Contractor

Owner

Main Subcontractor

PROJECT NAME: Khabat Thermal Power Plant Units 1&2


OWNER: Ministry of Electricity of Kurdistan Regional Goverment
CONTRACTOR: POSCO Engineering & Construction Co. Ltd.
MAIN SUBCONTRACTOR: GAMA Power Systems Engineering &
Contracting Inc.
PROJE REFERENCE NO:
Re
v
A

Revision
Date
15.09.201
5

Description
For Review

Revision History
Created by
Checked by
A.E.
AKMAN

Emission
Status

Return
Status

B. GKCE

Vendor doc No.:

Vendor Logo

Approved by

Document Code :

Title, Subtitle

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

Format
A4

Rev. A

Date
15.09.2015

Lang.
En

Date
15.09.2015

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

ENG. N

SH/OF
2 / 11

CLIENT N

REV.

Summary
LIST OF REQUIRED TEST EQUIPMENT S
INSULATION RESISTANCE AND POLARIZATION INDEX TES

Signature

WINDING RESISTANCE TEST

4.

TURN RATIO TEST

5.

VECTOR GROUP TEST

6.

%PF TEST

7.

BUSHING TEST

10

8.

RATIO AND SATURATION TEST OF CURRENT

11

KESR Mh. Elektrik


ti.
Name

Revision

3.

TRANSFORMERS IN BUSHING

Date

Page

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

ENG. N

SH/OF
3 / 11

CLIENT N

REV.

1. LIST OF REQUIRED TEST EQUIPMENTS


Test Equipment
Designation / Manufacturer
DC Insulation tester/MEGER
Vanguart WRM-40
DV Power
Omcron CPC-100
Omcron CPC-100

KESR Mh. Elektrik


ti.
Date
Name
Signature

Test corresponding to paragraph

Type / Serial Nr

X
X
X
X
X

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

SH/OF
4 / 11

CLIENT N

REV.

2. INSULATION RESISTANCE DATA RECORD


TRANSFORMER SET
Trf Name :

Rat.Power (MVA) :

Vector Symbol :

Trf Type :

Serial No :

Year of Mfr. :

Top oil Temp. :

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

INSULATION RESISTANCE (MEGGER) DATA


GIGAOHMS READINGS
TEST
VOLTAGE

TIME
(SEC.)

HV / Tank
(LV
Guarded)

LV / Tank

HV / LV

(HV Guarded)

(Tank Guarded)

TEST
VOLTAGE

TIME
(SEC.)

5000 V

15

2500 V

15

5000 V

30

2500 V

30

5000 V

45

2500 V

45

5000 V

2500 V

60

5000 V

5000 V

5000 V

5000 V

5000 V

5000 V

5000 V

5000 V

5000 V

10

COMMENT

KESR Mh. Elektrik


ti.
Date
Name
Signature

CORE / TANK

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

ENG. N

SH/OF
5 / 11

CLIENT N

REV.

INSULATION RESISTANCE (MEGGER) DATA (POLARIZATION INDEX)


GIGAOHMS READINGS
TEST
VOLTAGE
5000/2500

TIME
(SEC.)

(Temp: C)

HV / Tank

LV / Tank

HV / LV

(LV Guarded)

(HV Guarded)

(Tank Guarded)

CORE / TANK

600
VALUES

POLARIZATION INDEX

HV / Tank

LV / Tank

HV / LV

(LV Guarded)

(HV Guarded)

(Tank Guarded)

COMMENT

KESR Mh. Elektrik


ti.
Date
Name
Signature

CORE / TANK

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

SH/OF
6 / 11

CLIENT N

REV.

3. WINDING RESISTANCE DATA RECORD


TRANSFORMER SET
Trf Name :

Rat.Power (MVA) :

Vector Symbol :

Trf Type :

Serial No :

Year of Mfr. :

Top oil Temp. :

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

WINDING RESISTANCE DATA


TAP
POSITION

R-N

S-N

T-N

r-s

s-t

t-r

1
2
3
4
5
6
7
8
9
10
11

COMMENTS

4. TURN RATIO TEST DATA RECORD


KESR Mh. Elektrik
ti.
Date
Name
Signature

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

SH/OF
7 / 11

CLIENT N

REV.

TRANSFORMER SET
Trf Name :

Rat.Power (MVA) :

Vector Symbol :

Trf Type :

Serial No :

Year of Mfr. :

Top oil Temp. :

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

TURN RATIO TEST DATA


TAP
NO.

