KING ABDULAZIZ INTERNATIONAL AIRPORT

DEVELOPMENT PROJECT
(KAIA)

CONTRACT:

J-10-421-PF-00
To the Construction Manager:

DAR AL HANDASAH (DAR)

Document Type

DOCUMENT SUBMITTAL
Document No.

421-DCS-SPC-32002-R0
Document Title:

EFPS-AMAN/DMAN System Long Lead Item List

st

Date: 31 January 2013

AviBit GmbH

AviBit Document Control

Edition No.

0.1

Edition Issue Date

31.01.2013

Author

G. Reiter

AviBit Reference

ICAD-ATM/CDRL-040/LLIL-D0.1

Copy No.

Draft

Stamp here

Copyright Notice
2012, 2013 AviBit data processing GmbH, Austria
All rights reserved.
No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or
by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written
permission of AviBit.

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

2/20

Approval Table
AviBit

Date

Project
Manager

Signature

ICAD

Date

Signature

31.01.2013

P. Venton
Quality
Manager

31.01.2013

T. Leitner

Document Identification
Full Title:
Total Number of Pages:

EFPS-AMAN/DMAN System Long Lead Item List


20

Distribution
COPY No.

Role

Primary Contractor

Organisation
ICAD

Edition History
Edition No.
0.1

Issue Date
31.01.2013

Author
G. Reiter

Reason
Initial draft

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

3/20

Review Table
Edition No.

Review type, scope,


depth & focus

Reviewers

Date

Conclusion

0.1

Complete Document

P. Venton

31 Jan 2013

OK

System Release
System Release:

Edition No.:

TBP

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

4/20

Table of Contents
1.

Scope ....................................................................................................................... 7

1.1.

Identification ................................................................................................................... 7

1.2.

Purpose of this Document ............................................................................................. 7

2.

Introduction ............................................................................................................. 8

3.

Long Lead Item List ................................................................................................ 9

4.

SYSTEM DESCRIPTION ............................................................................................... 10

5.

COMPLIANCE STATEMENTS........................................................................................ 11

6.

MATERIAL LIST ......................................................................................................... 13

7.

DATA SHEETS........................................................................................................... 15

8.

TEST CERTIFICATES .................................................................................................. 16

9.

SPARE PARTS .......................................................................................................... 17

10.

Appendix A: ACRONYMS ................................................................................... 19

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

5/20

List of Tables
Table 1 Aerodrome System Deployment ............................................................................................... 7

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

6/20

1. SCOPE
1.1.

IDENTIFICATION

This document describes the Long Lead Item List used for the ICAD New Jeddah Tower Project.
King Abdulaziz International Airport (KAIA) is expanding its runway and passenger capability. To facilitate
this expansion, a new Air Traffic Control Tower (ATCT), a new West Support Tower, a new passenger
terminal, transport facilities and support buildings will be constructed.
The new airport will initially support up to 30 million passengers per year, growing to 45 million in the first
few years to an eventual capacity of 80 million passengers per year.
The expansion creates a need to extend and add to the Air Traffic Management Systems in order to
provide safe and efficient air traffic control services as the volume of air traffic increases.
These systems will be fully integrated giving users access to timely, accurate and consistent information
as and when needed as well as the control functions necessary for reliable and effective management of
air operations.
This project foresees deployment for the AviBit systems shown in the following table at KAIA in Jeddah:
Aerodrome

System to be delivered
DIFLIS;

KAIA Jeddah

AMAN/DMAN;
Table 1 Aerodrome System Deployment

1.2.

PURPOSE OF THIS DOCUMENT

This document identifies those items that should be ordered before the provisioning conference and the
subsequent spares order, because of the extensive production lead time.

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

7/20

2. INTRODUCTION
The Long Lead Item List (LLIL) is provided to identify those recommended spare items that, because of
extensive production lead time, should be ordered before the provisioning conference and the
subsequent selected spares order. An item qualifies as "long lead" if its production lead time is more than
one year.

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

8/20

3. LONG LEAD ITEM LIST


None of the system parts used by AviBit are considered long lead items. All production lead times are
less than one year.

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

9/20

4. SYSTEM DESCRIPTION
NOT APPLICABLE FOR THIS DOCUMENT

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

10/20

5. COMPLIANCE
STATEMENTS
NOT APPLICABLE FOR THIS DOCUMENT

421-DCS-SPC-32002-R0

EFPS-AMAN/DMAN System Long Lead Item List

11/20

Material Compliance with Project Specifications


Submittal Title:

Rev. No.

Facility Code:

Sub-Contractor:

Area of Application:

Project Specifications

Material Specifications
Compliance

Specifications
Specifications
No.

Clause

Standard
Reference

Specifications

Standard
Reference

Remarks
Supplier

Contractor

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

12/20

The Construction Manager:

King Abdulaziz
International Airport

The Contractor:

Development Project
(Phase I) Jeddah, KSA

6. MATERIAL LIST
NOT APPLICABLE FOR THIS DOCUMENT

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

13/20

The Construction Manager:

King Abdulaziz
International Airport

The Contractor:

Development Project
(Phase I) Jeddah, KSA

Sr.#

Product Number

Product Description

Sub-Header

Sub-Header

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

14/20

The Construction Manager:

King Abdulaziz
International Airport

The Contractor:

Development Project
(Phase I) Jeddah, KSA

7. DATA SHEETS
NOT APPLICABLE FOR THIS DOCUMENT

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

15/20

The Construction Manager:

King Abdulaziz
International Airport

The Contractor:

Development Project
(Phase I) Jeddah, KSA

8. TEST CERTIFICATES
NOT APPLICABLE FOR THIS DOCUMENT

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

16/20

The Construction Manager:

King Abdulaziz
International Airport

The Contractor:

Development Project
(Phase I) Jeddah, KSA

9. SPARE PARTS
NOT APPLICABLE FOR THIS DOCUMENT

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

17/20

The Construction Manager:

King Abdulaziz
International Airport

The Contractor:

Development Project
(Phase I) Jeddah, KSA
Sr.#

Product Number

Product Description

Qty

Sub-Header

Sub-Header

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

18/20

10.

APPENDIX A: ACRONYMS
Acronym

Description

A
AMAN

Arrival Manager

ATCT

Air Traffic Control Tower

ATM

Air Traffic Management

CDRL

Contract Deliverables Requirements List

DAR

Dar Al Handasah

DIFLIS

Departure Information Flight List System

DMAN

Departure Manager

ICAD

Innovative Contractors for Advanced Dimensions

KAIA

King Abdul Aziz International Airport

KSA

Kingdom of Saudi Arabia

LLIL

Long Lead Item List

TBP

To Be Provided

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

19/20

DOCUMENT FINAL PAGE

421-DCS-SPC-32002-R0
EFPS-AMAN/DMAN System Long Lead Item List

20/20

Das könnte Ihnen auch gefallen