TS Gedung Bogor
TS Gedung Bogor
PROYEK
PEKERJAAN
LOKASI
NO
URAIAN PEKERJAAN
BOBOT
%
I.
PEKERJAAN PERSIAPAN
A.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
A.
B.
C.
D.
E.
III.
PEKERJAAN ARSITEKTUR
A.
PEKERJAAN LANTAI I
B.
PEKERJAAN LANTAI II
C.
E.
PEKERJAAN HALAMAN
IV.
A.
PEKERJAAN PANEL
B.
PENGKABELAN PANEL
C.
D.
Jun - 16
3
Bulan ke- 1
256,391,920.00
0.4433
3,411,163,930.00
2,449,810,376.00
2,448,481,394.00
1,127,091,602.00
1,222,750,660.00
5.8984
4.2361
4.2338
1.9489
2.1143
4,186,233,348.00
5,346,216,426.00
5,762,168,435.00
35,642,500.00
4,436,970,869.00
7.2386
9.2444
9.9637
0.0616
7.6722
1,856,402,260.71
1,417,840,014.50
3,919,957,774.23
65,744,000.00
3.2100
2.4517
6.7782
0.1137
Jul - 16
7
Aug - 16
8
Bulan ke- 2
Bulan ke- 3
0.2216707578 0.2216707578
0.9830721828
0.9830721828
0.9830721828
0.706017208
0.9830721828
0.706017208
0.9830721828
0.706017208
0.7056342052
0.9830721828
0.706017208
0.7056342052
0.7238648695
0.7238648695
0.9244439891
0.706017208
0.7056342052
0.3248194529
0.7239
0.9244439891
0.9963685623
10
Aug - 16
11
12
13
Bulan ke- 3
0.706017208
0.7056342052
0.3248194529
0.7239
0.9244439891
0.9963685623
0.0088044896
0.8025020755
14
Sept - 16
15
16
17
Bulan ke- 4
18
Oct - 16
19
Bulan ke- 5
0.7056342052
0.3248194529
0.352387685
0.7056342052
0.3248194529
0.352387685
0.3248194529
0.352387685
0.3248194529
0.352387685
0.352387685
0.352387685
0.7239
0.9244439891
0.9963685623
0.0088044896
0.9590266094
0.7239
0.9244439891
0.9963685623
0.0088044896
0.9590266094
0.7239
0.9244439891
0.9963685623
0.0088044896
0.9590266094
0.7239
0.9244439891
0.9963685623
0.0088044896
0.9590266094
0.7239
0.9244439891
0.9963685623
0.0088044896
0.9590266094
0.7239
0.9244439891
0.9963685623
0.0088044896
0.9590266094
0.9244439891
0.9963685623
0.9963685623
0.9590266094
0.9590266094
Nop - 16
20
21
22
Bulan ke- 6
S Curve
PROYEK
PEKERJAAN
LOKASI
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
URAIAN PEKERJAAN
BOBOT
%
PEKERJAAN PERSIAPAN
Sondir Tanah
Pengukuran dan Pematokan ( Bouwplank )
Direksi Keet/Sewa Bangunan
Dokumentasi dan Pelaporan
Mobilisasi dan Demobilisasi
Koordinasi Lalu lintas
Penyediaan Lahan Kerja
Papan Nama Proyek
Bongkaran Bangunan Lama
PEKERJAAN BORED PILE DIA =50 CM, 30 TITIK , TINGGI = 8 METER
Pek. Galian Tanah Pondasi
Pek. Bored pile dia 50
Pengeboran
Pek. Tiang Bored Pile
Cassing
Pembesian
Beton K-350
PEKERJAAN BANGUNAN BAWAH
Lantai Kerja
Baja Tulangan Beton Struktur Abutmen
Bekisting Beton Stuktur Abutmen
Beton Ready Mix K-350 Struktur Abutmen
Bekisting Beton Stuktur sayap dan Plat Injak
Baja Tulangan Beton untuk sayap dan Plat Injak
Beton Ready Mix K-350 Struktur sayap dan Plat Injak
PEKERJAAN BANGUNAN ATAS JEMBATAN
Unit Pracetak Gelar Type I bentang = 35.8 M, H = 2.10 M
Beton K-500 ( Pengadaan, Pengiriman, Stresting, Erection )
Diafragma t-20 cm, K-350 ( Pengadaan + Pemasangan )
Deck Slab t-7 cm, K-350 ( Pengadaan +Pemasangan )
Pasang Elastomeric Bearing Plat 40 x 50
Pasang Pipa Air Drainase 3" (Deck Drain)
Baja Tulangan Untuk Plat
Beton Ready Mix untuk Plat
Expansion Joint
Baja Tulangan Barrier dan Trotoar
Bekisting Struktur Barrier dan Trotoar
Beton Ready Mix K-225 Untuk Barrier dan Trotoar
Railling Jembatan
Lapis Perekat Permukaan Lantai dengan Teack Coat
Lapis Hotmix Tebal 3 cm untuk lantai
PEKERJAAN JALAN PENDEKAT
Pasangan Batu Untuk Penahan Tanah dan lonengan
Plesteran
Timbunan Tanah Pilihan
LPA Klas A