LV

HV

RATO
VOLTAGE

RATO
VOLTAGE

THEORA
TICAL
TURN
RATIO

MEASURED TURN RATIO


RN / rt

% ERR.

1
2
3
4
5
6
7
8
9
10
11

5. VECTOR GROUP DATA RECORD


TRANSFORMER SET

KESR Mh. Elektrik


ti.
Date
Name
Signature

SN / sr

% ERR

RN / ts

% ERR

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

SH/OF
8 / 11

CLIENT N

REV.
Trf Name :

Rat.Power (MVA) :

Vector Symbol :

Trf Type :

Serial No :

Year of Mfr.

Top oil Temp. :

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

VECTOR GROUP DATA


APPLIED VOLTAGES

SKETCH

VALUE

R
S
T
MEASURED VALUES
R
S
T
VECTOR GROUP
ACCEPTANCE CRTERIA

VuU >VUV > VwW


COMMENTS

6. %PF TEST DATA RECORD


TRANSFORMER SET
KESR Mh. Elektrik
ti.
Date
Name
Signature

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

SH/OF
9 / 11

CLIENT N

REV.
Trf Name :

Rat.Power (MVA) :

Vector Symbol :

Trf Type :

Serial No :

Year of Mfr. :

Top oil Temp. :

Humidity :

Air Temp. :

TEST EQUIPMENT
NAME OF MANUFACTURER :

SERIAL NO :

CALIBRATION DUE DATE

MODEL

%PF TEST DATA

1
2

HV

LV

LV

HV

LV -UST
LV Cable
Graund

Watts

Reading

mA

Reading

Reading

mA

Reading

Watts

CHL

10

CH+CL

10

BUSSHING TEST

Signature

Capacitances
(pF)

CL

10

7. BUSHING TEST

Name

PF

CL+CHL

COMMENTS

Date

20 C

CH

10

KESR Mh. Elektrik


ti.

%Pf

CH+CHL

10
HV

HV
LV

Calculated results

10

LV

HV

Measured results
TEST kV

Guarded

LV

HV

Grounded

Energized

TEST NO.

Test Connections

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

SH/OF
10 / 11

CLIENT N

REV.

10

10

10

10

10

10

Watts

Reading

mA

Watts

Reading

Calculated results

Multipl

Reading

mA

Multipl.

Serial No

Measured results
Reading

TEST kV

Phases

Test Connections

%Pf

Capacitances
(pF)

C1

C1

C1

C1

C1

C1

10

T-N

10

Multiplier

S-N

Reading

Reading

10

Test kV

R-N

Floated

Grounded

UST

Measured

Energized

Phases
Tap. Pos.1

EXCITING CURRENT MEASUREMENT

mA

8. RATIO AND SATURATION TEST OF CURRENT TRANSFORMERS IN BUSHING


TRANSFORMER SET
KESR Mh. Elektrik
ti.
Date
Name
Signature

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N

POWER TRANSFORMER
TEST REPORT
(FOR PRIMARY)

SH/OF
11 / 11

CLIENT N

REV.
Trf Name :

Rat.Power (MVA) :

Vector Symbol :

Winding

RATIO
TEST

Trf Type :

Serial No :

Year of Mfr.

Top oil Temp. :

Humidity :

Air Temp. :

TEST EQUIPMENT

SATURATON TEST

CT 2-12
S1-S3
NAME
OF MANUFACTURER
:

SERIAL NO :

CALIBRATION
DUE DATE
CT 3-13
S1-S2

MODEL

CT 3-14
Bushing
CT 3-15
CT

S1-S2

CT 3-16

S1-S2

CT 1-1

S1-S3

CT 1-2

S1-S3

CT 1-3

S1-S2
S2-S3

CT 1-4

S1-S3

CT 1-5

S1-S3

CT 1-6

S1-S2
S2-S3

CT 1-7

S1-S2

CT 1-8

S1-S3

CT 1-9

S1-S3

CT 1-10

S1-S2
S2-S3

CT 2-11

S1-S3

S1-S2
Secondary
Applied
Voltage (V)

Primary
Measured
Voltage (mV)

KESR Mh. Elektrik


ti.
Date
Name
Signature

Calculated
Ratio

Theorical Ratio

Knee
Voltage
(V)

Knee
Amper
(mA)