TeReDy Perse Do Not THce Away
MARINE FPSO DESIGN BASISCONTENTS
1.0 INTRODUCTION
4.1 GENERAL
4.2 DEFINTIONS
1.3 CLASSIFICATION, RULES, REGULATIONS AND REGISTRATION
1.4 GENERAL REQUIREMENTS
4.5 WARRANTY AND PERFORMANCE GUARANTEES
1.6 MATERIALS AND WORKMANSHIP
1.7 HSE REQUIREMENTS
1.8 DRAWING LIST AND REQUIREMENTS
2.0 GENERAL DESIGN AND CONSTRUCTION REQUIREMENTS
24 SITE SPECIFIC REQUIREMENTS
2.2 DESIGN SERVICE LIFE
2.3 PRINCIPAL PARTICULARS
24 LOADING Conomions
2.5 NOISE AND VIBRATION
2.6 DOCUMENTATION
2.7 Quaury
2.8 SUPERVISION, INSPECTION AND TESTING
3.0 HULL DESIGN
3.41 GENERAL
3.2 MAINHULL
3.3. HULL ARRANGEMENT
3.4 MATERIAL CONTROL (TRACEABILITY)
3.5 FOUNDATIONS / SPECIAL STRUCTURES
3.6 CoaTINes
3.7 ANODES
3.8 EXTERIOR IMPRESSED CURRENT
4.0 HULL OUTFITTING
44 TANDEM OFFLOADING System (No CALM)
4.2 __ ALTERNATE OFFLOADING SYSTEM - REMOTE BUOY SPM DEEPWATER OFFLOADING SYSTEMWITH
‘TANDEM BACKUP
4.3 MOORING AND RISER EQUIPMENT
4.4 CARGO HANDLING SYSTEM
45 BALLAST SysTEM
4.6 BILGE AND DRAINAGE SysTEMS
47 Princ
4.8 MASTS, POSTS AND RIGGING
49 LIFESAVING
4.10 Access
4.12 HELIFUEL SYSTEM
4.13 CORROSION ConTROL4.14 SUPPLY BOAT OFFLOADING STATIONS.
5.0 ACCOMMODATION
5.1 COMPLEMENT/ CABINS
5.2 PUBLICSPACES
5.3 STORES/ PROVISION SPACES
5.4 AIR CONDITIONING SysTEM
6.0 MACHINERY
6.1 GENERAL
6.2 ELECTRIC GENERATING PLANT
6.3 AUXILIARY EQUIPMENT
64 UTILITIES Systems
65 PIPING
66 FUELOIL SYSTEM
6.7 COOLING WATER SysTEM
6.8 COMPRESSED AIR SYSTEM
6.9 FRESH WATER SYSTEM
6.10 MISCELLANEOUS F.W. SANITARY, BILGE, FIRE & WASHDECK EQUIPMENT.
6.11 CALCIUM NiTRATE SYSTEM
6.12 MISCELLANEOUS EQUIPMENT
6.13 WORKSHOP AND STORES
6.14 MAINTENANCE EQUIPMENT
6.15 VENTILATION OF MACHINERY SPACE
6.16 FLOORS, GRATING AND LADDERS IN THE MACHINERY SPACES
6.17 MACHINERY SPACE MISCELLANEOUS
6.18 ELEVATORS
7.0 ELECTRICAL
71 GENERAL DESIGN
7.2 GENERATORS
7.3 DCUPS
74 ACUPS
7.5 TRANSFORMERS
7.6 DISTRIBUTION
7.7 CABLES AND WIRING
7.8 Motors & ConTRoLs
7.9 MICROPROCESSOR EQUIPMENT
7.10 ELECTRONIC SYSTEMS AND INSTRUMENT POWER SUPPLIES
7.41 LIGHTING AND RECEPTACLES
742 Test PANEL
7.43 HELICOPTER RE-START PACKAGE
8.0 CONTROL, INSTRUMENTATION & AUTOMATION
8.1 AUTOMATION AND CENTRALIZED WATCH
8.2 FIRE AND GAS DETECTION SysTEMS
@®