APPENDIX 1
GC3 The Health and Safety Practical Application
Candidate and course provider declarations:
For completion by the candidate:
I declare that the work submitted for this practical application assessment i.e. The completed
observation sheets and the report to management, is my own work. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in
the NEBOSH Malpractice policy.
Name (Print)

___________________________________

Signature

____________________________________

Date

____________________________________

For completion by a course provider representative (eg internal practical assessor):


I declare that the work marked is identical to that received from the candidate. I recognise that
contravention of this statement constitutes malpractice and may result in my being subject to the
penalties set out in the NEBOSH Malpractice policy.
Name (Print)

____________________________________

Signature

____________________________________

Date

____________________________________

For completion by the course providers internal practical assessor:


I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I
recognise that contravention of this statement constitutes malpractice and may result in my being
subject to the penalties set out in the NEBOSH Malpractice policy.
Name (Print)

____________________________________

Signature

____________________________________

Date

____________________________________

NB: This declaration must be completed in full, submitted and retained with the candidates
script. If this declaration is not submitted the candidates result may be declared void.

APPENDIX 3

GC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Assessors marking sheet

Date of practical application

Name of assessor

Course provider
number
Student number

Course provider
name
00332912

Student name

TRIMURTHULU KAKI

Maximum
marks
available

Criteria
1

Completion of observation sheets

1.1

Range
and
consequences

1.2

Identification of suitable control measures and


timescales

Report - Introduction and Executive


Summary

2.1

Introduction providing an overview of the


chosen area

2.2

Executive summary

Report - Main findings of the inspection

3.1

Quality of interpretation of findings

15

3.2

Identification of possible breaches of legislation


and/or standards

3.3

Persuasiveness / conciseness / technical content

10

Report - Conclusions and Recommendations

4.1

Clear and concise conclusions which are clearly


related to report findings and are effective in
convincing management to take action

15

4.2

Recommendations which present realistic


actions to improve health and safety in the
chosen area

15

outline

of

hazards

TOTAL MARKS

and

15
15

100

Assessors
marks
awarded

NEBOSH
moderated
marks
(if different)

Outcome: PASS (60% or more)

REFER (less than 60%)

Date assessed ____ / ____ / ____


Assessors signature ______________________
Date received by course provider ____ / ____ / ____
Date received by NEBOSH
(if applicable) _____ / _____ / _____

Assessors additional comments on the practical application:

ASSESSED BY (name in block letters) _________________________________________________


The mark sheet must be retained by the Course Provider and sent to NEBOSH only if
requested.
NEBOSH USE ONLY
NEBOSH Moderators comments:

APPENDIX 4
GC3 THE HEALTH AND
SAFETY PRACTICAL APPLICATION

Candidates observation
sheet

Sheet number

of _____

Student name ph____________________________________

Student number __________________

Place inspected _____________________________________

Date of inspection ___ / _____ / _____

Observations
Hazards and consequence

Control measures
Immediate and longer term actions

Timescale

1. Fall of material, tools and persons


into the excavation of 10 feet depth
due to lack of edge protection causing
bone fractures to workers, head
injuries, cuts and bruises.

2. Fall of workers and objects from the


scaffold at a height of 30 meters due
the poor surface (uneven floor) and no
guard rail, outriggers broken, the
braces and toe boards have large
gaps on the work platform causing
major head injuries and impact on the
workers.

Immediate action:
To provide to provision of signage and
authorized peoples only.
Long term action:
To build the hydraulic shore on the
ditch of 10 feet sides to protects the
cave. And its protects the slip and trips
hazard for the employees
Immediate action:
Provision of guard rails, toe boards,
securing tools, replace the platforms.

One month

One day
One day

Regular inspections.
Long term action:
All the scaffold materials purchase by
the component person and using all
the safety for scaffold erection.
Revise the risk assessments and
permits.

3. Failure and toppling of mobile crane


from the oil spillages and wet surfaces
in the construction site leading to
collisions with workers and structures
causing fatalities and property
damage.

One day

One week

One week

Immediate action:
Regularly
Clean up spillages
Cautions for wet floors and spillages
Pre use checks foe mobile cranes.
Long term action:
Every month

4.Severe
back
pains
and
musculoskeletal
disorders
while
workers carrying manually cement
bags, bricks and sand causing hernia,
muscle cramps and slipped disc.

5. In the construction site the workers


are handling concrete mixer without
hopper. As a result workers inhale
cement and dust that may lead to
respiratory problems and
asphyxiation.

