Beruflich Dokumente
Kultur Dokumente
: MEJORAMIENTO DEL PARQUE JORGE CHAVEZ, URB. SANTA LUZMILA - ZONAL 06,
DISTRITO DE COMAS - LIMA -LIMA (I ETAPA)
: CORPORACION J& J CAM S.A.C
: ING BORIS GABRIEL RUIDIAS PEREDA CIP 63410
: INGDANIEL WISES GUILLEM VICENTE CIP 24769
: Setiembre de 2014
(K Setiembre)
S/. 181,641.46
(incl. I.G.V.)
: Mayo del 2014
(K Junio)
S/. 181,641.46
(incl. I.G.V.)
1.00000000
OBRA
EJECUTA
SUPERVISOR
SUPERVISOR
MES VALORIZADO
MONTO DEL PRESUPUESTO BASE
FECHA PRESUPUESTO BASE
MONTO DEL PRESUP. CONTRATADO
FACTOR DE RELACION (F.R.)
MONTO
CONTRATADO
AMORTIZACIONES
(ADELANTO DIRECTO
20%, MATERIALES 40%)
INCLUYE IGV
RETENCION POR
FIEL
CUMPLIMIENTO
10% INC. IGV
NETO A PAGAR
AUTORIZADO INC. IGV
N DE VALOR. O
REAJ.
MONTO
(S/.)
VALORIZACION Nro 01
01
S/. 135,231.30
S/. 0.00
S/. 0.00
S/. 135,231.30
S/. 0.00
VALORIZACION Nro 02
01
S/. 46,410.16
S/. 0.00
S/. 0.00
S/. 46,410.16
S/. 0.00
REAJUSTE
01
S/. 5,449.24
S/. 0.00
S/. 0.00
S/. 5,449.24
S/. 5,449.24
S/. 187,090.70
S/. 0.00
S/. 181,641.46
RESUMEN TOTAL
A LA FECHA
S/. 187,090.70
S/. 0.00
S/. 0.00
MONTOS ACUMULADOS
MONTOS ACUMULADO
VALORIZACION
INCLUYE REAJUSTE
AMORTIZACION
RETENCION
S/. 187,090.70
S/. 0.00
S/. 0.00
S/. 5,449.24
REAJUSTE DE LA OBRA
OBRA
EJECUTA
SUPERVISOR
MES VALORIZADO
MONTO DEL PRESUPUESTO BASE
FECHA PRESUPUESTO BASE
MONTO DEL PRESUP. CONTRATADO
FACTOR DE RELACION (F.R.)
: MEJORAMIENTO DEL PARQUE JORGE CHAVEZ, URB. SANTA LUZMILA ZONAL 06, DISTRITO DE COMAS - LIMA -LIMA (I ETAPA)
: CORPORACION J& J CAM S.A.C
: INGDANIEL WISES GUILLEM VICENTE CIP 24769
: Setiembre de 2014
(K Setiembre)
S/. 181,641.46
(incl. I.G.V.)
: Mayo del 2014
(K Junio)
S/. 181,641.46
(incl. I.G.V.)
1.00000
DESCRIPCION
MONTO
VALORIZACION
VALORIZACION 01 :
VALORIZACION 02 :
COSTO DIRECTO TOTAL
GASTOS GENERALES
UTILIDADES
7.00%
7.00%
1.00000
Vmes
R
Re
VB = Vmes + R - D
(-)
(-)
VN = VB - A
MONTO A CANCELAR
IGV 18%(VN)
100,528.78
34,500.56
135,029.34
9,452.05
9,452.05
153,933.44
153,933.44
4,618.00
3,438.08
1,179.92
0.00
0.00
0.00
0.00
0.00
0.00
158,551.44
0.00
0.00
0.00
158,551.44
28,539.26
VN+IGV
187,090.70
VN+IGV
187,090.70
OBRA
FINANCIA
EJECUTA
MOD. EJEC
SUPERVISOR
ITEM
DESCRIPCION PARTIDA
UNIDAD
CANTIDAD
01.00.00
OBRAS PROVISIONALES
01.01.00
und
1.00
01.02.00
glb
1.00
02.00.00
OBRAS PRELIMINARES
02.01.00
MOVILIZACION Y DESMOVILIZACION
glb
1.00
02.02.00
MANTENIMIENTO DE TRANSITO
est
1.00
02.03.00
GASTOS DE OPERACION
glb
1.00
03.00.00
VEREDAS
03.01.00
TRABAJOS PRELIMINARES
03.01.01
m2
1,786.13
03.01.02
m2
151.99
03.02.00
MOVIMIENTO DE TIERRAS
03.02.01
m2
1,324.19
03.02.02
m2
1,324.19
03.02.03
m3
322.61
03.03.00
03.05.01
m2
1324.19
03.05.02
m2
1236.21
03.05.03
m2
370.86
03.05.04
CURADO DE VEREDAS
m2
1236.21
03.05.05
247.24
03.05.06
m2
29.52
03.05.07
82.81
03.05.08
82.81
03.05.09
m2
58.46
03.05.10
m2
58.46
04.00.00
EQUIPAMIENTO URBANO
04.01.00
TACHOS METALICO
04.01.01
und
10.00
05.00.00
RECREACION EN PARQUES
05.01.00
POZO DE ARENA
05.01.02
m2
226.98
05.01.03
06.00.00
AREAS VERDES
06.01.00
JARDINERIA
06.01.01
06.01.02
07.00.00
VARIOS
07.01.00
m2
201.06
SEMBRADO DE GRASS
m2
209.78
SEMBRADO DE ARBOLES
und
50.00
m2
1786.13
: MEJORAMIENTO DEL PARQUE JORGE CHAVEZ, URB. SANTA LUZMILA - ZONAL 06, DISTRITO DE COMAS - LIMA -LIMA (I ETAPA)
: MUNICIPALIDAD DISTRITAL DE COMAS
: CORPORACION J& J CAM S.A.C
: CONTRATO A SUMA ALZADA.
