NO

JENIS BAHAN

BAHAN AGREGAT KASAR, BAHAN


PEREKAT DAN BAHAN JADINYA
Pasir Urug
Sirtu
Pasir Pasang
Pasir Beton
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Tempel Hitam
Bata merah kelas I
Inter Blok Natural 6 cm
Paving Blok natural 8 cm
Paving Blok Warna 6 cm
Kanstin Paving Blok
Glass Block
Semen PC Tiga Roda / 50 kg
Semen Putih
Semen warna
Aspal (ESO) 1 Drum 150 kg

SATUAN

HARGA BAHAN
Rp.

m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
bh
m2
m2
m2
m1
m2
zak
kg
kg
kg

70,000.00
150,000.00
240,000.00
250,000.00
250,000.00
250,000.00
250,000.00
250,000.00
175,000.00
80,000.00
500.00
25,000.00
28,000.00
30,000.00
30,000.00
15,000.00
40,000.00
3,500.00
3,500.00
8,000.00

Dempul Kayu Cap Kucing


Dempul Kayu Avian
Meni Kayu/ Besi
Sincromat
Cat Kayu pinoguar
Cat Besi Seiv
Cat Kayu Avian
Cat Besi Duco Danaglos / ICI
Lem Kayu Putih (Fox)
Lem Kayu Kuning (AIBON)

kg
kg
bh
bh
bh
5 ltr
bh
bks
ltr
kg
kg
ltr
ltr
lbr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

18,000.00
5,100.00
15,000.00
5,000.00
5,000.00
12,000.00
7,500.00
1,000.00
2,500.00
6,000.00
21,500.00
2,000.00
18,000.00
2,500.00
9,500.00
6,000.00
20,000.00
60,000.00
24,000.00
60,000.00
45,000.00
130,000.00
8,500.00
14,000.00

BAHAN KAYU BERIKUT BAHAN JADINYA


Kayu Terentang
Kayu Balok Borneo Super
Kayu papan Borneo Super
Kayu kaso 5/7 Borneo Super

m3
m3
m3
m3

310,000.00
1,700,000.00
1,700,000.00
1,700,000.00

BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA
Plamir Tembok Ex. Paragon
Cat Tembok Sanlex
Rool Cat Tembok
Kape Tembok
Kape Kayu
Soligneum 1 Blek
Kwas 3 "
Otem (Pewarna Plitur)
Spirtus
Bahan Plitur Kripik (Sirlak India)
Dempul Halus/ Infra (Wood Filler)/Impra
Terpentin
Tiner
Ampelas

NO

JENIS BAHAN

SATUAN

HARGA BAHAN

Kayu 5/10 kayu awet kls I


Kayu Awet Kls I
Kayu KAMPER
Kayu Balok Rasamala
Kayu papan Rasamala
Kayu Balok Kamper Medan (Kruing)
Kayu Papan Kamper Medan (Kruing)
Kayu Balok Kamper Banjar
Kayu Papan Kamper Banjar
Kayu Balok Kamper Samarinda
Kayu Papan Kamper Samarinda
Kayu Jati jabar
Dolken 5 s/d 7
Dolken 7 s/d 10 / kaso 4/6 untuk stootwork
List Profil kamper 1 cm
List Profil kamper 2 cm (45x45)
Kayu Reng 2/3 Borneo Super
Kayu Reng 3/4 Borneo Super
kayu ulin

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt
m1
m1
m1
m1
m3

Rp.
1,700,000.00
1,250,000.00
3,600,000.00
2,100,000.00
2,100,000.00
1,600,000.00
1,600,000.00
2,100,000.00
2,100,000.00
5,500,000.00
5,500,000.00
7,000,000.00
7,000.00
11,500.00
1,000.00
2,750.00
1,500.00
3,000.00
1,650,000.00

BAHAN PENUTUP RANGKA PLAPON


Bahan Plapon Eternit 4 mm
Kalsiboard
List Kayu 4 / 4
List Kayu 5 / 5
Gypsum 9 mm

lbr
lbr
btng
btng
lbr

42,500.00
38,000.00
18,000.00
27,000.00
75,000.00

BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240
Triplek 4 mm 120 x 240
Triplek 6 mm 120 x 240
Multiplek 12 mm 120 x 240
Multiplek 12 mm ukuran pintu
Teak Wood 4 mm 120 x240
Formika

lbr
lbr
lbr
lbr
lbr
lbr
lbr

33,000.00
39,000.00
42,000.00
112,500.00
236,250.00
75,000.00
69,000.00

BAHAN LANTAI DAN PELAPIS DINDING


Keramik lantai 20 x 20 Putih Polos "MULIA"
Keramik dinding 20 x 25 Putih Polos "MULIA"
Keramik 30X30 Putih Polos "MULIA"
Lantai Pear Stone
Floor Hardener Ferofax sekualitas Metaltop

m2
m2
m2
m2
kg

45,000.00
48,000.00
46,000.00
89,000.00
60,000.00

G. BAHAN SALURAN AIR KOTOR / BERSIH


Grafel U 20 cm
Grafel U 30 cm
Buis Beton dia. 20 cm ( 1 m )
Buis Beton dia.30 cm (1 m )

m'
m'
m'
m'

20,000.00
30,000.00
45,000.00
60,000.00

BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata-rata
Pagar BRC T.120 Lengkap Tiang
Pagar BRC T.175 Lengkap Tiang
Besi Canal
Besi Siku L
Besi IWF DN SII
Besi HWF
Besi plat
Kawat Beton

kg
m1
m1
kg
kg
kg
kg
kg
kg

14,000.00
132,000.00
612,500.00
14,000.00
14,000.00
14,000.00
14,000.00
14,000.00
19,500.00

NO

JENIS BAHAN
Kawat Duri
Seng plat BJLS 28 ( lebar = 90 cm )
Seng Glb BJLS 28
Ram kawat

SATUAN

HARGA BAHAN
Rp.

kg
m1
lbr
m2

12,500.00
35,000.00
20,500.00
35,000.00

Cermin

m2
m2
m2

57,000.00
65,000.00
89,000.00

BAHAN PAKU DAN MUR BAUT


Paku biasa
Paku hak Pj. 15 cm

kg
bh

15,000.00
6,000.00

Pipa GIP Medium B dia. 1/2"

bt

17,000.00

Pipa GIP Medium B dia. 3/4"

bt

23,000.00

Pipa GIP Medium B dia. 1"

bt

25,000.00

Pipa GIP Medium B dia. 1 1/2"

bt

43,000.00

Pipa GIP Medium B dia. 2"

bt

60,000.00

Pipa PVC MASPION ABU dia. 2" (AW)

bt

75,000.00

Pipa PVC MASPION ABU dia. 3" (AW)

bt

140,000.00

Pipa PVC MASPION ABU dia. 4" (AW)

bt

230,000.00

Grefel beton 1/2 dia. 30 cm

m1

30,000.00

BAHAN KACA
Kaca polos 3 mm (ASAHI)
Kaca polos 5 mm (ASAHI)

BAHAN PERPIPAAN

BAHAN SANITAIR DAN PERPIPAAN


Stop Kran 3/4 " KIT

bh

75,000.00

Stop Kran 1 1/2 " KIT

bh

125,000.00

Kran bebek Sun Ei 1/2 "

bh

85,000.00

Floor drain

bh

20,000.00

Wastafel Lengkap Toto Type L 34

bh

350,000.00

Closet Jongkok Standard Putih Poslin INA

unit

125,000.00

closet duduk ex toto

unit

1,050,000.00

kran air 1/2"

bh

37,300.00

shower

unit

250,000.00

kichensink

unit

250,000.00

BAHAN PENUTUP ATAP


Genteng Palentong

bh

1,000.00

Wuwung Genteng

bh

18,500.00

Atap genteng Morando glazur

bh

2,000.00

Wuwung Genteng morando glazur

bh

4,000.00

Genteng Ex KIA (11 bh )

m2

58,685.00

BAHAN ELEKTRIKAL
Saklar Broko Tunggal Standard (1Phase)
Saklar Broko Seri Standard (1 Phase)
Stop Kontak Broko Standard (1 Phase)
Lampu Neon TL Philip 1 X 36 W Type TKI
Pentanahan Penangkal Petir lengkap bak kontrol
pipa kabel
Kabel NYY 2 X 2,5 mm Prima
Kabel NYY 3 X 2,5 mm Prima

bh
bh
bh
bh
ttk
bt
m1
M1

16,000.00
16,000.00
9,000.00
17,500.00
900,000.00
8,000.00
4,000.00
5,000.00

NO

JENIS BAHAN

SATUAN

HARGA BAHAN
Rp.

BAHAN ALAT PENGGANTUNG DAN KUNCI


Kunci 2 Slaag
Kunci KM Bulat ALPA
Espanyolet/Slot Tanam
Hak Angin Kait Jendela Biasa ( Kait )
Engsel Pintu Arch Standard
Engsel Jendela Arch
Pasang roda type 61. K/ N ex Henderson

bh
bh
bh
bh
bh
bh
bh

75,000.00
75,000.00
30,000.00
15,000.00
6,000.00
4,000.00
65,000.00

BAHAN PENGHISAP AIR SUMUR DALAM


Mesin Pompa Air 400 W - Sanyo

unit

650,000.00

BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3 ( Pinguinl )
Tangki Air Fiber Glass 2000 liter ( Pinguinl )
Bak km Fiber 50 X 50

bh
bh
bh

1,200,000.00
1,900,000.00
125,000.00

ANALISA HARGA SATUAN PEKERJAAN

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.

II

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

PEKERJAAN TANAH
1 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 1 meter

44,625.00

44,625.00

Tenaga
Pekerja

0.7500

OH

Mandor

0.0250

OH

59,500.00

44,625.00

2 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 2 meter

53,550.00

53,550.00

Tenaga
Pekerja

0.9000

OH

Mandor

0.0450

OH

59,500.00

53,550.00

3 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 3 meter

62,475.00

62,475.00

Tenaga
Pekerja

1.0500

OH

Mandor

0.0670

OH

59,500.00

62,475.00

4 1 m3 Mengerjakan Galian Tanah Keras Sedalam 1 meter

59,500.00

59,500.00

Tenaga
Pekerja

1.0000

OH

Mandor

0.0320

OH

59,500.00

59,500.00

5 1 m3 Mengerjakan Galian Tanah Cadas Sedalam 1 meter

89,250.00

89,250.00

Tenaga
Pekerja

1.5000

OH

Mandor

0.0600

OH

59,500.00

89,250.00

6 1 m3 Pekerjaan Mengerjakan Galian Tanah Lumpur Sedalam 1 meter

71,400.00

71,400.00

Tenaga
Pekerja

1.2000

OH

Mandor

0.0450

OH

59,500.00

71,400.00

7 1 m2 Pekerjaan Stripping tanah tebing setinggi 1 m

2,975.00

2,975.00

Tenaga
Pekerja

0.0500

OH

Mandor

0.0050

OH

59,500.00

2,975.00

8 1 m3 Pembuangan Tanah sejauh 15 m

19,635.00

19,635.00

Tenaga
Pekerja

0.3300

OH

Mandor

0.0100

OH

59,500.00

19,635.00

9 1 m3 Urugan Tanah Kembali

14,875.00

14,875.00

Cat. Mengurug Kembali 1 m3 Galian Tanah dihitung dari 1/3 kali indeks Pekerjaan Galian Tanah
1 m3 Urugan Tanah Kembali Galian Tanah Biasa Maksimal keadalaman 1 m'
Tenaga
Pekerja

