PENGAJUAN PENAWARAN ADDENDUM PEKERJAAN

STOCK YARD PT CAHAYA INDOTAMA ENGINEERING CIBITUNG

No.

I
1

JENIS PEKERJAAN

SAT

Ongkos,
Matrial ,
Alat berat

27.5

m2

1,600,000

44,000,000

25,000,000

23.3

1,600,000

37,200,000

37,200,000

2.0

set

5,000,000

10,000,000

10,000,000

VOL

PEKERJAAN PINTU GERBANG , PERKUATAN

Satu Set pintu gerbang t. 2,5 m x 11 m (merah)


- UNP 8
- hollow 5 (3 mm)
- siku 5
- Plat galvanis 2 mm
- ornamen
- roda D14
Satu Set pintu gerbang kupu- kupu t. 2,5 m x 9.3 m
- UNP 8, hollow 2mm
- Plat galvanis 2 mm
- Dua (2) set tiang (full cor)
Akses masuk
- Pengaspalan Jalan masuk
* Hotmix/Sensit
* Primer
* Upah gelar
* Pemadatan (stum - sewa + mobdemob)

JUMLAH

TOTAL

15.2
40.0
39.2
1.0

ton
ltr
m2
ls

1,600,000

24,384,000

24,384,000

21,000

840,000

840,000

25,000

980,000

980,000

4,000,000

4,000,000

4,000,000
102,404,000

II PEKERJAAN PEMINDAHAN TIANG


1 Tiang Listrik
- Material tiang listrik
- Jasa pemindahan
- Beban pemadaman
2 Tiang Telpon

1.0

4.0

set
ls
ls
set

4,213,000

4,213,000

4,213,000

1,897,371

1,897,371

1,897,371

2,920,000

2,920,000

2,920,000

1,500,000

6,000,000

6,000,000
15,030,371

III PEKERJAAN SALURAN/ DRAINASE


1 Gorong-gorong saluran
- 2 Pipa beton diameter 40 cm x 13 m'
- Pancang 40 x 40 (dua sisi) x 13 m'
2 Valve (outlet) buangan air hujan
3 Pekerjaan Pasangan Batu Kali 2 sisi (pemasangan + repair)
1 pc : 6 psr
4 Tutup saluran (deker)

500,000

13,000,000

13,000,000

500,000

13,000,000

13,000,000

54,000

4,050,000

4,050,000

70.0

m'
m'
pcs
m'

675,000

47,250,000

47,250,000

70.0

m'

320,000

22,400,000

22,400,000

26.0
26.0
75.0

99,700,000

IV
1
2
3
4

PEKERJAAN PEMBONGKARAN PAGAR PANEL


Pembongkaran panel (jasa + material loss)
Pembongkaran Ring balok (jasa + material loss)
Pembongkaran Sloof (jasa + material loss)
Pembongkaran Slab + Pancang (jasa + material loss)
- Sewa Excavator 25 jam (termasuk mobdemob, uang makan operator)
- Solar 25 jam

14
14
14
12
25
250

m'
m'
m'
m'
jam
Ltr

670,000

9,380,000

70,000

980,000

980,000

95,000

1,330,000

1,330,000

750,000

9,000,000

9,000,000

7,500,000

7,500,000

2,975,000

2,975,000

11,900

9,380,000

31,165,000

V PEKERJAAN CUTTING DAN SILENT BETON


(material aspal + jasa cutting beton dan aplikasi aspal)

- Bentangan melintang
- Bentangan membujur

2,085.6
1,768.7

m'
m'

32,000

66,739,840

66,739,840

32,000

56,597,440

56,597,440
123,337,280

Jumlah Total

371,636,651

Bekasi, 08 Oktober 2015