Maintenance of the equipment.


Competent operator.
Communication between all the
operators.
Immediately action:
To the supervisor are takes
responsibility and instruct the worker
carry the safe worker capability of
load limit.
Long term action:
The organising recognised the
manually handling workers and how
to handle the manual workers
organisation training for all the
manual handling workers tell to the
manual techniques and maximum
weight that one can carry and
consequences if they exceed the
weight limits
Immediate action:
Provide respiratory protective
equipment.
Provide hopper for mixing
Long term action:
Conduct health surveillance
programme

1 day

One month

1 day
4 weeks

12.In the ware house of


construction site Workers performing
iron pipes unloading work in a
awkward position ,this may cause
back pain ,prolapsed discs, injuries
cuts etc.

13. I observed the workers in the


construction site were shouting each
other and they are blaming each
other. Here the other workers disturb
and damage work because of loss of
working time. Some workers may
lead to stress.

14. In the ware house of


construction site under poor lighting
workers needs to get construction
materials from the warehouse. Lack
good lighting, workers may slips trips
and may also falls inside the
warehouse, resulting injuries such as
head injury, bone fracture, piercing of
any sharp laid item on floor.
15. In the work site emergency fire
exit door has been obstructed with a
wooden material. Which can obstruct
the walk or running in emergency
and that leads to severe injuries by
fall and trips.

16. I am observed in a
construction site area there are
nearly 10 LPG gas cylinders are
stored. And the worker are doing
welding work on top of the cylinders.
Here the welding sparks ejected are
falling on the gas cylinders. This
may cause large fire and explosion
that leads to third degree burn
injuries, and many people may lose
their lives also. Here not only
workers, but other people such as
visitors, office workers and
surrounding living propels also
injured.

Immediate action:
Perform unloading work in open
place and then put in warehouse
Long term action:
Make warehouse spacious by
maintaining good storage methods,
and provide place for loading and
unloading work.
Immediate action:
Conduct counselling programme to
individuals.
Long term action:
Introduce and maintain zero tolerance
policy.
Check workers background during
recruitment time.
Immediate action:
To be provides a clear lighting in
the ware house so that workers can
carry out work easily.
Long term action:
To providing natural lighting
regular house keeping

and

Immediate action:
To remove the obstruction objects
from the emergency fire exit door.
Long term action:
Maintain good house keeping
And provide proper training and fire
drills.
Immediate action:
To stop the welding work
immediately and cover the area with
fire retracing materials. Take a gas
cylinders away from work site.
Long term action:
The welding activities carry out by
competent persons only.
Do the major parts of welding at
separate place and assemble can be
done at required area.
To give a training, instruction,
information and supervision properly.

1 day

3 days

1day
1week

1day

1 week

1 day

2 weeks

1 day

10days

17.
In the construction site, at the
ground floor workers are working on
to fit the lift. The work area is wet and
water also. Here the welding activity
performed in wet conditions to fix the
lift. Here the welding machine cord
and power supply cables are laying
on the wet floor can cause to
electrical shock and burns to
workers.

Immediate action:
Welding cords to be laid away from
wet conditions and to maintenance
good housekeeping.

18.
In the construction site
workers working with sand, bricks,
cement and rocks, inhalation of dust
of these materials cause respiratory
problems and also cause skin
allergies.

Immediate action:
To control the dust particles by the
water damping down. And using the
respirators.

19. In the construction site area


workers are doing electrical works on
the 2nd floor , wires of equipment
trailing on floor .By the trailing cables
there may be a chances of fall and
trip leading to bone fractures and
head injuries

Long term action:


The working area should be kept
clean and dry to be maintained by the
maintenance staff and regular
checking by competent person.

Long term action:


To be provided a well-ventilated
area and sufficient and suitable
personal protect equipment and
provide dust catch filter face masks
also provided.

Immediate action: Immediately


remove all trailing cables from the
walking areas and positioned in
secure place.
Long term action:
To be provide a training and shows
a videos to workers about the
accidents relating to trailing cables.

20.In the construction sites cellar


area the carpenter performing wood
work of doors for building. The
carpenters using bench mounted
circular saw, the machine dont have
any guard. And those peoples are
working manual chopping of the
wood materials and it makes a lot of
noise and dust also, but they are not
using any ear protection, hand gloves
and face masks. Circular saw causes
cuts and severing

Immediate action:
Add adjustable top guard fitted above
the blade and provide a suitable
PPE.