0.2500

OH

Mandor

0.0083

OH

59,500.00

14,875.00

10 1 m3 Memadatan tanah (Per 20 cm)

29,750.00

29,750.00

Tenaga
Pekerja

0.5000

OH

Mandor

0.0500

OH

59,500.00
-

29,750.00
-

Analisa Harga Satuan


Halaman 5

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

11 1 m3 Pekerjaan Urugan Pasir

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

118,800.00

17,850.00

136,650.00

Bahan
Pasir Urug

1.2000

m3

Pekerja

0.3000

OH

Mandor

0.0100

OH

99,000.00

118,800.00

Tenaga
59,500.00
-

17,850.00
-

Analisa Harga Satuan


Halaman 6

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

12 1 m3 Pekerjaan Urugan Tanah

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

75,600.00

17,850.00

93,450.00

Bahan
Tanah urug

1.2000

m3

Pekerja

0.3000

OH

Mandor

0.0100

OH

63,000.00

75,600.00

Tenaga
59,500.00

17,850.00

13 1 m3 Urugan Sirtu padat untuk peninggian Lantai Bangunan

129,600.00

14,875.00

144,475.00

Bahan
Sirtu

1.2000

m3

Pekerja

0.2500

OH

Mandor

0.0250

OH

108,000.00

129,600.00

Tenaga

III

59,500.00

14,875.00

PEKERJAAN PONDASI

14 1 m3 Pasangan Batu Kosong (Aanstamping)

282,768.00

75,660.00

358,428.00

Bahan
Batu Belah 15 cm/ 20 cm

1.2000

m3

200,000.00

240,000.00

Pasir urug

0.4320

m3

99,000.00

42,768.00

Pekerja

0.7800

OH

59,500.00

46,410.00

Tukang batu

0.3900

OH

67,000.00

26,130.00

Kepala tukang

0.0390

OH

80,000.00

3,120.00

Mandor

0.0390

OH

Tenaga

15 1 m3 Pasangan Pondasi Batu Belah, Campuran 1 Pc : 3Ps

639,030.00

145,500.00

784,530.00

Bahan
Batu Belah 15 cm/ 20 cm

m3

200,000.00

240,000.00

Kg

1,500.00

303,000.00

0.4850

m3

198,000.00

96,030.00

Pekerja

1.5000

OH

59,500.00

89,250.00

Tukang Batu

0.7500

OH

67,000.00

50,250.00

Kepala Tukang

0.0750

OH

80,000.00

6,000.00

Mandor

0.0750

OH

Semen Portland
Pasir Pasang

1.2000
###

Tenaga

16 1 m3 Pasangan Pondasi Batu Belah, Campuran 1 Pc : 5Ps

551,712.00

145,500.00

697,212.00

Bahan
Batu Belah 15 cm/ 20 cm

m3

200,000.00

240,000.00

Kg

1,500.00

204,000.00

0.5440

m3

198,000.00

107,712.00

Pekerja

1.5000

OH

59,500.00

89,250.00

Tukang Batu

0.7500

OH

67,000.00

50,250.00

Kepala Tukang

0.0750

OH

80,000.00

6,000.00

Mandor

0.0750

OH

Semen Portland
Pasir Pasang

1.2000
###

Tenaga

17 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah

### 242,250.00

2,645,430.00

Bahan
Batu Belah 15 cm/ 20 cm
Semen Portland

0.4800
###

m3

200,000.00

96,000.00

Kg

1,500.00

291,000.00

Pasir Beton

0.3120

m3

270,000.00

84,240.00

Kerikil

0.4680

m3

405,000.00

189,540.00

kg

13,500.00

1,701,000.00

kg

23,000.00

41,400.00

Besi Beton
Kawat Beton

###
1.8000

Analisa Harga Satuan


Halaman 7

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Tenaga
Pekerja

3.0000

OH

59,500.00

178,500.00

Tukang Batu

0.8500

OH

67,000.00

56,950.00

Kepala Tukang

0.0850

OH

80,000.00

6,800.00

Mandor

0.1700

OH

Analisa Harga Satuan


Halaman 8

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

18 1 m3 Pasangan Pondasi Sumuran, diameter 100 cm

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

654,780.00

202,800.00

857,580.00

Bahan
Batu Belah 15 cm/ 20 cm
Semen Portland

0.4500
###

m3

200,000.00

90,000.00

Kg

1,500.00

291,000.00

Pasir Beton

0.3120

m3

270,000.00

84,240.00

Kerikil

0.4680

m3

405,000.00

189,540.00

Pekerja

2.4000

OH

59,500.00

142,800.00

Tukang Batu

0.8000

OH

67,000.00

53,600.00

Kepala Tukang

0.0800

OH

80,000.00

6,400.00

Mandor

0.1190

OH

Tenaga

IV

PEKERJAAN DINDING

19 1 m2 Pasangan dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura 78,475.00

25,350.00

103,825.00

Bahan
Bata merah

70.0000

bh

700.00

49,000.00

Semen Portland

14.3700

Kg

1,500.00

21,555.00

0.0400

m3

198,000.00

7,920.00

Pekerja

0.3000

OH

59,500.00

17,850.00

Tukang Batu

0.1000

OH

67,000.00

6,700.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0150

OH

Pasir Pasang
Tenaga

20 1 m2 Pasangan dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura 72,430.00

25,350.00

97,780.00

Bahan
Bata merah

70.0000

bh

700.00

49,000.00

Semen Portland

9.6800

Kg

1,500.00

14,520.00

Pasir Pasang

0.0450

m3

198,000.00

8,910.00

Pekerja

0.3000

OH

59,500.00

17,850.00

Tukang Batu

0.1000

OH

67,000.00

6,700.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0150

OH

Tenaga

21 1 m2 Pasangan dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran sp 162,336.00

25,350.00

187,686.00

Bahan
Terawang (roster)

30.0000

bh

4,500.00

135,000.00

Semen Portland

14.0000

Kg

1,500.00

21,000.00

0.0320

m3

198,000.00

6,336.00

Pekerja

0.3000

OH

59,500.00

17,850.00

Tukang Batu

0.1000

OH

67,000.00

6,700.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0150

OH

Pasir Pasang
Tenaga

22 1 m2 Pasangan dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spe 158,430.00

25,350.00

183,780.00

Bahan
Terawang (roster)

30.0000

bh

4,500.00

135,000.00

Semen Portland

11.0000

Kg

1,500.00

16,500.00

0.0350

m3

198,000.00

6,930.00

Pekerja

0.3000

OH

59,500.00

17,850.00

Tukang Batu

0.1000

OH

67,000.00

6,700.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0150

OH

Pasir Pasang
Tenaga

Analisa Harga Satuan


Halaman 9

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

16,218.00

29,100.00

PEKERJAAN PELESTERAN

23 1 m2 Plesteran Dinding 1Pc : 3Ps tebal 15 mm

45,318.00

Bahan
Semen Portland

7.7760

Kg

1,500.00

11,664.00

Pasir Pasang

0.0230

m3

198,000.00

4,554.00

Pekerja

0.3000

OH

59,500.00

17,850.00

Tukang Batu

0.1500

OH

67,000.00

10,050.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0150

OH

Tenaga

Analisa Harga Satuan


Halaman 10

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

24 1 m2 Plesteran Dinding 1Pc : 5Ps tebal 15 mm

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

12,924.00

29,100.00

42,024.00

Bahan
Semen Portland

5.1840

Kg

1,500.00

7,776.00

Pasir Pasang

0.0260

m3

198,000.00

5,148.00

Pekerja

0.3000

OH

59,500.00

17,850.00

Tukang Batu

0.1500

OH

67,000.00

10,050.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0150

OH

Tenaga

25 1 m2 Plesteran Dinding 1Pc : 3Ps tebal 20 mm

21,690.00

30,470.00

52,160.00

Bahan
Semen Portland

10.3680

Kg

1,500.00

15,552.00

0.0310

m3

198,000.00

6,138.00

Pekerja

0.2600

OH

59,500.00

15,470.00

Tukang Batu

0.2000

OH

67,000.00

13,400.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0130

OH

Pasir Pasang
Tenaga

26 1 m2 Plesteran Dinding 1Pc : 5Ps tebal 20 mm

17,298.00

38,800.00

56,098.00

Bahan
Semen Portland

6.9120

Kg

1,500.00

10,368.00

Pasir Pasang

0.0350

m3

198,000.00

6,930.00

Pekerja

0.4000

OH

59,500.00

23,800.00

Tukang Batu

0.2000

OH

67,000.00

13,400.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0220

OH

Tenaga

27 1 m2 Plesteran Berapen 1Pc : 5Ps, tebal 15 mm

12,924.00

14,550.00

27,474.00

Bahan
Semen Portland

5.1840

Kg

1,500.00

7,776.00

Pasir Pasang

0.0260

m3

198,000.00

5,148.00

Pekerja

0.1500

OH

59,500.00

8,925.00

Tukang Batu

0.0750

OH

67,000.00

5,025.00

Kepala Tukang

0.0075

OH

80,000.00

600.00

Mandor

0.0075

OH

Tenaga

28 1 m2 Plesteran Skoning 1Pc : 2Ps, Lebar 10 mm

3,324.00

34,760.00

38,084.00

Bahan
Semen Portland

0.5000

Kg

1,500.00

750.00

Pasir Pasang

0.0130

m3

198,000.00

2,574.00

Pekerja

0.0800

OH

59,500.00

4,760.00

Tukang Batu

0.4000

OH

67,000.00

26,800.00

Kepala Tukang

0.0400

OH

80,000.00

3,200.00

Mandor

0.0040

OH

Tenaga

29 1 m2 Pelesteran Ciprat 1 Pc : 2 Ps

7,668.00

25,350.00

33,018.00

Bahan
Semen Portland

4.3200

Kg

1,500.00

6,480.00

Pasir Pasang

0.0060

m3

198,000.00

1,188.00

Pekerja

0.3000

OH

59,500.00

17,850.00

Tukang Batu

0.1000

OH

67,000.00

6,700.00

Tenaga

Analisa Harga Satuan


Halaman 11

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Kepala Tukang

0.0100

OH

Mandor

0.0150

OH

HARGA
SATUAN
UPAH
Rp.
F
80,000.00
-

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

800.00
-

Analisa Harga Satuan


Halaman 12

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

30 1 m2 Pelesteran Siar Pasangan Dinding Bata Merah (= 20 m')

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

4,662.00

14,550.00

19,212.00

Bahan
Semen Portland

3.1080

Kg

1,500.00

4,662.00

Pekerja

0.1500

OH

59,500.00

8,925.00

Tukang Batu

0.0750

OH

67,000.00

5,025.00

Kepala Tukang

0.0075

OH

80,000.00

600.00

Mandor

0.0075

OH

Tenaga

31 1 m2 Pelesteran Siar Pasangan Dinding con Block ekspose (= 8 m')

