-1

Km
Km
900.PROGRAMA DE CIERRE DE OBRA
DEPOSITO DE DESECHOS
DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS
EXCAVACION EN EXPLANACIONES
MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE
MEJORAMIENTOS EN ALCANTARILLAS
DEMOLICION DE ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS
REMOCION DE CARPETA ASFALTICA
PUENTES PEATONALES (RAMPAS)
PUENTES PEATONALES (PUENTES)
900.PROGRAMA DE SEGUIMIENTO Y CONTROL
JULIO 2014
(Primer Informe)
OCTUBRE 2014
(Segundo Informe)

m3

ha

ha

ha

m2

ACUMULADO MES ACTUAL

48,753.54

112,799.32
48,753.54
48,484.97
268.57

5.95
-

INICIO

(V. A.)
++
+++
(*)
(V. A.)

(V. A.)
(V. A.)

C.P.

++
+++

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

FIN

1,068.16
18,560.16
16,003.70
675.79
22.46
11,185.87
623.18
614.21

17.50
-

Este monto acumulado representa al corte de explanaciones y su sustento esta en la partida 205.C
Este monto acumulado representa a los montos de los del contrato principal de los adicionales N02 y N03
(*)
Este monto viene del 60% del acumulado de la partida 605.EE
(V. A.)
Estas partidas ya han sido valorizadas anteriormente por eso ya no se coloca los sustentos.

5.00
5.00

5.00
5.00

10.00

10.00

0.65
-

20.00
10.00
10.00
-

40.00
10.00
10.00
-

32.21
-

11.00
-

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

0+000
0+020
0+040
0+060
0+080
0+100
0+120
0+140
0+160
0+180
0+200
0+220
0+240
0+260
0+280
0+300
0+320
0+340
0+360
0+380
0+400
0+420
0+440
0+460

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

0+480
0+500
0+520
0+540
0+560
0+580
0+600
0+620
0+640
0+660
0+680
0+700
0+720
0+740
0+760
0+780
0+800
0+820
0+840
0+860
0+880
0+900
0+920
0+940

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

0+960
0+980
1+000

20.00
20.00
20.00

Sub-Total: km 0+000 - 1+000

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

VC:

VC:

VC:

0.00

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

1+800
1+820
1+840
1+860
1+880
1+900
1+920
1+940
1+960
1+980
2+000

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Sub-Total: km 1+000 - 2+000

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VC:

VC:

VC:

0.00

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

2+020
2+040
2+060
2+080
2+100
2+120
2+140
2+160
2+180
2+200
2+220
2+240
2+260
2+280
2+300
2+320
2+340
2+360
2+380
2+400
2+420
2+440
2+460

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

2+480
2+500
2+520
2+540
2+560
2+580
2+600
2+620
2+640
2+660
2+680
2+700
2+720
2+740
2+760
2+780
2+800
2+820
2+840
2+860
2+880
2+900
2+920
2+940

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

2+960
2+980
3+000

20.00
20.00
20.00

Sub-Total: km 2+000 - 3+000

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00

VC:

VC:

VC:

0.00

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

3+020
3+040
3+060
3+080
3+100
3+120
3+140
3+160
3+180
3+200
3+220
3+240
3+260
3+280
3+300
3+320
3+340
3+360
3+380
3+400
3+420
3+440
3+460

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

3+480
3+500
3+520
3+540
3+560
3+580
3+600
3+620
3+640
3+660
3+680
3+700
3+720
3+740
3+760
3+780
3+800
3+820
3+840
3+860
3+880
3+900
3+920
3+940

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

3+960
3+980
4+000

20.00
20.00
20.00

Sub-Total: km 3+000 -4+000

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

VC:

VC:

VC:

0.00

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

4+020
4+040
4+060
4+080
4+100
4+120
4+140
4+160
4+180
4+200
4+220
4+240
4+260
4+280
4+300
4+320
4+340
4+360
4+380
4+400
4+420
4+440
4+460

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

4+480
4+500
4+520
4+540
4+560
4+580
4+600
4+620
4+640
4+660
4+680
4+700
4+720
4+740
4+760
4+780
4+800
4+820
4+840
4+860
4+880
4+900
4+920
4+940

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

4+960
4+980
5+000

20.00
20.00
20.00

Sub-Total: km 4+000 - 5+000

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00

0.00
0.00
0.00

VC:

VC:

VC:

0.00

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

5+020
5+040
5+060
5+080
5+100
5+120
5+140
5+160
5+180
5+200
5+220
5+240
5+260
5+280
5+300
5+320
5+340
5+360
5+380
5+400
5+420
5+440
5+460

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

5+480
5+500
5+520
5+540
5+560
5+580
5+600
5+620
5+640
5+660
5+680
5+700
5+720
5+740
5+760
5+780
5+800
5+820
5+840
5+860
5+880
5+900
5+920
5+940

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

5+960
5+980
6+000

20.00
20.00
20.00

Sub-Total: km 5+000 - 6+000

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00

0.00
0.00
0.00

VC:

VC:

VC:

0.00

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

6+020
6+040
6+060
6+080
6+100
6+120
6+140
6+160
6+180
6+200
6+220
6+240
6+260
6+280
6+300
6+320
6+340
6+360
6+380
6+400
6+420
6+440
6+460

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

6+480
6+500
6+520
6+540
6+560
6+580
6+600
6+620
6+640
6+660
6+680
6+700
6+720
6+740
6+760
6+780
6+800
6+820
6+840
6+860
6+880
6+900
6+920
6+940

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

6+960
6+980
7+000

20.00
20.00
20.00

Sub-Total: km 6+000 -7+000

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00

0.00
0.00
0.00

VC:

VC:

VC:

0.00

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

7+020
7+040
7+060
7+080
7+100
7+120
7+140
7+160
7+180
7+200
7+220
7+240
7+260
7+280
7+300
7+320
7+340
7+360
7+380
7+400
7+420
7+440
7+460

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

7+480
7+500
7+520
7+540
7+560
7+580
7+600

20.00
20.00
20.00
20.00
20.00
20.00
20.00

Sub-Total: km 7+000 - 8+000

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

volumen

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

VC:

VC:

VC:

0.00

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

Nota: El volumen util del material de corte es 0%, por que no cumple con las especificaciones tecnicas de material para terraplenes . Este dato esta sustentado en el estudio de suelos.

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
INICIO

Distancia

Km

MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL
Corte (m2)

volumen

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL
Corte (m2)

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

volumen

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
Corte (m2)

METRADOS DE MEJORAMIENTO Y TRANSPORTE


UBICACIN

Inicio

Final

LADO

00+000

01+000

LI Y LD

01+800

02+000

02+000

220.B: Mejoramiento de Suelo a nivel de subrasante (m3)

Long

C.G.

Segn proyecto

CANTERA VACA

Ubicacin

1,000

0.50

10.02582

LD

200

1.90

10.02582

03+000

LD

1,000

2.50

10.02582

03+000

04+000

LI Y LD

1,000

3.50

10.02582

04+000

05+000

LI Y LD

1,000

4.50

10.02582

MOVIMIENTO DE TIERRAS
AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE MEJORAMIENTOS
MEJORAMIENTO - CARRIL
AUXILIAR IZQUIERDO

MEJORAMIENTO - AMPLIACION
IZQUIERDA - CARRIL CENTRAL

MEJORAMIENTO - AMPLIACION
DERECHA - CARRIL CENTRAL

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

INICIO

Distancia

Km

05+000

06+000

LI Y LD

1,000

5.50

10.02582

06+000

07+000

LI Y LD

1,000

6.50

10.02582

07+000

07+600

LI Y LD

600

7.30

10.02582

Corte (m2)

volumen

Corte (m2)

6,800.00

volumen

Corte (m2)

volumen

Corte (m2)

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00

0.00
0.00
0.00

VC:

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VC:

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00

0.00
0.00
0.00

VC:

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00

0.00
0.00
0.00

VC:

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO

220.B: Mejoram de suelo a


NSR

volumen

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
VC:

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
VC:

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
VC:

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

n el estudio de suelos.

220.B: Mejoram de suelo a


NSR

m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
VC:

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

CANTERA VACA

Acceso

220.B: Mejoram de suelo a


NSR

m3

700.A: Transporte de 700.B: Transporte


mat granular D < 1
de mat granular
km
D>< 1 km

DT

Km

m3.km

m3.km

D.M.E

Ubicacin

Acceso

DT

Km

700.E: Transporte 700.F: Transporte


de mat excedente de mat excedente
D < 1 km
D>< 1 km
m3.km

m3.km

71.410

80.936

0.00

0.00

5.30

4.800

0.00

0.00

71.410

79.536

0.00

0.00

5.30

3.400

0.00

0.00

71.410

78.936

0.00

0.00

5.30

2.800

0.00

0.00

71.410

77.936

0.00

0.00

5.30

1.800

0.00

0.00

71.410

76.936

0.00

0.00

5.30

0.800

0.00

0.00

MEJORAMIENTO - CARRIL
AUXILIAR DERECHO
volumen

220.B: Mejoram de suelo a


NSR

m3

71.410

75.936

0.00

0.00

5.30

0.200

0.00

0.00

71.410

74.936

0.00

0.00

5.30

1.200

0.00

0.00

71.410

74.136

0.00

0.00

5.30

2.000

0.00

0.00

MOVIMIENTO DE TIERRAS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETER


TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

220.B CONSOLIDADO MEJORAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

PROGRESIVA

AMPLIACION CALZADA

MATERIAL
220.B MEJORAMIENTO
EXCAVADO A
DE SUELOS A NIVEL DE
ELIMINAR
SUBRASANTE (m3)
(m3)

DE

IZQUIERDO

DERECHO

00+00

1+000

0.00

0.00

0.00

0.00

1+800

2+000

0.00

0.00

0.00

0.00

2+000

3+000

0.00

0.00

0.00

0.00

3+000

4+000

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4+000

5+000

5+000

6+000

0.00

0.00

0.00

0.00

6+000

7+000

485.20

0.00

485.20

485.20

7+000

7+600

197.15
682.35

438.35
438.35

635.50

635.50
1,120.70

1,120.70

En el presente mes no se hicieron trabajos de mejoramiento de suelos por lo que los metrados son los acumulados a la ultima valorizacin

MOVIMIENTO DE TIERRAS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETER


TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

220.B CONSOLIDADO MEJORAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

MOVIMIENTO DE TIERRAS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETER


TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

220.B CONSOLIDADO MEJORAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

MOVIMIENTO DE TIERRAS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETER


TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

220.B CONSOLIDADO MEJORAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

MOVIMIENTO DE TIERRAS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETER


TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

220.B CONSOLIDADO MEJORAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

MOVIMIENTO DE TIERRAS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETER


TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

220.B CONSOLIDADO MEJORAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA


O MARIA AGUAYTA PUCALLPA
- ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

RAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

MATERIAL DE
CANTERA
(m3)

0.00
0.00
0.00
0.00
0.00
0.00
485.20
635.50
1,120.70

amiento de suelos por lo que los metrados son los acumulados a la ultima valorizacin

DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA


O MARIA AGUAYTA PUCALLPA
- ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

RAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA


O MARIA AGUAYTA PUCALLPA
- ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

RAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA


O MARIA AGUAYTA PUCALLPA
- ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

RAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA


O MARIA AGUAYTA PUCALLPA
- ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

RAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA


O MARIA AGUAYTA PUCALLPA
- ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

RAMIENTO DE SUELOS A NIVEL DE SUB RASANTE

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Izquierdo


Relleno hasta
subrasante
(m.)
Mejoramiento (m.)

Total de
material de
cantera (m.)

Volumen de
Mejoramiento
(m3)

De

Hasta

0+000

0+010

0.6

0.6

0+010

0+030

0.6

0.6

0+030

0+050

0.6

0.6

0+050

0+070

0.6

0.6

0+070

0+090

0.6

0.6

0+090

0+110

0.6

0.6

0+110

0+130

0.6

0.6

0+130

0+150

0.6

0.6

0+150

0+170

0.6

0.6

0+170

0+190

0.6

0.6

0+190

0+210

0.6

0.6

0+210

0+230

0.6

0.6

0+230

0+250

0.6

0.6

0+250

0+270

0.6

0.6

0+270

0+290

0.6

0.6

0+290

0+310

0.6

0.6

0+310

0+330

0.6

0.6

0+330

0+350

0.6

0.6

0+350

0+370

0.6

0.6

0+370

0+390

0.6

0.6

0+390

0+410

0.6

0.6

0+410

0+430

0.6

0.6

0+430

0+450

0.6

0.6

0+450

0+470

0.6

0.6

0+470

0+490

0.6

0.6

0+490

0+510

0.6

0.6

0+510

0+530

0.6

0.6

0+530

0+550

0.6

0.6

0+550

0+570

0.6

0.6

0+570

0+590

0.6

0.6

0+590

0+610

0.6

0.6

0+610

0+630

0.6

0.6

0+630

0+650

0.6

0.6

0+650

0+670

0.39

0.6

0.99

0+670

0+690

0.6

0.6

0+690

0+710

0.6

0.6

0+710

0+730

0.6

0.6

0+730

0+750

0.6

0.6

0+750

0+770

0.6

0.6

0+770

0+790

0.6

0.6

0+790

0+810

0.6

0.6

Area a mejorar
(m.)

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Izquierdo


Relleno hasta
subrasante
(m.)
Mejoramiento (m.)

Total de
material de
cantera (m.)

Volumen de
Mejoramiento
(m3)

De

Hasta

0+810

0+830

0.6

0.6

0+830

0+850

0.6

0.6

0+850

0+870

0.6

0.6

0+870

0+890

0.6

0.6

0+890

0+910

0.6

0.6

0+910

0+930

0.6

0.6

0+930

0+950

0.6

0.6

0+950

0+970

0.6

0.6

0+970

0+990

0.6

0.6

0+990

1+010

0.6

0.6

SUB TOTAL

Area a mejorar
(m.)

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Izquierdo


Relleno hasta
subrasante
(m.)
Mejoramiento (m.)

Total de
material de
cantera (m.)

Volumen de
Mejoramiento
(m3)

De

Hasta

6+010

6+030

0.6

0.6

6+030

6+050

0.6

0.6

6+050

6+070

0.6

0.6

6+070

6+090

0.34

0.6

0.94

6+090

6+110

0.6

0.6

6+110

6+130

0.5

0.5

6+130

6+150

0.5

0.5

1.38

6.9

6+150

6+170

0.5

0.5

1.48

28.6

6+170

6+190

0.5

0.5

7.4

6+190

6+210

0.5

0.5

6+210

6+230

0.43

0.5

0.93

6+230

6+250

0.62

0.45

1.07

6+250

6+270

0.29

0.5

0.79

6+270

6+290

0.5

0.50

6+290

6+310

0.5

0.50

6+310

6+330

0.5

0.50

6+330

6+350

0.5

0.50

1.65

6+350

6+370

0.5

0.50

1.65

33

6+370

6+390

0.32

0.6

0.92

1.7

33.5

6+390

6+410

0.6

0.60

1.86

35.6

6+410

6+430

0.6

0.60

1.98

38.4

6+430

6+450

0.6

0.60

1.98

39.6

6+450

6+470

0.6

0.60

1.98

39.6

6+470

6+490

0.6

0.60

9.9

6+490

6+510

2.25

0.6

2.85

6+510

6+530

0.6

0.6

6+530

6+550

0.67

0.6

1.27

6+550

6+570

0.78

0.6

1.38

6+570

6+590

0.77

0.6

1.37

6+590

6+610

0.57

0.6

1.17

6+610

6+630

0.6

0.6

6+630

6+650

0.6

0.6

1.98

9.9

6+650

6+670

0.63

0.6

1.23

1.68

36.6

6+670

6+690

0.47

0.6

1.07

1.83

35.1

6+690

6+710

0.6

0.60

1.96

37.9

6+710

6+730

0.6

0.60

1.88

38.4

6+730

6+750

0.6

0.60

1.85

37.3

6+750

6+770

0.6

0.60

9.25

6+770

6+790

0.6

0.60

6+790

6+810

0.6

0.60

6+810

6+830

0.6

0.60

6+830

6+850

0.6

0.60

6+850

6+870

0.6

0.60

6+870

6+890

0.6

0.6

6+890

6+910

0.45

0.6

1.05

6+910

6+930

0.45

0.6

1.05

Area a mejorar
(m.)

0
8.25

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Izquierdo


Relleno hasta
subrasante
(m.)
Mejoramiento (m.)

Total de
material de
cantera (m.)

Volumen de
Mejoramiento
(m3)

De

Hasta

6+930

6+950

0.47

0.6

1.07

6+950

6+970

0.48

0.6

1.08

6+970

6+990

0.81

0.6

1.41

6+990

7+010

0.61

0.6

1.21

SUB TOTAL

Area a mejorar
(m.)

0
485.2

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Izquierdo


Relleno hasta
subrasante
(m.)
Mejoramiento (m.)

Total de
material de
cantera (m.)

Volumen de
Mejoramiento
(m3)

De

Hasta

7+010

7+030

0.91

0.6

1.51

7+030

7+050

7+050

7+070

0.83

0.6

1.43

7+070

7+090

0.87

0.6

1.47

7+090

7+110

1.04

1.04

7+110

7+130

0.92

0.6

1.52

7+130

7+150

0.76

0.6

1.36

7+150

7+170

0.6

0.6

7+170

7+190

0.6

0.6

7+190

7+210

0.6

0.6

1.2

7+210

7+230

0.66

0.6

7+230

7+250

0.7

0.6

7+250

7+270

1.44

7+270

7+290

7+290

7+310

7+310

Area a mejorar
(m.)

0
1.41

7.05

1.26

1.1

25.1

1.3

0.84

19.4

0.6

2.04

4.2

1.33

1.33

1.14

1.14

7+330

0.96

0.6

1.56

0.45

2.25

7+330

7+350

1.05

1.05

2.25

7+350

7+370

1.1

1.1

7+370

7+390

1.15

1.15

7+390

7+410

0.6

0.6

1.69

8.45

7+410

7+430

0.6

0.6

2.18

38.7

7+430

7+450

0.6

0.6

1.98

41.6

7+450

7+470

0.6

0.6

1.89

38.7

7+470

7+490

0.88

0.6

1.48

9.45

7+490

7+510

0.99

0.99

7+510

7+530

0.96

0.6

1.56

7+530

7+550

1.03

1.03

7+550

7+570

0.6

0.6

7+570

7+590

1.11

1.11

7+590

7+610

1.5

1.5

7+610

7+630

1.3

1.3

7+630

7+650

0.6

0.6

7+650

7+670

1.11

1.11

7+670

7+690

0.85

0.6

1.45

7+690

7+710

0.96

0.6

1.56

7+710

7+730

0.8

0.6

1.4

7+730

7+750

0.74

0.6

1.34

7+750

7+770

0.53

0.6

1.13

7+770

7+790

0.59

0.6

1.19

7+790

7+810

0.6

0.6

7+810

7+830

0.33

0.6

0.93

7+830

7+850

0.46

0.6

1.06

7+850

7+870

0.5

0.6

1.1

7+870

7+890

0.54

0.6

1.14

7+890

7+910

0.64

0.6

1.24

7+910

7+930

0.46

0.6

1.06

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Izquierdo


Relleno hasta
subrasante
(m.)
Mejoramiento (m.)