21
In the construction site
workers are doing excavation around
the underground drainage to be 4
feet depth has no protected by
barriers and sign boards it may
causes to falling people by slip,
topple of excavator. Peoples have
injured death to serious injury but not
limited to bone breaks or factures.

Immediate action:
To stop the excavation work
activities.

Long term action:


To provide a proper training about
the bench mounted circular saw. And
the properly inspection by the
competent person and routine
inspection.

Long term action:


To provides barrier along with the
excavation area. And provide
adequate training on safety practices
of excavation process and policy.

One day

Within 1 day

1 day

1 month

monthly

1 month

1 day

2 weeks

1day

1week

22. In the construction site area a


big generator realises lot of smoke.
Here the workers are effected by the
smoke, inhalation of smoke causes
respiratory problems, high blood
pressure.

Immediate action:
Workers are using suitable personal
protect equipment.

23. In the work site worker are


painted outside of the building by
using scaffold. I am observed the
scaffold is not erected on the flat
surface, worker are not using guard
rails braces are not well fitted. There
is no toe boards .here the hazard is
collapse the scaffold due to improper
fitting and may falls from objects
causes. The worker are not using
even PPE also.

Immediate action:
Make surface flat and place sole
boards
Provide with guard rails & toe boards
and make braces well fit
Long term action:
Alteration needed must be done by
competent person and do regular
inspection.

24. In the construction site on the


1st floor the worker are polished by
the grinding. Here the workers are
helpers are caused sparks are flying
and lead to eye injury and skin burns.

Immediate action:
In the work activity area should be
isolated and people should be
provided with face shield, coveralls.

25. In the construction site, near the


excavation area has main electric
power supply for the entire
construction site. Here this area was
not protected and no signage of
danger being placed that can lead to
electrocution, burns, death and fall
from height due to throw off can
cause serious injury of bone fractures
and head injuries.

Long term action:


To be build a smoke exist fans and
using local exhaust ventilation by
using filters and by using smoke
chimney or ducts. Good servicing
maintenance of generator.

1 day

1 month

Immediately

1 month

Immediately

Long term action:


Training should be provided to
the workers on safe grinding activity.

1 day

Immediate action:
To be put a danger signage
boards.

1 day

Long term action:


To be barricade the area from the
excavation by isolating lock out tag
out system.
Require permit to work.

1 week

26. In the construction site


organisation has provided locker
facility for each and every one
separately for men and women.

Continue

27. Observed the first aid provisions


were appropriate and accessible to
the workers at the site with the
complete kit.

It promotes recovery, prevents


deterioration and preserves life
during emergencies.

28. Provision of drinking water facility


at each floor and clearly indicated
with sign boards and can easily
access.

Good working atmosphere for


employees and ability to work with
moral.

29. I am observed that each floor


have fire fighting lines, sprinklers and
smoke detectors. In the Warehouse
area maintained fire cylinders.
30. In the work site separate toilets
for men and women, and maintaining
neat & clean. Here the provision of
hand wash liquids, soaps,

APPENDIX 5

UNIT GC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Candidate report template

Student number_____________________________________
Location___________________________________________

Date of review

Structure report under the following headings:


Introduction including overview of area inspected and activities taking place
The above report follows the health and safety inspection in the biggest construction projects of
RUSHITA CONSTRUSTIONS. It is a real estate company in Visakhapatnam, Andhra Pradesh, India.
It is. Here the indoor and outdoor activities and storage of raw materials and marketing of the flats
Clients consultations, site visitors other peoples. In the construction the total number of worker is 70
peoples nearly and it is a 10 cores project. Here total 9 floors and 36 apartments. I am inspecting in
the work site areas warehouse and construction buildings at the time 10 am to 12 noon on 09-042016.
The activities being performed are Workers are doing in the ground level excavation, Workers are
carrying manual handling by the raw materials, and Workers are doing outdoor activities such as
outside painting of the building by using scaffold and cherry picker and spray guns. In door activities
are welding at the lift fitting at a wet floor area by using power. Carpenters are working ground floor
doing wood work activities by using bench mounted circular saw without any guards. Near the
excavation beside the power supply transformer without any barricades and sign boards. Warehouse
indoor activities and safe stacking and storing of construction materials such as cement in the
warehouse and welding roads, bricks, and wood separate storage area. In the warehouse are
vehicles are loading and unloading and also taking reversing when the corners without stoppage and
without banks men and blind sports directions are not there. Worker are manual handling of carrying
cement and bricks construction materials. Poor lighting at the ware house and ventilation at the
cement storage area.
Some workers are using personal protect equipment, All the welfare facilities are provided. The site
engineer, managers and supervisors are doing her activities they are wearing different colours of
helmets, all the floor maintained fire fighting lines, fire cylinders sprinklers, smoke detectors.
This report is clearly inspection report to highlight the areas of construction site and existing health
and safety hazards and to reduce the accidents and incidents statistics, and minted of the health and
safety policy. To be minted safe system of work, safe plant and machinery, safe system of work
environment to be provided. To follow the minimum welfare facilities and reduced the accidents such
as 0 percentage accident, injuries and fatalities. And finally to check whether it meets the legal
standards.