2,400.00

6,790.00

9,190.00

Bahan
Semen Portland

1.6000

Kg

1,500.00

2,400.00

Pekerja

0.0700

OH

59,500.00

4,165.00

Tukang Batu

0.0350

OH

67,000.00

2,345.00

Kepala Tukang

0.0035

OH

80,000.00

280.00

Mandor

0.0035

OH

Tenaga

32 1 m2 Acian

4,875.00

19,400.00

24,275.00

Bahan
Semen Portland

3.2500

Kg

1,500.00

4,875.00

Pekerja

0.2000

OH

59,500.00

11,900.00

Tukang Batu

0.1000

OH

67,000.00

6,700.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0100

OH

Tenaga

VI

PEKERJAAN KAYU

33 1m3 Pasang Kusen Pintu dan Jendela, Kayu Kelas II Atau Kelas III

###

### 6,014,750.00

Bahan
Kayu Balok Kelas II Atau Kelas III

1.2000

m3

Paku 10 Cm

1.2500

Kg

15,000.00

###

4,200,000.00
18,750.00

Lem Kayu

1.0000

Kg

35,000.00

35,000.00

Tenaga
Pekerja

6.0000

OH

59,500.00

18.0000

OH

70,000.00

Kepala Tukang

1.8000

OH

80,000.00

Mandor

0.3000

OH

Tukang Kayu

357,000.00
###
144,000.00

34 1m3 Pasang Kusen Pintu dan Jendela Kayu Lanan

###

### 9,650,750.00

Bahan
Kayu Balok Kayu Lanan

1.2000

m3

Paku 10 Cm

1.2500

Kg

15,000.00

###

7,836,000.00
18,750.00

Lem Kayu

1.0000

Kg

35,000.00

35,000.00

Tenaga
Pekerja

6.0000

OH

59,500.00

18.0000

OH

70,000.00

Kepala Tukang

1.8000

OH

80,000.00

Mandor

0.3000

OH

Tukang Kayu

357,000.00
###
144,000.00

35 1m2 Pasang Pintu Panel Kayu Lanan

299,740.00

293,500.00

593,240.00

Bahan
Papan Kayu Lanan

0.0400

m3

Lem Kayu

0.5000

Kg

1.0000

OH

###

282,240.00

35,000.00

17,500.00

Tenaga
Pekerja

59,500.00

59,500.00

Analisa Harga Satuan


Halaman 13

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Tukang Kayu

3.0000

OH

70,000.00

210,000.00

Kepala Tukang

0.3000

OH

80,000.00

24,000.00

Mandor

0.0500

OH

TOTAL
HARGA

Analisa Harga Satuan


Halaman 14

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

36 1m2 Pasang Pintu dan Jendela Kaca Kayu Lanan

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

179,844.00

234,800.00

414,644.00

Bahan
Papan Kayu Lanan

0.0240

m3

Lem Kayu

0.3000

Kg

###

169,344.00

Pekerja

0.8000

OH

59,500.00

47,600.00

Tukang Kayu

2.4000

OH

70,000.00

168,000.00

Kepala Tukang

0.2400

OH

80,000.00

19,200.00

Mandor

0.0400

OH

35,000.00

10,500.00

Tenaga

37 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu borneo (l

278,220.00

205,450.00

483,670.00

Bahan
Papan Kayu Borneo

0.0250

m3

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

###

143,000.00
720.00

Lem Kayu

0.5000

Kg

35,000.00

17,500.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

117,000.00

117,000.00

Pekerja

0.7000

OH

59,500.00

41,650.00

Tukang Kayu

2.1000

OH

70,000.00

147,000.00

Kepala Tukang

0.2100

OH

80,000.00

16,800.00

Mandor

0.0350

OH

Tenaga

38 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lanan (le

311,620.00

205,450.00

517,070.00

Bahan
Papan Kayu Lanan

0.0250

m3

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

###

176,400.00
720.00

Lem Kayu

0.5000

Kg

35,000.00

17,500.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

117,000.00

117,000.00

Pekerja

0.7000

OH

59,500.00

41,650.00

Tukang Kayu

2.1000

OH

70,000.00

147,000.00

Kepala Tukang

0.2100

OH

80,000.00

16,800.00

Mandor

0.0350

OH

Tenaga

39 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lokal (leb 212,720.00

205,450.00

418,170.00

Bahan
Papan Kayu lokal

0.0250

m3

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

###

77,500.00
720.00

Lem Kayu

0.5000

Kg

35,000.00

17,500.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

117,000.00

117,000.00

Pekerja

0.7000

OH

59,500.00

41,650.00

Tukang Kayu

2.1000

OH

70,000.00

147,000.00

Kepala Tukang

0.2100

OH

80,000.00

16,800.00

Mandor

0.0350

OH

Tenaga

40 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lokal (leb 233,153.60

205,450.00

438,603.60

Bahan
Papan Kayu lokal

0.0250

m3

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

###

77,500.00
720.00

Lem Kayu

0.5000

Kg

35,000.00

17,500.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

117,000.00

117,000.00

Aluminium

1.0800

lbr

18,920.00

20,433.60

Pekerja

0.7000

OH

59,500.00

41,650.00

Tukang Kayu

2.1000

OH

70,000.00

147,000.00

Kepala Tukang

0.2100

OH

80,000.00

16,800.00

Tenaga

Analisa Harga Satuan


Halaman 15

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Mandor

0.0350

OH

HARGA
SATUAN
UPAH
Rp.
F
-

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Analisa Harga Satuan


Halaman 16

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

41 1m2 Pasang Pintu Plywood Rangkap, rangka ekspose Kayu Lanan

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

315,853.60

234,800.00

550,653.60

Bahan
Papan Kayu Lanan

0.0256

m3

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

###

180,633.60
720.00

Lem Kayu

0.5000

Kg

35,000.00

17,500.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

117,000.00

117,000.00

Pekerja

0.8000

OH

59,500.00

47,600.00

Tukang Kayu

2.4000

OH

70,000.00

168,000.00

Kepala Tukang

0.2400

OH

80,000.00

19,200.00

Mandor

0.0400

OH

Tenaga

42 1m2 Pasang Pintu Plywood Rangkap, rangka ekspose Kayu Borneo

281,652.00

234,800.00

516,452.00

Bahan
Papan Kayu Borneo

0.0256

m3

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

###

146,432.00
720.00

Lem Kayu

0.5000

Ltr

35,000.00

17,500.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

117,000.00

117,000.00

Pekerja

0.8000

OH

59,500.00

47,600.00

Tukang Kayu

2.4000

OH

70,000.00

168,000.00

Kepala Tukang

0.2400

OH

80,000.00

19,200.00

Mandor

0.0400

OH

Tenaga

43 1m2 Pasang Pintu Teakwood Rangkap, rangka ekspose Kayu Lanan

307,620.00

234,800.00

542,420.00

Bahan
Papan Kayu Lanan

0.0250

m3

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

###

176,400.00
720.00

Lem Kayu

0.3000

Kg

35,000.00

10,500.00

Teakwood tebal 4 mm ukuran (90x220) cm

1.0000

lbr

120,000.00

120,000.00

Pekerja

0.8000

OH

59,500.00

47,600.00

Tukang Kayu

2.4000

OH

70,000.00

168,000.00

Kepala Tukang

0.2400

OH

80,000.00

19,200.00

Mandor

0.0400

OH

Tenaga

44 1m2 Pasang Pintu Teakwood Rangkap, rangka ekspose Kayu Borneo

274,220.00

234,800.00

509,020.00

Bahan
Papan Kayu Borneo

0.0250

m3

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

###

143,000.00
720.00

Lem Kayu

0.3000

Ltr

35,000.00

10,500.00

Teakwood tebal 4 mm ukuran (90x220) cm

1.0000

lbr

120,000.00

120,000.00

Pekerja

0.8000

OH

59,500.00

47,600.00

Tukang Kayu

2.4000

OH

70,000.00

168,000.00

Kepala Tukang

0.2400

OH

80,000.00

19,200.00

Mandor

0.0400

OH

Tenaga

45 1m3 Pasang Konstruksi Kuda - kuda Kayu Lanan

###

### 9,056,000.00

Bahan
Balok Kayu lanan
Besi Strip tebal 5 mm
Paku 12 cm

1.1000

m3

15.0000

Kg

41,000.00

###

7,183,000.00
615,000.00

5.6000

Kg

15,000.00

84,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang

4.0000

OH

59,500.00

238,000.00

12.0000

OH

70,000.00

840,000.00

1.2000

OH

80,000.00

96,000.00

Analisa Harga Satuan


Halaman 17

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Mandor

0.2000

OH

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

46 1m3 Pasang Konstruksi Kuda - kuda Kayu kls II (Lokal)

JUMLAH
UPAH

###

### 5,723,000.00

Bahan
Balok Kayu kls II
Besi Strip tebal 5 mm
Paku 12 cm

1.1000

m3

15.0000

Kg

41,000.00

###

3,850,000.00
615,000.00

5.6000

Kg

15,000.00

84,000.00

Tenaga
Pekerja

4.0000

OH

59,500.00

238,000.00

12.0000

OH

70,000.00

840,000.00

Kepala Tukang

1.2000

OH

80,000.00

96,000.00

Mandor

0.2000

OH

Tukang Kayu

Analisa Harga Satuan


Halaman 18

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

47 1m3 Pasang Konstruksi Gordeng, Kayu meranti

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

### 704,400.00

8,547,400.00

Bahan
Balok Kayu meranti

1.1000

m3

15.0000

Kg

41,000.00

615,000.00

3.0000

Kg

15,000.00

45,000.00

Pekerja

2.4000

OH

59,500.00

142,800.00

Tukang Kayu

7.2000

OH

70,000.00

504,000.00

Kepala Tukang

0.7200

OH

80,000.00

57,600.00

Mandor

0.1200

OH

Besi Strip Tebal 5 mm


Paku 12 cm

###

7,183,000.00

Tenaga

48 1m3 Pasang Konstruksi Gordeng, Kayu Kelas II (Lokal)

### 704,400.00

5,214,400.00

Bahan
Balok Kayu Kelas II

1.1000

m3

15.0000

Kg

41,000.00

615,000.00

3.0000

Kg

15,000.00

45,000.00

Pekerja

2.4000

OH

59,500.00

142,800.00

Tukang Kayu

7.2000

OH

70,000.00

504,000.00

Kepala Tukang

0.7200

OH

80,000.00

57,600.00

Mandor

0.1200

OH

Besi Strip Tebal 5 mm


Paku 12 cm

###

3,850,000.00

Tenaga

49 1m2 Pasang Rangka Atap Genteng Keramik Kayu Kelas II

50,940.00

13,750.00

64,690.00

Bahan
Kaso 5/7 cm Kayu Kelas II

0.0140

m3

###

36,750.00

Reng 2/3 cm Kayu Kelas II

0.0036

m3

###

10,440.00

Paku Biasa 5 cm dan 10 cm

0.2500

Kg

Pekerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.1000

OH

70,000.00

7,000.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0050

OH

15,000.00

3,750.00

Tenaga

50 1m2 Pasang Rangka Atap Genteng Keramik Kayu Lanan

118,678.00

13,750.00

132,428.00

Bahan
Kaso 5/7 cm (Lanan)

0.0140

m3

###

91,420.00

Reng 2/3 cm (Lanan)

0.0036

m3

###

23,508.00

Paku Biasa 5 cm dan 10 cm

0.2500

Kg

Pekerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.1000

OH

70,000.00

7,000.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0050

OH

15,000.00

3,750.00

Tenaga

51 1m2 Pasang Rangka Atap Genteng Plentong Kayu Kelas II

50,940.00

13,750.00

64,690.00

Bahan
Kaso 5/7 cm Kayu Kelas II

0.0140

m3

###

36,750.00

Reng 2/3 cm Kayu Kelas II

0.0036

m3

###

10,440.00

Paku Biasa 5 cm dan 10 cm

0.2500

Kg

Pekerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.1000

OH

70,000.00

7,000.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0050

OH

15,000.00

3,750.00

Tenaga

52 1m2 Pasang Rangka Atap Sirap Beton Kayu Lanan

###

16,500.00

1,096,950.00

Bahan

Analisa Harga Satuan


Halaman 19

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

###

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Kayu Lanan

0.1650

m3

Paku Biasa 5 cm dan 10 cm

0.2000

Kg

1,077,450.00

Pekerja

0.1200

OH

59,500.00

7,140.00

Tukang Kayu

0.1200

OH

70,000.00

8,400.00

Kepala Tukang

0.0120

OH

80,000.00

960.00

Mandor

0.0060

OH

15,000.00

3,000.00

Tenaga

Analisa Harga Satuan


Halaman 20

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

53 1m' Pasang Lisplank ( 3 x 20 )cm Kayu Lanan

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

77,704.80

21,550.00

99,254.80

Bahan
Papan Kayu Lanan

0.0108

m3

Paku Biasa 5 dan 7 cm

0.1000

Kg

###

76,204.80

Pekerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.2000

OH

70,000.00

14,000.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0050

OH

15,000.00

1,500.00

Tenaga

54 1m' Pasang Lisplank ( 3 x 30 )cm Kayu lanan

78,366.00

21,550.00

99,916.00

Bahan
Papan Kayu Lanan

0.0110

m3

Paku Biasa 5 dan 7 cm

0.0500

Kg

###

77,616.00

Pekerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.2000

OH

70,000.00

14,000.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0050

OH

15,000.00

750.00

Tenaga

55 1m' Pasang Lisplank ( 3 x 30 )cm Kayu klas II

34,850.00

21,550.00

56,400.00

Bahan
Papan Kayu klas II

0.0110

m3

Paku Biasa 5 dan 7 cm

0.0500

Kg

###

34,100.00

Pekerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.2000

OH

70,000.00

14,000.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0050

OH

15,000.00

750.00

Tenaga

56 1m' Pasang Calsiplank GRC (0,8 x 20) cm

50,250.00

21,550.00

71,800.00

Bahan
Papan calsiplank

1.1000

btg

45,000.00

49,500.00

Paku Biasa 5 dan 7 cm

0.0500

Kg

15,000.00

750.00

Pekerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.2000

OH

70,000.00

14,000.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0050

OH

Tenaga

57 1m2 Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Kelas II atau III

100,250.00

44,025.00

144,275.00

Bahan
Balok Kayu Kelas II atau III

0.0280

m3

Paku Biasa 5 dan 7 cm

0.1500

Kg

###

98,000.00

Pekerja

0.1500

OH

59,500.00

8,925.00

Tukang Kayu

0.4500

OH

70,000.00

31,500.00

Kepala Tukang

0.0450

OH

80,000.00

3,600.00

Mandor

0.0080

OH

15,000.00

2,250.00

Tenaga

58 1m2 Pasang Rangka Dinding Pemisah Kayu Lanan (60 x 120) cm Kayu Lanan

185,090.00

44,025.00

229,115.00

Bahan
Balok Kayu Lanan

0.0280

m3

Paku Biasa 5 dan 7 cm

0.1500

Kg

###

182,840.00

Pekerja

0.1500

OH

59,500.00

8,925.00

Tukang Kayu

0.4500

OH

70,000.00

31,500.00

15,000.00

2,250.00

Tenaga

Analisa Harga Satuan


Halaman 21

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Kepala Tukang

0.0450

OH

Mandor

0.0080

OH

HARGA
SATUAN
UPAH
Rp.
F
80,000.00
-

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

3,600.00
-

Analisa Harga Satuan


Halaman 22

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

59 1m2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Lanan

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

307,890.00

44,025.00

351,915.00

Bahan
Balok Kayu Lanan (6x12) cm

0.0280

m3

Paku Biasa 5 dan 10 cm

0.1500

Kg

15,000.00

###

182,840.00
2,250.00

Teakwood tebal 4 mm ukuran 120 cm x 240

0.8600

Lbr

120,000.00

103,200.00

Lem Kayu

0.5600

Kg

35,000.00

19,600.00

Pekerja

0.1500

OH

59,500.00

8,925.00

Tukang Kayu

0.4500

OH

70,000.00

31,500.00

Kepala Tukang

0.0450

OH

80,000.00

3,600.00

Mandor

0.0750

OH

Tenaga

60 1m2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Lanan

307,890.00

58,700.00

366,590.00

Bahan
Balok Kayu Lanan (6x12) cm

0.0280

m3

Paku Biasa 5 dan 10 cm

0.1500

Kg

15,000.00

###

182,840.00
2,250.00

Plywood tebal 4 mm ukuran 120 cm x 240

0.8600

Lbr

120,000.00

103,200.00

Lem Kayu

0.5600

Kg

35,000.00

19,600.00

Pekerja

0.2000

OH

59,500.00

11,900.00

Tukang Kayu

0.6000

OH

70,000.00

42,000.00

Kepala Tukang

0.0600

OH

80,000.00

4,800.00

Mandor

0.0100

OH

Tenaga

VII

PEKERJAAN BETON ( SNI 7394 : 2008 )


CATATAN
Bobot isi pasir beton

1,400

kg/m3

Bobot isi kerikil

1,350

kg/m3

Bukling factor pasir = 20 %


61 1 m3 Membuat beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87

837,792.86

118,840.00

956,632.86

Bahan
Semen Portland

###

Kg

1,500.00

370,500.00

Pasir Beton

###

Kg

192.86

167,592.86

Kerikil (Masimal 30 mm)

###

Kg

300.00

299,700.00

Air

###

Ltr

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Kepala Tukang

0.0280

OH

80,000.00

2,240.00

Mandor

0.0830

OH

62 1 m3 Membuat beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78

876,900.00

118,840.00

995,740.00

Bahan
Semen Portland

###

Kg

1,500.00

414,000.00

Pasir Beton

###

Kg

192.86

159,300.00

Kerikil (Masimal 30 mm)

###

Kg

300.00

303,600.00

Air

###

Ltr

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Kepala Tukang

0.0280

OH

80,000.00

2,240.00

Mandor

0.0830

OH

63 1 m3 Membuat beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72

907,692.86

118,840.00

1,026,532.86

Bahan

Analisa Harga Satuan


Halaman 23

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Semen Portland

###

Kg

1,500.00

448,500.00

Pasir Beton

###

Kg

192.86

154,092.86

Kerikil (Masimal 30 mm)

###

Kg

300.00

305,100.00

Air

###

Ltr

TOTAL
HARGA

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Kepala Tukang

0.0280

OH

80,000.00

2,240.00

Mandor

0.0830

OH

Analisa Harga Satuan


Halaman 24

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

64 1 m3 Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c 825,321.43

86,400.00

911,721.43

Bahan
Semen Portland

###

Kg

1,500.00

345,000.00

Pasir Beton

###

Kg

192.86

172,221.43

Kerikil (Masimal 30 mm)

###

Kg

300.00

308,100.00

Air

###

Ltr

Tenaga
Pekerja

1.2000

OH

59,500.00

71,400.00

Tukang Batu

0.2000

OH

67,000.00

13,400.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0060

OH

65 1 m3 Membuat beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66

944,271.43

118,840.00

1,063,111.43

Bahan
Semen Portland

###

Kg

1,500.00

489,000.00

Pasir Beton

###

Kg

192.86

146,571.43

Kerikil (Masimal 30 mm)

###

Kg

300.00

308,700.00

Air

###

Ltr

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Kepala Tukang

0.0280

OH

80,000.00

2,240.00

Mandor

0.0830

OH

66 1 m3 Membuat beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61

978,278.57

118,840.00

1,097,118.57

Bahan
Semen Portland

###

Kg

1,500.00

528,000.00

Pasir Beton

###

Kg

192.86

140,978.57

Kerikil (Masimal 30 mm)

###

Kg

300.00

309,300.00

Air

###

Ltr

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Kepala Tukang

0.0280

OH

80,000.00

2,240.00

Mandor

0.0830

OH

67 1 m3 Membuat beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58

### 118,840.00

1,124,054.29

Bahan
Semen Portland

###

Kg

1,500.00

556,500.00

Pasir Beton

###

Kg

192.86

134,614.29

Kerikil (Masimal 30 mm)

###

Kg

300.00

314,100.00

Air

###

Ltr

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Kepala Tukang

0.0280

OH

80,000.00

2,240.00

Mandor

0.0830

OH

68 1 m3 Membuat beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56

### 118,840.00

1,139,997.14

Bahan
Semen Portland

###

Kg

1,500.00

576,000.00

Pasir Beton

###

Kg

192.86

133,457.14

Kerikil (Masimal 30 mm)

###

Kg

300.00

311,700.00

Air

###

Ltr

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Analisa Harga Satuan


Halaman 25

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Kepala Tukang

0.0280

OH

Mandor

0.0830

OH

HARGA
SATUAN
UPAH
Rp.
F
80,000.00
-

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

2,240.00
-

Analisa Harga Satuan


Halaman 26

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

69 1 m3 Membuat beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

### 118,840.00

1,167,554.29

Bahan
Semen Portland

###

Kg

1,500.00

609,000.00

Pasir Beton

###

Kg

192.86

131,914.29

Kerikil (Masimal 30 mm)

###

Kg

300.00

307,800.00

Air

###

Ltr

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Kepala Tukang

0.0280

OH

80,000.00

2,240.00

Mandor

0.0830

OH

70 1 m3 Membuat beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52

### 118,840.00

1,175,975.71

Bahan
Semen Portland

###

Kg

1,500.00

619,500.00

Pasir Beton

###

Kg

192.86

131,335.71

Kerikil (Masimal 30 mm)

###

Kg

300.00

306,300.00

Air

###

Ltr

Tenaga
Pekerja

1.6500

OH

59,500.00

98,175.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Kepala Tukang

0.0280

OH

80,000.00

2,240.00

Mandor

0.0830

OH

71 1 m3 Membuat beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49

### 151,200.00

1,240,714.29

Bahan
Semen Portland

###

Kg

1,500.00

658,500.00

Pasir Beton

###

Kg

192.86

129,214.29

Kerikil (Masimal 30 mm)

###

Kg

300.00

301,800.00

Air

###

Ltr

Tenaga
Pekerja

2.1000

OH

59,500.00

124,950.00

Tukang Batu

0.3500

OH

67,000.00

23,450.00

Kepala Tukang

0.0350

OH

80,000.00

2,800.00

Mandor

0.1050

OH

72 1 m3 Membuat beton mutu fc = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48

### 151,200.00

1,251,835.71

Bahan
Semen Portland

###

Kg

1,500.00

672,000.00

Pasir Beton

###

Kg

192.86

128,635.71

Kerikil (Masimal 30 mm)

###

Kg

300.00

300,000.00

Air

###

Ltr

Tenaga
Pekerja

2.1000

OH

59,500.00

124,950.00

Tukang Batu

0.3500

OH

67,000.00

23,450.00

Kepala Tukang

0.0350

OH

80,000.00

2,800.00

Mandor

0.1050

OH

73 1 Kg Pembesian dengan Besi Polos atau Besi Ulir


10 Kg Pembesian dengan Besi Polos atau Besi Ulir

14,520.00

962.50

15,482.50

145,200.00

9,625.00

154,825.00

Bahan
Besi Beton ( Polos / Ulir )

10.5000

Kg

13,500.00

141,750.00

0.1500

Kg

23,000.00

3,450.00

Perkerja

0.0700

OH

59,500.00

4,165.00

Tukang Besi

0.0700

OH

70,000.00

4,900.00

Kepala Tukang

0.0070

OH

80,000.00

560.00

Kawat Beton
Tenaga

Analisa Harga Satuan


Halaman 27

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Mandor

0.0040

OH

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

10 Kg Pembesian Kabel presstressed polos/strands

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

74 1 Kg Pembesian Kabel presstressed polos/strands

JUMLAH
UPAH

14,405.00

687.50

15,092.50

144,050.00

6,875.00

150,925.00

Bahan
Besi Beton ( Polos / Ulir )

