10
Sr.No
1
2
3
4
5
6
7
Vaccum Pump PM
Condensor
BFP 1A Mech
BFP 1B Mech
10
11
12
13
14
DR-13
15
Vaccum Pump-B
HPH-6
OIL CENTRIFUGE
HPH-6
HPH-6 TO HPH-5 IMPLUSE LINE
HPH- 5
HPH-6
BFP 1C Mech
DMCW Pump B Mech
ACW Pump B Mech
Oil Vapour Exhauster Fan(OVF) B
Mech
GSC Exhauster Fan A Mech
CW pump 1- Mech
LTPRDS
LTPRDS
LTPRDS
AS7
Dearator
MS-106
MAL- 11
MAL- 26
Deaerator
Deaerator
Vacccum pump
A&B
10
CEP 1A Mech
11
12
13
CW pump 2- Mech
14
Bp-06
CEP-A
MS line
Compressor
CW pump -1B
Vacuum Pump- 1B
SAFETY VALVE
Condensor
HGP
LT-PRDS
10
CEP 1B Mech
11
12
13
ACW System
14
Deareator
15
MAL- 26 MIV
CW pump -1B
SAFETY VALVE
HGP
GSC
GSC
10
11
12
13
AC AOP 1A mech
AC AOP 1B mech
SOP 1A
LT PRDS
PRDS
BP 08
CD-27
AS-7
SAFETY VALVE
HGP
10
PHE 1 A Mech
11
PHE 1 B Mech
12
PHE 1 C Mech
13
HPBP Mech
14
15
16
17
DC EOP Mech
18
MOT
19
FRS
DMCW Pump
MAL
DR-16
Turbine
HPBypass
CRH
21 mtr
10
CD-25
11
FD-5A
12
13
14
15
16
AC JOP Mech
17
DC JOP Mech
18
SOP 1A
JOP
Vaccum pump-1A
SOP 1A
Turbine
Turbine
7
8
MB FFED Pump-B
N-pit Pump-A
Deaerator pegging line from CRH drain line leakage after isolation valve
Deaerator ex com line drn elbow weld lkg
Vaccum pump to (PHE) plate heat exchanger cleaning required as cooling is not affective
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Passing
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Valve jam
Remove and cleaning of cartriage of RO-2
Removal of grating for housekeeping
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
PTW NO
Work Status
1462
Completed
1466
Completed
1468
Completed
1471
Completed
1469
Completed
1470
Completed
1460
Completed
PTW NO
Work Status
1473
Completed
1474
Completed
1475
Completed
1476
Completed
1466
Completed
1477
Completed
1488
Completed
1489
Completed
1494
Completed
1621
Completed
1614
Completed
NA
Completed
3499
Completed
**
Completed
1460
Completed
PTW NO
Work Status
1649
Completed
1650
Completed
1651
Completed
1652
Completed
1659
Completed
1666
Completed
1678
Completed
1684
Completed
1689
Completed
1685
Completed
1498
Completed
1500
Completed
1471
Completed
1466
Completed
PTW NO
Work Status
1471
Completed
1734
Completed
1736
Completed
1737
Completed
1834
Completed
1750
Completed
1751
Completed
1752
Completed
A- 1753
B- 1754
Completed
1807
Completed
1812
Completed
1759
Completed
1763
Completed
1847
Completed
1819
Completed
1820
Completed
1825
Completed
1766
Completed
Not Clear
1477
Completed
1840
Completed
1848
Completed
1851
Completed
1766
Completed
1773
Completed
302
Completed
1750
Completed
1901
1903
Completed
A-1796
B-1797
C-1798
Completed
Not Clear
1907
Completed
1911
Completed
No Permit
Completed
No Permit
Completed
1788
Completed
1791
Completed
1792
Completed
1918
Completed
1922
Completed
Completed
1907
Completed
Completed
1942
Completed
1734
Completed
1871/1889
Completed
1875
Completed
1876
Completed
1872
Completed
1878
Completed
1879
Completed
1880
Completed
1881
Completed
1884
Completed
1940
Completed
1939
Completed
1962
Completed
1951
Completed
1950
Completed
Completed
1954
Completed
2004
Completed
2003
Completed
1952
Completed
1955
Completed
1961
Mechanically ok.
jammed
Actuator
3499
2007
Completed
1943
Completed
1899
Completed
1945
Completed
1946
Completed
3509
1918
Completed
1922
Completed
2005
Completed
2009
Completed
1967
Completed
1968
Completed
1918
Completed
1922
Completed
2005
Completed
1970
Completed
1950
Completed
1969
Completed
3511
Completed
3511
Completed