Beruflich Dokumente
Kultur Dokumente
VESSEL
LOCATION
TANGGAL
NO.
ITEM
CHECK POINTS
Operate satisfactorily.
Safety devices function properly.
Remote control function properly.
Check the alarm lamp operation
Oil pressure 0.49 to 0.64 Mpa / 5.0 to 6.5
kgf/cm2 ( during operation )
Oil pressure 0.2 to 0.29 mpa / 2 to 3
kgf/cm2 ( standard pressure / no load )
Coolant temperature gauge 70 to 80 C
MAIN ENGINE
( during operation )
PORTSIDE
Water level at expansion tank
(CUMMINS KTA 38 Check condition and level the Engine Oil
M2)
The oil filter and by pass oil filter
Condition of The Zinc Rods
Condition of the V- Belt
Measure Deflection of The V-Belt
( 10 to 15 mm)
Damper vibration
Color of exhaust smoke
Sea water discharging volume
Tightening torque of bolts
Operate satisfactorily.
Oil pressure 4.0 to 5.0 bar
( Clutch disengaged )
Oil pressure appr. 22 bar
( Clutch engaged)
Oil level ( between " Min " and " Max" )
and condition of The Oil
GEARBOX PORT
(TWIN DISC MGX Oil temperature from the Thermometer
( 30 to 60 C and max 70 C )
5321 DC)
Running
hours
:
:
:
TB LSBL IX
SEI. PITUNG
29 JULI 2015
SATISFACTORY
REMAKS
Yes
Yes
Yes
Yes
No
No
No
No
Good
Good
Yes
No
Yes
No
Yes
No
Good
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Good
Good
Yes
No
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
Yes
No
Yes
No
Yes
No
Good
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Good
Good
Yes
No
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
Yes
No
Yes
No
Yes
Yes
Yes
No
No
No
Berfungsi
Good
Good
Good
Good
Good
Good
Good
Berfungsi
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
NO.
4
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
GM.83 )
ITEM
CHECK POINTS
Air Filter
Condition of the Viscous Damper
Lubricating Oil Pressure
( 280 kN/m2 / 2.5 kgf/cm2 )
Operate satisfactorily.
ALTERNATOR
Abnormal vibration
(MAGNAPLUS MPH
Synchronasation system
754)
Output voltage
Operate satisfactorily.
MAIN ENGINE
Safety devices function properly.
PORTSIDE
Water level at Expansion Tank
(CUMMINS KTA 38 Condition of the V - Belt
M2)
Measure deflection of the V - Belt
GENERATOR
(10 mm )
ENGINES
Condition The Oil and Level Oil
STARBOARD (
( Full mark )
CUMMINS 6 BT5-9- Lubricating Oil Filter
GM.83 )
Color of exhaust smoke
Sea water discharging volume
Air Filter
Condition of the Viscous Damper
Lubricating Oil Pressure
( 280 kN/m2 / 2.5 kgf/cm2 )
Operate satisfactorily.
ALTERNATOR
Abnormal vibration
(MAGNAPLUS MPH
Synchronasation system
754)
Output voltage
Operate satisfactorily.
FIRE SISTEM
Water level at expansion tank
Abnormal noise and vibrate
Operate satisfactorily.
Abnormal noise and vibrate
leakage from the pump casing
FIRE PUMP
Greasing
All valves operate satisfactorily.
Piping in good order.
Operate satisfactorily.
EMERGENCY FIRE leakage from the pump casing
PUMP
All valves operate satisfactorily.
Piping in good order.
Ballast pump Operate satisfactorily.
BALLAST SYSTEM No heavy corrosion and leakage.
PORT & STBD
All valves operate satisfactorily.
Piping in good order.
Bilge & GS Pump operate satisfactorily.
BILGE & GS
No heavy corrosion and leakage.
SYSTEM
All valves operate satisfactorily.
Piping in good order.
Sea water cooling Pump operate
satisfactorily.
SEA WATER
No heavy corrosion and leakage.
COOLING SYSTEM
All valves operate satisfactorily.
Piping in good order.
Fuel oil Pump operate satisfactorily.
No heavy corrosion and leakage.
FUEL OIL SYSTEM All valves operate satisfactorily.
Piping in good order.
Emergency stop operating satisfactorily
Dirty oil Pump operate satisfactorily.
No heavy corrosion and leakage.
DIRTY OIL SYSTEM
All valves operate satisfactorily.
Piping in good order.
SEWAGE
Operate satisfactorily.
TREATMENT
Remote and control function properly.
PLANT
Meters and gauges in good order.
Operate satisfactorily.
OILY WATER
Remote and control function properly.
SEPARATOR
Meters and gauges in good order.
HYDRAULIC
Operate satisfactorily.
POWER PACK AND Remote and control function properly.
CONTROL
Meters and gauges in good order.
No heavy corrosion and leakage.
PIPING
All valves operate satisfactorily.
BLOWER E/R
Operate satisfactorily.
EMERGENCY
Operate satisfactorily.
STEERING
CONTROL
Operate satisfactorily.
CONSOL
COMMUNICATION
Operate satisfactorily.
SYSTEM
CLEANLINESS of
Must be clean without rubbish or waste oil.
E/R
GUARDS AND
Protection covers and/or guards in good
FENCING
order.
QUICK CLOSING
VALVE
Lighting in E/R
Running
hours
SATISFACTORY
REMAKS
Yes
Yes
No
No
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Good
Yes
No
Good
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Operate satisfactorily.
Yes
No
Yes
Yes
No
No
Yes
No
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
NO.
25
26
27
28
29
30
31
1
ITEM
Lighting in Acc.
Spaces
Lighting in working
room, steering room
Emergency lights
Insulating mats
around MSB
CHECK POINTS
Running
hours
SATISFACTORY
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Yes
No
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
REMAKS
Bena Sopan R.
Abdi Subiantoro
Chief Engineers
Date : 29 Juli 2015
Technical Superintendent
Date : 29 Juli 2015