(CALCULATION OF WALKWAY AT ORTH PORTAL
[pescPTION [LENGTH mi Tenor inet) HEIGHT Juris [avant
[conceeTe ios] a3 035leum 23635
[excavarion 105 a3] oslcum 73.5}
FILLING UNDER WALIWAY WITH MASS CONCRETE
(Eno, Lena ts) fore nar) HeGrTTwar) [units Tava
7 a a a5}cuMe Fr)
FILLING UNDER WALIWAY WITH STONE MASONARY
[ENO [ENG tae [eT nar) [HEGHraA Torte Taoanaiy
3] a i aslcum 403
‘BREAST Wh (b1] BACK SIDE THE WaALKWAT
[SESCRPTION [LENGTH Ge) [iO ae) HENGET ty [urns —— [avant
breast wall ES ‘07 28cm 26.1268
base po = Fe ‘Taian | a7 70is6|
free a Taal sje Taare)
ening Es aa Tislaam 7
[erenaTION a a ial Bae]
Ino. oF weePHoues an
‘BREAST WALL (b2) BACKSIDE AND FRONT SIDE THE WALKWAY
(SRCRPTION
reas al
lbcerpad
RCAVATION
No. oF weEPHOLES
[eNera ie
‘CONCRETE BEAM FOR FENCING
[oT fae
Z| 0.755
Fy FE]
Fa 133
Fa mH
Fa
ET me Toi
ileum
TBlam
Tasleam
Tile
Tom
[aan
32.975
Tes]
oa
a
sd
[ENG:
[Era ied
Mori
TET) ute
vant
3 ol
‘oaleum
3.4ran
[pescaPTON
[CONCRETE WAL
[CONCRETE RED
[STORE WALL
pee
[cavaTon
Ino.oF weEPHotes
LeNGra ie
z
a
a
x
[oni
re)
ag
[eter it)
H
a
oa
oa
i
[com
ican
ican
Icom
lca
rains
[oesourTON —[ENGTH inte [onions Gna) [RETGET my [unis evan
[conceeve wa x a ‘o7sfouw 535
[concaeTe we a a lem a7]
MASS CONCRETE
lwaut 2d ass osloum zo
lpee a a oas[eom Ba)
[ScavaTON, Fs a Os|cou Taal
Ino. oF weePHouss 2
[BESCRPTION [LENGTH mt [errr fney [REICH Tey nts away
[CONcaETE WALL wa ol 3 foun 364
[CONCRETE BED. za aa oa|cou 7a)
[STONE WALL aay a Oa|com EFC)
Ieee i a oas|eom 3a
(SCAVATION, Fr) a alow TES
Ino. oF weePHotes ul[pescapron [NTH [ware fm) HeGHT men Jurts [anny
[concreTe wa zl ____93 oz|cum aa
[GGRRETE RED al a Taleo 76]
[concneTe Wa ai a o7\cow aa
Pee al i Tis|euw aa
[EXCAVATION al i oaleow aa
‘CONCRETE SAB
(Eno: [ERSTE ime foTHee EGAT med [OTS —[ouenaty_]
3 ‘i asfeum 15335]
‘CONCRETE StAB2
Eno: NTH [Tames eign imag [ows — Tauanty
Ba a as]eun 73a
‘CONCRETE S.AB
(sno. LENST fe [MOTH regu Omen [ows — Tauantiy
a 6a ‘as|eum 178125}
Protection wall
[DESCRITION [LENGTH [THimie EIGHT imap [WTS Tauantiy
[CONCRETE WAIL a 7 25feum 233
ree. 3] 7 Tis|aam aa
[EcavATION rz 7 Telem ag
ss2
Steel Cutting Bending & Fixing
aaa : ios | tens | TOR) [Weehe al] Tear
bid SCHON ai i tT tengen | wer | weight
T eel erieal) z is = 920] 0535] 363.1863
z eel horzancl 3 3 18 30] 0.385| 2an.san9
Torm___—_612.5
FTC
‘Steel Cutting Bending & Fixing
ai : or | tong | Te [weeheintal] Toul
sno DESCRIPTION o vena | ee, ee Tee
i Seal Neal) 3 = eS [e528 306) aan.2i6|
z tee horzantal) o 32 a saa] 365) 2149136
: yom 433.1882
Steel Cutting B ing,
7 a sn] Toa preantin] Tota
Sr DESCRIPTION a vera | me eer] reat
i RAND BRDER io a 2 192] osa7] 210.5183
2 RAIN VERTICAL 10__| 15 25 203|__ost7| 184.8673
3 DRAIN BINDER 10 30 25 250] o.s7|” 18432
4 DRA 3 VERTICAL 10 us| _208 | 238.25[ 0617] is. 5207
5 DRA a BINDER 10 a a2 155] 517] 96.2563
é ‘DRAIN A VERTICAL 10 eo 26 356]___ 0171 96.2569
z RAI VERTICAL 20 35 29 | a55|asir] 700609
= DRAIN SANDER 0 as or 10s] —oni7| eaatesi|5 oe z a a Tao] 0395] soa]
30 SLAB 2 45 3s | a27s[ 0395] 168.609]
1 Dra vere 0 2 3 220] 0.617] 208.148
2 Drain finder 20 35 ise a7] 0.617] 146.2563]
Tova Wee 1743.55]
Protection wall stone masonary-3 (RM)
(Sescapmion ——[eNaTa ime [Te eg) EEG i nice
(sone wall a 1a a3feum
[based a a4 dalam
[Pee Fa) Tad Calan
fa x ag Deseo
[ExcavaTiON 3 75
Connecting Drain 1
[DESCRIPTION LENGTH) [maoTH fea) [eG mid [ones [avant
[conceere waits a oa afoum a
[concneTe eo al ia] Talcum 7a
[conceere wane a a lea a
a Fl al as |cuM
[ERCAVATION al ial 3am
[rotary
[roar
[conerae
[anion
reas wall
[wseoholes
ste!