Total de
material de
cantera (m.)

Volumen de
Mejoramiento
(m3)

De

Hasta

7+930

7+950

0.68

0.6

1.28

7+950

7+970

0.6

0.6

7+970

7+990

0.6

0.6

7+990

8+010

0.6

0.6

SUB TOTAL

Area a mejorar
(m.)

197.15

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Derecho


De

Hasta

0+000
0+010

Total de
material de
Area a
cantera (m.) mejorar (m.)

Volumen de
Mejoramiento
(m3)

Relleno hasta
subrasante (m.)

Mejoramiento
(m.)

0+010

0.6

0.6

0+030

0.6

0.6

0+030

0+050

0.6

0.6

0+050

0+070

0.6

0.6

0+070

0+090

0.6

0.6

0+090

0+110

0.6

0.6

0+110

0+130

0.6

0.6

0+130

0+150

0.6

0.6

0+150

0+170

0.6

0.6

0+170

0+190

0.6

0.6

0+190

0+210

0.6

0.6

0+210

0+230

0.6

0.6

0+230

0+250

0.6

0.6

0+250

0+270

0.6

0.6

0+270

0+290

0.6

0.6

0+290

0+310

0.6

0.6

0+310

0+330

0.6

0.6

0+330

0+350

0.6

0.6

0+350

0+370

0.6

0.6

0+370

0+390

0.6

0.6

0+390

0+410

0.6

0.6

0+410

0+430

0.6

0.6

0+430

0+450

0.6

0.6

0+450

0+470

0.6

0.6

0+470

0+490

0.6

0.6

0+490

0+510

0.6

0.6

0+510

0+530

0.6

0.6

0+530

0+550

0.6

0.6

0+550

0+570

0.6

0.6

0+570

0+590

0.6

0.6

0+590

0+610

0.6

0.6

0+610

0+630

0.6

0.6

0+630

0+650

0.6

0.6

0+650

0+670

0.6

0.6

0+670

0+690

0.6

0.6

0+690

0+710

0.6

0.6

0+710

0+730

0.6

0.6

0+730

0+750

0.6

0.6

0+750

0+770

0.6

0.6

0+770

0+790

0.6

0.6

0+790

0+810

0.6

0.6

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Derecho


De

Hasta

0+810
0+830

Total de
material de
Area a
cantera (m.) mejorar (m.)

Volumen de
Mejoramiento
(m3)

Relleno hasta
subrasante (m.)

Mejoramiento
(m.)

0+830

0.6

0.6

0+850

0.6

0.6

0+850

0+870

0.6

0.6

0+870

0+890

0.6

0.6

0+890

0+910

0.6

0.6

0+910

0+930

0.6

0.6

0+930

0+950

0.67

0.6

1.27

0+950

0+970

0.6

0.6

0+970

0+990

0.6

0.6

0+990

1+010

0.28

0.6

0.88

SUB TOTAL

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Derecho


De

Hasta

6+010
6+030
6+050
6+070

Total de
material de
Area a
cantera (m.) mejorar (m.)

Volumen de
Mejoramiento
(m3)

Relleno hasta
subrasante (m.)

Mejoramiento
(m.)

6+030

0.6

0.6

6+050

0.6

0.6

6+070

0.6

0.6

6+090

0.62

0.6

1.22

6+090

6+110

0.6

0.6

6+110

6+130

0.6

0.6

6+130

6+150

0.5

0.5

6+150

6+170

0.5

0.5

6+170

6+190

0.5

0.5

6+190

6+210

0.5

0.5

6+210

6+230

0.5

0.5

6+230

6+250

0.5

0.5

6+250

6+270

0.5

0.5

6+270

6+290

0.5

0.5

6+290

6+310

0.5

0.5

6+310

6+330

0.4

0.5

0.9

6+330

6+350

0.35

0.5

0.85

6+350

6+370

0.41

0.5

0.91

6+370

6+390

0.29

0.6

0.89

6+390

6+410

0.3

0.6

0.9

6+410

6+430

0.6

0.6

6+430

6+450

0.6

0.6

6+450

6+470

0.59

0.6

1.19

6+470

6+490

0.18

0.6

0.78

6+490

6+510

0.76

0.6

1.36

6+510

6+530

0.85

0.6

1.45

6+530

6+550

0.73

0.6

1.33

6+550

6+570

0.87

0.6

1.47

6+570

6+590

0.39

0.6

0.99

6+590

6+610

0.27

0.6

0.87

6+610

6+630

0.84

0.6

1.44

6+630

6+650

0.91

0.6

1.51

6+650

6+670

0.73

0.6

1.33

6+670

6+690

0.6

0.6

6+690

6+710

0.64

0.6

1.24

6+710

6+730

0.6

0.6

6+730

6+750

0.89

0.6

1.49

6+750

6+770

0.38

0.6

0.98

6+770

6+790

0.6

0.6

6+790

6+810

0.6

0.6

6+810

6+830

0.6

0.6

6+830

6+850

0.6

0.6

6+850

6+870

0.6

0.6

6+870

6+890

0.6

0.6

6+890

6+910

0.6

0.6

6+910

6+930

0.6

0.6

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Derecho


De

Hasta

6+930
6+950

Total de
material de
Area a
cantera (m.) mejorar (m.)

Volumen de
Mejoramiento
(m3)

Relleno hasta
subrasante (m.)

Mejoramiento
(m.)

6+950

0.6

0.6

6+970

0.6

0.6

6+970

6+990

0.6

0.6

6+990

7+010

0.6

0.6

SUB TOTAL

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Derecho


De

Hasta

7+010
7+030

Total de
material de
Area a
cantera (m.) mejorar (m.)

Volumen de
Mejoramiento
(m3)

Relleno hasta
subrasante (m.)

Mejoramiento
(m.)

7+030

0.6

0.6

7+050

0.61

0.6

1.21

7+050

7+070

0.48

0.6

1.08

7+070

7+090

0.6

0.6

7+090

7+110

0.6

0.6

7+110

7+130

0.46

0.6

1.06

7+130

7+150

0.52

0.6

1.12

7+150

7+170

0.6

0.6

7+170

7+190

0.6

0.6

7+190

7+210

0.43

0.6

1.03

7+210

7+230

0.6

0.6

1.9

38

7+230

7+250

0.6

0.6

1.93

38.3

7+250

7+270

0.73

0.6

1.33

7+270

7+290

0.6

0.6

7+290

7+310

0.56

0.6

1.16

1.71

8.55

7+310

7+330

0.45

0.6

1.05

1.91

36.2

7+330

7+350

0.6

0.6

1.84

37.5

7+350

7+370

0.6

0.6

9.2

7+370

7+390

0.6

0.6

7+390

7+410

0.6

0.6

1.83

9.15

7+410

7+430

0.6

0.6

1.84

36.7

7+430

7+450

0.6

0.6

1.79

36.3

7+450

7+470

0.6

0.6

1.79

35.8

7+470

7+490

0.6

0.6

1.84

36.3

7+490

7+510

0.46

0.6

1.06

1.77

36.1

7+510

7+530

1.03

0.6

1.63

1.09

28.6

7+530

7+550

0.55

0.6

1.15

1.44

25.3

7+550

7+570

1.1

1.1

7+570

7+590

1.11

1.11

7+590

7+610

1.11

1.11

7+610

7+630

1.32

1.32

7+630

7+650

0.7

0.6

1.3

7+650

7+670

0.98

0.6

1.58

7+670

7+690

0.99

0.6

1.59

7+690

7+710

0.6

0.6

7+710

7+730

0.67

0.6

1.27

7+730

7+750

0.6

0.6

7+750

7+770

0.45

0.6

1.05

7+770

7+790

0.33

0.6

0.93

7+790

7+810

0.6

0.6

1.2

7+810

7+830

0.64

0.6

1.24

7+830

7+850

0.26

0.6

0.86

7+850

7+870

0.94

0.6

1.54

7+870

7+890

0.82

0.6

1.42

7+890

7+910

0.47

0.6

1.07

7+910

7+930

0.74

0.6

1.34

0
1.9

9.5

9.65
0

7.2

220.B MEJORAMIENTO DE SUELOS A NIVEL DE SUB RAZANTE

Zona Urbana Ampliacion Calzada Derecho


De

Hasta

7+930
7+950

Total de
material de
Area a
cantera (m.) mejorar (m.)

Volumen de
Mejoramiento
(m3)

Relleno hasta
subrasante (m.)

Mejoramiento
(m.)

7+950

0.84

0.6

1.44

7+970

0.6

0.6

7+970

7+990

0.35

0.6

0.95

7+990

8+010

0.4

0.6

SUB TOTAL

438.35

SUB BASES
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

PLANILLA DE METRADOS DE SUB BASE GRANULAR


METRADO DE SUB BASE GRANULAR VIA AUXILIAR IZQUIERDO

METRADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION IZQUIERDA)

Distancia
(m)

Ancho de sub
base inferior
(m)

01+020.00
01+040.00
01+060.00
01+080.00
01+100.00
01+120.00
01+140.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00

8.70
8.70
8.70
8.70
8.70
8.70
8.70

8.70
8.70
8.70
8.70
8.70
8.70
8.70

0.18
0.18
0.18
0.18
0.18
0.18
0.18

1.52
1.52
1.52
1.52
1.52
1.52
1.52

15.23
30.45
30.45
30.45
30.45
30.45
30.45

50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

7.61
15.23
15.23
15.23
15.23
15.23
15.23

4.75
4.70
4.71
4.77
4.70
4.70
4.69

4.44
4.39
4.40
4.46
4.39
4.39
4.38

0.20
0.20
0.20
0.20
0.20
0.20
0.20

01+160.00
01+180.00
01+200.00
01+220.00
01+240.00
01+260.00
01+280.00
01+300.00
01+320.00
01+340.00
01+360.00
01+380.00
01+400.00
01+420.00
01+440.00
01+460.00
01+480.00
01+500.00
01+520.00
01+540.00
01+560.00
01+580.00
01+600.00
01+620.00
01+640.00
01+660.00
01+680.00
01+700.00
01+720.00
01+740.00
01+760.00
01+780.00
01+800.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

8.70
8.70
8.70

8.70
8.70
8.70

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

1.52
1.52
1.52

30.45
30.45
30.45

50.00%
50.00%
50.00%

15.23
15.23
15.23
7.61
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23

4.60
4.60
4.57
4.59
4.58
4.48
6.41
6.31
6.31
4.37
4.41
4.43
3.91
3.81
3.91
3.88
3.92
3.95
3.91
3.92
3.90
3.95
3.90
3.90
3.94
3.94
3.95
3.96
3.95
3.96
3.94
3.93
3.95

4.29
4.29
4.26
4.28
4.27
4.17
6.41
6.31
6.31
4.06
4.10
4.12
3.91
3.81
3.91
3.88
3.92
3.95
3.91
3.92
3.90
3.95
3.90
3.90
3.94
3.94
3.95
3.96
3.95
3.96
3.94
3.93
3.95

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

Estaca
(Km)

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

Ancho de sub
Area
base superior Espesor (m) transversal Volumen (m3)
(m)
(m2)

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52

15.23
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45

% Avance
Acumulado

50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

Volumen a
Valorizar

Ancho de sub
Area
Ancho de sub
base superior Espesor (m) transversal
base inferior (m)
(m)
(m2)

METRADO DE SUB BASE GRANULAR VIA


Ancho de sub base Ancho de sub base
inferior (m)
superior (m)

Volumen (m3)

% Avance
Acumulado

0.92
0.91
0.91
0.92
0.91
0.91
0.91

9.19
18.27
18.19
18.33
18.31
18.17
18.15

50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

4.59
9.14
9.10
9.17
9.16
9.09
9.08

6.61
7.54
7.92
7.96
6.74
6.87
6.76

6.30
7.54
7.92
7.96
6.43
6.56
6.45

0.89
0.89
0.88
0.89
0.88
0.86

17.95
17.77
17.71
17.69
17.71
17.49

50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

0.78
0.76
0.78
0.78
0.78
0.79
0.78
0.78
0.78
0.79
0.78
0.78
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79

7.82
15.44
15.44
15.58
15.60
15.74
15.72
15.66
15.64
15.70
15.70
15.60
15.68
15.76
15.78
15.82
15.82

50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

8.98
8.89
8.86
8.85
8.86
8.75
3.91
7.72
7.72
7.79
7.80
7.87
7.86
7.83
7.82
7.85
7.85
7.80
7.84
7.88
7.89
7.91
7.91
-

6.86
6.84
6.81
6.76
6.81
6.79
6.88
6.86
6.82
6.83
6.40
8.22
8.19
8.20
4.52
4.53
4.48
6.96
6.92
6.30
6.44
6.40
6.27
6.35
6.34
6.35
6.34
6.33
6.37
6.32
6.33
6.32
6.29

6.55
6.53
6.50
6.45
6.50
6.48
6.57
6.55
6.51
6.52
6.40
8.22
8.19
8.20
4.52
4.53
4.48
6.65
6.61
6.30
6.44
6.40
6.27
6.35
6.34
6.35
6.34
6.33
6.37
6.32
6.33
6.32
6.29

Volumen a
Valorizar

SUB BASES
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

PLANILLA DE METRADOS DE SUB BASE GRANULAR


METRADO DE SUB BASE GRANULAR VIA AUXILIAR IZQUIERDO

METRADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION IZQUIERDA)

METRADO DE SUB BASE GRANULAR VIA

Distancia
(m)

Ancho de sub
base inferior
(m)

01+820.00
01+840.00
01+860.00
01+880.00
01+900.00
01+920.00
01+940.00
01+960.00
01+980.00

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52

30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45
30.45

50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23
15.23

3.95
3.92
3.97
3.97
4.01
4.00
3.99
3.96
4.07

3.95
3.92
3.97
3.97
4.01
4.00
3.99
3.96
4.07

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.79
0.78
0.79
0.79
0.80
0.80
0.80
0.79
0.81

6.32
6.38
6.23
6.25
6.23
6.31
6.32
6.26
4.81

6.32
6.38
6.23
6.25
6.23
6.31
6.32
6.26
4.81

02+000.00

20.00

8.70

8.70

0.18

1.52

30.45

50.00%

15.23

4.03

4.03

0.20

0.81

4.76

4.76

Estaca
(Km)

Sub-Total: Km 1+000 - 2+000

Ancho de sub
Area
base superior Espesor (m) transversal Volumen (m3)
(m)
(m2)

1157.10

% Avance
Acumulado

Volumen a
Valorizar

578.55

Ancho de sub
Area
Ancho de sub
base superior Espesor (m) transversal
base inferior (m)
(m)
(m2)

Volumen (m3)

483.42

% Avance
Acumulado

Ancho de sub base Ancho de sub base


inferior (m)
superior (m)

Volumen a
Valorizar

241.71

SUB BASES
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

PLANILLA DE METRADOS DE SUB BASE GRANULAR


METRADO DE SUB BASE GRANULAR VIA AUXILIAR IZQUIERDO
Estaca
(Km)

07+020.00
07+040.00
07+060.00
07+080.00
07+100.00
07+120.00
07+140.00
07+160.00
07+180.00
07+200.00
07+220.00
07+240.00
07+260.00
07+280.00
07+300.00
07+320.00
07+340.00
07+360.00
07+380.00
07+400.00
07+420.00
07+440.00
07+460.00
07+480.00
07+500.00
07+520.00
07+540.00
07+560.00
07+580.00
07+600.00
07+620.00
07+640.00
07+660.00
07+680.00
07+700.00
07+720.00
07+740.00
07+760.00
07+780.00
07+800.00
07+820.00
07+840.00
07+860.00
07+880.00
07+900.00

Distancia
(m)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ancho de sub
base inferior
(m)

Ancho de sub
Area
base superior Espesor (m) transversal Volumen (m3)
(m)
(m2)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

METRADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION IZQUIERDA)


Ancho de sub
Area
Ancho de sub
base superior Espesor (m) transversal
base inferior (m)
(m)
(m2)

Volumen a
Valorizar
-

5.93
5.91
5.95
5.99
5.97
7.00
7.01
6.05
6.00
6.04
6.06
6.08
6.05
6.11
6.11
6.09
6.13
6.12
6.14
6.15
6.71
6.13
6.15
6.12
6.14
6.15
6.12
6.12
6.15
6.15
6.13
6.17
6.16
6.15
6.16
6.19
6.18
6.18
6.21
6.21
6.22
6.21
6.26
6.22
6.29

5.62
5.60
5.64
5.68
5.66
6.69
6.70
5.74
5.69
5.73
5.75
5.77
5.74
5.80
5.80
5.78
5.82
5.81
5.83
5.84
6.40
5.82
5.84
5.81
5.83
5.84
5.81
5.81
5.84
5.84
5.82
5.86
5.85
5.84
5.85
5.88
5.87
5.87
5.90
5.90
5.91
5.90
5.95
5.91
5.98

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1.20
1.20
1.20
1.20
1.21
1.21
1.21
1.21
1.21
1.21
1.21
1.22
1.21
1.23

Volumen (m3)

12.03
24.04
24.01
24.00
24.08
24.13
24.11
24.17
24.23
24.25
24.25
24.33
24.35
24.40

% Avance
Acumulado

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA

Volumen a
Valorizar
12.03
24.04
24.01
24.00
24.08
24.13
24.11
24.17
24.23
24.25
24.25
24.33
24.35
24.40

Ancho de sub base Ancho de sub base


inferior (m)
superior (m)
5.35
5.33
5.38
5.45
5.41
6.39
6.33
5.38
5.36
5.30
5.32
5.33
5.27
5.17
5.27
5.25
5.30
5.25
5.26
5.32
5.07
5.22
5.27
5.20
5.17
5.23
5.22
5.20
5.19
5.23
5.19
5.18
5.18
5.20
5.09
5.18
5.18
5.18
5.17
5.13
5.13
5.11
5.13
5.12
5.08

5.04
5.02
5.07
5.14
5.10
6.08
6.02
5.07
5.05
4.99
5.01
5.02
4.96
4.86
4.96
4.94
4.99
4.94
4.95
5.01
4.76
4.91
4.96
4.89
4.86
4.92
4.91
4.89
4.88
4.92
4.88
4.87
4.87
4.89
4.78
4.87
4.87
4.87
4.86
4.82
4.82
4.80
4.82
4.81
4.77

SUB BASES
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

PLANILLA DE METRADOS DE SUB BASE GRANULAR


METRADO DE SUB BASE GRANULAR VIA AUXILIAR IZQUIERDO
Estaca
(Km)
07+920.00
07+940.00
07+960.00
07+980.00
08+000.00

Distancia
(m)
20.00
20.00
20.00
20.00
20.00

Sub-Total: Km. 7+000 - 8+000

Ancho de sub
base inferior
(m)

Ancho de sub
Area
base superior Espesor (m) transversal Volumen (m3)
(m)
(m2)
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

METRADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION IZQUIERDA)


Ancho de sub
Area
Ancho de sub
base superior Espesor (m) transversal
base inferior (m)
(m)
(m2)

