Beruflich Dokumente
Kultur Dokumente
Content
1
Successful Cases
Container
System
Cabinet
Management
System
Cabling
System
Rack
System
Cooling System
Project Scope
ITEM
Description
Generally consulting and Designing activities are necessary for a data center project, help the owner
Project preparation
to choose suitable solution and products, also provide all kinds of products specification and draft
design, these documents are often used to make a project tender.
1.Construction of building or room renting for IDS2000 modular data center
Site Preparation
2. An open field and basic site construction such as civil work needed for IDS1000 container data
center solution.
Power system1
High voltage (HV) system, include Transformer, Diesel Generator ,Fuel Tank, HV Distribution System.
Light voltage (LV) system,include UPS system for IT equipement, Battery system for IT
Power system2
equipement,UPS and Battery system for continuous cooling, LV Power Distribution system
Racks system
All kinds of racks, Server Cabinet, Cabling Cabinet , Aisle containment , and container body.
Cooling system
Air-conditioner indoor units in IT room and power room
Unified data center management system, include Hardware and software, license,basic
Management system management fuctions for all facilities,security system, value added fuction :energy efficiency
management fuction,asset management
Fire protection system FM200, coverage, include control unit, cylinders, gas, pipe, sensors, etc
Cabling System
Include Cable tray,Cat 6 UTP cable, OM3 Fiber, patch panel, for 75cabinetsTelecom cabling system
Service
Product training, I&C, maintenance
Responsible
HUAWEI
Customer
Customer
HUAWEI
HUAWEI
HUAWEI
HUAWEI
HUAWEI
Customer
HUAWEI
Layout
Summary Description:
Total area:
40 ft All-in-one container: 12.192*2.438=29.72
Power
Cooling
Structure
customer scope
ATS
UPS
lighting
Battery
Container DC
In row A/C
AC Load + Monitoring
Fire protection
Management
Power
Cooling
Structure
Fire protection
Management
Reliable lightning-proof
Ground bars
connect with
grounding grid
bypass switch.
by earthing point .
earthing point
Power
Cooling
Structure
Fire protection
Management
In-Row cooling: 20 kW cooling capacity in-row AC with 3+1 redundancy ,DX cooling type , horizontal air flow,
Superior operation and maintenance experience
9
Power
Cooling
Structure
Fire protection
Management
Associated cabinet
design, saves space
Triple cabinet can
support 1200mm wide
standard mounting.
High quality Cabinet material, reliable welding structure, protect equipment to avoid the external damage.
10
Power
Cooling
Structure
Fire protection
Management
sprayer
each aisle
Controller
Manual start/stop button
Gas cylinder
Emergency light
(each aisle)
Power
Cooling
Structure
Fire protection
Report Mgt
View Mgt
3D View
Capacity
Mgt
Energy Mgt
Work-flow Mgt
Northbound
interface
Platform
Server
System interface
Collector
Water
leakage
T&H
ECC
Cooling devices
Environment
devices
Smoke
License
Web UI
Air
Condition
12
Chillers
Security devices
Power devices
UPS
PDU
Access
Video
Management
8-10 week
1 week
Prefabrication in factory
Power
Installation on site
Rack
Decoration
Cooling
Anti-fire
Flexible
Smart
Fast
13
On-demand Deployment
Business
Power
Fast
Flexible
N+X to 2N
Smart
Flexible
14
Copy of facility
container
Cooling
Dynamic
Including monitoring
on UPS, PDF, ATS
and air conditioner
Fast
Flexible
Video
Smart
Monitoring DC or
module through
camera
Smart
15
Environment
Monitoring DC
operation
environment through
temp.& humi. sensor
Security
Access control
through access door
and card reader
Warning
Real-time monitoring
Flexible warning
methods, like sms, email, sound, displayer
E-work order
Warning data base
store the warning
analysis to guide
maintenance job
Fast
Flexible
Smart
Smart
16
Report
Template build-in
abundant report
template and pattern
Customization possible
to customize report,
more convenient
Inquiry support various
type of inquiry, data
graphic visualization
Capacity
Efficiency
Real-time
monitoring
on power
consumption of
infrastructure
Statistics
on equipment power
consumption
Optimization
suggestion to raise
efficiency
KCC Painting
8 degree anticorrosion
Ultimate Temp.
Weather Proof
-40 to 55 degC
Wide Range
17
Class
IP56
Easy Delivery
Anti-seismic
recognized by classification
society, connection ports
embedded, convenient to
deliver
rd
3 class road1000km
delivery tested
9 degree intensity
anti-seismic
Rigid connection from
top to bottom
Content
1
Successful Cases
18
6 months time-to-market
Harsh Environment
Insufficient technical support
Huawei solution
10 weeks delivery
with CT equipment
Yangon DC
19
Myanmar
20
Myanmar
2K
Phase1
The legacy data center is not enough for the fast business development
Modular design to meet the phased deployment
Tier 3 certification
Annual PUE<1.2 and transient PUE<1.3
Benefits
Phase2
Huawei Solution
Benefits
21
THANK YOU
Copyright2013 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future
product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in
the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the
information at any time without notice.