METHOD STATEMENT

akio KUNO & partner INSULATION Co. Ltd


Department

Doc. No.

Section/Location

Catofin Reactor/Nozzle

Name of working agency

Job Title

Ceramic Fibre Blanket lining

Work order/Requisition No.

Job Duration

Start date

Sl. No.
1
2

End date

Hazards

Activities(Sequence of work)
Staff Training, and PPE
Permits to work

Site Access and Egress

All mechanical activities are over and ready for CFB lining work

Material Handling

Scaffold & Access to height

Workers for working in Catofin Reactor Nozzle area to be shifted

Persons responsible
Safety Supervisor
Safety Supervisor

Condition of tools/tackles ok/not ok

Site in Charge
Client

1) Fall of materials
2) Injury during loading /unloading in the material cage.
3)Mannual handling
1) Fall of materials
2) Injury during loading /unloading in the material cage.
3) Mannual handling
1. Fall of persons
2. Heat
Fall of materials

CF Blanket work to be started as per drawing and sequences.

1) Fall of materials/Person injury from scaffolding/platform.


2) Electric Shock

10

Completion of job.

House Keeping

Departmental representative

Safety Precautions

1) Fall of workmen
2) Injury during movement through metal parts in the platform/access door etc.

All required materials are in working position

CMJ Services Pvt Ltd

1.Loading of materials proprly and upto the maximum limit.


2.Co ordination with Supervisor and workmen while materials shifting is taken place.

Site in Charge

Lifting tolls if used i.e. Power Winch etc.

Site in Charge/Supervisor
Ensure the proper use of PPE with all the workmen.
1. Proper unloading of materials in working zone.
2. Working platforms are in position.
3. All required machines are in position with proper arrangements.
1. Start work carefully with proper safety equipment.
2. Ensure Working platforms is balanced properly with man and materials.
3. Ensure materials do not fall from platform.
1. Switch off the power connections.
2. Clean the area properly.
3. Shift the debris to proper place.
4. Inform concern officer for completion of work.

Site in Charge

Hand tools for CF Blanket work

Site in Charge

Site in Charge

Site in Charge

Contractors representative

Hand tools for CF Blanket work