Volumen a
Valorizar
-

0.00

0.00

6.25
6.26
6.29
6.28
6.23

5.94
5.95
5.98
5.97
5.92

0.20
0.20
0.20
0.20
0.20

1.22
1.22
1.23
1.23
1.22

Volumen (m3)
24.46
24.40
24.47
24.52
24.41
448.70

% Avance
Acumulado
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA

Volumen a
Valorizar
24.46
24.40
24.47
24.52
24.41
448.70

Ancho de sub base Ancho de sub base


inferior (m)
superior (m)
5.09
5.10
5.14
5.10
5.13

4.78
4.79
4.83
4.79
4.82

SUB BASES
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

PLANILLA DE METRADOS DE SUB BASE GRANULAR


METRADO DE SUB BASE GRANULAR VIA AUXILIAR IZQUIERDO
Estaca
(Km)

08+020.00
08+040.00
08+060.00
08+080.00
08+100.00
08+120.00
08+140.00
08+160.00
08+180.00
08+200.00
08+220.00
08+240.00
08+260.00
08+280.00
08+300.00
08+320.00
08+340.00
08+360.00
08+380.00
08+400.00
08+420.00
08+440.00
08+460.00
08+480.00
08+500.00
08+520.00
08+540.00
08+560.00
08+580.00
08+600.00
08+620.00
08+640.00
08+660.00
08+680.00
08+700.00
08+720.00
08+740.00
08+760.00
08+780.00
08+800.00
08+820.00
08+840.00
08+860.00
08+880.00
08+900.00

Distancia
(m)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ancho de sub
base inferior
(m)

Ancho de sub
Area
base superior Espesor (m) transversal Volumen (m3)
(m)
(m2)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

METRADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION IZQUIERDA)


Ancho de sub
Area
Ancho de sub
base superior Espesor (m) transversal
base inferior (m)
(m)
(m2)

Volumen a
Valorizar
-

6.26
6.22
6.26
6.33
4.85
3.31
5.84
11.30
12.36
13.42
14.48
13.28
13.22
13.22
13.22
13.22
13.22
13.22
10.97
10.52
10.52
10.52
10.52
10.99
6.21
6.23
6.23
6.22
6.23
6.22
6.22
7.23
6.23
6.23
6.23
6.21
6.29
6.29
6.34
6.30
6.29
6.34
6.28
6.22
6.26

5.95
5.91
5.95
6.02
4.54
3.00
5.53
10.70
11.76
12.82
13.88
12.68
12.62
12.62
12.62
12.62
12.62
12.62
10.37
9.92
9.92
9.92
9.92
10.39
5.90
5.92
5.92
5.91
5.92
5.91
5.91
6.92
5.92
5.92
5.92
5.90
5.98
5.98
6.03
5.99
5.98
6.03
5.97
5.91
5.95

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2.20
2.41
2.62
2.84
2.60
2.58
2.58
2.58
2.58
2.58
2.58
2.13
2.04
2.04
2.04
2.04
2.14
1.21
1.22
1.22
1.21
1.22
1.21
1.21
1.42
1.22
1.22
1.22
1.21
1.23
1.23
1.24
1.23
1.23
1.24
1.23
1.21
1.22

Volumen (m3)

21.99
46.11
50.35
54.59
54.31
51.79
51.67
51.67
51.67
51.67
51.67
47.17
41.77
40.87
40.87
40.87
41.81
33.49
24.27
24.31
24.29
24.29
24.29
24.27
26.29
26.31
24.31
24.31
24.27
24.39
24.55
24.65
24.67
24.57
24.65
24.63
24.39
24.35

% Avance
Acumulado

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA

Volumen a
Valorizar
21.99
46.11
50.35
54.59
54.31
51.79
38.75
38.75
38.75
38.75
38.75
35.38
31.33
30.65
30.65
30.65
31.36
33.49
24.27
24.31
24.29
24.29
24.29
24.27
26.29
26.31
24.31
24.31
24.27
24.39
24.55
24.65
24.67
24.57
24.65
24.63
24.39
24.35

Ancho de sub base Ancho de sub base


inferior (m)
superior (m)
5.14
5.07
5.10
5.12
5.13
5.11
5.14
13.92
14.62
15.88
16.74
14.68
13.67
13.57
13.48
13.39
13.30
13.29
10.52
10.52
10.52
10.52
10.52
10.90
5.08
5.10
5.04
5.08
5.08
5.08
5.10
6.15
5.13
5.03
5.09
5.07
5.10
5.06
5.00
5.03
5.07
5.07
5.05
5.05
5.10

4.83
4.76
4.79
4.81
4.82
4.80
4.83
13.32
14.02
15.28
16.14
14.08
13.07
12.97
12.88
12.79
12.70
12.69
9.92
9.92
9.92
9.92
9.92
10.30
4.77
4.79
4.73
4.77
4.77
4.77
4.79
5.84
4.82
4.72
4.78
4.76
4.79
4.75
4.69
4.72
4.76
4.76
4.74
4.74
4.79

SUB BASES
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

PLANILLA DE METRADOS DE SUB BASE GRANULAR


METRADO DE SUB BASE GRANULAR VIA AUXILIAR IZQUIERDO
Estaca
(Km)
08+920.00
08+940.00
08+960.00
08+980.00
09+000.00

Distancia
(m)
20.00
20.00
20.00
20.00
20.00

Sub-Total: Km. 8+000 - 9+000

Ancho de sub
base inferior
(m)

Ancho de sub
Area
base superior Espesor (m) transversal Volumen (m3)
(m)
(m2)
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

METRADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION IZQUIERDA)


Ancho de sub
Area
Ancho de sub
base superior Espesor (m) transversal
base inferior (m)
(m)
(m2)

Volumen a
Valorizar
-

0.00

6.26
6.29
6.29
6.27
6.29

5.95
5.98
5.98
5.96
5.98

0.20
0.20
0.20
0.20
0.20

1.22
1.23
1.23
1.22
1.23

Volumen (m3)
24.43
24.49
24.55
24.51
24.51
1438.93

% Avance
Acumulado
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA

Volumen a
Valorizar
24.43
24.49
24.55
24.51
24.51
1311.01

Ancho de sub base Ancho de sub base


inferior (m)
superior (m)
4.92
5.02
5.07
5.09
5.02

4.61
4.71
4.76
4.78
4.71

SUB BASES
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

PLANILLA DE METRADOS DE SUB BASE GRANULAR


METRADO DE SUB BASE GRANULAR VIA AUXILIAR IZQUIERDO
Estaca
(Km)

09+020.00
09+040.00
09+060.00
09+080.00
09+100.00
09+120.00
09+140.00
09+160.00
09+180.00
09+200.00
09+220.00
09+240.00
09+260.00
09+280.00
09+300.00
09+320.00
09+340.00
09+360.00
09+380.00
09+400.00
09+420.00
09+440.00
09+460.00
09+480.00
09+500.00
09+520.00
09+540.00
09+560.00
09+580.00
09+600.00
09+620.00
09+640.00
09+660.00
09+680.00
09+700.00
09+720.00
09+740.00
09+760.00
09+780.00
09+800.00
09+820.00
09+840.00
09+860.00
09+880.00
09+900.00

Distancia
(m)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

Ancho de sub
base inferior
(m)

Ancho de sub
Area
base superior Espesor (m) transversal Volumen (m3)
(m)
(m2)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

METRADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION IZQUIERDA)


Ancho de sub
Area
Ancho de sub
base superior Espesor (m) transversal
base inferior (m)
(m)
(m2)

Volumen a
Valorizar
-

6.28
6.28
6.28
6.30
6.30
6.28
6.27
6.32
6.27
6.29
6.29
6.31
6.29
6.23
6.24
6.20
6.23
6.20
6.18
5.99
5.89
5.69
5.99
5.49
5.98
6.22
5.69
5.96
6.09
6.03
5.96
5.92
5.98
5.96
5.77
6.71
5.72
5.55
5.60
5.67
5.65
5.58
5.46
5.46
5.50

5.97
5.97
5.97
5.99
5.99
5.97
5.96
6.01
5.96
5.98
5.98
6.00
5.98
5.92
5.93
5.89
5.92
5.89
5.87
5.68
5.58
5.38
5.68
5.18
5.67
5.91
5.38
5.65
5.78
5.72
5.65
5.61
5.67
5.65
5.46
6.40
5.41
5.24
5.28
5.35
5.33
5.26
5.14
5.14
5.19

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1.23
1.23
1.23
1.23
1.23
1.23
1.22
1.23
1.22
1.23
1.23
1.23
1.23
1.22
1.22
1.21
1.22
1.21
1.21
1.17
1.15
1.11
1.17
1.07
1.17
1.21
1.11
1.16
1.19
1.18
1.16
1.15
1.17
1.16
1.12
1.31
1.11
1.08
1.09
1.10
1.10
1.08
1.06
1.06
1.07

Volumen (m3)

% Avance
Acumulado

24.53
24.51
24.51
24.55
24.59
24.55
24.49
24.57
24.57
24.51
24.55
24.59
24.59
24.43
24.33
24.27
24.25
24.25
24.15
23.73
23.15
22.55
22.75
22.35
22.33
23.79
23.21
22.69
23.49
23.63
23.37
23.15
23.19
23.27
22.85
24.35
24.25
21.93
21.67
21.89
21.99
21.81
21.43
21.20
21.30

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA

Volumen a
Valorizar
24.53
24.51
24.51
24.55
24.59
24.55
24.49
24.57
24.57
24.51
24.55
24.59
24.59
24.43
24.33
24.27
24.25
24.25
24.15
23.73
23.15
22.55
22.75
22.35
22.33
23.79
23.21
22.69
23.49
23.63
23.37
23.15
23.19
23.27
22.85
24.35
24.25
21.93
21.67
21.89
21.99
21.81
21.43
21.20
21.30

Ancho de sub base Ancho de sub base


inferior (m)
superior (m)
5.03
5.09
5.02
5.04
5.45
5.00
5.00
4.99
5.05
5.04
5.06
5.11
5.07
5.12
5.11
5.14
5.29
5.10
5.14
5.18
5.27
5.24
5.30
5.28
5.39
5.26
5.30
5.35
5.35
5.35
5.39
5.42
5.43
5.44
5.53
6.49
5.58
5.49
5.41
5.35
5.33
5.37
5.49
5.63
5.70

4.72
4.78
4.71
4.73
5.14
4.69
4.69
4.68
4.74
4.73
4.75
4.80
4.76
4.81
4.80
4.83
4.98
4.79
4.83
4.87
4.96
4.93
4.99
4.97
5.08
4.95
4.99
5.04
5.04
5.04
5.08
5.11
5.12
5.13
5.22
6.18
5.27
5.20
5.13
5.07
5.05
5.09
5.21
5.34
5.40

SUB BASES
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

PLANILLA DE METRADOS DE SUB BASE GRANULAR


METRADO DE SUB BASE GRANULAR VIA AUXILIAR IZQUIERDO
Estaca
(Km)
09+920.00
09+940.00
09+960.00
09+980.00
10+000.00

Distancia
(m)
20.00
20.00
20.00
20.00
20.00

Ancho de sub
base inferior
(m)

Ancho de sub
Area
base superior Espesor (m) transversal Volumen (m3)
(m)
(m2)
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

10+025.82

25.82

Sub-Total: Km. 10+000 - 11+000

0.00

Ancho de sub
Area
Ancho de sub
base superior Espesor (m) transversal
base inferior (m)
(m)
(m2)

Volumen a
Valorizar
-

0.00

Sub-Total: Km. 9+000 - 10+000

% Avance
Acumulado

METRADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION IZQUIERDA)

0.00

5.16
5.15
5.35
11.73
11.03

0.20
0.20
0.20
0.20
0.20

1.06
1.06
1.10
2.38
2.24

0.00
-

0.00

5.47
5.46
5.66
12.04
11.34

Volumen (m3)
21.33
21.25
21.63
34.79
46.15

% Avance
Acumulado
100.00%
100.00%
100.00%
100.00%
100.00%

1201.42
1.03

0.99

0.20

0.20

2.61

Volumen a
Valorizar
21.33
21.25
21.63
34.79
46.15

Ancho de sub base Ancho de sub base


inferior (m)
superior (m)
5.75
5.80
6.11
13.43
11.31

5.44
5.49
5.80
13.12
11.00

1.32

1.01

1201.42
100.00%

2.61

METRADO DE SUB BASE GRANULAR VIA

2.61

2.61

RADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION DERECHA)

Espesor (m)

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

Area
transversal
(m2)

Volumen (m3)

% Avance
Acumulado

1.32

13.21

50.00%

1.34
1.34
1.33
1.32
1.33
1.33

26.61
26.77
26.67
26.51
26.51
26.57

50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

METRADO DE SUB BASE GRANULAR VIA AUXILIAR DERECHO

Volumen a
Valorizar

Ancho de sub Ancho de sub


base inferior base superior Espesor (m)
(m)
(m)

Area
transversal
(m2)

Volumen (m3)

% Avance
Acumulado

Volumen a
Valorizar

6.60

8.70
8.70
8.70
8.70
8.70
8.70
8.70

8.70
8.70
8.70
8.70
8.70
8.70
8.70

0.18
0.18
0.18
0.18
0.18
0.18
0.18

13.31
13.39
13.34
13.26
13.26
13.29
-

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

RADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION DERECHA)

Espesor (m)

Area
transversal
(m2)

Volumen (m3)

% Avance
Acumulado

METRADO DE SUB BASE GRANULAR VIA AUXILIAR DERECHO


Ancho de sub Ancho de sub
base inferior base superior Espesor (m)
(m)
(m)

Volumen a
Valorizar

Area
transversal
(m2)

Volumen (m3)

% Avance
Acumulado

Volumen a
Valorizar

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70
8.70

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

0.20

8.70

8.70

0.18

172.87

86.43

0.00

0.00

RADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION DERECHA)

Espesor (m)

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

Area
transversal
(m2)

1.00
1.00
1.01
0.99
1.00
1.00
1.00
1.00
0.99
1.00
0.99
0.99
0.99
0.98

Volumen (m3)

10.05
20.09
20.13
19.95
19.91
20.09
20.09
20.07
19.97
19.90
19.87
19.86
19.88
19.78

% Avance
Acumulado

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA AUXILIAR DERECHO

Volumen a
Valorizar
10.05
20.09
20.13
19.95
19.91
20.09
20.09
20.07
19.97
19.90
19.87
19.86
19.88
19.78

Ancho de sub Ancho de sub


base inferior base superior Espesor (m)
(m)
(m)
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

Area
transversal
(m2)

Volumen (m3)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

Volumen a
Valorizar
-

RADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION DERECHA)

Espesor (m)

Area
transversal
(m2)

Volumen (m3)

0.20
0.20
0.20
0.20
0.20

0.99
0.99
1.00
0.99
1.00

19.71
19.75
19.86
19.87
19.85
368.74

% Avance
Acumulado
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA AUXILIAR DERECHO

Volumen a
Valorizar
19.71
19.75
19.86
19.87
19.85
368.74

Ancho de sub Ancho de sub


base inferior base superior Espesor (m)
(m)
(m)
0.18
0.18
0.18
0.18
0.18

Area
transversal
(m2)

Volumen (m3)

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

Volumen a
Valorizar
-

0.00

0.00

RADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION DERECHA)

Espesor (m)

Area
transversal
(m2)

Volumen (m3)

% Avance
Acumulado

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

1.00
0.98
0.99
0.99
0.99
0.99
1.00
2.72
2.86
3.12
3.29
2.88
2.67
2.65
2.64
2.62
2.60
2.60
2.04
2.04
2.04
2.04
2.04
2.12
0.99
0.99
0.98
0.99
0.99
0.99
0.99
1.20
1.00
0.98
0.99
0.98
0.99
0.98
0.97
0.98
0.98
0.98
0.98
0.98
0.99

9.97
19.79
19.72
19.82
19.87
19.85
19.88
37.21
55.87
59.79
64.03
61.63
55.49
53.27
52.89
52.53
52.17
51.97
46.41
40.87
40.87
40.87
40.87
41.63
31.05
19.75
19.67
19.63
19.71
19.71
19.75
21.89
21.95
19.71
19.63
19.71
19.73
19.71
19.51
19.45
19.59
19.67
19.63
19.59
19.69

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA AUXILIAR DERECHO

Volumen a
Valorizar
9.97
19.79
19.72
19.82
19.87
19.85
19.88
37.21
55.87
59.79
64.03
61.63
55.49
53.27
52.89
52.53
52.17
51.97
46.41
40.87
40.87
40.87
40.87
41.63
31.05
19.75
19.67
19.63
19.71
19.71
19.75
21.89
21.95
19.71
19.63
19.71
19.73
19.71
19.51
19.45
19.59
19.67
19.63
19.59
19.69

Ancho de sub Ancho de sub


base inferior base superior Espesor (m)
(m)
(m)

Area
transversal
(m2)

Volumen (m3)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

Volumen a
Valorizar
-

RADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION DERECHA)

Espesor (m)

Area
transversal
(m2)

Volumen (m3)

0.20
0.20
0.20
0.20
0.20

0.95
0.97
0.98
0.99
0.97

19.43
19.27
19.57
19.71
19.61
1503.64

% Avance
Acumulado
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA AUXILIAR DERECHO

Volumen a
Valorizar
19.43
19.27
19.57
19.71
19.61
1503.64

Ancho de sub Ancho de sub


base inferior base superior Espesor (m)
(m)
(m)

Area
transversal
(m2)

Volumen (m3)

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

Volumen a
Valorizar
-

0.00

0.00

RADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION DERECHA)

Espesor (m)

Area
transversal
(m2)

Volumen (m3)

% Avance
Acumulado

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.98
0.99
0.97
0.98
1.06
0.97
0.97
0.97
0.98
0.98
0.98
0.99
0.98
0.99
0.99
1.00
1.03
0.99
1.00
1.01
1.02
1.02
1.03
1.03
1.05
1.02
1.03
1.04
1.04
1.04
1.05
1.05
1.06
1.06
1.08
1.27
1.09
1.07
1.05
1.04
1.04
1.05
1.07
1.10
1.11

9.76
19.63
19.61
19.51
20.37
20.29
19.39
19.37
19.47
19.57
19.59
19.73
19.75
19.77
19.85
19.89
20.25
20.17
19.87
20.03
20.29
20.41
20.47
20.55
20.73
20.69
20.51
20.69
20.79
20.79
20.87
21.01
21.09
21.13
21.33
23.43
23.53
21.55
21.22
20.95
20.79
20.83
21.15
21.66
22.06

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

METRADO DE SUB BASE GRANULAR VIA AUXILIAR DERECHO

Volumen a
Valorizar
9.76
19.63
19.61
19.51
20.37
20.29
19.39
19.37
19.47
19.57
19.59
19.73
19.75
19.77
19.85
19.89
20.25
20.17
19.87
20.03
20.29
20.41
20.47
20.55
20.73
20.69
20.51
20.69
20.79
20.79
20.87
21.01
21.09
21.13
21.33
23.43
23.53
21.55
21.22
20.95
20.79
20.83
21.15
21.66
22.06

Ancho de sub Ancho de sub


base inferior base superior Espesor (m)
(m)
(m)

Area
transversal
(m2)

Volumen (m3)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

Volumen a
Valorizar
-

RADO DE SUB BASE GRANULAR VIA CENTRAL (AMPLIACION DERECHA)

Espesor (m)

Area
transversal
(m2)

