Presupuesto
Subpresupuesto
Cliente
ELECTRONORTE S.A.
Lugar
Item
01
Descripcin
Und.
Metrado
Precio S/.
TRABAJOS PRELIMINARES
01.01
m2
106.05
1.70
01.02
m2
63.63
1.86
02
MOVIMIENTO DE TIERRAS
02.01
m3
101.38
1,066.11
02.02
ML
72.00
318.14
02.03
m3
135.53
4.84
03
CONCRETO ARMADO
03.01
m2
297.79
49.96
03.02
m3
101.38
443.60
03.03
kg
10,712.71
7.19
03.04
m2
183.82
34.53
03.05
m3
36.76
424.55
03.06
kg
1,832.94
7.19
COSTO DIRECTO
GASTOS GENERALES (10 %)
UTILIDAD (5%)
SUB TOTAL
IGV (18%)
TOTAL OBRA
SON :
ON DE LA C.H.
Parcial S/.
298.64
180.29
118.35
131,644.28
108,082.23
22,906.08
655.97
172,006.74
14,877.59
44,972.17
77,024.38
6,347.30
15,606.46
13,178.84
303,949.66
30,394.97
15,197.48
349,542.11
62,917.58
412,459.69