Construction of Safaniya 380/230kV BSP(Change order)


Contract No. 30933106/00
SITE INSTRUCTION NOTES
Civil / Elect. /Mech./Materials/Safety
Location: - Safaniya 380/230kV Substation
10th April 2016

Date:

Ref.02/C/PM
To,
Site Manager,
SIEMENS
Safaniya 380/230kV Substation

Subject : Erection of steel structures for Marjan Gantries East Side(2 nos).
It is to bring into your kind notice that casting of both the Gantries on the East side for Marjan has
finished on 26th of march 2016. After that neither segregation of assembly members nor assembling
of structure at ground has started until today. As per your commitment erection of steel structures
along with connecting beams of both the Gantries has to be finished before the end of Month of April
2016. Kindly start the activities in the aforesaid areas as soon as possible in order to meet schedule.

For your immediate action and strict compliance.


___________________________________________________________________________________________________________

Signed by:

____________
_________________
Yasir Nisar Syed
Received by SIEMENS
Civil Engineer
Representative
Dar Engineering

_____________________________________________________________________________________
CC: RRC/File,

SEC-EOA File
Page 1 of 2

_____________________________________________________________________________________

____
___________________________________________________________________________

Contractor to reply this site note within 48 hours


ACTION TAKEN
Date: ______________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
________________________________________

Signed By:
_______________________
SIEMENS Representative
Decision by SEC Representative
[ ] Accepted
[ ] Rejected.

_____________________________________________________________________________________

____
___________________________________________________________________________
Page 2 of 2

_____________________________________________________________________________________

Das könnte Ihnen auch gefallen