Volumen (m3)

0.20
0.20
0.20
0.20
0.20

1.12
1.13
1.19
2.66
2.23

22.29
22.49
23.21
38.47
48.87

% Avance
Acumulado
100.00%
100.00%
100.00%
100.00%
100.00%

1069.84
0.20

0.23

31.83

31.83

METRADO DE SUB BASE GRANULAR VIA AUXILIAR DERECHO

Volumen a
Valorizar
22.29
22.49
23.21
38.47
48.87

Ancho de sub Ancho de sub


base inferior base superior Espesor (m)
(m)
(m)

Area
transversal
(m2)

Volumen (m3)

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1069.84
100.00%

31.83

31.83

% Avance
Acumulado

Volumen a
Valorizar
-

0.00
0.00

0.00

0.00

BASE GRANULAR
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE BASE GRANULAR

METRADO DE BASE GRANULAR VIA AUXILIAR IZQUIERDO


Estaca
(Km)

Distancia
(m)

Ancho de
Ancho de base
base superior
inferior (m)
(m)

Espesor
(m)

Area
transversal
(m2)

Volumen
(m3)

% Avance
Acumulado

METRADO DE BASE GRANULAR EN VIA CENTRAL

Volumen a
Valorizar

Ancho de
Ancho de
Espesor
base inferior
base
(m)
(m)
superior (m)

(AMPLIACION IZQUIERDA)

Area
transversal Volumen (m3) % Avance
(m2)
Acumulado

METRADO DE BASE GRANULAR EN VIA CENTRAL

Volumen a
Valorizar

Ancho de
Ancho de base Espesor
base inferior
superior (m)
(m)
(m)

Area
transversal
(m2)

08+020.00

20.00

0.00

0.00

5.95

5.64

0.18

1.01

20.23

0.00

4.83

4.52

0.18

0.82

08+040.00

20.00

0.00

0.00

5.91

5.60

0.18

1.01

20.21

0.00

4.76

4.45

0.18

0.81

08+060.00

20.00

0.00

0.00

5.95

5.64

0.18

1.01

20.21

0.00

4.79

4.48

0.18

0.81

08+080.00

20.00

0.00

0.00

6.02

5.71

0.18

1.03

20.41

0.00

4.81

4.50

0.18

0.81

08+100.00

20.00

0.00

0.00

4.54

4.23

0.18

0.77

17.95

0.00

4.82

4.51

0.18

0.82

08+120.00

20.00

0.00

0.00

3.00

2.69

0.18

0.50

12.66

0.00

4.80

4.49

0.18

0.81

08+140.00

20.00

0.00

0.00

5.53

5.22

0.18

0.94

14.39

0.00

4.83

4.52

0.18

0.82

08+160.00

20.00

0.00

0.00

10.70

10.39

0.18

1.84

27.86

0.00

13.32

13.01

0.18

2.30

08+180.00

20.00

0.00

0.00

11.76

11.45

0.18

2.03

38.75

0.00

14.02

13.71

0.18

2.43

08+200.00

20.00

0.00

0.00

12.82

12.51

0.18

2.22

42.46

0.00

15.28

14.97

0.18

2.65

08+220.00

20.00

0.00

0.00

13.88

13.57

0.18

2.40

46.17

0.00

16.14

15.83

0.18

2.80

08+240.00

20.00

0.00

0.00

12.68

12.37

0.18

2.19

45.92

0.00

14.08

13.77

0.18

2.44

08+260.00

20.00

0.00

0.00

12.62

12.31

0.18

2.18

43.72

0.00

13.07

12.76

0.18

2.26

08+280.00

20.00

0.00

0.00

12.62

12.31

0.18

2.18

43.61

0.00

12.97

12.66

0.18

2.24

08+300.00

20.00

0.00

0.00

12.62

12.31

0.18

2.18

43.61

0.00

12.88

12.57

0.18

2.23

08+320.00

20.00

0.00

0.00

12.62

12.31

0.18

2.18

43.61

0.00

12.79

12.48

0.18

2.21

08+340.00

20.00

0.00

0.00

12.62

12.31

0.18

2.18

43.61

0.00

12.70

12.39

0.18

2.19

08+360.00

20.00

0.00

0.00

12.62

12.31

0.18

2.18

43.61

0.00

12.69

12.38

0.18

2.19

08+380.00

20.00

0.00

0.00

10.37

10.06

0.18

1.79

63.98

0.00

9.92

9.61

0.18

1.71

08+400.00

20.00

0.00

0.00

9.92

9.61

0.18

1.71

34.95

0.00

9.92

9.61

0.18

1.71

08+420.00

20.00

0.00

0.00

9.92

9.61

0.18

1.71

34.16

0.00

9.92

9.61

0.18

1.71

08+440.00

20.00

0.00

0.00

9.92

9.61

0.18

1.71

34.16

0.00

9.92

9.61

0.18

1.71

08+460.00

20.00

0.00

0.00

9.92

9.61

0.18

1.71

34.16

0.00

9.92

9.61

0.18

1.71

08+480.00

20.00

0.00

0.00

10.39

10.08

0.18

1.79

34.99

0.00

10.30

9.99

0.18

1.77

08+500.00

20.00

0.00

0.00

5.90

5.59

0.18

1.01

27.96

100%

27.96

4.77

4.46

0.18

0.81

08+520.00

20.00

0.00

0.00

5.92

5.61

0.18

1.01

20.15

100%

20.15

4.79

4.48

0.18

0.81

08+540.00

20.00

0.00

0.00

5.92

5.61

0.18

1.01

20.19

100%

20.19

4.73

4.42

0.18

0.80

08+560.00

20.00

0.00

0.00

5.91

5.60

0.18

1.01

20.17

100%

20.17

4.77

4.46

0.18

0.81

08+580.00

20.00

0.00

0.00

5.92

5.61

0.18

1.01

20.17

100%

20.17

4.77

4.46

0.18

0.81

08+600.00

20.00

0.00

0.00

5.91

5.60

0.18

1.01

20.17

100%

20.17

4.77

4.46

0.18

0.81

(AMPLIACION DERE

BASE GRANULAR
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE BASE GRANULAR

METRADO DE BASE GRANULAR VIA AUXILIAR IZQUIERDO


Estaca
(Km)

Distancia
(m)

Ancho de
Ancho de base
base superior
inferior (m)
(m)

Espesor
(m)

Area
transversal
(m2)

Volumen
(m3)

% Avance
Acumulado

METRADO DE BASE GRANULAR EN VIA CENTRAL

Volumen a
Valorizar

Ancho de
Ancho de
Espesor
base inferior
base
(m)
(m)
superior (m)

(AMPLIACION IZQUIERDA)

Area
transversal Volumen (m3) % Avance
(m2)
Acumulado

METRADO DE BASE GRANULAR EN VIA CENTRAL

Volumen a
Valorizar

Ancho de
Ancho de base Espesor
base inferior
superior (m)
(m)
(m)

Area
transversal
(m2)

08+620.00

20.00

0.00

0.00

5.91

5.60

0.18

1.01

20.15

100%

20.15

4.79

4.48

0.18

0.81

08+640.00

20.00

0.00

0.00

6.92

6.61

0.18

1.18

21.92

100%

21.92

5.84

5.53

0.18

1.00

08+660.00

20.00

0.00

0.00

5.92

5.61

0.18

1.01

21.94

100%

21.94

4.82

4.51

0.18

0.82

08+680.00

20.00

0.00

0.00

5.92

5.61

0.18

1.01

20.19

100%

20.19

4.72

4.41

0.18

0.80

08+700.00

20.00

0.00

0.00

5.92

5.61

0.18

1.01

20.19

100%

20.19

4.78

4.47

0.18

0.81

08+720.00

20.00

0.00

0.00

5.90

5.59

0.18

1.01

20.15

100%

20.15

4.76

4.45

0.18

0.81

08+740.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.26

100%

20.26

4.79

4.48

0.18

0.81

08+760.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.40

100%

20.40

4.75

4.44

0.18

0.80

08+780.00

20.00

0.00

0.00

6.03

5.72

0.18

1.03

20.48

100%

20.48

4.69

4.38

0.18

0.79

08+800.00

20.00

0.00

0.00

5.99

5.68

0.18

1.02

20.50

100%

20.50

4.72

4.41

0.18

0.80

08+820.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.41

100%

20.41

4.76

4.45

0.18

0.81

08+840.00

20.00

0.00

0.00

6.03

5.72

0.18

1.03

20.48

100%

20.48

4.76

4.45

0.18

0.81

08+860.00

20.00

0.00

0.00

5.97

5.66

0.18

1.02

20.47

100%

20.47

4.74

4.43

0.18

0.80

08+880.00

20.00

0.00

0.00

5.91

5.60

0.18

1.01

20.26

100%

20.26

4.74

4.43

0.18

0.80

08+900.00

20.00

0.00

0.00

5.95

5.64

0.18

1.01

20.22

100%

20.22

4.79

4.48

0.18

0.81

08+920.00

20.00

0.00

0.00

5.95

5.64

0.18

1.01

20.29

100%

20.29

4.61

4.30

0.18

0.78

08+940.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.34

100%

20.34

4.71

4.40

0.18

0.80

08+960.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.40

100%

20.40

4.76

4.45

0.18

0.81

08+980.00

20.00

0.00

0.00

5.96

5.65

0.18

1.02

20.36

100%

20.36

4.78

4.47

0.18

0.81

09+000.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.36

100%

20.36

4.71

4.40

0.18

0.80

Sub-Total:

0.00

1364.00

538.57

(AMPLIACION DERE

BASE GRANULAR
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE BASE GRANULAR

METRADO DE BASE GRANULAR VIA AUXILIAR IZQUIERDO


Estaca
(Km)

Distancia
(m)

Ancho de
Ancho de base
base superior
inferior (m)
(m)

Espesor
(m)

Area
transversal
(m2)

Volumen
(m3)

% Avance
Acumulado

METRADO DE BASE GRANULAR EN VIA CENTRAL

Volumen a
Valorizar

Ancho de
Ancho de
Espesor
base inferior
base
(m)
(m)
superior (m)

(AMPLIACION IZQUIERDA)

Area
transversal Volumen (m3) % Avance
(m2)
Acumulado

METRADO DE BASE GRANULAR EN VIA CENTRAL

Volumen a
Valorizar

Ancho de
Ancho de base Espesor
base inferior
superior (m)
(m)
(m)

Area
transversal
(m2)

09+020.00

20.00

0.00

0.00

5.97

5.66

0.18

1.02

20.38

100%

20.38

4.72

4.41

0.18

0.80

09+040.00

20.00

0.00

0.00

5.97

5.66

0.18

1.02

20.36

100%

20.36

4.78

4.47

0.18

0.81

09+060.00

20.00

0.00

0.00

5.97

5.66

0.18

1.02

20.36

100%

20.36

4.71

4.40

0.18

0.80

09+080.00

20.00

0.00

0.00

5.99

5.68

0.18

1.02

20.40

100%

20.40

4.73

4.42

0.18

0.80

09+100.00

20.00

0.00

0.00

5.99

5.68

0.18

1.02

20.43

0.00

5.14

4.83

0.18

0.87

09+120.00

20.00

0.00

0.00

5.97

5.66

0.18

1.02

20.40

0.00

4.69

4.38

0.18

0.79

09+140.00

20.00

0.00

0.00

5.96

5.65

0.18

1.02

20.34

0.00

4.69

4.38

0.18

0.79

09+160.00

20.00

0.00

0.00

6.01

5.70

0.18

1.03

20.41

0.00

4.68

4.37

0.18

0.79

09+180.00

20.00

0.00

0.00

5.96

5.65

0.18

1.02

20.41

0.00

4.74

4.43

0.18

0.80

09+200.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.36

0.00

4.73

4.42

0.18

0.80

09+220.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.40

0.00

4.75

4.44

0.18

0.80

09+240.00

20.00

0.00

0.00

6.00

5.69

0.18

1.02

20.43

0.00

4.80

4.49

0.18

0.81

09+260.00

20.00

0.00

0.00

5.98

5.67

0.18

1.02

20.43

0.00

4.76

4.45

0.18

0.81

09+280.00

20.00

0.00

0.00

5.92

5.61

0.18

1.01

20.29

0.00

4.81

4.50

0.18

0.82

09+300.00

20.00

0.00

0.00

5.93

5.62

0.18

1.01

20.20

0.00

4.80

4.49

0.18

0.81

09+320.00

20.00

0.00

0.00

5.89

5.58

0.18

1.00

20.15

0.00

4.83

4.52

0.18

0.82

09+340.00

20.00

0.00

0.00

5.92

5.61

0.18

1.01

20.13

0.00

4.98

4.67

0.18

0.84

09+360.00

20.00

0.00

0.00

5.89

5.58

0.18

1.00

20.13

100%

20.13

4.79

4.48

0.18

0.81

09+380.00

20.00

0.00

0.00

5.87

5.56

0.18

1.00

20.05

100%

20.05

4.83

4.52

0.18

0.82

09+400.00

20.00

0.00

0.00

5.68

5.37

0.18

0.97

19.68

100%

19.68

4.87

4.56

0.18

0.83

09+420.00

20.00

0.00

0.00

5.58

5.27

0.18

0.95

19.17

100%

19.17

4.96

4.65

0.18

0.84

09+440.00

20.00

0.00

0.00

5.38

5.07

0.18

0.91

18.65

100%

18.65

4.93

4.62

0.18

0.84

09+460.00

20.00

0.00

0.00

5.68

5.37

0.18

0.97

18.82

100%

18.82

4.99

4.68

0.18

0.85

09+480.00

20.00

0.00

0.00

5.18

4.87

0.18

0.88

18.47

100%

18.47

4.97

4.66

0.18

0.84

09+500.00

20.00

0.00

0.00

5.67

5.36

0.18

0.97

18.45

100%

18.45

5.08

4.77

0.18

0.86

09+520.00

20.00

0.00

0.00

5.91

5.60

0.18

1.01

19.73

100%

19.73

4.95

4.64

0.18

0.84

09+540.00

20.00

0.00

0.00

5.38

5.07

0.18

0.91

19.22

100%

19.22

4.99

4.68

0.18

0.85

09+560.00

20.00

0.00

0.00

5.65

5.34

0.18

0.96

18.77

100%

18.77

5.04

4.73

0.18

0.86

09+580.00

20.00

0.00

0.00

5.78

5.47

0.18

0.98

19.47

100%

19.47

5.04

4.73

0.18

0.86

09+600.00

20.00

0.00

0.00

5.72

5.41

0.18

0.97

19.59

100%

19.59

5.04

4.73

0.18

0.86

(AMPLIACION DERE

BASE GRANULAR
CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADO DE BASE GRANULAR

METRADO DE BASE GRANULAR VIA AUXILIAR IZQUIERDO


Estaca
(Km)

Distancia
(m)

Ancho de
Ancho de base
base superior
inferior (m)
(m)

Espesor
(m)

Area
transversal
(m2)

Volumen
(m3)

% Avance
Acumulado

METRADO DE BASE GRANULAR EN VIA CENTRAL

Volumen a
Valorizar

Ancho de
Ancho de
Espesor
base inferior
base
(m)
(m)
superior (m)

(AMPLIACION IZQUIERDA)

Area
transversal Volumen (m3) % Avance
(m2)
Acumulado

METRADO DE BASE GRANULAR EN VIA CENTRAL

Volumen a
Valorizar

Ancho de
Ancho de base Espesor
base inferior
superior (m)
(m)
(m)

Area
transversal
(m2)

09+620.00

20.00

0.00

0.00

5.65

5.34

0.18

0.96

19.36

100%

19.36

5.08

4.77

0.18

0.86

09+640.00

20.00

0.00

0.00

5.61

5.30

0.18

0.96

19.17

100%

19.17

5.11

4.80

0.18

0.87

09+660.00

20.00

0.00

0.00

5.67

5.36

0.18

0.97

19.21

100%

19.21

5.12

4.81

0.18

0.87

09+680.00

20.00

0.00

0.00

5.65

5.34

0.18

0.96

19.28

100%

19.28

5.13

4.82

0.18

0.87

09+700.00

20.00

0.00

0.00

5.46

5.15

0.18

0.93

18.91

100%

18.91

5.22

4.91

0.18

0.89

09+720.00

20.00

0.00

0.00

6.40

6.09

0.18

1.09

20.22

100%

20.22

6.18

5.87

0.18

1.05

09+740.00

20.00

0.00

0.00

5.41

5.10

0.18

0.92

20.13

100%

20.13

5.27

4.96

0.18

0.90

09+760.00

20.00

0.00

0.00

5.24

4.93

0.18

0.89

18.10

100%

18.10

5.20

4.89

0.18

0.88

09+780.00

20.00

0.00

0.00

5.28

4.97

0.18

0.90

17.87

100%

17.87

5.13

4.82

0.18

0.87

09+800.00

20.00

0.00

0.00

5.35

5.04

0.18

0.91

18.05

100%

18.05

5.07

4.76

0.18

0.86

09+820.00

20.00

0.00

0.00

5.33

5.02

0.18

0.91

18.14

100%

18.14

5.05

4.74

0.18

0.86

09+840.00

20.00

0.00

0.00

5.26

4.95

0.18

0.89

17.98

100%

17.98

5.09

4.78

0.18

0.86

09+860.00

20.00

0.00

0.00

5.14

4.83

0.18

0.87

17.65

100%

17.65

5.21

4.90

0.18

0.88

09+880.00

20.00

0.00

0.00

5.14

4.83

0.18

0.87

17.45

100%

17.45

5.34

5.03

0.18

0.91

09+900.00

20.00

0.00

0.00

5.19

4.88

0.18

0.88

17.55

100%

17.55

5.40

5.09

0.18

0.92

09+920.00

20.00

0.00

0.00

5.16

4.85

0.18

0.88

17.58

100%

17.58

5.44

5.13

0.18

0.93

09+940.00

20.00

0.00

0.00

5.15

4.84

0.18

0.87

17.51

100%

17.51

5.49

5.18

0.18

0.93

09+960.00

20.00

0.00

0.00

5.35

5.04

0.18

0.91

17.84

100%

17.84

5.80

5.49

0.18

0.99

09+980.00

20.00

0.00

0.00

11.73

11.42

0.18

2.03

29.36

100%

29.36

13.12

12.81

0.18

2.27

10+000.00

20.00

0.00

0.00

11.03

10.72

0.18

1.90

39.30

100%

39.30

11.00

10.69

0.18

1.90

1.01

0.70

0.18

0.15

0.00

Sub-Total:

10+025.82

Sub-Total:

25.82

0.00

0.00

996.76

0.68

0.00

0.37

0.18

0.09

25.77

25.77

732.36

100%

25.77

25.77

(AMPLIACION DERE

R EN VIA CENTRAL

(AMPLIACION DERECHA)

Volumen (m3)

% Avance
Acumulado

METRADO DE BASE GRANULAR VIA AUXILIAR DERECHO

Volumen a
Valorizar

Ancho de
Ancho de base Espesor Area transversal
base inferior
superior (m)
(m)
(m2)
(m)

Volumen (m3)

