RAPP-7&8

Construction of Main Plant Civil Work- Package-I


List of Approved QAPs/ ITPs
SR.
NO
.

QAP / ITP NO.

DOCUMENT TITLE

1.

HCC P 085 17 001

2.

HCC P 085 17 002

Quality Assurance Plan (ITP) for Surveying work.


Quality Assurance Plan (ITP) for Excavation

3.

4.

HCC T 085 17
003(R2)
HCC T 085 17
004(R1)

work.
Quality Assurance Plan for construction material
testing- Cement, Fly Ash, Coarse aggregate
(Normal & heavy), Fine aggregate (Normal &
heavy), Water, Concrete admixture, Ice,
Reinforcement steel bars
Quality Assurance Plan for Fabrication and
Erection of EPs.
Quality Assurance Plan for Fabrication and

5.

HCC T 085 17 005

6.

HCC P 085 17 008

7.
8.

HCC P 085 17 010 ITP for Vertical Cyclic Plate Load test on rock.
HCC P 085 17 011 ITP for Cyclic Lateral Load test on rock.
HCC T 085 17
Grounding & Lightning Protection works.
013(R2)
HCC P 085 17
Lab test on rock samples.
037F
HCC P 085 17
Cross-hole test.
037E
Work Procedure for Packer Water Percolation Test
HCC P 085 17 023
and Consolidation Grouting.
HCC P 085 17 012 ITP for Concrete Rock Interface Shear test.
HCC T 085 17
Water proofing
020A
HCC T 085 17 021 HDPE Duct
HCC T 085 17 006 Inspection Test plan for Fabrication and erection

9.
10.
11.
12.
13.
14.
15.
16
17
18
19
20
21
22

HCC P 085 17 038


HCC P 085 17 020
HCC T 085 17 009
HCC T 085 17 023
HCC T 085 17 044
HCC T 085 17 024

Erection of Miscellaneous structural steel works.


Rotary Drilling.

of dished end for IC Dome.


Concrete Post Pour Inspection
Inspection test plan for Splicing of HSD rebar
with Bartec Coupler.
Control on Concrete
Inspection plan for Pre Stressing works
Procedure for Pre stressing works
Inspection and test plan for material testing for
pre-stressing works

REMAR
KS
Approved
Approved
Approved

Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved

SR.
NO
.

QAP / ITP NO.

23

HCC T 085 17
009(R2)

24

HCC T 085 17
009A(R1)

25
26
27

HCC T 085 17
003(R1)
HCC T 085 17
022(R2)
HCC T 085 17
022A(R2)

29

HCC T 085 17
025(R0)
HCC T 085 17
026(R0)

30

HCC T 085 17
029(R0)

31

HCC T 085 17
032(R0)

28

DOCUMENT TITLE
Inspection and test plan (QAP) for Mix desingn of
Concrete
Inspection and test plan (QAP) for Mix design of
Concrete
Quality Assurance Plan (ITP) for Construction
Material Testing
Fabrication and Erection of CV & IC liner works
QAP(ITP) for fabrication and erection of inner
containment IC liner works
ITP FOR CONSTRUCTIUON MATERIALS
Inspection and test plan for cone. Works for mic.
Main plant
QAP/ITP for fabrication & Installation of GI water
Stop
QAP FOR SPECIAL HEAVY CONCRETE

REMAR
KS
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved