Beruflich Dokumente
Kultur Dokumente
59th Street
61st Street
62nd Street
63rd Street
RIVERSIDE BOULEVARD
PHASE 5
PHASE 1
64th Street
65th Street
66th Street
67th Street
68th Street
69th Street
70th Street
71st Street
72nd Street
PHASE 3
PHASE 6
PHASE 2
PHASE 3
HIGHWAY
OVERHEAD
PHASE 4
HUDSON RIVER
WORK AREA
COMPLETION
Phase 1 Park
Phase 2 Park
Phase 3 Park
Phase 4 Park
Phase 5 Park
Phase 6 Park
YEAR
2001
2003
2005
2008
2018
2018
TOTAL COST
$15,800,000
$8,000,000
$8,600,000
$11,300,000
$25,000,000
$24,600,000
DEVELOPED BY
HWA-TRUMP/NEW WORLD
HWA-TRUMP/NEW WORLD
HWA-TRUMP/NEW WORLD
HWA-EXTELL
PARKS
RC5
LEGEND
200
400
64th St.
65th St.
67th St.
68th St.
69th St.
66th St.
RIVE
RSID
13
3
12
E BL
VD.
4
7
6
9
8
10
STATUS
LEGEND
1.
2.
3.
4.
5.
6.
7.
11
8. Children Swings
9. Volleyball Courts
10. Pedestrian Promenade
11. Bikeway
12. Comfort Station
13. Dog Run
SITEWORK AWARDED:
12 April 2016
CONSTRUCTION: June 2016 - Spring 2018
ARCHITECTURE TO BE BID: Summer 2016
CONSTRUCTION: Winter 2016 - Spring 2018
N
0 50 100
COST
SITEWORK:
ARCHITECTURE (ESTIMATED):
TOTAL:
FUNDING SOURCE
FEDERAL
$21,900,000
$3,100,000
$25,000,000
AMOUNT
$12,500,000
CITY
$2,800,000
PARK ESCROW
$9,700,000
TOTAL:
$25,000,000
RIVE
59th St.
61st St.
62nd St.
63rd St.
64th St.
65th St.
66th St.
67th St.
68th St.
69th St.
70th St.
RIVERSIDE BOULEVARD
RSID
70TH ST STAIRS
(REMOVED)
PHASE 6
E BL
VD.
61ST ST STAIRS
(REMOVED)
HUDSON RIVER
100 200
59th St.
61st St.
62nd St.
63rd St.
64th St.
65th St.
66th St.
4
2
RIVE
4
1
4
2
3
5
E BL
VD.
11
7
8
10
STATUS
LEGEND
1. Multi-purpose Sports Field
with Sports Field Lights
2. Viewing Slope
3. Picnic Area
4. Overlook
5. Pedestrian Promenade
RSID
6. Bikeway
7. Tot Area
8. Basketball Courts (Full Courts -High School)
9. M&O Building (Sustainable) with Public Restroom
10. M&O Yard
11. 61st Access Ramp
BID AWARD:
CONSTRUCTION:
Late 2016
2017-2018
0 50 100
OUTLINE OF
TOT AREA
AERIAL PHOTO
RIVE
RSID
0 50 100
SLIDE #3
59th St.
61st St.
62nd St.
63rd St.
64th St.
65th St.
66th St.
67th St.
68th St.
69th St.
70th St.
Tunnel Access
DPR/DOT Only
Riv
Concrete Paver
Pedestrian Path
ers
ide
Bou
leva
rd
Asphalt Pavement
Service Road
Bikeway
Picnic Area
10 20
3
N
3
N
EL 45'-0"
B.O. HIGHWAY
PERFORATED CORRUGATED
ALUMINUM
RAINSCREEN SYSTEM
EL 18'-6"
T.O. CLERESTORY
EL 14'-6"
T.O. PARAPET
EL 2'-6"
(EL 10.0' AMSL) FINISHED FLOOR
EL 1'-10"
(EL 9.348' AMSL) FLOOD PLANE
EL 0'-0"
(EL 7.50' AMSL) GRADE
WEST ELEVATION
0
12
PERFORATED SCREEN
OVER GLAZING AT
CORNER, TYP.
24
| Phase
RIVERSIDE
PARK
SOUTH
6 M&O ELEVATION
Building West Elevation
RIVERSIDE
PARK
SOUTH
(PHASE
6)|WEST
12
24
LINOLEUM TILE
PHASE 6
2018
SITE 1
(GID)
2018
RIVERSIDE
BLVD
2017
SITE 2
(DERMOT)
2016
SEATING GROVE
CASCADE
WATER CHANNEL
FOUNTAIN
SITE 3
(GID)
2019
OUT
ACE
S
M PL
SITE 4
(GID)
2019
5
ONE SITE
WEST END
(ONEAVENUE
WEST END
AVENUE)
2017
EDO
PLAYGROUND
FRE
CONIFER
GROVE
MEADOW
LAWN
COST
SITEWORK:
COST OF ARCHITECTURE (ESTIMATED):
$22,400,000
$2,200,000
TOTAL:
$24,600,000
FUNDING SOURCE
AMOUNT
PARK ESCROW
$9,500,000
$16,500,000
TOTAL:
$26,000,000