Inspection Checklist - 1
Project Name
Contractor
Owner Name
Main Subcontractor
Area / Unit
SEE ATTACHED
DRAWING/CABLE LIST
ITP No
KP-00+++-CQ712-B7907
ITP Item
Report No
Date
Rev.B
Drawing No
Approximate Date/Time of Related Activity:
No.
ITEM DESCRIPTION
Floor civil works are done by civil discipline in accordance with the approved drawings
MV Switchgear and all accessories are installed in accordance with the approved
drawings
MV Switchgear and all accessories are fixed onto the suitable supports at particular
intervals as per approved drawings
Cable connections and test are done in accordance with the approved MS and ITP for
Cable Pulling Termination and Jointing
Remarks / Comments
Subcontractor
GAMA
Subcontractor
Name:Date:Sign:
GAMA
Name:Date:Sign:
3rd Party / AI
Name:Date:Sign:
POSCO
Name:Date:Sign:
Doc. No: KP-00+++-CQ712-B7907-F01,
Rev.B