APPENDIX 5

UNIT GC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Candidate report template

Student number_____________________________________
Location___________________________________________

Date of review

Executive Summary
I thanks to the RUSHITA construction for giving me the opportunity to carry out the health and safety
inspection. Its appreciated that the construction site has good practices like
Drinking water facility at each floor level for employees hot and cold option according to the worker
need. Locker facility allocated for employees separately according to their needs and nearest to the
work place area workers easy to access. First aid appropriate and accessible to with workers at the
site with the complete kit. In this site each floor has minted fire fighting lines and sprinklers and smoke
detectors. Toilets have been maintained clean and tidy with all provision to the workers like soaps,
hand wash liquids etc.
In the construction site I am observed some major hazards. The management has to look and rectify
issues they are
Scaffold is not erected on the flat surface, no guard rails, braces and it is not fitted properly. Not follow
the safety rules such as toe boards have huge gaps can lead to scaffold collapse. Peoples and object
fall from height. Workers are working at high risk of the excavation of storage of fire fighting safety
(sump) here the construction of hydraulic shoring or any wood sheet and iron sheet are not at this
area. In the welders are doing her welding activities closer the LPG storage area. Which can lead to
expose and fire causes form several injuries and property damage. In the warehouse transport
peoples are not stopping at the blind corners and can lead to collision with other vehicle and workers
also. Here the no banks men. It is May cause death and property damages. In this are one of the
worker has painted outside of the building at 9th floor. He didnt have any edge protection and safety
belt. He is using only boatswains chair and brushes only.
The above observation breaches the following legal compliances Acts are:
1. Indian factory Act 1948 section 32C-subsection 3e
2. Fire prevention and fire safety Act 1986 by the government of India.
3. Scaffolding and lifting Act 1912 and regulation 1950.
4. Indian electricity Act and rules 1956 rule 29.
5. Chemical regulation 1990 (No 177).
6. Control of substances hazards to health (COSHH 2002).
7. Safety and health in construction convention (C167 ) capital ILO
Therefore I recommend the management to improve the training, information, instruction and
supervision and safe methods of working practices especially on fire, scaffold, excavation, electrical
and chemical related work activate

APPENDIX 5

UNIT GC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Candidate report template

Student number_____________________________________
Location___________________________________________

Date of review

Main findings of the inspection


1. Fire hazard (Observation no: 16)
In the construction site workers are working welding the rods which is closer to gas cylinders
(LPG) storage area and sparks while welding can contact with the LPG gas lead s to cause fire and
explosion property damage and mass casualties in the workplace. Here the loss of origination may
casualties and property damage cost Rs 100000/- and other indirect costs of court fines.
Which breaches the international legislation of convention C167 safety and health in construction
convention in 1988 Article no 167 and fire protection and prevention Act1997.
Indian factory act 1948 section 32C-subsection 3e.
Fire prevention and fire safety act 1986 by the government of India.
Recommendation:
The origination to be provided a separate covered welding area. The whole construction site
where all welding works can be take place separately. Which eventually presents mass casualties and
property damage. It is may be cost of the 50000/-.
2. Scaffold collapse, falling of people and objects (observation no: 2, 23)
In the construction major accidents may causes scaffolds collapse, falling from edges and
Falling objects. Scaffold being used by the workers at construction site different types of heights and
even surface area also, out riggers were broken and not being replaced, toe board have huge gaps
and some braces been missing and other peoples are not fitted properly which may lead to collapse
of scaffold, falling of people and object form height can lead to injured seriously from head injury to
muscle stress and pains.
The international legislation of convention C167- health and safety in construction in 1988 article no
167 and health and safety at work 1974 (HASWA).
Scaffolding and lifting act 1912 and regulation 1950.
Recommendation:
The origination peoples are selected the competent persons to makes scaffold be perfect using
purpose. And purchase of new scaffold materials. And provide safety nets at working area. To be
saved the many peoples life and prevents falling of objects and collapsing of scaffold which would
cost 70000/-