16.28

0.00

0.00

0.00

16.23

0.00

0.00

0.00

16.17

0.00

0.00

0.00

16.26

0.00

0.00

0.00

16.30

0.00

0.00

0.00

16.28

0.00

0.00

0.00

16.31

0.00

0.00

0.00

31.22

0.00

0.00

0.00

47.29

0.00

0.00

0.00

50.72

0.00

0.00

0.00

54.43

0.00

0.00

0.00

52.33

0.00

0.00

0.00

46.96

0.00

0.00

0.00

45.01

0.00

0.00

0.00

44.68

0.00

0.00

0.00

44.37

0.00

0.00

0.00

44.05

0.00

0.00

0.00

43.88

0.00

0.00

0.00

63.31

0.00

0.00

0.00

34.16

0.00

0.00

0.00

34.16

0.00

0.00

0.00

34.16

0.00

0.00

0.00

34.16

0.00

0.00

0.00

34.83

0.00

0.00

0.00

25.83

100%

25.83

0.00

0.00

16.20

100%

16.20

0.00

0.00

16.13

100%

16.13

0.00

0.00

16.09

100%

16.09

0.00

0.00

16.16

100%

16.16

0.00

0.00

16.16

100%

16.16

0.00

0.00

% Avance
Acumulado

Volumen a
Valorizar

R EN VIA CENTRAL

(AMPLIACION DERECHA)

METRADO DE BASE GRANULAR VIA AUXILIAR DERECHO

Ancho de
Ancho de base Espesor Area transversal
base inferior
superior (m)
(m)
(m2)
(m)

Volumen (m3)

% Avance
Acumulado

Volumen a
Valorizar

16.20

100%

16.20

0.00

0.00

18.07

100%

18.07

0.00

0.00

18.12

100%

18.12

0.00

0.00

16.16

100%

16.16

0.00

0.00

16.09

100%

16.09

0.00

0.00

16.16

100%

16.16

0.00

0.00

16.18

100%

16.18

0.00

0.00

16.16

100%

16.16

0.00

0.00

15.99

100%

15.99

0.00

0.00

15.93

100%

15.93

0.00

0.00

16.06

100%

16.06

0.00

0.00

16.13

100%

16.13

0.00

0.00

16.09

100%

16.09

0.00

0.00

16.06

100%

16.06

0.00

0.00

16.14

100%

16.14

0.00

0.00

15.92

100%

15.92

0.00

0.00

15.78

100%

15.78

0.00

0.00

16.04

100%

16.04

0.00

0.00

16.16

100%

16.16

0.00

0.00

16.07

100%

16.07

0.00

0.00

1285.64

432.07

Volumen (m3)

0.00

% Avance
Acumulado

Volumen a
Valorizar

R EN VIA CENTRAL

(AMPLIACION DERECHA)

METRADO DE BASE GRANULAR VIA AUXILIAR DERECHO

Ancho de
Ancho de base Espesor Area transversal
base inferior
superior (m)
(m)
(m2)
(m)

Volumen (m3)

% Avance
Acumulado

Volumen a
Valorizar

Volumen (m3)

15.97

100%

15.97

0.00

0.00

16.09

100%

16.09

0.00

0.00

16.07

100%

16.07

0.00

0.00

15.99

100%

15.99

0.00

0.00

16.74

100%

16.74

0.00

0.00

16.67

100%

16.67

0.00

0.00

15.88

100%

15.88

0.00

0.00

15.86

100%

15.86

0.00

0.00

15.95

100%

15.95

0.00

0.00

16.04

100%

16.04

0.00

0.00

16.06

100%

16.06

0.00

0.00

16.18

100%

16.18

0.00

0.00

16.20

100%

16.20

0.00

0.00

16.21

100%

16.21

0.00

0.00

16.28

100%

16.28

0.00

0.00

16.32

100%

16.32

0.00

0.00

16.63

100%

16.63

0.00

0.00

16.56

100%

16.56

0.00

0.00

16.30

100%

16.30

0.00

0.00

16.44

100%

16.44

0.00

0.00

16.67

100%

16.67

0.00

0.00

16.77

100%

16.77

0.00

0.00

16.83

100%

16.83

0.00

0.00

16.90

100%

16.90

0.00

0.00

17.05

100%

17.05

0.00

0.00

17.02

100%

17.02

0.00

0.00

16.86

100%

16.86

0.00

0.00

17.02

100%

17.02

0.00

0.00

17.11

100%

17.11

0.00

0.00

17.11

100%

17.11

0.00

0.00

% Avance
Acumulado

Volumen a
Valorizar

R EN VIA CENTRAL

(AMPLIACION DERECHA)

METRADO DE BASE GRANULAR VIA AUXILIAR DERECHO

Ancho de
Ancho de base Espesor Area transversal
base inferior
superior (m)
(m)
(m2)
(m)

Volumen (m3)

% Avance
Acumulado

Volumen a
Valorizar

17.18

100%

17.18

0.00

0.00

17.30

100%

17.30

0.00

0.00

17.37

100%

17.37

0.00

0.00

17.40

100%

17.40

0.00

0.00

17.58

100%

17.58

0.00

0.00

19.42

100%

19.42

0.00

0.00

19.50

100%

19.50

0.00

0.00

17.78

100%

17.78

0.00

0.00

17.53

100%

17.53

0.00

0.00

17.30

100%

17.30

0.00

0.00

17.16

100%

17.16

0.00

0.00

17.19

100%

17.19

0.00

0.00

17.47

100%

17.47

0.00

0.00

17.91

100%

17.91

0.00

0.00

18.24

100%

18.24

0.00

0.00

18.42

100%

18.42

0.00

0.00

18.59

100%

18.59

0.00

0.00

19.22

100%

19.22

0.00

0.00

32.58

100%

32.58

0.00

0.00

41.68

100%

41.68

0.00

0.00

890.60

26.44

26.44

Volumen (m3)

890.60

100%

26.44

0.00

0.00

26.44

0.00

0.00

% Avance
Acumulado

Volumen a
Valorizar

PAVIMENTOS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA
TRAMO: DV. AEROPUERTO PUCALLPA ALTURA DEL CEMENTERIO JARDIN DEL BUEN RETIRO

METRADO PAVIMENTO ASFALTICO CARRIL CENTRAL


SECCION TRANSVERSAL
Estaca
(Km)

08+020.00
08+040.00
08+060.00
08+080.00
08+100.00
08+120.00
08+140.00
08+160.00
08+180.00
08+200.00
08+220.00
08+240.00
08+260.00
08+280.00
08+300.00
08+320.00
08+340.00
08+360.00
08+380.00
08+400.00
08+420.00
08+440.00
08+460.00
08+480.00
08+500.00
08+520.00
08+540.00
08+560.00
08+580.00
08+600.00
08+620.00
08+640.00
08+660.00
08+680.00

Distancia

Berma

Ancho Va

Berma

(m)

izquierda

central (ambos
lados)

derecha

(m)

( m)

(m)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

9.400
10.500
10.500
10.500
10.500
10.900
13.450
10.980
12.740
15.070
17.550
18.610
20.960
23.410
25.230
27.910
30.240
32.150
32.240
27.870
22.350
16.800
12.630
9.590
9.400
9.400
9.400
9.400
9.400
9.400
9.400
11.400
9.400
9.400

PAVIMENTOS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA
TRAMO: DV. AEROPUERTO PUCALLPA ALTURA DEL CEMENTERIO JARDIN DEL BUEN RETIRO

METRADO PAVIMENTO ASFALTICO CARRIL CENTRAL


SECCION TRANSVERSAL
Estaca
(Km)

08+700.00
08+720.00
08+740.00
08+760.00
08+780.00
08+800.00
08+820.00
08+840.00
08+860.00
08+880.00
08+900.00
08+920.00
08+940.00
08+960.00
08+980.00
09+000.00
Sub-Total:

Distancia

Berma

Ancho Va

Berma

(m)

izquierda

central (ambos
lados)

derecha

(m)

( m)

(m)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

10.290
10.500
10.500
10.500
16.530
10.500
10.500
10.500
10.500
9.400
9.400
9.400
9.400
9.400
9.400
9.400

PAVIMENTOS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA
TRAMO: DV. AEROPUERTO PUCALLPA ALTURA DEL CEMENTERIO JARDIN DEL BUEN RETIRO

METRADO PAVIMENTO ASFALTICO CARRIL CENTRAL


SECCION TRANSVERSAL
Estaca
(Km)

09+020.00
09+040.00
09+060.00
09+080.00
09+100.00
09+120.00
09+140.00
09+160.00
09+180.00
09+200.00
09+220.00
09+240.00
09+260.00
09+280.00
09+300.00
09+320.00
09+340.00
09+360.00
09+380.00
09+400.00
09+420.00
09+440.00
09+460.00
09+480.00
09+500.00
09+520.00
09+540.00
09+560.00
09+580.00
09+600.00
09+620.00
09+640.00
09+660.00
09+680.00
09+700.00
09+720.00

Distancia

Berma

Ancho Va

Berma

(m)

izquierda

central (ambos
lados)

derecha

(m)

( m)

(m)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
10.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400

PAVIMENTOS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA
TRAMO: DV. AEROPUERTO PUCALLPA ALTURA DEL CEMENTERIO JARDIN DEL BUEN RETIRO

METRADO PAVIMENTO ASFALTICO CARRIL CENTRAL


SECCION TRANSVERSAL
Estaca
(Km)

09+740.00
09+760.00
09+770.00
09+780.00
09+790.00
09+800.00
09+810.00
09+820.00
09+830.00
09+840.00
09+850.00
09+860.00
09+870.00
09+880.00
09+900.00
09+920.00
09+940.00
09+960.00
09+980.00
10+000.00

Distancia

Berma

Ancho Va

Berma

(m)

izquierda

central (ambos
lados)

derecha

(m)

( m)

(m)

20.00
20.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

9.400
9.400
9.600
11.800
11.800
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
9.400
11.800
9.400
9.400
9.400
9.400
9.400

20.00
20.00
20.00
20.00

10.800
10.800
10.800
10.800

Sub-Total:
10+020.00
10+040.00
10+060.00
10+080.00
Sub-Total:

PAVIMENTOS

ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA
TRAMO: DV. AEROPUERTO PUCALLPA ALTURA DEL CEMENTERIO JARDIN DEL BUEN RETIRO

METRADO PAVIMENTO ASFALTICO CARRIL CENTRAL


SECCION TRANSVERSAL
Estaca

Distancia

Berma

Ancho Va

Berma

(m)

izquierda

central (ambos
lados)

derecha

(m)

( m)

(m)

(Km)

METRADO PAVIMENTO ASFALTICO - RESUM


CANTERA "ISLA GUINEAL"
P.U. MEZCLA ASFALTICA =
% CEMENTO ASFALTICO =
P.U. CEMENTO ASFALTICO =

CEMENTO ASF. x m3 DE MEZCLA =

( km al km )
0 + 000.00
1 + 000.00
2 + 000.00
3 + 000.00
4 + 000.00
5 + 000.00
6 + 000.00
7 + 000.00
8 + 000.00
9 + 000.00
10 + 000.00

1 + 000.00
2 + 000.00
3 + 000.00
4 + 000.00
5 + 000.00
6 + 000.00
7 + 000.00
8 + 000.00
9 + 000.00
10 + 000.00
10 + 025.82

TOTAL
METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

Pavimento de Concreto

Imprimacion
Asfaltica

PROGRESIVA

Ancho+Bermas

Asfaltico Caliente (m3)

Sobreancho

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,242.40
6,226.00
864.00
12,332.40

1,755,458.44
12,332.40
6,108.30
6,224.10

Ancho+Bermas
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A TINGO MARIA AGUAYTA PUCALLPA

R
i
e
g
o

AL
total

Imprimacion
Asfaltica

(m)
9.40
10.50
10.50
10.50
10.50
10.90
13.45
10.98
12.74
15.07
17.55
18.61
20.96
23.41
25.23
27.91
30.24
32.15
32.24
27.87
22.35
16.80
12.63
9.59
9.40
9.40
9.40
9.40
9.40
9.40
9.40
11.40
9.40
9.40

Ancho ( m)
9.40
10.50
10.50
10.50
10.50
10.90
13.45
10.98
12.74
15.07
17.55
18.61
20.96
23.41
25.23
27.91
30.24
32.15
32.24
27.87
22.35
16.80
12.63
9.59
9.40
9.40
9.40
9.40
9.40
9.40
9.40
11.40
9.40
9.40

ToTal ( m2)
188.00
210.00
210.00
210.00
210.00
218.00
269.00
219.60
254.80
301.40
351.00
372.20
419.20
468.20
504.60
558.20
604.80
643.00
644.80
557.40
447.00
336.00
252.60
191.80
188.00
188.00
188.00
188.00
188.00
188.00
188.00
228.00
188.00
188.00

% Avance
Acumulado

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

Volumen a
Valorizar

d
e
(
m
L
2
i)
g
a

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
188.00###
188.00###
188.00###
188.00###
188.00###
188.00###
188.00###
228.00###
188.00###
188.00###

A TINGO MARIA AGUAYTA PUCALLPA

R
i
e
g
o

AL
total

Imprimacion
Asfaltica

(m)
10.29
10.50
10.50
10.50
16.53
10.50
10.50
10.50
10.50
9.40
9.40
9.40
9.40
9.40
9.40
9.40

Ancho ( m)
10.29
10.50
10.50
10.50
16.53
10.50
10.50
10.50
10.50
9.40
9.40
9.40
9.40
9.40
9.40
9.40

ToTal ( m2)
205.80
210.00
210.00
210.00
330.60
210.00
210.00
210.00
210.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
13,884.00

% Avance
Acumulado
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

d
(e
m
Volumen a L
2
i)
Valorizar
g
a
205.80###
210.00###
210.00###
210.00###
330.60###
210.00###
210.00###
210.00###
210.00###
188.00###
188.00###
188.00###
188.00###
188.00###
188.00###
188.00###
5,242.40###

A TINGO MARIA AGUAYTA PUCALLPA

R
i
e
g
o

AL
total

Imprimacion
Asfaltica

(m)
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
10.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40

Ancho ( m)
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
10.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40

ToTal ( m2)
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
208.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00
188.00

% Avance
Acumulado
100%
100%
100%
100%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

50%
50%

d
(e
m
Volumen a L
2
i)
Valorizar
g
a
188.00###
188.00###
188.00###
188.00###
94.00###
94.00###
94.00###
94.00###
94.00###
94.00###
94.00###
94.00###
94.00###
94.00###
94.00###
94.00###
94.00###
188.00###
188.00###
188.00###
188.00###
188.00###
188.00###
188.00###
188.00###
208.00###
188.00###
188.00###
188.00###
188.00###
188.00###
- ###
- ###
- ###
94.00###
94.00###

A TINGO MARIA AGUAYTA PUCALLPA

R
i
e
g
o

AL
total

Imprimacion
Asfaltica

(m)

Ancho ( m)
9.40
9.40
9.60
11.80
11.80
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
11.80
9.40
9.40
9.40
9.40
9.40

9.40
9.40
9.60
11.80
11.80
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
11.80
9.40
9.40
9.40
9.40
9.40

ToTal ( m2)
188.00
188.00
96.00
118.00
118.00
94.00
94.00
94.00
94.00
94.00
94.00
94.00
94.00
188.00
236.00
188.00
188.00
188.00
188.00
188.00

% Avance
Acumulado
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%

9,612.00
10.80
10.80
10.80
10.80

10.80
10.80
10.80
10.80

216.00
216.00
216.00
216.00
864.00

d
(e
m
Volumen a L
2
i)
Valorizar
g
a
94.00###
94.00###
48.00###
59.00###
59.00###
47.00###
47.00###
47.00###
47.00###
47.00###
47.00###
47.00###
47.00###
94.00###
118.00###
94.00###
94.00###
94.00###
94.00###
94.00###
6,226.00###

100%
100%
100%
100%

216.00###
216.00###
216.00###
216.00###
864.00###

A TINGO MARIA AGUAYTA PUCALLPA

R
i
e
g
o

AL
total

Imprimacion
Asfaltica

(m)

Ancho ( m)

ToTal ( m2)

FALTICO - RESUMEN CARRIL CENTRAL

2.28

Ton/m3

5.80%

(Marshall)

1.00

Ton/m3

132.30

kg/m3

vimento de Concreto

Asfalto

sfaltico Caliente (m3)

Diluido Tipo MC-30 (lt)

Sobreancho

Ancho+Bermas

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sobreancho
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

% Avance
Acumulado

Volumen a
Valorizar

d
(e
m
L
2
i)
g
a

PAVIMENTOS
ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA ALTURA DEL CEMENTERIO JARDIN DEL BUEN RETIRO

METRADO PAVIMENTO ASFALTICO

PROGRESIVA

( km al km )
0 + 000.00
1 + 000.00
1 + 000.00
2 + 000.00
2 + 000.00
3 + 000.00
3 + 000.00
4 + 000.00
4 + 000.00
5 + 000.00
5 + 000.00
6 + 000.00
6 + 000.00
7 + 000.00
7 + 000.00
8 + 000.00
8 + 000.00
9 + 000.00
9 + 000.00
10 + 000.00
10 + 000.00 10 + 025.82

Pavimento de Concreto
Asfaltico Caliente (m3)

Imprimacion
Asfaltica
Ancho+Berma Sobreanch
s
o
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,242.40
6,226.00
864.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Accesos

Asfalto
Diluido Tipo MC-30 (lt)

Cemento Asfaltico
(kg)

Ancho+Berm Sobreanch
Ancho+Berma Sobrean
Ancho+Berm Sobreanc
Accesos
Accesos
as
o
s
cho
as
ho
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Accesos

Aditivo Mejorador de Adherencia


(% PEN) (kg)
Ancho+Be Sobrean
rmas
cho

Accesos

Filler Mineral
(kg)
Ancho+Ber Sobre
mas
ancho

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Accesos

Riego de Liga
(m2)
Ampliaciones

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
pavimento viejo con pavimento nuevo
concreto-pavimento

TOTAL

12,332.40

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

185,494.64
12,332.40
4,012.30
8,320.10

16,538.14
0.00

241,143.03
0.00

2,187,995.39
0.00

10,939.98
0.00

710,709.85
0.00

0.00

0.00

0.00

0.00

0.00

113,734.44
0.00
0.00

TRANSPORTES
ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

METRADOS DE TRANSPORTE DE MEZCLA ASFALTICA A OBRA

PLAN
UBICACIN

CARPETA ASFALTICA

UBICACIN (KM)
ACCESO (KM)

INICIO

FINAL

LONG.

C.G.

Ancho+Bermas

Sobreancho

Accesos

VOLUMEN
TOTAL

DISTANCIA
TRANSP.

00+000
01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000

01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
10+026

1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
26

0.50
1.50
2.50
3.50
4.50
5.50
6.50
7.50
8.50
9.50
10.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

86.53
85.53
84.53
83.53
82.53
81.53
80.53
79.53
78.53
77.53
77.01

MATERIAL TRANSPORTADO

TRANSPORTE DE
MATERIAL

DISTANCIA
MEDIA

MATERIAL TRANSPORTADO
D <= 1 KM

D > 1 KM

KM

#DIV/0!