: INGDANIEL WISES GUILLEM VICENTE CIP 24769
VALOR REFERENCIAL :
S/. 181,641.46
MONTO CONTRATADO :
S/. 181,641.46
MES DE VALORIZACION : : OCTUBRE de 2014
PRESUPUESTO BASE : : Mayo 2014
PLAZO DE EJECUCION : : 30 dias Calendarios
AVANCES
DESCRIPCION PARTIDA
UNIDAD
METRADO
PRECIO
UNITARIO
SUBTOTAL
AVANCE ANTERIOR
%
MET
SALDO
AVANCE ACTUAL
VALORIZADO
MET
AVANCE ACUMULADO
VALORIZADO
S/.
MET
VALORIZADO
S/.
MET
VALORIZADO
S/.
S/.
01.00.00
OBRAS PROVISIONALES
01.01.00
und
1.00
850
850.00
100.00
1.00
850.00
1.00
850.00
01.02.00
glb
1.00
1,800.00
1,800.00
100.00
1.00
1,800.00
1.00
1,800.00
02.00.00
OBRAS PRELIMINARES
02.01.00
MOVILIZACION Y DESMOVILIZACION
glb
1.00
1,400.00
1,400.00
75.00
0.75
1,050.00
25.00
0.25
350.00
1.00
1,400.00
02.02.00
MANTENIMIENTO DE TRANSITO
est
1.00
1,009.09
1,009.09
75.00
0.75
756.82
25.00
0.25
252.27
1.00
1,009.09
02.03.00
GASTOS DE OPERACION
glb
1.00
730.00
730.00
70.00
0.70
511.00
30.00
0.30
219.00
1.00
730.00
03.00.00
VEREDAS
03.01.00
TRABAJOS PRELIMINARES
03.01.01
m2
1,786.13
0.91
1,625.38
100.00
1,786.13
1,625.38
1,786.13
1,625.38
03.01.02
m2
151.99
14.33
2,178.02
100.00
151.99
2,178.02
151.99
2,178.02
03.02.00
MOVIMIENTO DE TIERRAS
03.02.01
m2
1,324.19
3.57
4,727.36
100.00
1,324.19
4,727.36
1,324.19
4,727.36
03.02.02
m2
1,324.19
6.76
8,951.52
100.00
1,324.19
8,951.52
1,324.19
8,951.52
03.02.03
m3
322.61
28.74
9,271.81
76.00
245.18
7,046.58
322.61
9,271.81
03.03.00
03.05.01
m2
1,324.19
17.39
23,027.66
100.00
1,324.19
23,027.66
03.05.02
m2
1,236.21
39.65
49,015.73
80.00
988.97
39,212.58
20.00
247.24
03.05.03
m2
370.86
27.00
10,013.22
80.00
296.69
8,010.58
20.00
74.17
03.05.04
CURADO DE VEREDAS
m2
1,236.21
0.79
976.61
80.00
988.97
781.28
20.00
03.05.05
247.24
6.42
1,587.28
03.05.06
m2
29.52
37.23
1,099.03
03.05.07
82.81
2.08
172.24
03.05.08
82.81
20.72
1,715.82
03.05.09
m2
58.46
4.32
252.55
03.05.10
m2
58.46
55.00
3,215.30
04.00.00
EQUIPAMIENTO URBANO
04.01.00
TACHOS METALICO
04.01.01
05.00.00
RECREACION EN PARQUES
05.01.00
POZO DE ARENA
05.01.02
m2
226.98
6.26
1,420.89
100.00
226.98
1,420.89
226.98
1,420.89
05.01.03
m2
201.06
6.76
1,359.17
100.00
201.06
1,359.17
201.06
1,359.17
06.00.00
AREAS VERDES
06.01.00
JARDINERIA
06.01.01
SEMBRADO DE GRASS
m2
209.78
9.64
2,022.28
100.00
209.78
2,022.28
209.78
2,022.28
06.01.02
SEMBRADO DE ARBOLES
und
50.00
28.27
1,413.50
100.00
50.00
1,413.50
50.00
1,413.50
07.00.00
VARIOS
07.01.00
24.00
und
10.00
403.39
4,033.90
1,786.13
0.65
1,160.98
23,027.66
9,803.15
1,236.21
49,015.73
2,002.64
370.86
10,013.22
247.24
195.32
1,236.21
976.61
100.00
247.24
