RIVERSIDE PARK SOUTH

From 59th Street to 72nd Street


in the Borough of Manhattan
CB7 Presentation
April 18, 2016
Thomas Balsley Associates
Sage and Coombe Architects

RIVERSIDE PARK SOUTH | Aerial Image (2009)

59th Street

61st Street

62nd Street

63rd Street

RIVERSIDE BOULEVARD

PHASE 5

PHASE 1

64th Street

65th Street

66th Street

67th Street

68th Street

69th Street

70th Street

71st Street

72nd Street

PHASE 3

PHASE 6

PHASE 2

PHASE 3

HIGHWAY
OVERHEAD

PHASE 4

HUDSON RIVER

WORK AREA

COMPLETION
Phase 1 Park
Phase 2 Park
Phase 3 Park
Phase 4 Park
Phase 5 Park
Phase 6 Park

YEAR
2001
2003
2005
2008
2018
2018

TOTAL COST
$15,800,000
$8,000,000
$8,600,000
$11,300,000
$25,000,000
$24,600,000

RIVERSIDE PARK SOUTH | Phasing Diagram & Project Cost

DEVELOPED BY
HWA-TRUMP/NEW WORLD
HWA-TRUMP/NEW WORLD
HWA-TRUMP/NEW WORLD
HWA-EXTELL
PARKS
RC5

LEGEND

200

400

64th St.

65th St.

67th St.

68th St.

69th St.

66th St.

RIVE

RSID

13
3

12

E BL
VD.

4
7

6
9

8
10

STATUS

LEGEND
1.
2.
3.
4.
5.
6.
7.

67th Street Plaza


Play Area
66th Street Plaza
Passive Lawn
65th Street Plaza
Bike Path
61st Access Ramp

11

8. Children Swings
9. Volleyball Courts
10. Pedestrian Promenade
11. Bikeway
12. Comfort Station
13. Dog Run

SITEWORK AWARDED:
12 April 2016
CONSTRUCTION: June 2016 - Spring 2018
ARCHITECTURE TO BE BID: Summer 2016
CONSTRUCTION: Winter 2016 - Spring 2018
N

RIVERSIDE PARK SOUTH | Phase 5 Schematic Plan

0 50 100

COST
SITEWORK:
ARCHITECTURE (ESTIMATED):
TOTAL:

FUNDING SOURCE
FEDERAL

$21,900,000
$3,100,000
$25,000,000

AMOUNT
$12,500,000

CITY

$2,800,000

PARK ESCROW

$9,700,000

TOTAL:

RIVERSIDE PARK SOUTH | Phase 5 Funding

$25,000,000

RIVE

59th St.

61st St.

62nd St.

63rd St.

64th St.

65th St.

66th St.

67th St.

68th St.

69th St.

70th St.

RIVERSIDE BOULEVARD

RSID

70TH ST STAIRS
(REMOVED)

PHASE 6

E BL
VD.

61ST ST STAIRS
(REMOVED)

HUDSON RIVER

RIVERSIDE PARK SOUTH | Phase 6 Schematic Plan

100 200

59th St.

61st St.

62nd St.

63rd St.

64th St.

65th St.

66th St.

4
2
RIVE

4
1

4
2

3
5

E BL
VD.

11
7
8

10

STATUS

LEGEND
1. Multi-purpose Sports Field
with Sports Field Lights
2. Viewing Slope
3. Picnic Area
4. Overlook
5. Pedestrian Promenade

RSID

6. Bikeway
7. Tot Area
8. Basketball Courts (Full Courts -High School)
9. M&O Building (Sustainable) with Public Restroom
10. M&O Yard
11. 61st Access Ramp

BID AWARD:
CONSTRUCTION:

Late 2016
2017-2018

RIVERSIDE PARK SOUTH | Phase 6 Current Plan

0 50 100

VIEW FROM PHASE 5 AREA

RIVERSIDE PARK SOUTH | Phase 6 Vignette 1

SOCCER / LITTLE LEAGUE/ MULTI-PURPOSE SPORTS FIELD


2

RIVERSIDE PARK SOUTH | Phase 6 Vignette 2

OUTLINE OF
TOT AREA

AERIAL PHOTO

RIVERSIDE PARK SOUTH | Highway Structure Over Tot Area

PARK LEVEL VIEW

RIVE
RSID

RIVERSIDE PARK SOUTH | Childrens Play Facilities


E BL
VD.