PLANTA DE ASFALTO

0.00

0.00

0.00

TOTAL

0.00

0.00

0.00

TRANSPORTES
ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

TRANSPORTE DE AGREGADOS PARA MEZCLA ASFALTICA


Ubicacin
Cantera Isla Guineal

Material
Planta

Inicio
(km)

Acceso
(km)

Inicio
(km)

Acceso
(km)

0+000

79.50

0+000

77.00

Distancia de
transporte
(km)

Volumen
Total
(m3)

Agregados
(m3)

Momento de
transporte
(m3km)

2.50

Cantera
Cantera Isla Guineal

Material a
transportar
(m3)
0.00

TOTAL

0.00

AGUAYTA PUCALLPA

A ASFALTICA A OBRA
UBICACIN (KM)
ACCESO (KM)

PLANTA DE ASFALTO
10.03
77.000

MATERIAL

MOMENTO

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

TRANSPORTE DE
MATERIAL DE
CANTERA
D <= 1 KM

D > 1 KM

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

A
Transporte de material
granular
(m3km)
D <= 1 km

D > 1 km

Transporte de material granular


(m3km)
D <= 1 KM
D > 1 KM
0.00

0.00

0.00

0.00

MOVIMIENTO DE TIERRAS
ESTUDIO DEFINITIVO DEL PROYECTO DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA
CARRETERA TINGO MARIA AGUAYTA PUCALLPA
TRAMO: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO JARDIN DEL BUEN RECUERDO

220.B: MEJORAMIENTO DE SUELOS A NIVEL DE SUB RASA


De

Hasta

Longitud

Area a mejorar

(m)

(m2)

Volumen de
Mejoramiento

SEGN PROYECTO
Area a mejorar

(m3)

(m2)

Volumen de
Mejoramiento
(m3)

