Sie sind auf Seite 1von 12

PROJECT DOCUMENTATION

LINK
NAME:

SK PERMATANG DAMAR LAUT SMK BATU MAUNG

LINK ID:

71569 - 71570

REGION:

NORTHERN

SITE
ENG:

KAMAL

LINK
CONFIG: 1 + 1

DATE:

CONTENT:
1)
2)
3)
4)
5)
6)
7)

CERAGON TRANSMISSION VALIDATION SIGNOFF


ACCEPTANCE TEST CERTIFICATE
LINK BUDGET
BOQ
INSTALLATION COMMISSIONING AND TESTING REPORT
SITE PHOTOGRAPH
AS BUILT DRAWING

CERAGON TRANSMISSION
VALIDATION SIGNOFF
CTVS.xlsx

ACCEPTANCE TEST
CERTIFICATE
Acceptance
Certificates_PAC .doc

LINK BUDGET

MRF

INSTALLATION

COMMISSIONING AND
TEST REPORT
Installation Checklist
Template.docx

Commissiong
Template rev1.4.2 25J une10 R .docx

SITE PHOTOGRAPH

15a New MW
Installation Photo Templat (TMN KLEBANG J YA - SK TASEK DAMAI).xlsx

AS BUILD DRAWING

SUBMISSION DETAILS

SPC.docx

COC

COC.docx

BOQ

BOQ.xlsx

Das könnte Ihnen auch gefallen