10.5000

Kg

13,500.00

141,750.00

0.1000

Kg

23,000.00

2,300.00

Perkerja

0.0500

OH

59,500.00

2,975.00

Tukang Besi

0.0500

OH

70,000.00

3,500.00

Kepala Tukang

0.0050

OH

80,000.00

400.00

Mandor

0.0030

OH

Kawat Beton
Tenaga

Analisa Harga Satuan


Halaman 28

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

75 1 Kg Jaring kawat baja/wire mesh

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

34,810.00

3,397.50

38,207.50

Bahan
Jaring Kawat Beton/wiremesh dilas

1.0200

Kg

33,000.00

33,660.00

Kawat Beton

0.0500

Kg

23,000.00

1,150.00

Perkerja

0.0250

OH

59,500.00

1,487.50

Tukang Besi

0.0250

OH

70,000.00

1,750.00

Kepala Tukang

0.0020

OH

80,000.00

160.00

Mandor

0.0010

OH

Tenaga

76 1 m2 Pasang Bekisting untuk Pondasi

50,800.00

51,220.00

102,020.00

Bahan
Kayu Kelas III (Papan Terentang)

0.0400

m3

Paku Biasa 5 - 10 Cm

0.3000

Kg

15,000.00

###

46,000.00
4,500.00

Minyak Bekisting

0.1000

Ltr

3,000.00

300.00

Perkerja

0.5200

OH

59,500.00

30,940.00

Tukang Kayu

0.2600

OH

70,000.00

18,200.00

Kepala Tukang

0.0260

OH

80,000.00

2,080.00

Mandor

0.0260

OH

Tenaga

77 1 m2 Pasang Bekisting untuk Sloof

56,550.00

51,220.00

107,770.00

Bahan
Kayu Kelas III (Papan Terentang)

0.0450

m3

Paku Biasa 5 - 10 Cm

0.3000

Kg

15,000.00

###

51,750.00
4,500.00

Minyak Bekisting

0.1000

Ltr

3,000.00

300.00

Perkerja

0.5200

OH

59,500.00

30,940.00

Tukang Kayu

0.2600

OH

70,000.00

18,200.00

Kepala Tukang

0.0260

OH

80,000.00

2,080.00

Mandor

0.0260

OH

Tenaga

78 1 m2 Pasang Bekisting untuk Kolom (Menggunakan Plywood)

155,250.00

65,010.00

220,260.00

Bahan
Kayu Kelas III (Papan Terentang)

0.0400

m3

Paku Biasa 5 - 12 Cm

0.4000

Kg

15,000.00

###

46,000.00

Minyak Bekisting

0.2000

Ltr

3,000.00

Balok Kayu Kelas II (Stoot)

0.0150

m3

Plywood 9 mm

0.3500

lbr

117,000.00

40,950.00

Dolken Kayu Galam 8 - 10 / 4m

2.0000

btg

16,000.00

32,000.00

Perkerja

0.6600

OH

59,500.00

39,270.00

Tukang Kayu

0.3300

OH

70,000.00

23,100.00

Kepala Tukang

0.0330

OH

80,000.00

2,640.00

Mandor

0.0330

OH

6,000.00
600.00

###

29,700.00

Tenaga

79 1 m2 Pasang Bekisting untuk Balok (Menggunakan Plywood)

161,190.00

65,010.00

226,200.00

Bahan
Kayu Kelas III (Papan Terentang)

0.0400

m3

Paku Biasa 5 - 12 Cm

0.4000

Kg

15,000.00

###

46,000.00

Minyak Bekisting

0.2000

Ltr

3,000.00

Balok Kayu Kelas II (Stoot)

0.0180

m3

Plywood 9 mm

0.3500

lbr

117,000.00

40,950.00

Dolken Kayu Galam 8 - 10 / 4m

2.0000

btg

16,000.00

32,000.00

Perkerja

0.6600

OH

59,500.00

39,270.00

Tukang Kayu

0.3300

OH

70,000.00

23,100.00

6,000.00
600.00

###

35,640.00

Tenaga

Analisa Harga Satuan


Halaman 29

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Kepala Tukang

0.0330

OH

Mandor

0.0330

OH

HARGA
SATUAN
UPAH
Rp.
F
80,000.00
-

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

2,640.00
-

Analisa Harga Satuan


Halaman 30

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

80 1 m2 Pasang Bekisting untuk Lantai (Menggunakan Plywood)

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

219,250.00

64,020.00

283,270.00

Bahan
Kayu Kelas III (Papan Terentang)

0.0400

m3

Paku Biasa 5 - 12 Cm

0.4000

Kg

15,000.00

###

46,000.00

Minyak Bekisting

0.2000

Ltr

3,000.00

Balok Kayu Kelas II (Stoot)

0.0150

m3

Plywood 9mm

0.3500

lbr

117,000.00

40,950.00

Dolken Kayu Galam 8 - 10 / 4m

6.0000

btg

16,000.00

96,000.00

Perkerja

0.6600

OH

59,500.00

39,270.00

Tukang Batu

0.3300

OH

67,000.00

22,110.00

Kepala Tukang

0.0330

OH

80,000.00

2,640.00

Mandor

0.0330

OH

6,000.00
600.00

###

29,700.00

Tenaga

81 1 m2 Pasang Bekisting untuk Dinding

171,963.35

64,020.00

235,983.35

Bahan
Kayu Kelas III (Papan Terentang)

0.0300

m3

Paku Biasa 5 - 12 Cm

0.4000

Kg

15,000.00

###

34,500.00

Minyak Bekisting

0.2000

Ltr

3,000.00

Balok Kayu Kelas II (Stoot)

0.0200

m3

Plywood 9mm

0.3500

lbr

117,000.00

40,950.00

Dolken Kayu Galam 8 - 10 / 4m

3.0000

btg

16,000.00

48,000.00

Formite/penjaga jarak bekisting/spacer

4.0000

bh

578.34

2,313.35

Perkerja

0.6600

OH

59,500.00

39,270.00

Tukang Batu

0.3300

OH

67,000.00

22,110.00

Kepala Tukang

0.0330

OH

80,000.00

2,640.00

Mandor

0.0330

OH

6,000.00
600.00

###

39,600.00

Tenaga

82 1 m2 Pasang Bekisting untuk Tangga

143,600.00

64,020.00

207,620.00

Bahan
Kayu Kelas III (Papan Terentang)

0.0300

m3

Paku Biasa 5 - 12 Cm

0.4000

Kg

15,000.00

###

34,500.00

Minyak Bekisting

0.1500

Ltr

3,000.00

Balok Kayu Kelas II (Stoot)

0.0150

m3

Plywood 9mm

0.3500

lbr

117,000.00

40,950.00

Dolken Kayu Galam 8 - 10 / 4m

2.0000

btg

16,000.00

32,000.00

Perkerja

0.6600

OH

59,500.00

39,270.00

Tukang Batu

0.3300

OH

67,000.00

22,110.00

Kepala Tukang

0.0330

OH

80,000.00

2,640.00

Mandor

0.0330

OH

6,000.00
450.00

###

29,700.00

Tenaga

83 1 m2 Jembatan untuk pengecoran beton

47,360.00

12,675.00

60,035.00

Bahan
Kayu Kelas III (Papan Terentang)

0.0264

m3

Paku Biasa 5 - 12 Cm

0.6000

Kg

15,000.00

###

30,360.00
9,000.00

Dolken Kayu Galam 8 - 10 / 4m

0.5000

btg

16,000.00

8,000.00

Perkerja

0.1500

OH

59,500.00

8,925.00

Tukang Batu

0.0500

OH

67,000.00

3,350.00

Kepala Tukang

0.0050

OH

80,000.00

400.00

Mandor

0.0080

OH

Tenaga

84 1 m3 Pekerjaan Sloof Beton ukuran 15x20 cm (412, 8-200) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (
1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

m3

944,271.43

kg

14,520.00

### 948,071.63

###
962.50

944,271.43

118,840.00

2,207,040.00

146,300.00

4,476,382.11

Analisa Harga Satuan


Halaman 31

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

1 m2 Pasang Bekisting untuk Sloof (2x paka 13.3333

m2

28,275.00

HARGA
SATUAN
UPAH
Rp.
F
51,220.00

85 1 m3 Pekerjaan Beton Kolom Praktis ukuran 11x11 cm (410, 6-200) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (
1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Kolom (4x pak 18.1818

m3

944,271.43

kg

14,520.00

m2

38,812.50

###

1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Kolom (2x pak 20.0000

m3

944,271.43

kg

14,520.00

m2

77,625.00

JUMLAH
UPAH

Rp.

Rp.

Rp.

H = (C X F )

I=(G+H)

376,999.06

682,931.63

###

### 5,335,864.29
118,840.00

962.50

2,236,800.19

148,272.74

65,010.00

705,681.11
###

###

TOTAL
HARGA

G=(CXE)

944,271.43

86 1 m3 Pekerjaan Kolom Beton ukuran 20x20 cm (412, 8-150) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

JUMLAH
BAHAN

###
### 5,913,053.93

944,271.43

118,840.00

962.50

1,873,080.00

124,162.50

65,010.00

1,552,500.00

###

Analisa Harga Satuan


Halaman 32

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

87 1 m3 Pekerjaan Kolom Beton ukuran 20x25 cm (612, 8-150) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (
1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Kolom (2x pak 18.0000

m3

944,271.43

kg

14,520.00

m2

77,625.00

1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Kolom (2x pak 13.3333

m3

944,271.43

kg

14,520.00

m2

77,625.00

1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Balok (4x paka 27.2727

m3

944,271.43

kg

14,520.00

m2

40,297.50

1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Balok (4x paka 18.1818

m3

944,271.43

kg

14,520.00

m2

40,297.50

1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Balok (2x paka 18.3333

m3

944,271.43

kg

14,520.00

m2

80,595.00

2,092,815.52

138,728.30

1,397,250.00
###

1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Balok (2x paka 17.3333

m3

944,271.43

kg

14,520.00

m2

80,595.00

1 Kg Pembesian dengan Besi Polos atau Besi

1.0000
###

1 m2 Pasang Bekisting untuk Balok (2x paka 13.3333

m3

944,271.43

kg

14,520.00

m2

80,595.00

962.50

2,148,530.21

142,421.51

65,010.00

1,034,997.41

866,797.83

###
###

1 Kg Pembesian dengan Besi Polos atau Besi


1 m2 Pasang Bekisting untuk Plat

1.0000
###
8.3333

m3

944,271.43

118,840.00

962.50

2,236,800.19

148,272.74

65,010.00

1,099,021.63
###

###

1 Kg Pembesian dengan Besi Polos atau Besi


1 m2 Pasang Bekisting untuk Plat

1.0000
###
10.0000

1 Kg Pembesian dengan Besi Polos atau Besi


1 m2 Pasang Bekisting untuk Plat (2x pakai

1.0000
###
12.5000

962.50

2,595,413.70

172,044.47

65,010.00

732,681.09
###

###

1 Kg Pembesian dengan Besi Polos atau Besi


1 m2 Pasang Bekisting untuk Plat (2x pakai

1.0000
###
16.6667

###
### 6,257,899.18

944,271.43

118,840.00

962.50

2,368,373.17

156,994.43

65,010.00

1,477,572.31
###

###

###
### 6,452,221.76

944,271.43

118,840.00

962.50

2,687,168.48

178,126.70

65,010.00

1,396,977.31
###

###

###
### 5,915,388.43

944,271.43

118,840.00

962.50

2,729,921.17

180,960.68

65,010.00

1,074,597.31

866,797.83

### 753,785.37
###

944,271.43

118,840.00

kg

14,520.00

962.50

1,530,408.00

101,447.50

m2

219,250.00

64,020.00

1,827,076.03

533,497.87

m3

944,271.43

### 878,390.00
###

944,271.43

118,840.00

kg

14,520.00

962.50

1,800,480.00

119,350.00

m2

219,250.00

64,020.00

2,192,500.00

640,200.00

m3

944,271.43

###
###

118,840.00

kg

14,520.00

962.50

2,138,070.00

141,728.13

109,625.00

64,020.00

1,370,312.50

800,250.00

m3

944,271.43

###
###

118,840.00
121,916.70

kg

14,520.00

962.50

1,839,200.48

109,625.00

64,020.00

1,827,086.99

5,815,641.43

### 5,918,317.73

944,271.43

m2

5,055,540.82

### 5,513,472.05

944,271.43

m2

96 1 m3 Pekerjaan Plat Beton Tebal 6 cm ( -100, 1 Lapis) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

