Site test Reports

Sl
No
1

Equipments
Switchboard
(HT)

Test
equipments
Bus bar
Breaker

CT

PT

LA
Ammeter
Voltmeter
Relay

Type of test
(Installation)

1. Breaker racking (IN/OUT)


2. Vacuum check
3. Operation
3.1.
Normal closing/ Tripping
3.2.
Emergency Tripping
3.3.
Anti-pumping
3.4.
Local/Remote operation
Visual inspection
Terminal cover

Type of test
(Commissioning)

Remarks

IR
Hipot
IR
Contact Resistance Test
Timer/ Timing test
Coil resistance measurement
Hipot
Scheme (ON/OFF/TRIP/LED/ ANNUINCIATOR)
IR
Polarity test
Secondary winding Resistance
Current ratio test (Relay/ MFM/ Ammeter)
Knee point Voltage test
IR
Polarity test
Secondary winding Resistance
Voltage ratio test (Relay/ MFM/ Ammeter)
Knee point Voltage test

General

IR

Panel/ Fdr wise

Calibration test/ Current ratio test


Selector switch check
Calibration test/ Voltage ratio test
Selector switch check
1. Measured value test
1.1.
Current
1.2.
Voltage
2. Synchronization check
3. O/C, E/F protection
4. Breaker failure protection
5. U/V protection
6. Relay checklist (BI/BO/LED/Trip/ Final

Panel/ Fdr wise

Panel/ Fdr wise

Primary current
injection to be done.

Cables

MFM
HT Cable

1. IR ( Before & after laying)

LT Cable

1. IR ( Before & after laying)

Control cable 1. Core identification.


2. Core continuity.

Transformer

Capacitor
bank

setting)
7. Other any
Ratio test
1. Phase sequence/ Continuity
2. IR ( Before & after Hipot)
3. Hi-pot
2. IR ( Before & after Connection)
3. Phase sequence/ Continuity
3. Core identification.
4. Core continuity.