0 50 100
SLIDE #3

59th St.

61st St.

62nd St.

63rd St.

64th St.

65th St.

66th St.

67th St.

68th St.

69th St.

70th St.

M&O BUILDING AND COMFORT STATION


3 Bega Lights

Tunnel Access
DPR/DOT Only

M&O Building with


Public Restrooms
(Sustainable)
2,170 SF

B-12 Light Pole, 75 O.C.Typ.

Edge of Exg Highway

Riv

Concrete Paver
Pedestrian Path

ers

M&O Storage Yard

ide

Bou

leva

rd

Asphalt Pavement

Service Road

Bikeway

Hex Block Pavers, Typ.

Sign Vehicles Only


Beyond This Point

RIVERSIDE PARK SOUTH | Enlarged Site Plan

Pier for Highway Above

B-12 Light Pole, 75 O.C.Typ.

8-0 Chain Link Security Fence

Picnic Area

10 20

3
N

RIVERSIDE PARK SOUTH | Existing Conditions View 3

RIVERSIDE PARK SOUTH | Phase 6 M&O Building Diagram

3
N

RIVERSIDE PARK SOUTH | Phase 6 Vignette 3

EL 45'-0"
B.O. HIGHWAY

PERFORATED CORRUGATED
ALUMINUM
RAINSCREEN SYSTEM

EL 18'-6"
T.O. CLERESTORY

EL 14'-6"
T.O. PARAPET

EL 2'-6"
(EL 10.0' AMSL) FINISHED FLOOR
EL 1'-10"
(EL 9.348' AMSL) FLOOD PLANE
EL 0'-0"
(EL 7.50' AMSL) GRADE

WEST ELEVATION
0

PERFORATED CORRUGATED ALUMINUM


RAINSCREEN SYSTEM

12

PERFORATED SCREEN
OVER GLAZING AT
CORNER, TYP.

24

| Phase
RIVERSIDE
PARK
SOUTH
6 M&O ELEVATION
Building West Elevation
RIVERSIDE
PARK
SOUTH
(PHASE
6)|WEST

12

24

RIVERSIDE PARK SOUTH | Phase 6 M&O Building Elevations

PERFORATED CORRUGATED STEEL PANELS

RECLAIMED WOOD DECKING

STOREFRONT GLAZING SYSTEMS

LINOLEUM TILE

RIVERSIDE PARK SOUTH | Phase 6 M&O Building Materials

WEST 61ST STREET

PHASE 6
2018

SITE 1
(GID)
2018

RIVERSIDE
BLVD
2017

SITE 2
(DERMOT)
2016

SEATING GROVE

CASCADE

WATER CHANNEL

WEST 60TH STREET

FOUNTAIN

SITE 3
(GID)
2019

OUT
ACE
S
M PL

SITE 4
(GID)
2019

5
ONE SITE
WEST END
(ONEAVENUE
WEST END
AVENUE)
2017

EDO

PLAYGROUND

FRE

CONIFER
GROVE

MEADOW

WEST 59TH STREET

ONE WEST END AVE Riverside Center Open Space Plan


May 7, 2014

RIVERSIDE PARK SOUTH | Riverside Center Open Space Plan

WEST END AVENUE

LAWN

COST
SITEWORK:
COST OF ARCHITECTURE (ESTIMATED):

$22,400,000
$2,200,000

TOTAL:

$24,600,000

FUNDING SOURCE

AMOUNT

PARK ESCROW

$9,500,000

ACTIVE OPEN SPACE

$16,500,000

TOTAL:

$26,000,000

RIVERSIDE PARK SOUTH | Phase 6 Funding