Zona Urbana Ampliacion Calzada Izquierdo


1+010

1+030

20.00

1.90

38.80

1.90

38.80

1+030

1+050

20.00

1.98

38.80

1.98

38.80

1+050

1+070

20.00

1.92

39.00

1.92

39.00

1+070

1+090

20.00

1.98

39.00

1.98

39.00

1+090

1+110

20.00

1.98

39.60

1.98

39.60

1+110

1+130

20.00

1.98

39.60

1.98

39.60

1+130

1+150

20.00

1.98

39.60

1.98

39.60

1+150

1+170

20.00

1.98

39.60

1.98

39.60

1+170

1+190

20.00

1.98

39.60

1.98

39.60

1+190

1+210

20.00

1.98

39.60

1.98

39.60

1+210

1+230

20.00

1.93

39.10

1.93

39.10

1+230

1+250

20.00

1.98

39.10

1.98

39.10

1+250

1+270

20.00

1.92

39.00

1.92

39.00

1+270

1+290

20.00

1.73

36.50

1.73

36.50

1+290

1+310

20.00

1.98

37.10

1.98

37.10

1+310

1+330

20.00

1.98

39.60

1.98

39.60

1+330

1+350

20.00

1.21

31.90

1.21

31.90

1+350

1+370

20.00

0.54

17.50

0.54

17.50

1+370

1+390

20.00

1.36

19.00

1.36

19.00

1+390

1+410

20.00

0.85

22.10

0.85

22.10

1+410

1+430

20.00

1.96

28.10

1.96

28.10

1+430

1+450

20.00

1.86

38.20

1.86

38.20

1+450

1+470

20.00

1.44

33.00

1.44

33.00

1+470

1+490

20.00

1.40

28.40

1.40

28.40

1+490

1+510

20.00

1.62

30.20

1.62

30.20

1+510

1+530

20.00

0.52

21.40

0.52

21.40

1+530

1+550

20.00

1+550

1+570

20.00

0.31

1.55

0.31

1.55

1+570

1+590

20.00

1.57

18.80

1.57

18.80

1+590

1+610

20.00

1.98

35.50

1.98

35.50

1+610

1+630

20.00

1.48

34.60

1.48

34.60

1+630

1+650

20.00

7.40

7.40

1+650

1+670

20.00

1+670

1+690

20.00

1+690

1+710

20.00

1+710

1+730

20.00

1.10

1+730

1+750

20.00

1+750

1+770

20.00

1+770

1+790

20.00

3.70

3.70

1+790

1+810

20.00

1+810

1+830

20.00

1+830

1+850

20.00

1+850

1+870

20.00

1+870

1+890

20.00

1+890

1+910

20.00

2.60

0.22

0.74

1.10

3.70

2.60

0.22

1.10
1.10
-

0.74

3.70

1+910

1+930

20.00

1.82

9.10

1.82

9.10

1+930

1+950

20.00

1.98

38.00

1.98

38.00

1+950

1+970

20.00

1.97

39.50

1.97

39.50

1+970

1+990

20.00

1.40

33.70

1.40

33.70

1+990

2+010

20.00

7.00

7.00

1,000.00

1,130.75

1,130.75

SUB TOTAL

2+010

2+030

20.00

2+030

2+050

20.00

2+050

2+070

20.00

1.94

9.70

1.94

9.70

2+070

2+090

20.00

1.57

35.10

1.57

35.10

2+090

2+110

20.00

2+110

2+130

20.00

1.32

6.60

1.32

6.60

2+130

2+150

20.00

1.76

30.80

1.76

30.80

2+150

2+170

20.00

1.98

37.40

1.98

37.40

2+170

2+190

20.00

1.98

39.60

1.98

39.60

2+190

2+210

20.00

1.98

39.60

1.98

39.60

2+210

2+230

20.00

1.98

39.60

1.98

39.60

2+230

2+250

20.00

1.98

39.60

1.98

39.60

2+250

2+270

20.00

1.98

39.60

1.98

39.60

2+270

2+290

20.00

1.98

39.60

1.98

39.60

2+290

2+310

20.00

1.26

32.40

1.26

32.40

2+310

2+330

20.00

1.51

27.70

1.51

27.70

2+330

2+350

20.00

1.81

33.20

1.81

33.20

2+350

2+370

20.00

0.86

26.70

0.86

26.70

2+370

2+390

20.00

1.37

22.30

1.37

22.30

2+390

2+410

20.00

1.75

31.20

1.75

31.20

2+410

2+430

20.00

2+430

2+450

20.00

1.20

6.00

1.20

6.00

2+450

2+470

20.00

1.33

25.30

1.33

25.30

2+470

2+490

20.00

1.15

24.80

1.15

24.80

2+490

2+510

20.00

1.35

25.00

1.35

25.00

2+510

2+530

20.00

1.20

25.50

1.20

25.50

2+530

2+550

20.00

1.45

26.50

1.45

26.50

2+550

2+570

20.00

1.16

26.10

1.16

26.10

2+570

2+590

20.00

1.00

21.60

1.00

21.60

2+590

2+610

20.00

1.49

24.90

1.49

24.90

2+610

2+630

20.00

1.47

29.60

1.47

29.60

2+630

2+650

20.00

1.18

26.50

1.18

26.50

2+650

2+670

20.00

1.46

26.40

1.46

26.40

2+670

2+690

20.00

0.99

24.50

0.99

24.50

2+690

2+710

20.00

2+710

2+730

20.00

1.61

8.05

1.61

8.05

2+730

2+750

20.00

1.86

34.70

1.86

34.70

2+750

2+770

20.00

1.22

30.80

1.22

30.80

2+770

2+790

20.00

2+790

2+810

20.00

2+810

2+830

20.00

2+830

2+850

20.00

0.98

4.90

0.98

4.90

2+850

2+870

20.00

1.86

28.40

1.86

28.40

2+870

2+890

20.00

1.71

35.70

1.71

35.70

2+890

2+910

20.00

1.98

36.90

1.98

36.90

2+910

2+930

20.00

0.90

28.80

0.90

28.80

2+930

2+950

20.00

1.18

20.80

1.18

20.80

2+950

2+970

20.00

1.98

31.60

1.98

31.60

2+970

2+990

20.00

0.99

29.70

0.99

29.70

2+990

3+010

20.00

1.66

26.50

1.66

26.50

SUB TOTAL

1,000.00

1.27

6.35

1.27

6.35

6.35

7.85

7.85

8.75

8.75

4.95

4.95

6.10
0.80

4.00

6.10
0.80

4.00

1,208.60

6.35

4.00
4.00

1,208.60

7+590

7+610

20.00

1.50

1.50

7+610

7+630

20.00

1.30

1.30

7+630

7+650

20.00

1.90

9.50

1.90

9.50

7+650

7+670

20.00

9.50

9.50

7+670

7+690

20.00

1.17

5.85

1.17

5.85

7+690

7+710

20.00

1.30

24.70

1.30

24.70

7+710

7+730

20.00

1.28

25.80

1.28

25.80

7+730

7+750

20.00

1.32

26.00

1.32

26.00

7+750

7+770

20.00

1.62

29.40

1.62

29.40

7+770

7+790

20.00

1.41

30.30

1.41

30.30

7+790

7+810

20.00

1.80

32.10

1.80

32.10

7+810

7+830

20.00

1.85

36.50

1.85

36.50

7+830

7+850

20.00

1.71

35.60

1.71

35.60

7+850

7+870

20.00

1.71

34.20

1.71

34.20

7+870

7+890

20.00

1.32

30.30

1.32

30.30

7+890

7+910

20.00

1.25

25.70

1.25

25.70

7+910

7+930

20.00

1.76

30.10

1.76

30.10

7+930

7+950

20.00

1.96

37.20

1.96

37.20

7+950

7+970

20.00

1.97

39.30

1.97

39.30

7+970

7+990

20.00

1.98

39.50

1.98

39.50

7+990

8+010

20.00

1.98

39.60

1.98

SUB TOTAL

1,040.00

541.15

39.60
541.15

8+010

8+030

20.00

1.98

39.60

1.98

39.60

8+030

8+050

20.00

1.98

39.60

1.98

39.60

8+050

8+070

20.00

1.98

39.60

1.98

39.60

8+070

8+090

20.00

1.98

39.60

1.98

39.60

8+090

8+110

20.00

1.98

39.60

1.98

39.60

8+110

8+130

20.00

1.98

39.60

1.98

39.60

8+130

8+150

20.00

1.65

36.30

1.65

36.30

8+150

8+170

20.00

1.75

34.00

1.75

34.00

8+170

8+190

20.00

1.65

34.00

1.65

34.00

8+190

8+210

20.00

2.26

39.10

2.26

39.10

8+210

8+230

20.00

2.69

49.50

2.69

49.50

8+230

8+250

20.00

2.57

52.60

2.57

52.60

8+250

8+270

20.00

2.90

54.70

2.90

54.70

8+270

8+290

20.00

3.21

61.10

3.21

61.10

8+290

8+310

20.00

3.55

67.60

3.55

67.60

8+310

8+330

20.00

3.35

69.00

3.35

69.00

8+330

8+350

20.00

2.65

60.00

2.65

60.00

8+350

8+370

20.00

3.04

56.90

3.04

56.90

8+370

8+390

20.00

15.20

15.20

8+390

8+410

20.00

8+410

8+430

20.00

8+430

8+450

20.00

1.35

6.75

1.35

6.75

8+450

8+470

20.00

1.23

25.80

1.23

25.80

8+470

8+490

20.00

1.43

26.60

1.43

26.60

8+490

8+510

20.00

1.25

26.80

1.25

26.80

8+510

8+530

20.00

1.27

25.20

1.27

25.20

8+530

8+550

20.00

1.55

28.20

1.55

28.20

8+550

8+570

20.00

1.64

31.90

1.64

31.90

8+570

8+590

20.00

1.79

34.30

1.79

34.30

8+590

8+610

20.00

1.79

35.80

1.79

35.80

8+610

8+630

20.00

0.25

20.40

0.25

20.40

8+630

8+650

20.00

1.51

17.60

1.51

17.60

8+650

8+670

20.00

1.18

26.90

1.18

26.90

8+670

8+690

20.00

1.36

25.40

1.36

25.40

8+690

8+710

20.00

1.53

28.90

1.53

28.90

8+710

8+730

20.00

1.25

27.80

1.25

27.80

8+730

8+750

20.00

1.36

26.10

1.36

26.10

8+750

8+770

20.00

0.87

22.30

0.87

22.30

8+770

8+790

20.00

0.54

14.10

0.54

14.10

8+790

8+810

20.00

0.45

9.90

0.45

9.90

8+810

8+830

20.00

0.62

10.70

0.62

10.70

8+830

8+850

20.00

0.47

10.90

0.47

10.90

8+850

8+870

20.00

0.64

11.10

0.64

11.10

8+870

8+890

20.00

1.05

16.90

1.05

16.90

8+890

8+910

20.00

0.80

18.50

0.80

18.50

8+910

8+930

20.00

1.11

19.10

1.11

19.10

8+930

8+950

20.00

1.27

23.80

1.27

23.80

8+950

8+970

20.00

1.15

24.20

1.15

24.20

8+970

8+990

20.00

1.25

24.00

1.25

24.00

8+990

9+010

20.00

0.62

18.70

0.62

SUB TOTAL

1,000.00

1,506.25

18.70
1,506.25

9+010

9+030

20.00

0.74

13.60

0.74

13.60

9+030

9+050

20.00

0.66

14.00

0.66

14.00

9+050

9+070

20.00

0.96

16.20

0.96

16.20

9+070

9+090

20.00

1.05

20.10

1.05

20.10

9+090

9+110

20.00

5.25

5.25

9+110

9+130

20.00

1.43

7.15

1.43

7.15

9+130

9+150

20.00

1.58

30.10

1.58

30.10

9+150

9+170

20.00

1.55

31.30

1.55

31.30

9+170

9+190

20.00

1.75

33.00

1.75

33.00

9+190

9+210

20.00

1.62

33.70

1.62

33.70

9+210

9+230

20.00

1.60

32.20

1.60

32.20

9+230

9+250

20.00

1.13

27.30

1.13

27.30

9+250

9+270

20.00

1.84

29.70

1.84

29.70

9+270

9+290

20.00

1.36

32.00

1.36

32.00

9+290

9+310

20.00

1.76

31.20

1.76

31.20

9+310

9+330

20.00

1.55

33.10

1.55

33.10

9+330

9+350

20.00

1.66

32.10

1.66

32.10

9+350

9+370

20.00

1.45

31.10

1.45

31.10

9+370

9+390

20.00

1.47

29.20

1.47

29.20

9+390

9+410

20.00

1.07

25.40

1.07

25.40

9+410

9+430

20.00

1.66

27.30

1.66

27.30

9+430

9+450

20.00

0.99

26.50

0.99

26.50

9+450

9+470

20.00

1.16

21.50

1.16

21.50

9+470

9+490

20.00

0.95

21.10

0.95

21.10

9+490

9+510

20.00

4.75

4.75

9+510

9+530

20.00

1.49

7.45

1.49

7.45

9+530

9+550

20.00

1.72

32.10

1.72

32.10

9+550

9+570

20.00

1.38

31.00

1.38

31.00

9+570

9+590

20.00

1.38

27.60

1.38

27.60

9+590

9+610

20.00

1.56

29.40

1.56

29.40

9+610

9+630

20.00

1.08

26.40

1.08

26.40

9+630

9+650

20.00

1.41

24.90

1.41

24.90

9+650

9+670

20.00

0.76

21.70

0.76

21.70

9+670

9+690

20.00

1.32

20.80

1.32

20.80

9+690

9+710

20.00

1.15

24.70

1.15

24.70

9+710

9+730

20.00

1.44

25.90

1.44

25.90

9+730

9+750

20.00

1.27

27.10

1.27

27.10

9+750

9+770

20.00

1.52

27.90

1.52

27.90

9+765

9+775

10.00

1.51

15.15

1.51

15.15

9+775

9+785

10.00

1.51

15.10

1.51

15.10

9+785

9+795

10.00

1.65

15.80

1.65

15.80

9+795

9+805

10.00

1.65

16.50

1.65

16.50

9+805

9+815

10.00

1.65

16.50

1.65

16.50

9+815

9+825

10.00

1.65

16.50

1.65

16.50

9+825

9+835

10.00

1.65

16.50

1.65

16.50

9+835

9+845

10.00

1.65

16.50

1.65

16.50

9+845

9+855

10.00

1.65

16.50

1.65

16.50

9+855

9+865

10.00

1.65

16.50

1.65

16.50

9+865

9+875

10.00

1.65

16.50

1.65

16.50

9+875

9+885

10.00

1.52

15.85

1.52

15.85

9+890

9+910

20.00

1.51

30.30

1.51

30.30

9+910

9+930

20.00

1.51

30.20

1.51

30.20

9+930

9+950

20.00

1.51

30.20

1.51

30.20

9+950

9+970

20.00

1.51

30.20

1.51

30.20

9+970

9+990

20.00

1.92

34.30

1.92

34.30

9+990

10+010

20.00

2.55

44.70

2.55

44.70

SUB TOTAL

1,000.00

1,329.60

1,329.60

10+010
SUB TOTAL

10+030

20.00
20.00

12.75
12.75

12.75
12.75

Zona Urbana Ampliacion Calzada Derecho


1+010

1+030

20.00

1.84

35.50

1.84

35.50

1+030

1+050

20.00

1.84

36.80

1.84

36.80

1+050

1+070

20.00

1.84

36.80

1.84

36.80

1+070

1+090

20.00

1.84

36.80

1.84

36.80

1+090

1+110

20.00

3.17

50.10

3.17

50.10

1+110

1+130

20.00

1.84

50.10

1.84

50.10

1+130

1+150

20.00

1.84

36.80

1.84

36.80

1+150

1+170

20.00

1.84

36.80

1.84

36.80

1+170

1+190

20.00

3.30

51.40

3.30

51.40

1+190

1+210

20.00

1.84

51.40

1.84

51.40

1+210

1+230

20.00

1.84

36.80

1.84

36.80

1+230

1+250

20.00

1.77

36.10

1.77

36.10

1+250

1+270

20.00

1.84

36.10

1.84

36.10

1+270

1+290

20.00

1+290

1+310

20.00

1.71

8.55

1.71

8.55

1+310

1+330

20.00

1.34

30.50

1.34

30.50

1+330

1+350

20.00

6.70

6.70

1+350

1+370

20.00

1+370

1+390

20.00

1.68

8.40

1.68

8.40

1+390

1+410

20.00

0.48

21.60

0.48

21.60

1+410

1+430

20.00

1+430

1+450

20.00

0.51

2.55

0.51

1+450

1+470

20.00

0.47

9.80

0.47

9.80

1+470

1+490

20.00

0.72

11.90

0.72

11.90

1+490

1+510

20.00

1.84

25.60

1.84

25.60

1+510

1+530

20.00

1+530

1+550

20.00

1+550

1+570

20.00

1+570

1+590

20.00

1+590

1+610

20.00

1+610

1+630

20.00

1.76

8.80

1.76

8.80

1+630

1+650

20.00

1.84

36.00

1.84

36.00

1+650

1+670

20.00

1.73

35.70

1.73

35.70

1+670

1+690

20.00

1.77

35.00

1.77

35.00

1+690

1+710

20.00

1.77

35.40

1.77

35.40

1+710

1+730

20.00

1.76

35.30

1.76

35.30

1+730

1+750

20.00

0.99

27.50

0.99

27.50

1+750

1+770

20.00

1.44

24.30

1.44

24.30

1+770

1+790

20.00

7.20

7.20

1+790

1+810

20.00

1+810

1+830

20.00

9.10

1+830

1+850

20.00

9.10

1+850

1+870

20.00

1+870

1+890

20.00

1+890

1+910

20.00

0.53

2.65

1+910

1+930

20.00

1.70

22.30

1+930

1+950

20.00

8.50

1+950

1+970

20.00

1+970

1+990

20.00

1+990

2+010

20.00

SUB TOTAL

1,000.00

9.20

9.20

2.40

2.40

9.20
1.84

9.20

9.20
1.84

9.20
0.34

1.70

9.20
9.20

0.34

1.70

954.00

2.55

1.70
1.70

1.82

9.10

954.00

7+590

7+610

20.00

1.11

1.11

7+610

7+630

20.00

1.32

1.32

7+630

7+650

20.00

1.15

5.75

1.15

5.75

7+650

7+670

20.00

0.78

19.30

0.78

19.30

7+670

7+690

20.00

0.82

16.00

0.82

16.00

7+690

7+710

20.00

1.84

26.60

1.84

26.60

7+710

7+730

20.00

1.10

29.40

1.10

29.40

7+730

7+750

20.00

1.84

29.40

1.84

29.40

7+750

7+770

20.00

1.11

29.50

1.11

29.50

7+770

7+790

20.00

1.51

26.20

1.51

26.20

7+790

7+810

20.00

1.00

25.10

1.00

25.10

7+810

7+830

20.00

0.96

19.60

0.96

19.60

7+830

7+850

20.00

1.27

22.30

1.27

22.30

7+850

7+870

20.00

0.66

19.30

0.66

19.30

7+870

7+890

20.00

0.63

12.90

0.63

12.90

7+890

7+910

20.00

1.28

19.10

1.28

19.10

7+910

7+930

20.00

0.84

21.20

0.84

21.20

7+930

7+950

20.00

0.57

14.10

0.57

14.10

7+950

7+970

20.00

1.83

24.00

1.83

24.00

7+970

7+990

20.00

0.97

28.00

0.97

28.00

7+990

8+010

20.00

0.91

18.80

0.91

SUB TOTAL

1,040.00

406.55

18.80
406.55

8+010

8+030

20.00

1.31

22.20

1.31

22.20

8+030

8+050

20.00

1.07

23.80

1.07

23.80

8+050

8+070

20.00

0.83

19.00

0.83

19.00

8+070

8+090

20.00

0.04

8.70

0.04

8.70

8+090

8+110

20.00

1.99

20.30

1.99

20.30

8+110

8+130

20.00

1.52

35.10

1.52

35.10

8+130

8+150

20.00

2.90

44.20

2.90

44.20

8+150

8+170

20.00

1.62

45.20

1.62

45.20

8+170

8+190

20.00

2.14

37.60

2.14

37.60

8+190

8+210

20.00

2.36

45.00

2.36

45.00

8+210

8+230

20.00

1.55

39.10

1.55

39.10

8+230

8+250

20.00

1.87

34.20

1.87

34.20

8+250

8+270

20.00

2.14

40.10

2.14

40.10

8+270

8+290

20.00

4.04

61.80

4.04

61.80

8+290

8+310

20.00

3.87

79.10

3.87

79.10

8+310

8+330

20.00

2.03

59.00

2.03

59.00

8+330

8+350

20.00

1.64

36.70

1.64

36.70

8+350

8+370

20.00

8.20

8.20

8+370

8+390

20.00

8+390

8+410

20.00

8+410

8+430

20.00

0.75

3.75

0.75

3.75

8+430

8+450

20.00

1.45

22.00

1.45

22.00

8+450

8+470

20.00

7.25

7.25

8+470

8+490

20.00

1.10

5.50

1.10

5.50

8+490

8+510

20.00

2.00

31.00

2.00

31.00

8+510

8+530

20.00

1.33

33.30

1.33

33.30

8+530

8+550

20.00

1.41

27.40

1.41

27.40

8+550

8+570

20.00

1.17

25.80

1.17

25.80

8+570

8+590

20.00

1.84

30.10

1.84

30.10

8+590

8+610

20.00

1.43

32.70

1.43

32.70

8+610

8+630

20.00

1.35

27.80

1.35

27.80

8+630

8+650

20.00

0.81

21.60

0.81

21.60

8+650

8+670

20.00

1.49

23.00

1.49

23.00

8+670

8+690

20.00

1.55

30.40

1.55

30.40

8+690

8+710

20.00

1.13

26.80

1.13

26.80

8+710

8+730

20.00

1.12

22.50

1.12

22.50

8+730

8+750

20.00

0.75

18.70

0.75

18.70

8+750

8+770

20.00

0.44

11.90

0.44

11.90

8+770

8+790

20.00

0.44

8.80

0.44

8.80

8+790

8+810

20.00

0.77

12.10

0.77

12.10

8+810

8+830

20.00

0.64

14.10

0.64

14.10

8+830

8+850

20.00

1.64

22.80

1.64

22.80

8+850

8+870

20.00

0.24

18.80

0.24

18.80

8+870

8+890

20.00

8+890

8+910

20.00

1.33

6.65

1.33

6.65

8+910

8+930

20.00

1.54

28.70

1.54

28.70

8+930

8+950

20.00

0.27

18.10

0.27

18.10

8+950

8+970

20.00

0.71

9.80

0.71

9.80

8+970

8+990

20.00

0.38

10.90

0.38

10.90

8+971

9+010

20.00

0.81

11.90

0.81

SUB TOTAL

1.20

1,000.00

1.20

1,224.65

11.90
1,224.65

9+010

9+030

20.00

0.72

15.30

0.72

15.30

9+030

9+050

20.00

0.07

7.90

0.07

7.90

9+050

9+070

20.00

0.17

2.40

0.17

2.40

9+070

9+090

20.00

1.42

15.90

1.42

15.90

9+090

9+110

20.00

7.10

7.10

9+110

9+130

20.00

1.43

7.15

1.43

7.15

9+130

9+150

20.00

1.70

31.30

1.70

31.30

9+150

9+170

20.00

1.56

32.60

1.56

32.60

9+170

9+190

20.00

0.55

21.10

0.55

21.10

9+190

9+210

20.00

2.75

2.75

9+210

9+230

20.00

9+230

9+250

20.00

9+250

9+270

20.00

0.28

1.40

0.28

1.40

9+270

9+290

20.00

1.40

1.40

9+290

9+310

20.00

9+310

9+330

20.00

9+330

9+350

20.00

0.70

3.50

0.70

3.50

9+350

9+370

20.00

0.57

12.70

0.57

12.70

9+370

9+390

20.00

2.85

2.85

9+390

9+410

20.00

0.68

3.40

0.68

3.40

9+410

9+430

20.00

3.40

3.40

9+430

9+450

20.00

9+450

9+470

20.00

9+470

9+490

20.00

9+490

9+510

20.00

9+510

9+530

20.00

9+530

9+550

20.00

9+550

9+570

20.00

9+570

9+590

20.00

9+590

9+610

20.00

0.76

3.80

0.76

3.80

9+610

9+630

20.00

1.03

17.90

1.03

17.90

9+630

9+650

20.00

1.74

27.70

1.74

27.70

9+650

9+670

20.00

0.07

18.10

0.07

18.10

9+670

9+690

20.00

0.35

0.35

9+690

9+710

20.00

9+710

9+730

20.00

9+730

9+750

20.00

0.07

0.35

0.07

0.35

9+750

9+770

20.00

0.48

5.50

0.48

5.50

9+765

9+775

10.00

0.60

5.40

0.60

5.40

9+775

9+785

10.00

0.97

7.85

0.97

7.85

9+785

9+795

10.00

0.27

6.20

0.27

6.20

9+795

9+805

10.00

0.66

4.65

0.66

4.65

9+805

9+815

10.00

0.75

7.05

0.75

7.05

9+815

9+825

10.00

0.90

8.25

0.90

8.25

9+825

9+835

10.00

0.75

8.25

0.75

8.25

9+835

9+845

10.00

0.83

7.90

0.83

7.90

9+845

9+855

10.00

0.49

6.60

0.49

6.60

9+855

9+865

10.00

1.32

9.05

1.32

9.05

9+865

9+875

10.00

1.10

12.10

1.10

12.10

9+875

9+885

10.00

0.13

6.15

0.13

6.15

9+890

9+910

20.00

0.65

0.65

9+910

9+930

20.00

9+930

9+950

20.00

9+950

9+970

20.00

0.10

0.50

0.10

0.50

9+970

9+990

20.00

0.50

0.50

9+990

10+010

20.00

0.26

1.30

0.26

SUB TOTAL

1,000.00

338.25

NOTA: EN EXPEDIENTE TECNICO CONSIDERAN UN VOL (M3) =


10+010
SUB TOTAL

10+030

20.00
20.00

NOTA: EN EXPEDIENTE TECNICO CONSIDERAN UN VOL (M3) =

1.30
338.25

6.20
-

1.30
1.30
0.00

1.30
1.30

Zona Urbana Calzada Auxiliar Carril Izquierdo


1+010

1+030

20.00

4.99

97.20

4.99

97.20

1+030

1+050

20.00

4.82

98.10

4.82

98.10

1+050

1+070

20.00

4.78

96.00

4.78

96.00

1+070

1+090

20.00

4.21

89.90

4.21

89.90

1+090

1+110

20.00

4.99

92.00

4.99

92.00

1+110

1+130

20.00

4.99

99.80

4.99

99.80

1+130

1+150

20.00

4.82

98.10

4.82

98.10

1+150

1+170

20.00

5.09

99.10

5.09

99.10

1+170

1+190

20.00

5.12

102.10

5.12

102.10

1+190

1+210

20.00

3.80

89.20

3.80

89.20

1+210

1+230

20.00

3.80

76.00

3.80

76.00

1+230

1+250

20.00

4.99

87.90

4.99

87.90

1+250

1+270

20.00

5.00

99.90

5.00

99.90

1+270

1+290

20.00

1+290

1+310

20.00

7.52

37.60

7.52

37.60

1+310

1+330

20.00

3.83

113.50

3.83

113.50

1+330

1+350

20.00

5.00

88.30

5.00

88.30

1+350

1+370

20.00

1+370

1+390

20.00

1+390

1+410

20.00

1+410

1+430

20.00

4.45

22.25

4.45

22.25

1+430

1+450

20.00

4.28

87.30

4.28

87.30

1+450

1+470

20.00

3.03

73.10

3.03

73.10

1+470

1+490

20.00

3.28

63.10

3.28

63.10

1+490

1+510

20.00

4.65

79.30

4.65

79.30

1+510

1+530

20.00

1+530

1+550

20.00

1+550

1+570

20.00

1+570

1+590

20.00

1+590

1+610

20.00

1+610

1+630

20.00

1+630

1+650

20.00

1+650

1+670

20.00

1+670

1+690

20.00

1+690

1+710

20.00

1+710

1+730

20.00

1+730

1+750

20.00

1.39

6.95

1.39

6.95

1+750

1+770

20.00

4.74

61.30

4.74

61.30

1+770

1+790

20.00

1+790

1+810

20.00

1+810

1+830

20.00

1+830

1+850

20.00

1+850

1+870

20.00

1+870

1+890

20.00

1+890

1+910

20.00

1+910

1+930

20.00

4.28

21.40

4.28

21.40

1+930

1+950

20.00

4.45

87.30

4.45

87.30

1+950

1+970

20.00

4.45

89.00

4.45

89.00

1+970

1+990

20.00

4.45

89.00

4.45

89.00

1+990

2+010

20.00

4.45

89.00

4.45

SUB TOTAL

1,000.00

25.00

25.00

25.00
4.82

24.10

25.00
4.82

24.10

24.10

23.25

4.45

22.25

23.25

4.45

22.25

22.25
22.25

23.70

2,423.35

24.10

23.70

89.00
2,423.35

2+010

2+030

20.00

2+030

2+050

20.00

2+050

2+070

20.00

2+070

2+090

20.00

2+090

2+110

20.00

2+110

2+130

20.00

2+130

2+150

20.00

4.62

23.10

4.62

23.10

2+150

2+170

20.00

4.62

92.40

4.62

92.40

2+170

2+190

20.00

4.44

90.60

4.44

90.60

2+190

2+210

20.00

4.62

90.60

4.62

90.60

2+210

2+230

20.00

4.62

92.40

4.62

92.40

2+230

2+250

20.00

4.62

92.40

4.62

92.40

2+250

2+270

20.00

4.40

90.20

4.40

90.20

2+270

2+290

20.00

4.62

90.20

4.62

90.20

2+290

2+310

20.00

4.52

91.40

4.52

91.40

2+310

2+330

20.00

3.38

79.00

3.38

79.00

2+330

2+350

20.00

4.19

75.70

4.19

75.70

2+350

2+370

20.00

2+370

2+390

20.00

2+390

2+410

20.00

2+410

2+430

20.00

2+430

2+450

20.00

2+450

2+470

20.00

2+470

2+490

20.00

2+490

2+510

20.00

2+510

2+530

20.00

2+530

2+550

20.00

2+550

2+570

20.00

2+570

2+590

20.00

2+590

2+610

20.00

2+610

2+630

20.00

2+630

2+650

20.00

2+650

2+670

20.00

2.21

11.05

2.21

11.05

2+670

2+690

20.00

3.51

57.20

3.51

57.20

2+690

2+710

20.00

2+710

2+730

20.00

3.06

15.30

3.06

15.30

2+730

2+750

20.00

3.34

64.00

3.34

64.00

2+750

2+770

20.00

2+770

2+790

20.00

2+790

2+810

20.00

2+810

2+830

20.00

2+830

2+850

20.00

2+850

2+870

20.00

2+870

2+890

20.00

2+890

2+910

20.00

2+910

2+930

20.00

2+930

2+950

20.00

2+950

2+970

20.00

2+970

2+990

20.00

4.74

23.70

4.74

23.70

2+990

3+010

20.00

4.12

88.60

4.12

88.60

SUB TOTAL

5.04

94.90

5.04

25.20

25.20

20.95

2.37

11.85

20.95

2.37

11.85

17.55

16.70

15.65

16.70

3.13

15.65

10.15

2.03

10.15

1,000.00

15.65
15.65

2.03

11.85
11.85

17.55

3.13

94.90

10.15
10.15

1,418.45

1,418.45

Zona Urbana Calzada Auxiliar Carril Derecho


1+010

1+030

20.00

4.99

99.80

4.99

99.80

1+030

1+050

20.00

4.65

96.40

4.65

96.40

1+050

1+070

20.00

2.12

67.70

2.12

67.70

1+070

1+090

20.00

4.65

67.70

4.65

67.70

1+090

1+110

20.00

4.99

96.40

4.99

96.40
98.10

1+110

1+130

20.00

4.82

98.10

4.82

1+130

1+150

20.00

4.99

98.10

4.99

98.10

1+150

1+170

20.00

5.50

104.90

5.50

104.90

1+170

1+190

20.00

3.80

93.00

3.80

93.00

1+190

1+210

20.00

3.80

76.00

3.80

76.00

1+210

1+230

20.00

4.99

87.90

4.99

87.90

1+230

1+250

20.00

4.44

94.30

4.44

94.30

1+250

1+270

20.00

4.99

94.30

4.99

94.30

1+270

1+290

20.00

4.65

96.40

4.65

96.40

1+290

1+310

20.00

4.65

93.00

4.65

93.00

1+310

1+330

20.00

4.65

93.00

4.65

93.00

1+330

1+350

20.00

3.24

78.90

3.24

78.90

1+350

1+370

20.00

3.99

72.30

3.99

72.30

1+370

1+390

20.00

4.55

85.40

4.55

85.40

1+390

1+410

20.00

3.41

79.60

3.41

79.60

1+410

1+430

20.00

1+430

1+450

20.00

3.11

15.55

3.11

1+450

1+470

20.00

4.49

76.00

4.49

76.00

1+470

1+490

20.00

7.33

118.20

7.33

118.20

1+490

1+510

20.00

4.45

117.80

4.45

117.80

1+510

1+530

20.00

1+530

1+550

20.00

3.60

18.00

3.60

18.00

1+550

1+570

20.00

2.27

58.70

2.27

58.70

1+570

1+590

20.00

3.39

56.60

3.39

56.60

1+590

1+610

20.00

3.25

66.40

3.25

66.40

1+610

1+630

20.00

1+630

1+650

20.00

4.44

22.20

4.44

22.20

1+650

1+670

20.00

4.49

89.30

4.49

89.30

1+670

1+690

20.00

3.05

75.40

3.05

75.40

1+690

1+710

20.00

3.52

65.70

3.52

65.70

1+710

1+730

20.00

2.23

57.50

2.23

57.50

1+730

1+750

20.00

1+750

1+770

20.00

3.25

16.25

1+770

1+790

20.00

1+790

1+810

20.00

1+810

1+830

20.00

1+830

1+850

20.00

1+850

1+870

20.00

1+870

1+890

20.00

1+890

1+910

20.00

2.71

13.55

1+910

1+930

20.00

4.05

67.60

1+930

1+950

20.00

1+950

1+970

20.00

1+970

1+990

20.00

1+990

2+010

SUB TOTAL

20.00
1,000.00

17.05

17.05

22.25

22.25

16.25

16.25

11.15
3.25

16.25

11.15

16.25

16.25

2.19

10.95

2.19

10.95

2,720.70

15.55

10.95
10.95
-

20.25

7.30

36.50
2,720.70

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (MATERIAL FILTRANTE PARA SUBDREN)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (MATERIAL FILTRANTE PARA SUBDREN)
PROGRESIVA
VOLUMEN (m3)
625.B:
Mat filtrante
Inicio (Km)
Fin (Km)
CG (Km)
Subdren
p/SubDren
SUBDRENES
1+840.00
1+940.00
1+890.00
1+840.00
1+940.00
1+890.00
1+940.00
2+040.00
1+990.00
2+040.00
2+160.00
2+100.00
2+040.00
2+160.00
2+100.00
2+420.00
2+520.00
2+470.00
2+520.00
2+780.00
2+650.00
2+520.00
2+780.00
2+650.00
2+880.00
2+980.00
2+930.00
2+880.00
2+980.00
2+930.00
2+980.00
3+200.00
3+090.00
3+200.00
3+340.00
3+270.00
3+200.00
3+340.00
3+270.00
3+010.00
3+320.00
3+165.00
3+010.00
3+320.00
3+165.00
TOTAL
-

CANTERA
Ubicacin
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

Acceso
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50
79.50

Distancia

D < 1 km

Km

m3.km

87.636
87.636
87.536
87.426
87.426
87.056
86.876
86.876
86.596
86.596
86.436
86.256
86.256
86.361
86.361

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

PLANILLA DE METRADOS

D > 1 km
m3.km
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (MATERIAL FILTRANTE)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (MATERIAL FILTRANTE)
Material
PROGRESIVA
filtrante
Inicio (Km)
Fin (Km)
CG (Km)
m3
MUROS EN RAMPAS, DESVIOS E INTERSECCIONES
LADO DERECHO DE LA VIA
DERECHO
1+361.45
1+430.00
1+395.73
1+430.00
1+460.00
1+445.00
2+010.00
2+072.00
2+041.00
2+171.45
2+260.00
2+215.73
2+941.95
3+010.00
2+975.98
3+611.40
3+700.00
3+655.70
IZQUIERDO
1+430.00
1+495.00
1+462.50
1+975.00
2+010.00
1+992.50
2+010.00
2+040.00
2+025.00
2+240.00
2+295.00
2+267.50
3+000.00
3+045.00
3+022.50
3+680.00
3+735.00
3+707.50
LADO IZQUIERDO DE LA VIA
DERECHO
3+388.53
3+300.00
3+344.27
IZQUIERDO
3+320.00
3+265.00
3+292.50
MUROS PARA VEREDA
1+410.00
1+430.00
1+420.00
1+756.00
1+770.00
1+763.00
-