### 5,745,249.50
118,840.00

95 1 m3 Pekerjaan Plat Beton Tebal 8 cm ( -100, 1 Lapis) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

###

944,271.43

94 1 m3 Pekerjaan Plat Beton Tebal 10 cm ( -200 2 Lapis) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

### 6,320,204.22

944,271.43

93 1 m3 Pekerjaan Plat Beton Tebal 12 cm ( -200 2 Lapis) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

### 5,255,858.39
118,840.00

92 1 m3 Pekerjaan Balok Beton ukuran 20x30 cm (812, 8-150) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

###

944,271.43

91 1 m3 Pekerjaan Balok Beton ukuran 15x25 cm (612, 8-150) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

### 5,862,085.25

962.50

90 1 m3 Pekerjaan Ring Balok Beton ukuran 15x20 cm (412, 8-150) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

Rp.
I=(G+H)

65,010.00

89 1 m3 Pekerjaan Ring Balok Beton ukuran 11x15 cm (410, 6-200) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

Rp.
H = (C X F )

118,840.00

###

TOTAL
HARGA

Rp.

944,271.43

88 1 m3 Pekerjaan Balok Lintel Beton ukuran 11x11 cm (410, 6-200) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

JUMLAH
UPAH

G=(CXE)
###
###

88 1 m3 Pekerjaan Kolom Beton ukuran 30x30 cm (814, 10-150) K.175


1 m3 Membuat beton mutu fc = 14,5 MPa (

JUMLAH
BAHAN

###

Analisa Harga Satuan


Halaman 33

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

CATATAN : PEKERJAAN BETON ( Belum ada Gambar Detailnya )


97 1 m3 Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )

### 519,235.00

3,928,785.00

Bahan
Kayu Kelas III

0.2000

m3

Paku Biasa 5 - 12 Cm

1.5000

Kg

15,000.00

Minyak Bekisting

0.4000

Ltr

3,000.00

1,200.00

Kg

13,500.00

2,126,250.00

Kg

23,000.00

51,750.00

Kg

1,500.00

504,000.00

Besi Beton Polos


Kawat Beton
Semen Portland

###
2.2500
###

###

230,000.00
22,500.00

Pasir Beton

0.5400

m3

270,000.00

145,800.00

Koral Beton

0.8100

m3

405,000.00

328,050.00

Perkerja

5.3000

OH

59,500.00

315,350.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Tukang Kayu

1.3000

OH

70,000.00

91,000.00

Tukang Besi

1.0500

OH

70,000.00

73,500.00

Kepala Tukang

0.2620

OH

80,000.00

20,960.00

Mandor

0.2650

OH

Tenaga

98 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting)

### 587,640.00

4,811,790.00

Bahan
Kayu Kelas III

0.2700

m3

Paku Biasa 5 - 12 Cm

2.0000

Kg

15,000.00

Minyak Bekisting

0.6000

Ltr

3,000.00

1,800.00

Kg

13,500.00

2,835,000.00

Kg

23,000.00

69,000.00

Kg

1,500.00

504,000.00

Besi Beton Polos


Kawat Beton
Semen Portland

###
3.0000
###

###

310,500.00
30,000.00

Pasir Beton

0.5400

m3

270,000.00

145,800.00

Koral Beton

0.8100

m3

405,000.00

328,050.00

Perkerja

5.6500

OH

59,500.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Tukang Kayu

1.5600

OH

70,000.00

109,200.00

Tukang Besi

1.4000

OH

70,000.00

98,000.00

Kepala Tukang

0.3230

OH

80,000.00

25,840.00

Mandor

0.2830

OH

Tenaga
336,175.00

99 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting)

### 732,640.00

7,618,990.00

Bahan
Kayu Kelas III

0.4000

m3

Paku Biasa 5 - 12 Cm

4.0000

Kg

15,000.00

Minyak Bekisting

2.0000

Ltr

3,000.00

6,000.00

Kg

13,500.00

4,252,500.00

Kg

23,000.00

103,500.00

Kg

1,500.00

504,000.00

Besi Beton Polos


Kawat Beton
Semen Portland

###
4.5000
###

###

460,000.00
60,000.00

Pasir Beton

0.5400

m3

270,000.00

145,800.00

Koral Beton

0.8100

m3

405,000.00

328,050.00

Kayu Kelas II

0.1500

m3

Plywood 9 mm

3.5000

lbr

117,000.00

409,500.00

20.0000

btg

16,000.00

320,000.00

Perkerja

7.0500

OH

59,500.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Tukang Kayu

1.6500

OH

70,000.00

115,500.00

Tukang Besi

2.1000

OH

70,000.00

147,000.00

Kepala Tukang

0.4030

OH

80,000.00

32,240.00

Dolken kayu galam, (8-10) cm, panjang 4

###

297,000.00

Tenaga
419,475.00

Analisa Harga Satuan


Halaman 34

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Mandor

0.3530

OH

HARGA
SATUAN
UPAH
Rp.
F
-

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Analisa Harga Satuan


Halaman 35

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

100 1 m3 Membuat Balok beton bertulang (200 kg besi + bekisting)

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

### 636,390.00

5,799,840.00

Bahan
Kayu Kelas III

0.3200

m3

Paku Biasa 5 - 12 Cm

3.2000

Kg

15,000.00

Minyak Bekisting

1.6000

Ltr

3,000.00

4,800.00

Kg

13,500.00

2,835,000.00

Kg

23,000.00

69,000.00

Kg

1,500.00

504,000.00

Besi Beton Polos


Kawat Beton
Semen Portland

###
3.0000
###

###

368,000.00
48,000.00

Pasir Beton

0.5400

m3

270,000.00

145,800.00

Koral Beton

0.8100

m3

405,000.00

328,050.00

Kayu Kelas II

0.1400

m3

Plywood 9 mm

2.8000

lbr

117,000.00

327,600.00

16.0000

btg

16,000.00

256,000.00

Perkerja

6.3500

OH

59,500.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Tukang Kayu

1.6500

OH

70,000.00

115,500.00

Tukang Besi

1.4000

OH

70,000.00

98,000.00

Kepala Tukang

0.3330

OH

80,000.00

26,640.00

Mandor

0.3180

OH

Dolken kayu galam, (8-10) cm, panjang 4

###

277,200.00

Tenaga
377,825.00

101 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting)

### 519,475.00

5,173,325.00

Bahan
Kayu Kelas III

0.3200

m3

Paku Biasa 5 - 12 Cm

3.2000

Kg

15,000.00

Minyak Bekisting

1.6000

Ltr

3,000.00

4,800.00

Kg

13,500.00

2,126,250.00

Kg

23,000.00

51,750.00

Kg

1,500.00

504,000.00

Besi Beton Polos


Kawat Beton
Semen Portland

###
2.2500
###

###

368,000.00
48,000.00

Pasir Beton

0.5400

m3

270,000.00

145,800.00

Koral Beton

0.8100

m3

405,000.00

328,050.00

Kayu Kelas II

0.1200

m3

Plywood 9 mm

2.8000

lbr

117,000.00

327,600.00

32.0000

btg

16,000.00

512,000.00

Perkerja

5.3000

OH

59,500.00

315,350.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Tukang Kayu

1.3000

OH

70,000.00

91,000.00

Tukang Besi

1.0500

OH

70,000.00

73,500.00

Kepala Tukang

0.2650

OH

80,000.00

21,200.00

Mandor

0.2650

OH

Dolken kayu galam, (8-10) cm, panjang 4

###

237,600.00

Tenaga

102 1 m3 Membuat Dinding beton bertulang (150 kg besi + bekisting)

### 519,235.00

5,032,285.00

Bahan
Kayu Kelas III

0.2400

m3

Paku Biasa 5 - 12 Cm

3.2000

Kg

15,000.00

Minyak Bekisting

1.6000

Ltr

3,000.00

4,800.00

Kg

13,500.00

2,126,250.00

Kg

23,000.00

51,750.00

Kg

1,500.00

504,000.00

Besi Beton Polos


Kawat Beton
Semen Portland

###
2.2500
###

###

276,000.00
48,000.00

Pasir Beton

0.5400

m3

270,000.00

145,800.00

Koral Beton

0.8100

m3

405,000.00

328,050.00

Kayu Kelas II

0.1600

m3

Plywood 9 mm

2.8000

lbr

117,000.00

327,600.00

24.0000

btg

16,000.00

384,000.00

5.3000

OH

Dolken kayu galam, (8-10) cm, panjang 4

###

316,800.00

Tenaga
Perkerja

59,500.00

315,350.00

Analisa Harga Satuan


Halaman 36

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Tukang Kayu

1.3000

OH

70,000.00

91,000.00

Tukang Besi

1.0500

OH

70,000.00

73,500.00

Kepala Tukang

0.2620

OH

80,000.00

20,960.00

Mandor

0.2650

OH

TOTAL
HARGA

Analisa Harga Satuan


Halaman 37

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

103 1 m3 Membuat Dinding beton bertulang (200 kg besi + bekisting)

