Sie sind auf Seite 1von 1

Ernest Medina

Mr. Burnett
NT2640

Unit 9 assignment 1
Scenario 1: The switches in the diagram booted at the same time. Based on the
information provided in the diagram fill in the chart below:
Switch Root Bridge (Y/N) Root Port(s) Designated Port(s) Forwarding Port(s) Blocking
Port(s) 1 NO ge0/0 ge0/1 ge0/1 ____ 2 YES None ge0/0, ge0/1, ge0/8 ge0/0, ge0/1,
ge0/8 ____ 3 NO ge0/0 ge0/1 ge0/1 Block, ge0/9 4 NO ge0/2 Block, ge0/0 Block,
ge0/0 Block, ge0/0
Scenario 2: The switches in the diagram booted at the same time. Based on the
information provided in the diagram fill in the chart below:
Switch Root Bridge (Y/N) Root Port(s) Designated Port(s) Forwarding Port(s) Blocking
Port(s) 1 NO ge0/0 ge0/1 ge0/1 ____ 2 NO ge0/1 ge0/0 ge0/0 Block, ge0/8 3 NO
ge0/0 Block, ge0/9 Block, ge0/9 Block, ge0/1 4 YES None ge0/2, ge0/0 ge0/2, ge0/0
____ Scenario 3: The switches in the diagram booted at the same time. Based on the
information provided in the diagram fill in the chart below: Switch Root Bridge (Y/N)
Root Port(s) Designated Port(s) Forwarding Port(s) Blocking Port(s)

Das könnte Ihnen auch gefallen