1,587.28
247.24
1,587.28
100.00
29.52
1,099.03
29.52
1,099.03
100.00
82.81
172.24
82.81
172.24
100.00
82.81
1,715.82
82.81
1,715.82
100.00
58.46
252.55
58.46
252.55
100.00
58.46
3,215.30
58.46
3,215.30
100.00
m2
2,225.23
1,324.19
77.43
10.00
100.00
1,786.13
4,033.90
10.00
1,160.98
1,786.13
4,033.90
1,160.98
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUBTOTAL
FACTOR DE RELACION
IGV
135,029.34
7.00%
7.00%
1.00000
18.00%
9,452.05
74.45%
100,528.78
7,037.01
25.55%
34,500.56
100.00%
2,415.04
135,029.34
0.00%
9,452.05
9,452.05
7,037.01
2,415.04
9,452.05
153,933.44
114,602.80
39,330.64
153,933.44
153,933.44
114,602.80
39,330.64
153,933.44
27,708.02
20,628.50
7,079.52
27,708.02
181,641.46
135,231.30
46,410.16
181,641.46
100.00
CALCULO DE REINTEGROS
FORM: UNICA
OBRA
: MEJORAMIENTO DEL PARQUE JORGE CHAVEZ, URB. SANTA LUZMILA - ZONAL 06, DISTRITO DE COMAS - LIMA -LIMA (I ETAPA)
EJECUTA
SUPERVISOR
MES VALORIZADO
: Setiembre de 2014
S/. 181,641.46
S/. 181,641.46
1.000
VALORIZACION
AVANCE PROGRAMADO
MENSUAL
MES
153,933.44
ACUMULADO
AVANCE REAL
MENSUAL
ACUMULADO
COEFICIENTE
REINTEGRO PROGRAMADO
DE REAJUSTE
MENSUAL
(C =A* (K-1 ))
ACUMULADO
REINTEGRO REAL
MENSUAL
REINTEGRO RECONOCIDO
ACUMULADO
MENSUAL
ACUMULADO
(C=B*(K-1))
01
SETIEMBRE. 2014
118,066.95
118,066.95
135,231.30
135,231.30
1.030
4,056.94
4,056.94
4,056.94
4,056.94
4,056.94
4,056.94
02
OCTUBRE. 2014
63,574.51
181,641.46
46,410.16
181,641.46
1.030
1,392.30
5,449.24
1,392.30
5,449.24
1,392.30
5,449.24
: MEJORAMIENTO DEL PARQUE JORGE CHAVEZ, URB. SANTA LUZMILA - ZONAL 06, DISTRITO DE COMAS - LIMA -LIMA (I ETAPA)
: UNICA
Frmula :
Presup. Base: : Mayo 2014
Area Geogrfica 2
K = 0.380 x Jr / Jo +0.051 x Mr / Mo+ 0.149 x Cr / Co + 0.180 x Ar / Ao + 0.128 x MAQr / MAQo + 0.112 x GGUUr / GGUUo
SIMBOLO
J
M
C
A
MAQ
GGUU
I.U.
47
CONCEPTO
COEFIC.
0.380
INCIDENCIA
(BASE)
01
02
ESPECIFICA
May-14
Oct-14
Nov-14
100.00%
0.380 x Jr / Jo
45
21
AGREGADO GRUESO
48
29
DLAR
39
523.70
0.380
0.400
312.050
0.051
100.00%
313.840
0.051
0.051
0.149
100.00%
339.42
354.05
0.149
0.155
0.180
100.00%
218.32
217.20
0.180
0.179
0.128
100.00%
338.34
343.61
0.128
0.130
0.112
42.857%
385.050
403.120
57.143%
400.34
404.55
0.051 x Mr / Mo
0.149 x Cr / Co
0.180 x Ar / Ao
0.128 x MAQr / MAQo
498.10
1.000
0.112
0.115
1.000
1.030
BASE
I.U.
May-14
May-14
Oct-14
Oct-14
Nov-14
Nov-14
Dec-14
Dec-14
Jan-15
Jan-15
Feb-15
Feb-15
Mar-15
Mar-15
47
498.10
313.84
339.42
218.32
338.34
385.05
400.34
523.70
312.05
354.05
217.20
343.61
403.12
404.55
523.70
312.05
354.05
217.20
343.61
403.12
404.55
45
21
5
48
29-30
39