Perkerasan Jalan Beton
PEKERJAAN PENGECATAN
1 Pengecatan
4,190,173,400.00
41,901,734.00
20,950,867.00
41,901,734.00
41,901,734.00
125,705,202.00
41,901,734.00
83,803,468.00
4,190,173.40
16,760,693.60
83,803,468.00
20,950,867.00
41,901,734.00
41,901,734.00
20,950,867.00
83,803,468.00
125,705,202.00
1.0000
0.5000
1.0000
1.0000
3.0000
1.0000
2.0000
0.1000
0.4000
0.25
5
6
Bulan ke- 2
0
0
0.1666666667 0.1666666667
0.3333333333
0.1428571429 0.1428571429 0.1428571429
0
0.1666666667
0.3333333333
0.1428571429
0.25
0.4
0.0333333333
0.08
0
0.0666666667
0.0055555556
0.0133333333
0
1.2
2
1.2
2.0000
0.5000
1.0000
1.0000
0.5000
2.0000
3.0000
83,803,468.00
125,705,202.00
209,508,670.00
2.0000
3.0000
2.0000
5.0000
2.0000
3.0000
5.0000
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
125,705,202.00
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
83,803,468.00
83,803,468.00
83,803,468.00
83,803,468.00
83,803,468.00
2.0000
2.0000
2.0000
2.0000
2.0000
125,705,202.00
TOTAL =
3.0000
100.00
83,803,468.00
125,705,202.00
83,803,468.00
209,508,670.00
May - 16
2
3
Bulan ke- 1
0.3333333333
0.1428571429
1
0
Err:522
Jun - 16
7
0.1428571429
1.3333333333
Jul - 16
10
Bulan ke- 3
0.1428571429
0.25
Err:522
Err:522
Err:522
0.3333333333
1
0.125
0.25
0.0555555556
1
0
0.39
1.07
5.04
0.73
7.24
Err:522
Err:522
Err:522
per Minggu
0.39
1.47
6.51
7.24
Err:522
Err:522
4,190,173,400.00
Err:522
0.03125
0
0.3333333333
Err:522
Err:522
0
1.3333333333
0.25
1.45
Err:522
Err:522
Err:522
Err:522
Err:522
0.0833333333
0
1
1
2.08
Err:522
Err:522
Jul - 16
11
Bulan ke- 3
12
0
0
0.3333333333
13
14
Aug - 16
15
Bulan ke- 4
16
17
18
Sept - 16
19
Bulan ke- 5
Oct - 16
20
21
22
Bulan ke- 6
0
0
1.5
0
1.5
1
0.75
0.375
0
1
2.5
0
0
2.5
1
0
0
1
1.5
1.6666666667
0
0
1.5
1.6666666667
1.6666666667
0
0.75
0.75
0
0
0
0
0
0
1.5
0
0
0
0
3.0
1.50
1.50
3.0000
3.0000
3.0000
1.5
1.5
3.0000
1.5
0.5
0.5
0.5
0.5
0.5
0.5
1
1
0.33
1.50
3.63
3.50
3.50
4.17
14.79
4.67
1.67
1.50
5.50
13.33
13.00
9.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
37.50
K
PE
PEK. PERSIAPAN
2
K
U
R
T
.S
R
TU
14
16
4
PEK. ARSITEKTUR
16
PE
K
.M
EK
14
AN
IK
AL
18
PEK. PENYAMBUNGAN
18
EL
ET
RI
KA
L
16
10
RINCIAN PEKERJAAN
1
A.
PEKERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
2
A.
B.
C.
D.
E.
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR DIBAWAH ELV -0,05
PEKERJAAN STRUKTUR ELV. -0,50 s/d 4,20
PEKERJAAN STRUKTUR ELV. + 4.20 m s/d + 8.40 m
PEKERJAAN STRUKTUR ELV. + 8.40 m s/d + 12.65 m
PEKERJAAN STRUKTUR ATAP BAJA ELV. + 12,65 m s/d 22,02 m
3
A.
B.
C.
D
E.
PEKERJAAN ARSITEKTUR
PEKERJAAN LANTAI I
PEKERJAAN LANTAI II
PEKERJAAN LANTAI III
PEKERJAAN KULIT LUAR BANGUNAN
PEKERJAAN HALAMAN
4
A.
B.
C.
D.
E.
F.
G.
H.
I
J.
K.
L.
PEKERJAAN ELEKTRONIK
PEKERJAAN MASTER ANTENA TELEVISION ( MATV )
PEKERJAAN CCTV
PEKERJAAN KABEL DATA
PEKERJAAN TELEPON
PEKERJAAN TATA SUARA / SOUND SISTEM
PEKERJAAN INSTALASI FIRE ALARM
PEKERJAAN NURSECALL
PEKERJAAN GAS MEDIS
A.
B,
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
PEKERJAAN MEKANIKAL
PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN LIFT
PEKERJAAN DEEP WEEL
PEKERJAAN POMPA & PIPA AIR BERSIH
PEKERJAAN PERALATAN UTAMA AIR PANAS
PEKERJAAN PIPA AIR KOTOR DAN AIR BEKAS & VENT
PEKERJAAN MESIN IPAL
PEKERJAAN AC R. MESIN LIFT
PEKERJAAN GENSET
PEKERJAAN AC
PEKERJAAN FLOOR DRAIN & CLEAN OUT
PEKERJAAN SANITAIR
BIAYA PENYAMBUNGAN
NCIAN PEKERJAAN
24
24
: LINTASAN KRITIS
: DUMMY