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

### 587,640.00

5,529,990.00

Bahan
Kayu Kelas III

0.2500

m3

Paku Biasa 5 - 12 Cm

3.0000

Kg

15,000.00

Minyak Bekisting

1.2000

Ltr

3,000.00

3,600.00

Kg

13,500.00

2,835,000.00

Kg

23,000.00

69,000.00

Kg

1,500.00

504,000.00

Besi Beton Polos


Kawat Beton
Semen Portland

###
3.0000
###

###

287,500.00
45,000.00

Pasir Beton

0.5400

m3

270,000.00

145,800.00

Koral Beton

0.8100

m3

405,000.00

328,050.00

Kayu Kelas II

0.1050

m3

Plywood 9 mm

2.5000

lbr

117,000.00

292,500.00

14.0000

btg

16,000.00

224,000.00

Perkerja

5.6500

OH

59,500.00

Tukang Batu

0.2750

OH

67,000.00

18,425.00

Tukang Kayu

1.5600

OH

70,000.00

109,200.00

Tukang Besi

1.4000

OH

70,000.00

98,000.00

Kepala Tukang

0.3230

OH

80,000.00

25,840.00

Mandor

0.2830

OH

Dolken kayu galam, (8-10) cm, panjang 4

###

207,900.00

Tenaga
336,175.00

104 1 M' kolom praktis beton bertulang (11 x 11) cm

55,250.00

15,330.00

70,580.00

Bahan
Kayu Kelas III

0.0020

m3

Paku Biasa 5 - 12 Cm

0.0100

Kg

15,000.00

###

2,300.00
150.00

Besi Beton Polos

3.0000

Kg

13,500.00

40,500.00

Kawat Beton

0.0450

Kg

23,000.00

1,035.00

Semen Portland

4.0000

Kg

1,500.00

6,000.00

Pasir Beton

0.0060

m3

270,000.00

1,620.00

Koral Beton

0.0090

m3

405,000.00

3,645.00

Perkerja

0.1800

OH

59,500.00

10,710.00

Tukang Batu

0.0200

OH

67,000.00

1,340.00

Tukang Kayu

0.0200

OH

70,000.00

1,400.00

Tukang Besi

0.0200

OH

70,000.00

1,400.00

Kepala Tukang

0.0060

OH

80,000.00

480.00

Mandor

0.0090

OH

Tenaga

105 1 M' Ring Balok beton bertulang (10 x 15) cm

70,255.00

25,302.50

95,557.50

Bahan
Kayu kelas III

0.0030

m3

Paku Biasa 5 - 12 Cm

0.0200

Kg

15,000.00

###

3,450.00
300.00

Besi Beton Polos

3.6000

Kg

13,500.00

48,600.00

Kawat Beton

0.0500

Kg

23,000.00

1,150.00

Semen Portland

5.5000

Kg

1,500.00

8,250.00

Pasir Beton

0.0090

m3

270,000.00

2,430.00

Koral Beton

0.0150

m3

405,000.00

6,075.00

Perkerja

0.2970

OH

59,500.00

17,671.50

Tukang Batu

0.0330

OH

67,000.00

2,211.00

Tukang Kayu

0.0330

OH

70,000.00

2,310.00

Tukang Besi

0.0330

OH

70,000.00

2,310.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0150

OH

Tenaga

VIII

PEKERJAAN PENTUP ATAP

Analisa Harga Satuan


Halaman 38

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

106 1m2 Pasang Atap Genteng Palentong Kecil

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

58,750.00

14,815.00

73,565.00

Bahan
Genteng Palentong

25.0000

bh

2,350.00

58,750.00

Perkerja

0.1500

OH

59,500.00

8,925.00

Tukang Kayu

0.0750

OH

70,000.00

5,250.00

Kepala Tukang

0.0080

OH

80,000.00

640.00

Mandor

0.0080

OH

Tenaga

Analisa Harga Satuan


Halaman 39

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

107 1m' Pasang Genteng Bubung Palentong

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

36,336.00

39,400.00

75,736.00

Bahan
Genteng Bubung Palentong

5.0000

bh

3,600.00

18,000.00

Semen Portland

8.0000

Kg

1,500.00

12,000.00

Pasir Pasang

0.0320

m3

198,000.00

6,336.00

Perkerja

0.4000

OH

59,500.00

23,800.00

Tukang Kayu

0.2000

OH

70,000.00

14,000.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0020

OH

Tenaga

108 1m' Pasang Genteng Bubung Palentong Besar

32,736.00

39,400.00

72,136.00

Bahan
Genteng Bubung Palentong

4.0000

bh

3,600.00

14,400.00

Semen Portland

8.0000

Kg

1,500.00

12,000.00

Pasir Pasang

0.0320

m3

198,000.00

6,336.00

Perkerja

0.4000

OH

59,500.00

23,800.00

Tukang Kayu

0.2000

OH

70,000.00

14,000.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0020

OH

Tenaga

109 1m2 Pasang Atap Genteng Multiroof Berpasir

125,400.00

19,700.00

145,100.00

Bahan
Genteng Multiroof

1.0200

lbr

120,000.00

122,400.00

Paku Biasa 2" - 5"

0.2000

Kg

15,000.00

3,000.00

Perkerja

0.2000

OH

59,500.00

11,900.00

Tukang Kayu

0.1000

OH

70,000.00

7,000.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0010

OH

Tenaga

110 1m2 Pasang Atap Sirap

169,800.00

29,377.00

199,177.00

Bahan
Atap sirap 5 mm

60.000

lbr

2,750.00

165,000.00

0.200

Kg

24,000.00

4,800.00

Perkerja

0.166

OH

59,500.00

9,877.00

Tukang Kayu

0.250

OH

70,000.00

17,500.00

Kepala Tukang

0.025

OH

80,000.00

2,000.00

Mandor

0.008

OH

Paku Biasa " - 1"


Tenaga

Analisa Harga Satuan


Halaman 40

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

111 1m' Pasang Nok Genteng Beton

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

228,286.00

39,400.00

267,686.00

Bahan
Genteng Beton

3.500

bh

54,000.00

Paku Biasa 2" - 5"

0.050

Kg

15,000.00

750.00

10.800

Kg

1,500.00

16,200.00

Pasir Pasang

0.032

m3

198,000.00

6,336.00

Semen Warna

1.000

Kg

16,000.00

16,000.00

Perkerja

0.400

OH

59,500.00

23,800.00

Tukang Kayu

0.200

OH

70,000.00

14,000.00

Kepala Tukang

0.020

OH

80,000.00

1,600.00

Mandor

0.020

OH

Semen PC

189,000.00

Tenaga

112 1m' Pasang Nok Genteng Metal

60,600.00

26,575.00

87,175.00

Bahan
Nok Genteng Metal

1.100

lbr

54,000.00

59,400.00

Paku Biasa 1/2" - 1"

0.050

Kg

24,000.00

1,200.00

Perkerja

0.250

OH

59,500.00

14,875.00

Tukang Kayu

0.150

OH

70,000.00

10,500.00

Kepala Tukang

0.015

OH

80,000.00

1,200.00

Mandor

0.013

OH

Tenaga

113 1m' Pasang Atap Nok Seng

10,260.00

6,432.50

16,692.50

Bahan
Seng Plat 3" x 6" BJLS 28

0.3000

Lbr

31,000.00

9,300.00

Paku Biasa 1 cm - 2.5 cm

0.0400

Kg

24,000.00

960.00

Perkerja

0.0150

OH

59,500.00

892.50

Tukang Kayu

0.0700

OH

70,000.00

4,900.00

Kepala Tukang

0.0080

OH

80,000.00

640.00

Mandor

0.0060

OH

Tenaga

IX

PEKERJAAN LANGIT - LANGIT

114 1 m2 Pas. Rangka Plapond Kayu Lokal Kelas II (Hanya Rangka)

60,405.00

29,906.25

90,311.25

Bahan
Kayu Lokal Kelas II

0.0210

m3

Paku

0.2200

kg

###

55,125.00

Perkerja

0.1875

org

59,500.00

11,156.25

Tukang Kayu

0.2250

org

70,000.00

15,750.00

Kepala Tukang

0.0375

org

80,000.00

3,000.00

Mandor

0.0105

org

24,000.00

5,280.00

Tenaga

115 1 m2 Pas. Rangka Plapond Besi Hollow (Hanya Rangka)

64,000.00

29,550.00

93,550.00

Bahan
Skrup 1"

25.0000

bh

400.00

Hollow 20/40 mm

0.2500

btg

31,500.00

10,000.00
7,875.00

Hollow 40/40 mm

0.6250

btg

45,000.00

28,125.00

Penggantungan

2.0000

bh

9,000.00

18,000.00

Perkerja

0.3000

org

59,500.00

17,850.00

Tukang Kayu

0.1500

org

70,000.00

10,500.00

Kepala Tukang

0.0150

org

80,000.00

1,200.00

Mandor

0.0100

org

Tenaga

Analisa Harga Satuan


Halaman 41

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

116 1 m2 Pas. Langit-langit gypsum board ukuran (1200x2400x9) mm

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

29,940.00

9,850.00

39,790.00

Bahan
Gypsum Board

0.3640

Lbr

75,000.00

27,300.00

Paku Skrup

0.1100

kg

24,000.00

2,640.00

Perkerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.0500

OH

70,000.00

3,500.00

Kepala Tukang

0.0050

OH

80,000.00

400.00

Mandor

0.0050

OH

Tenaga

Analisa Harga Satuan


Halaman 42

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

117 1 m2 langit-langit dari GRC Internal tebal 4 mm

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

28,484.00

9,850.00

38,334.00

Bahan
GRC internal

0.3640

Lbr

71,000.00

25,844.00

Paku Skrup

0.1100

kg

24,000.00

2,640.00

Perkerja

0.1000

OH

59,500.00

5,950.00

Tukang Kayu

0.0500

OH

70,000.00

3,500.00

Kepala Tukang

0.0050

OH

80,000.00

400.00

Mandor

0.0050

OH

Tenaga

118 1 m' Pas. List Plapond gypsum board profil

22,425.00

8,250.00

30,675.00

Bahan
List Gypsum profil

1.0500

m'

20,000.00

21,000.00

Tepung gypsum

0.1500

kg

9,500.00

1,425.00

Perkerja

0.0600

OH

59,500.00

3,570.00

Tukang Kayu

0.0600

OH

70,000.00

4,200.00

Kepala Tukang

0.0060

OH

80,000.00

480.00

Mandor

0.0030

OH

Tenaga

119 1 m2 List Langit - langit Kayu Profil

4,965.00

6,875.00

11,840.00

Bahan
List Kayu Profil

1.0500

m'

4,500.00

4,725.00

Paku

0.0100

Kg

24,000.00

240.00

Perkerja

0.0500

OH

59,500.00

2,975.00

Tukang Kayu

0.0500

OH

70,000.00

3,500.00

Kepala Tukang

0.0050

OH

80,000.00

400.00

Mandor

0.0030

OH

Tenaga

PEKERJAAN SANITASI

120 Memasang 1 buah Kloset Duduk / Monoblok

### 273,430.00

2,184,430.00

Bahan
Kloset Duduk / MonoblOH
Perlengkapan

1.0000

bh

30% Dari bahan

###

1,470,000.00

441,000.00

441,000.00

Tenaga
Perkerja

3.3000

OH

59,500.00

196,350.00

Tukang Batu

1.1000

OH

70,000.00

77,000.00

Kepala Tukang

0.0010

OH

80,000.00

80.00

Mandor

0.1600

OH

121 Memasang 1 buah Kloset Jongkok Porselen

345,980.00

280,000.00

625,980.00

Bahan
Kloset JongkOH Porselen (putih)

