Sie sind auf Seite 1von 1

MATERIALS SLIP REQUEST

Existing Dewania HFO Project

Time ;

08 :15

REQUEST BY
COMPANY

Sr SHEET
No.
No.

SECTION

24-Apr-16

ORIGINATOR

N/A

SLIP No : 01

PM

CONSTRUCTION

A.B

DATE

AM

DATE

Sabah Noori Sabah

APPRV BY

LINE NUMBER:

REV

Item
Code.

N/A

N/A

N/A

Approved by CMS

Mechanical
4/24/2016
Eng. Ahmed Atta

CMS MATERIAL
APPRV BY

RECEIVED

Eng.Mohaimn Nassir

DATE

Pipe 6" , Thik: 625"X0.280" ,Sch 40B ,ASTM A106N,ASME A55/A53 M


HEAT NO.142216,SMLS

A.B
24-Apr-16

DATE

4/24/2016

Signature

Desicription / Specification

COMPANY

REVD BY
SIZE
(Inch)

REQUEST
Qty

UNITS

6"

Pcs

REMARKS

Sign GE Power Energy

Das könnte Ihnen auch gefallen