Sie sind auf Seite 1von 2

N

T 2

2
midi

i 1
N

Fidi
i 1

THIS IS A APPROXIMATE METHOD YOU CAN USING


BEFOREHAND SAP2000 FOR VIEWING
DISPLACEMENT,AFTER THAT YOU CAN COMPARE
PERIOD VALUE

THIS SPREADSHEET PREPARED BY ONUR A. AT GEBZE INSTITUTE OF


TECHNOLOGY

CALCULATE OF THE BUILDING PERIOD

CALCULATE OF THE SPECIAL PERIOD

STORY
8
7
6
5
4
3
2
1

F(KN)
d(m)
w(kn)
m
240.0
0.0223
2600
210.0
0.0197
2900
180.0
0.0168
2900
150.0
0.0136
2900
120.0
0.0107
2900
90.0
0.0078
2900
60.0
0.0051
2900
30.0
0.0025
3200

SUM:

265.0
295.6
295.6
295.6
295.6
295.6
295.6
326.2

m*d^2
F*d
0.132
0.115
0.083
0.055
0.034
0.018
0.008
0.002
0.446

T=

1.020

5.35
4.14
3.02
2.04
1.28
0.70
0.31
0.08

16.920

Das könnte Ihnen auch gefallen