CANTERA
Ubicacin
Acceso

Distancia
Km

D < 1 km
m3.km

D > 1 km
m3.km

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

71.41
71.41
71.41
71.41
71.41
71.41

80.040
79.991
79.395
79.220
78.460
77.780

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

71.41
71.41
71.41
71.41
71.41
71.41

79.973
79.443
79.411
79.168
78.413
77.728

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

10+025.82

71.41

78.092

0.00

0.00

10+025.82

71.41

78.143

0.00

0.00

10+025.82
10+025.82

71.41
71.41

80.016
79.673

0.00
0.00

0.00
0.00

2+310.00
2+470.00
2+630.00
3+370.00
3+450.00
3+930.00
1+250.00
1+790.00
1+810.00
3+090.00
TOTAL

2+330.00
2+489.00
2+650.00
3+430.00
3+470.00
3+984.50
1+290.00
1+810.00
1+830.00
3+130.00

2+320.00
2+479.50
2+640.00
3+400.00
3+460.00
3+957.25
1+270.00
1+800.00
1+820.00
3+110.00

10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82
10+025.82

71.41
71.41
71.41
71.41
71.41
71.41
71.41
71.41
71.41
71.41

79.116
78.956
78.796
78.036
77.976
77.479
80.166
79.636
79.616
78.326

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.E TRANSPORTE DE DESECHOS Y EXCAVACION A DME D< 1KM (EXCAVACION PARA ESTRUCTURAS)
700.F TRANSPORTE DE DESECHOS Y EXCAVACION A DME D>1 KM (EXCAVACION PARA ESTRUCTURAS)
D.M.E
PROGRESIVA
VOLUMEN (m3)
D.M.E - 5+300
PROYECTO
Exc
Ref
Ubicaci
Acces Ubicaci Acces
Inicio (Km)
Fin (Km)
CG (Km)
Total
p/estr
cimentac
n
o
n
o
ALCANTARILLAS AMC
0+070.25
72.38
38.36
110.74
###
0+354.65
105.46
13.52
118.98
###
1+838.20
36.30
100.59
136.89
###
2+415.90
38.02
52.39
90.41
###
2+780.55
###
3+102.40
175.57
85.10
260.67
###
4+640.00
42.16
29.62
71.78
###
9.147
4+914.40
106.46
33.62
140.08
###
5+280.20
125.82
38.47
164.29
###
5+579.55
105.57
37.72
143.29
###
9.147
6+204.40
13.53
16.88
30.41
###
9.147
6+499.40
3.41
13.75
17.16
###
9.147
6+733.70
15.31
11.17
26.48
###
9.147
7+233.65
12.99
16.00
28.98
###
9.147
7+942.55
128.30
38.11
166.42
###
9.147
8+468.75
11.37
18.13
29.50
###
9.147
8+714.50
35.12
33.21
68.33
###
9.147
9+094.30
38.04
90.09
128.13
###
9.147
9+369.75
4.84
9.08
13.92
###
9.147
9+707.60
###
SUBDRENES
1+840.00
1+940.00
1+890.00
###
1+840.00
1+940.00
1+890.00
###
1+940.00
2+040.00
1+990.00
###
2+040.00
2+160.00
2+100.00
###
2+040.00
2+160.00
2+100.00
###
2+420.00
2+520.00
2+470.00
###
2+520.00
2+780.00
2+650.00
###
2+520.00
2+780.00
2+650.00
###
2+880.00
2+980.00
2+930.00
###
2+880.00
2+980.00
2+930.00
###
2+980.00
3+200.00
3+090.00
###
3+200.00
3+340.00
3+270.00
###
3+200.00
3+340.00
3+270.00
###
3+010.00
3+320.00
3+165.00
###
3+010.00
3+320.00
3+165.00
###
MUROS PARA PROTECCION DE TALUDE
VIA AUXILIAR DERECHA
1+270.00
1+360.00
1+315.00
349.22
349.22
###
9.147
1+495.00
1+610.00
1+552.50
460.11
460.11
###
9.147
1+610.00
1+730.00
1+670.00
500.06
500.06
###
9.147
1+730.00
1+830.00
1+780.00
398.49
398.49
###
9.147
1+830.00
1+850.00
1+840.00
149.97
149.97
###
9.147
1+850.00
1+975.00
1+912.50
722.34
722.34
###
9.147
2+295.00
2+590.00
2+442.50 1,337.15
1,337.15
###
9.147
2+590.00
2+610.00
2+600.00
###
2+610.00
2+670.00
2+640.00
###
2+670.00
2+691.79
2+680.90
###
3+310.00
3+610.00
3+460.00 1,373.22
1,373.22
###
9.147
VIA AUXILIAR IZQUIERDA
1+410.00
1+790.00
1+600.00 1,626.31
1,626.31
###
9.147
1+790.00
1+830.00
1+810.00
266.75
266.75
###
9.147
1+830.00
1+850.00
1+840.00
67.27
67.27
###
9.147
1+850.00
1+910.00
1+880.00
424.38
424.38
###
9.147
1+910.00
2+030.00
1+970.00
565.28
565.28
###
9.147
2+110.00
2+310.00
2+210.00
805.03
805.03
###
9.147
MUROS EN RAMPAS, DESVIOS E INTER
LADO DERECHO DE LA VIA
DERECHO
1+361.45
1+430.00
1+395.73
###
1+430.00
1+460.00
1+445.00
###
2+010.00
2+072.00
2+041.00
177.28
177.28
###
2+171.45
2+260.00
2+215.73
###
2+941.95
3+010.00
2+975.98
###
3+611.40
3+700.00
3+655.70
###
IZQUIERDO
1+430.00
1+495.00
1+462.50
###
1+975.00
2+010.00
1+992.50
###
2+010.00
2+040.00
2+025.00
###
2+240.00
2+295.00
2+267.50
###
3+000.00
3+045.00
3+022.50
###
3+680.00
3+735.00
3+707.50
###
LADO IZQUIERDO DE LA VIA
DERECHO
3+388.53
3+300.00
3+344.27
###
IZQUIERDO
3+320.00
3+265.00
3+292.50
###
MUROS PARA VEREDA
1+410.00
1+430.00
1+420.00
###
1+756.00
1+770.00
1+763.00
###
2+310.00
2+330.00
2+320.00
###
2+470.00
2+489.00
2+479.50
55.48
55.48
###
9.147
2+630.00
2+650.00
2+640.00
87.00
87.00
###
9.147
3+370.00
3+430.00
3+400.00
###
3+450.00
3+470.00
3+460.00
45.60
45.60
###
9.147
3+930.00
3+984.50
3+957.25
350.67
350.67
###
9.147
1+250.00
1+290.00
1+270.00
###
1+790.00
1+810.00
1+800.00
137.20
137.20
###
9.147
1+810.00
1+830.00
1+820.00
###
3+090.00
3+130.00
3+110.00
216.40
216.40
###
9.147
TOTAL
###
675.79
###

5+300
PROYECTO

###
###

DME - PROYECTO
DME - 5+300

Distan Distan
D < 1 km
cia
cia
Km
Km
m3.km

14.533

D<1
km
m3.km

D>1
km
m3.km

97.45
104.71
120.46
79.56
0.00
229.39
0.00
54.01
3.25

468.39
469.43
337.00
170.33
0.00
312.18
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

3.904
3.855
3.259
3.084
2.324
1.644

0.00
0.00
156.01
0.00
0.00
0.00

0.00
0.00
400.48
0.00
0.00
0.00

3.838
3.308
3.275
3.033
2.278
1.593

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

1.956

0.00

0.00

2.008

0.00

0.00

3.880
3.537
2.980

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.230
4.945
3.462
2.884
2.519
2.198
0.000
0.386
0.020

13.593
12.968
12.673
12.439
11.939
11.230
10.704
10.458
10.079
9.803

D > 1 km
m3.km

63.17

971.41

126.10
26.76
15.10
23.30
25.51
146.45
25.96
60.13
112.75
12.25

1,804.50
363.94
200.27
302.93
317.05
1,702.47
286.28
646.32
1,163.23
122.53

4.408
3.410
3.410
3.310
3.200
3.200
2.830
2.650
2.650
2.370
2.370
2.210
2.030
2.030
2.135
2.135

17.858
17.620
17.503
17.393
17.333
17.260
16.730

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

307.31
404.90
440.05
350.67
131.97
635.66
1,176.69

5,887.09
7,647.18
8,252.40
6,532.37
2,449.43
11,745.48
21,033.80

2.700
2.660
2.619
15.713

1,208.43

20,203.94

17.573
17.363
17.333
17.293
17.203
16.963

1,431.15
234.74
59.20
373.45
497.45
708.43

26,952.54
4,364.78
1,098.71
6,914.35
9,159.13
12,850.55

16.693
16.533

48.82
76.56

870.67
1,351.36

40.13
308.59

670.90
4,984.97

120.74

2,246.35

1.900
15.713
15.216
4.030
17.373
3.480
16.063

190.43
###

3,259.59
###
844.84

###
###

###
###

###

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.E TRANSPORTE DE DESECHOS Y EXCAVACION A DME D< 1KM (EXCAVACION PARA ESTRUCTURAS)

DME - PROYECTO
DME - 5+300
700.F TRANSPORTE DE DESECHOS Y EXCAVACION A DME D>1 KM (EXCAVACION PARA ESTRUCTURAS)
D.M.E
Distan Distan
D<1
D>1
PROGRESIVA
VOLUMEN (m3)
D.M.E - 5+300
D < 1 km D > 1 km
PROYECTO
cia
cia
km
km
Exc
Ref
Ubicaci
Acces Ubicaci Acces
Inicio (Km)
Fin (Km)
CG (Km)
Total
Km
Km
m3.km
m3.km
m3.km m3.km
p/estr
cimentac
n
o
n
o

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA : CONSORCIO PUCALLPA


SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
1100 PUENTES PEATONALES (RAMPAS)
PROGRESIVA

*
*
*

Del

Al

Km

Km

RAMPAS
0+660.00
1+205.40
2+120.00
2+470.00
3+580.00
ACUMULADO MES ACTUAL

C.P.

LADO

601.C

605.A

220.EE

610.D

610.G

612.A

612.B

Excavacin para
estructuras en
material comn

Relleno para
estructuras

Material de
cantera para
relleno

Concreto Clase D
(f'c=210 kg/cm2)

Concreto Clase
G (f'c=100
kg/cm2)

Encofrado y
desencofrado

Encofrado y
desencofrado
caravista

m3

m3

m3

m3

m3

m2

m2

168.36
176.66
165.92
112.24

98.50
106.67
96.10
43.25

98.50
106.67
96.10
43.25

208.47
213.91
215.40
219.29

4.88
4.88
4.88
4.80

73.20
73.20
73.20
73.20

823.95
845.37
880.98
900.25

623.18

344.52

344.52

857.07

19.44

292.80

3,450.55

METRADO AUTORIZADO
826.32
477.27
477.27
1,068.95
24.40
366.00
4,328.91
ACUMULADO MES ACTUAL
623.18
344.52
344.52
857.07
19.44
292.80
3,450.55
ACUMULADO MES ANTERIOR
623.18
344.52
344.52
857.07
19.44
292.80
3,450.55
PRESENTE VALORIZACION
Metrados ejecutados en un 100% segn partidas y las cuales han sido valorizadas anteriormente por eso ya no es necesario sustentar en esta valorizaci

METRADOS
615.A

690.A

Acero de
refuerzo fy=4200
kg/cm2

Baranda
metlicas

kg

19,631.29
19,895.40
19,895.40
19,895.40
79,317.49

103,025.77
79,317.49
79,317.49
alorizadas anteriormente por eso ya no es necesario sustentar en esta valorizacion

2,030.89
-

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA : CONSORCIO PUCALLPA


SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
1100 PUENTES PEATONALES (PUENTES)
PROGRESIVA

601.C

605.A

220.EE

Excavacin para
estructuras en
material comn

Relleno para
estructuras

Material de
cantera para
relleno

m3

m3

m3

156.87
139.38
148.38
169.58

96.45
81.25
89.23
108.23

96.45
81.25
89.23
108.23

ACUMULADO MES ACTUAL

614.21

375.16

375.16

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR

789.47
614.21
614.21

472.78
375.16
375.16

472.78
375.16
375.16

Del

*
*
*

C.P.

Km
PUENTES
0+660.00
1+205.40
2+120.00
2+470.00
3+580.00

Al
Km

PRESENTE VALORIZACION
(*)

LADO

610.C

610.D

Concreto Clase C Concreto Clase D


(f'c=280 kg/cm2) (f'c=210 kg/cm2)
m3

m3

215.37
-

610.G

612.A

Concreto Clase
G (f'c=100
kg/cm2)

Encofrado y
desencofrado

m3

m2

90.10
96.70
96.58
96.23

3.33
3.33
3.33
3.33

48.90
48.90
48.90
48.90

379.61

13.32

195.60

512.97
379.61
379.61

16.63
13.32
13.32

244.50
195.60
195.60

Metrados ejecutados en un 100% segn partidas y las cuales han sido valorizadas anteriormente por eso ya no es necesario sustentar en esta valorizaci

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA : CONSORCIO PUCALLPA


SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
1100 PUENTES PEATONALES (PUENTES)
PROGRESIVA
Del

*
*
*

Km
PUENTES
0+660.00
1+205.40
2+120.00
2+470.00
3+580.00

Al
Km

ACUMULADO MES ACTUAL


C.P.

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

PLANILLA DE METRADOS
612.B

LADO

615.A

Encofrado y
desencofrado
caravista
m2

680

Acero de
Cubierta de
refuerzo fy=4200
puente peatonal
kg/cm2
kg

6,103.56
6,103.56
6,103.56
6,103.56

785.62

24,414.24

1,008.05
785.62
785.62

161,823.28
24,414.24
24,414.24

5.00
-

1110.B
Apoyo de
neoprene
p/puentes
peatonales
u

612.C

700.E
Transporte de
desechos y
excavacin a
DME D<=1 Km
m3km

Encofrado
metlico en
altura
m2

286.20
278.12
276.58
248.00

164.70
184.99
218.89
217.04

1006.B
Junta de
dilatacin
p/puente
peatonal
m

15.00
-

40.00
-

306.00
-

1,088.90
1,406.46
1,088.90
1,088.90
-

das anteriormente
(*)
por eso
Metrados
ya no esejecutados
necesario en
sustentar
un 100%
ensegn
esta valorizacion
partidas y las cuales han sido valorizadas anteriormente por eso ya no es necesario sustentar en esta valorizaci

OBRA

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA

TRAMO

: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA : CONSORCIO PUCALLPA


SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

1100 PUENTES PEATONALES (PUENTES)


PROGRESIVA
Del

*
*
*

Km
PUENTES
0+660.00
1+205.40
2+120.00
2+470.00
3+580.00

Al
Km

ACUMULADO MES ACTUAL


C.P.

METRADO AUTORIZADO
ACUMULADO MES ACTUAL
ACUMULADO MES ANTERIOR
PRESENTE VALORIZACION

(*)

LADO

700.F
Transporte de
desechos y
excavacin a
DME D>1 Km
m3km
1,006.46
688.97
4,935.40
202.91
6,833.73
32,649.60
6,833.73
6,833.73
-

Metrados ejecutados en un 100% segn partidas y las cuales han sido valorizadas anteriormente por eso ya

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (AGREGADOS PARA CONCRETO)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (AGREGADOS PARA CONCRETO)
PROGRESIVA
VOLUMEN (m3)
Concreto
Concreto
Concreto
Inicio (Km)
Fin (Km)
CG (Km)
100
210
280
PUENTES PEATONALES
0+680.00
0+680.00
0+680.00
1+205.40
1+205.40
1+205.40
8.21
298.57
2+120.00
2+120.00
2+120.00
8.21
310.61
2+470.00
2+470.00
2+470.00
8.21
311.98
3+580.00
3+580.00
3+580.00
8.13
315.52
TOTAL
32.76
1,236.68
Los metrados se tiene como techo los contractuales, los cuales se estan considerando

Agregados
p/C
383.48
398.53
400.24
404.56
1,586.80

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.A TRANSPORTE DE MATERIAL GRANULAR D< 1KM (RELLENO PARA ESTRUCTURAS)
700.B TRANSPORTE DE MATERIAL GRANULAR D>1 KM (RELLENO PARA ESTRUCTURAS)
PROGRESIVA
VOLUMEN (m3)
Relleno
Relleno
Inicio (Km)
Fin (Km)
CG (Km)
p/estructur p/estructur
as Rampas as Puentes
PUENTES PEATONALES
0+680.00
0+680.00
0+680.00
1+205.40
1+205.40
1+205.40
4.88
90.10
2+120.00
2+120.00
2+120.00
106.67
81.25
2+470.00
2+470.00
2+470.00
96.10
89.23
3+580.00
3+580.00
3+580.00
43.25
108.23
TOTAL
250.90
368.81
Los metrados se tiene como techo los contractuales, los cuales se estan considerando

GO MARIA-AGUAYTIA-PUCALLPA

LUMEN (m3)
Vol total

94.98
187.92
185.33
151.48
619.71
s se estan considerando

OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-102

TRAMO

: CONSTRUCCION DE LA AMPLIACION DE LA SEGUNDA CALZADA DE LA CARRETERA TINGO MARIA-AGUAYTIA-PUCALLPA


: DV. AEROPUERTO PUCALLPA - ALTURA DEL CEMENTERIO DEL JARDIN DEL BUEN RECUERDO

CONTRATISTA

: CONSORCIO PUCALLPA

SUPERVISOR

: CONSORCIO SUPERVISOR PUCALLPA

PLANILLA DE METRADOS
700.00 TRANSPORTE
700.E TRANSPORTE DE DESECHOS Y EXCAVACION A DME D< 1KM (EXCAVACION PARA ESTRUCTURAS)
700.F TRANSPORTE DE DESECHOS Y EXCAVACION A DME D>1 KM (EXCAVACION PARA ESTRUCTURAS)
PROGRESIVA
Vol (m3)
D.M.E
Excavacin
Inicio (Km)
Fin (Km)
CG (Km)
Ubicacin
Acceso
p/estructuras
PUENTES PEATONALES
0+680.00
0+680.00
0+680.00
05+300.00
1+205.40
1+205.40
1+205.40
325.23 05+300.00
2+120.00
2+120.00
2+120.00
316.04 05+300.00
2+470.00
2+470.00
2+470.00
314.30 10+025.82
9.15
3+580.00
3+580.00
3+580.00
281.82 05+300.00
TOTAL
1,237.39

Distancia

D < 1 km

D > 1 km

Km

m3.km

m3.km

4.620
4.095
3.180
16.703
1.720

0.00
286.20
278.12
276.58
248.00
1,088.90

0.00
1,006.46
688.97
4,935.40
202.91
6,833.73

Das könnte Ihnen auch gefallen