Sie sind auf Seite 1von 32

METHOD OF STATEMENT

REPAIR EMBEDED ON CORE WALL (F

We hereby confirm that this submission (for approval) complies with the contract specifications
and drawings in strict accordance with no deviation to the contract
PBI
TJP
TT - JO
Approved by:
Approved by:
Approved by:

Cons. Manager

Cons. Manager

Julius
Project Manager

Matsushita
Plan. Manager

Watanab
Cons. Man

OD OF STATEMENT

D ON CORE WALL (FLOOR 12th)

TT - JO
Approved by:

Watanabe
Cons. Manager

Prepared by :

Didik. S
QC Manager

M. Rizal
Chief QC

TJP
Approved by :

Cons. Manager

TTJO
Approved by :

Chec

Julius

Matsushita

Watanabe

Project Manager

Plan. Manager

Cons. Manager

Did

QC M

TTJO
Checked by:

Prepared by:

Didik S

M. Rizal

QC Manager

QC Chief

REPORT VERTICALITY JOINT COLUMN AND


12th FL to 14th FL

TJP
Approved by :

Cons. Manager

TTJO
Approved by :

Julius

Matsushita

Watanabe

Project Manager

Plan. Manager

Cons. Manager

Didik

QC Manag

JOINT COLUMN AND WELDING JOINT

2th FL to 14th FL

TTJO

oved by :

Checked by:

Prepared by:

Didik

M. Rizal

Catur

QC Manager

QC Chief

QC

FINAL INSPECTION REPORT


Re : FABRICATION PIPE COLUMN TIER-7
(Lv. 11 - Lv.12)
6 JANUARY 2016

TJP
Approved by :

Cons. Manager

TTJO
Approved by :

Chec

Julius

Matsushita

Watanabe

Project Manager

Plan. Manager

Cons. Manager

Did

QC M

L INSPECTION REPORT

COLUMN TIER-7

TTJO
Checked by:

Prepared by:

Didik S

M. Rizal

QC Manager

QC Chief

REPORT VERTICALITY JOINT COLUMN AND WEL


7thFL to 8thFL

TJP
Approved by :

Cons. Manager

TTJO
Approved by :

Chec

Julius

Matsushita

Watanabe

Project Manager

Plan. Manager

Cons. Manager

Did

QC M

JOINT COLUMN AND WELDING JOINT


7thFL to 8thFL

TTJO
Checked by:

Prepared by:

Didik S

M. Rizal

QC Manager

QC Chief

REPORT VERTICALITY JOINT COLUMN AND WEL


7thFL to 8thFL

TJP
Approved by :

Cons. Manager

TTJO
Approved by :

Chec

Julius

Matsushita

Watanabe

Project Manager

Plan. Manager

Cons. Manager

Did

QC M

JOINT COLUMN AND WELDING JOINT


7thFL to 8thFL

TTJO
Checked by:

Prepared by:

Didik S

M. Rizal

QC Manager

QC Chief

RESULT OF CONCRETE CYLINDER STR

TJP
Approved by :

Cons. Manager

TTJO
Approved by :

Julius

Matsushita

Watanabe

Project Manager

Plan. Manager

Cons. Manager

Didik

QC Manag

ETE CYLINDER STRENGTH TEST

TTJO

oved by :

Checked by:

Prepared by:

Didik

M. Rizal

Kenneth

QC Manager

QC Chief

QC

RESULT OF TENSILE AND BENDIN

TJP
Approved by :

Cons. Manager

TTJO
Approved by :

Julius

Matsushita

Watanabe

Project Manager

Plan. Manager

Cons. Manager

Didik

QC Manag

ENSILE AND BENDING TEST

TTJO

oved by :

Checked by:

Prepared by:

Didik

M. Rizal

Wildan

QC Manager

QC Chief

QC

Das könnte Ihnen auch gefallen