3. Excavation or caves (observation no: 1)


In the site area worker are ditch of 10feet in depth excavation. Here water to be storage because
of any fire fighting issues (sump) on the building area in the futures and it is an Act of law. I am found
there is no protection form the excavation peoples slip and fall into the ditch as well as there is no
protection and signage boards.
In the ILO legislation of convention C 167 safety and health in construction convention in 1988 Article
no 167.
Safety and health in construction convention (C167) capital ILO.
Recommendation:
Here the origination should provide Hydraulic shoring of trench would prevent workers to fall from
height by slip or soil to cave in and would cost approximately 20000/- and it is easier to fix by one
person and can be used for new upcoming projects.
4. Electrician hazard (observation no: 17, 25)
In the work site, the main electric power supply for the entire construction site that located near the
excavation area is unprotected and no signage of danger being placed, can lead to electrocution,
shocks, burns and death. In the secondary effects such as fall from height due to throw off can cause
serious injury of bone fractures and head injury.
The breaches of the law Indian electricity act and rules 1956 rule 29.
Recommendation:
Management should allocate resources for barricading the high danger electricity power supply area
by isolating and that would cost around Rs18000/- .can prevent burns, electrocution and even
death .Danger Signage boards should also positioned near the power supply area.

5. Chemical Hazard Observation No: 10


Painter was working at 6th floor outside the building by using spray. These spray paints forms small
droplets in the atmosphere and creates volatile vapours around working area and the person working
there may inhale of these volatile paint vapour which lead to suffocation and respiratory problems and
leading to heath issues and acute effects. It also cause skin cancers and burning sensation in eyes
In breaches law Chemicals regulation, 1990 (No 177) and Control of substances hazards to health
(COSHH 2002)
Recommendation:
Management have to ensure that worker are wearing respiratory protective equipment to prevent
respiratory problems, coveralls to prevent from skin allergies and goggles to protect eyes. These
protective equipment would cost approx. Rs25000/-

APPENDIX 5

UNIT GC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Candidate report template

Student number_____________________________________
Location___________________________________________

Date of review

Conclusions
In this construction origination I am observed my health and safety knowledge find major problems in
this origination. In this origination major findings needs to be immediate action towards the safety of
workers from health and safety management. These are excavation falling peoples, electricity shocks
and burners, fire explosion, collision with vehicle pedestrians at warehouse by vehicles or forklifts
which can be controlled and followed the safety policy and rules.
Other safety concerns such as manual handling, vibration, noise, stress, biological effect, chemical
exposure, heat, stress, lighting and ventilation can also be controlled with suitable preventive control
measures which also recommended on the observation sheet.
The workforces were seemed to be very happily because of the origination to be followed welfare
facilities such as locker, first aid provisions, drinking water, rest room ,toilet facilities both men and
women separately and smoker zones areas. The origination is followed the health and safety policy is
maimed sufficiently.
And finally I would request to the management please takes any accidental issue may be occur in the
site take immediately action on the suitable recommendation for the good implementation of health
and safety culture. The origination people should be followed by the International labour origination
acts and minted.

APPENDIX 5

UNIT GC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Candidate report template

Student number_____________________________________
Location___________________________________________

Date of review

Recommendations include as a table in the following format:


Recommendation
Observation No:2 & 23
Purchase of new scaffold
materials
select the competent
person
training to all scaffold
employees
Observation No:1
Trench for the excavation
Hydraulic shoring to
prevent fall of edges
Observation No:16
1Cover the welding area
with fire retardant materials

Likely resource implications

Priority

Target date

Purchase new scaffold


material cost 50000/Training by a competent
person cost around Rs 8000/per hour
2hours training to employees
Hydraulic shoring it may be
cost of 25000/-

High

One month

High
1 month

Cost of fire retardant material


Rs 2000/high

1 month

2 Damp the work area


3. Fire extinguishers

Cost of fire extinguisher Rs


3000/-

Observation No:10
Painting at outside of the
building area.to be
provided with RPE,
Coveralls, Goggles

Cost of RPE ,Coveralls and


goggles cost around Rs
25000/-

High

1 day

Observation No:17&25
Barricade the high voltage
main power supply in the
construction area.

Here the cost of the barricade


would be Rs 5000/-

High

1 month

Place Danger sign boards

Sign board cost Rs 500/-