1.0000

bh

335,000.00

335,000.00

Semen Portland

6.0000

Kg

1,500.00

9,000.00

Pasir Pasang

0.0100

m3

198,000.00

1,980.00

Perkerja

1.0000

OH

59,500.00

59,500.00

Tukang Batu

1.5000

OH

67,000.00

100,500.00

Kepala Tukang

1.5000

OH

80,000.00

120,000.00

Mandor

0.1600

OH

Tenaga

122 Memasang 1 buah Urinoir

### 134,500.00

2,485,480.00

Bahan
Urinoir
Perlengkapan

1.0000

bh

30% Harga Urinoir

###
540,000.00

1,800,000.00
540,000.00

Analisa Harga Satuan


Halaman 43

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Semen Portland

6.0000

Kg

1,500.00

9,000.00

Pasir Pasang

0.0100

m3

198,000.00

1,980.00

Perkerja

1.0000

OH

59,500.00

59,500.00

Tukang Batu

1.0000

OH

67,000.00

67,000.00

Kepala Tukang

0.1000

OH

80,000.00

8,000.00

Mandor

0.1000

OH

Tenaga

Analisa Harga Satuan


Halaman 44

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

123 Memasang 1 buah Wastafel

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

738,980.00

168,650.00

907,630.00

Bahan
Wastafel lengkap accessories
Perlengkapan

1.0000

bh

12% Harga Wastafel

650,000.00

650,000.00

78,000.00

78,000.00

Semen Portland

6.0000

Kg

1,500.00

9,000.00

Pasir Pasang

0.0100

m3

198,000.00

1,980.00

Perkerja

1.0000

OH

59,500.00

59,500.00

Tukang Batu

1.4500

OH

67,000.00

97,150.00

Kepala Tukang

0.1500

OH

80,000.00

12,000.00

Mandor

0.1000

OH

Tenaga

124 Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m3

460,200.00

331,200.00

791,400.00

Bahan
Bak Mandi Fiber

1.0000

Perlengkapan

18% Harga Bak

bh

390,000.00

390,000.00

70,200.00

70,200.00

Tenaga
Perkerja

1.8000

OH

59,500.00

107,100.00

Tukang Batu

2.7000

OH

67,000.00

180,900.00

Kepala Tukang

0.5400

OH

80,000.00

43,200.00

Mandor

0.1100

OH

125 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 5

208,915.00

119,941.00

328,856.00

Bahan
Bata merah

0.2500

m2

700.00

175.00

77.0000

Kg

1,500.00

115,500.00

Pasir Pasang

0.1300

m3

198,000.00

25,740.00

Batu Kerikil

0.0200

m3

405,000.00

8,100.00

Besi Beton

2.6000

kg

13,500.00

35,100.00

Pasir Beton

0.0900

m3

270,000.00

24,300.00

Perkerja

1.4200

OH

59,500.00

84,490.00

Tukang Batu

0.4730

OH

67,000.00

31,691.00

Kepala Tukang

0.0470

OH

80,000.00

3,760.00

Mandor

0.0710

OH

Semen Portland

Tenaga

126 Memasang 1 m' Pipa PVC tipe AW "

11,082.50

6,642.00

17,724.50

Bahan
Pipa PVC D 1/2"

1.2000

Perlengkapan

35% Harga Pipa

m'

7,150.00

8,580.00

2,502.50

2,502.50

Tenaga
Perkerja

0.0360

OH

59,500.00

2,142.00

Tukang Batu

0.0600

OH

67,000.00

4,020.00

Kepala Tukang

0.0060

OH

80,000.00

480.00

Mandor

0.0018

OH

127 Memasang 1 m' Pipa PVC tipe AW "

13,446.25

6,642.00

20,088.25

Bahan
Pipa PVC tipe AW "

1.2000

Perlengkapan

35% Harga Pipa

m'

8,675.00

10,410.00

3,036.25

3,036.25

Tenaga
Perkerja

0.0360

OH

59,500.00

2,142.00

Tukang Batu

0.0600

OH

67,000.00

4,020.00

Kepala Tukang

0.0060

OH

80,000.00

480.00

Mandor

0.0018

OH

128 Memasang 1 m' Pipa PVC tipe AW 1"

13,640.00

6,642.00

20,282.00

Analisa Harga Satuan


Halaman 45

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Bahan
Pipa PVC tipe AW 1"
Perlengkapan

1.2000

m'

35% Harga Pipa

8,800.00

10,560.00

3,080.00

3,080.00

Tenaga
Perkerja

0.0360

OH

59,500.00

2,142.00

Tukang Batu

0.0600

OH

67,000.00

4,020.00

Kepala Tukang

0.0060

OH

80,000.00

480.00

Mandor

0.0018

OH

Analisa Harga Satuan


Halaman 46

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

129 Memasang 1 m' Pipa PVC tipe D 2"

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

30,263.75

6,642.00

36,905.75

Bahan
Pipa PVC tipe D 2"

1.2000

Perlengkapan

35% Harga Pipa

m'

19,525.00

23,430.00

6,833.75

6,833.75

Tenaga
Perkerja

0.0360

OH

59,500.00

2,142.00

Tukang Batu

0.0600

OH

67,000.00

4,020.00

Kepala Tukang

0.0060

OH

80,000.00

480.00

Mandor

0.0018

OH

130 Memasang 1 m' Pipa PVC tipe D 4"

63,511.25

14,944.50

78,455.75

Bahan
Pipa PVC tipe D 4"

1.2000

Perlengkapan

35% Harga Pipa

m'

40,975.00

49,170.00

14,341.25

14,341.25

Tenaga
Perkerja

0.0810

OH

59,500.00

4,819.50

Tukang Batu

0.1350

OH

67,000.00

9,045.00

Kepala Tukang

0.0135

OH

80,000.00

1,080.00

Mandor

0.0041

OH

131 Memasang 1 bh Kran " atau "

81,612.50

8,095.00

89,707.50

Bahan
Kran Air (Sanei)

1.0000

bh

81,500.00

81,500.00

Seal tape

0.0250

bh

4,500.00

112.50

Perkerja

0.0100

OH

59,500.00

595.00

Tukang Batu

0.1000

OH

67,000.00

6,700.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0050

OH

Tenaga

132 Memasang 1 bh Floor Drain

61,000.00

8,095.00

69,095.00

Bahan
Floor drain stainless

1.0000

bh

61,000.00

61,000.00

Perkerja

0.0100

OH

59,500.00

595.00

Tukang Batu

0.1000

OH

67,000.00

6,700.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0050

OH

Tenaga

XI

PEKERJAAN BESI DAN ALLUMINIUM

133 1 M' Kusen Alumunium

125,200.00

5,590.00

130,790.00

Bahan
Profil alumunium

1.1000

m'

Sealent

0.0600

tube

113,000.00

124,300.00

15,000.00

900.00

Perkerja

0.0430

OH

59,500.00

2,558.50

Tukang Khusus Alumunium

0.0430

OH

62,500.00

2,687.50

Kepala Tukang

0.0043

OH

80,000.00

344.00

Mandor

0.0021

OH

Tenaga

134 1 Unit Pasang Pintu PVC KM/WC lengkap Accessories

345,000.00

144,375.00

489,375.00

Bahan
Pintu PVC lengkap Accessories

1.0000

unit

345,000.00

345,000.00

Perkerja

1.0500

OH

59,500.00

62,475.00

Tukang Kayu

1.0500

OH

70,000.00

73,500.00

Tenaga

Analisa Harga Satuan


Halaman 47

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Kepala Tukang

0.1050

OH

Mandor

0.0052

OH

HARGA
SATUAN
UPAH
Rp.
F
80,000.00
-

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

8,400.00
-

Analisa Harga Satuan


Halaman 48

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

135 1 m' Pasang Talang Datar/Jurai , Seng BJLS 28 lebar 90 cm

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

153,740.00

41,900.00

195,640.00

Bahan
Seng Plat

1.0500

m'

42,500.00

Paku Biasa 1 cm - 2.5 cm atau Sekrup

0.0150

Kg

29,000.00

44,625.00

Papan Kayu Borneo

0.0190

m3

Perkerja

0.2000

OH

59,500.00

11,900.00

Tukang Kayu

0.4000

OH

70,000.00

28,000.00

Kepala Tukang

0.0250

OH

80,000.00

2,000.00

Mandor

0.0100

OH

435.00

###

108,680.00

Tenaga

136 1 m' Pasang Talang Lingkaran 15 cm, Seng BJLS 28 Lebar 45 cm

53,340.00

32,325.00

85,665.00

Bahan
Seng Plat

1.0500

m'

31,000.00

Paku Biasa 1 cm - 2.5 cm atau Sekrup

0.0100

Kg

29,000.00

32,550.00
290.00

Besi Strip

0.5000

Kg

41,000.00

20,500.00

Perkerja

0.1500

OH

59,500.00

8,925.00

Tukang Kayu

0.3000

OH

70,000.00

21,000.00

Kepala Tukang

0.0300

OH

80,000.00

2,400.00

Mandor

0.0080

OH

Tenaga

XII

PEKERJAAN KUNCI DAN KACA

137 1 Buah Pasang Kunci Tanam Antik

142,000.00

50,370.00

192,370.00

Bahan
Kunci Tanam Antik

1.0000

Bh

142,000.00

142,000.00

Pekerja

0.0600

OH

59,500.00

3,570.00

Tukang Kayu

0.6000

OH

70,000.00

42,000.00

Kepala Tukang

0.0600

OH

80,000.00

4,800.00

Mandor

0.0030

OH

Tenaga

138 1 Buah Pasang Kunci Tanam Biasa

55,000.00

36,395.00

91,395.00

Bahan
Kunci Tanam Biasa

1.0000

Bh

55,000.00

55,000.00

Pekerja

0.0100

OH

59,500.00

595.00

Tukang Kayu

0.5000

OH

70,000.00

35,000.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0050

OH

Tenaga

139 1 Buah Pasang Kunci Anak Tanam

150,000.00

36,395.00

186,395.00

Bahan
Kunci Anak Tanam

1.0000

Bh

150,000.00

150,000.00

Pekerja

0.0100

OH

59,500.00

595.00

Tukang Kayu

0.5000

OH

70,000.00

35,000.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0050

OH

Tenaga

139 1 Buah Pasang Kunci Slot

30,500.00

16,790.00

47,290.00

Bahan
Kunci Slot

1.0000

Bh

30,500.00

30,500.00

Pekerja

0.0200

OH

59,500.00

1,190.00

Tukang Kayu

0.2000

OH

70,000.00

14,000.00

Tenaga

Analisa Harga Satuan


Halaman 49

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

Kepala Tukang

0.0200

OH

Mandor

0.0010

OH

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

80,000.00

1,600.00

140 1 Buah Pasang Engsel Pintu

JUMLAH
UPAH

52,000.00

12,592.50

64,592.50

Bahan
Engsel Pintu

1.0000

Bh

52,000.00

52,000.00

Pekerja

0.0150

OH

59,500.00

892.50

Tukang Kayu

0.1500

OH

70,000.00

10,500.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0008

OH

Tenaga

Analisa Harga Satuan


Halaman 50

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

141 1 Buah Pasang Engsel Angin Untuk Pintu

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

16,500.00

16,790.00

33,290.00

Bahan
Engsel Angin

1.0000

Bh

16,500.00

16,500.00

Pekerja

0.0200

OH

59,500.00

1,190.00

Tukang Kayu

0.2000

OH

70,000.00

14,000.00

Kepala Tukang

0.0200

OH

80,000.00

1,600.00

Mandor

0.0100

OH

Tenaga

142 1 Buah Pasang Engsel Jendela

38,000.00

12,592.50

50,592.50

Bahan
Engsel Jendela

1.0000

Bh

38,000.00

38,000.00

Pekerja

0.0150

OH

59,500.00

892.50

Tukang Kayu

0.1500

OH

70,000.00

10,500.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0008

OH

Tenaga

1 1 Buah Pasang Grendel Tanam

76,000.00

12,592.50

88,592.50

Bahan
Grendel Tanam

1.0000

Bh

76,000.00

76,000.00

Pekerja

0.0150

OH

59,500.00

892.50

Tukang Kayu

0.1500

OH

70,000.00

10,500.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0008

OH

Tenaga

1 1 Buah Pasang Pegagang Pintu

100,000.00

12,592.50

112,592.50

Bahan
Pegangan pintu

1.0000

set

100,000.00

100,000.00

Pekerja

0.0150

OH

59,500.00

892.50

Tukang Kayu

0.1500

OH

70,000.00

10,500.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0008

OH

Tenaga

143 1 Buah Pasang Kait angin

16,500.00

12,592.50

29,092.50

Bahan
Kait Angin

1.0000

Bh

16,500.00

16,500.00

Pekerja

0.0150

OH

59,500.00

892.50

Tukang Kayu

0.1500

OH

70,000.00

10,500.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0008

OH

Tenaga

144 1 Buah Door Closer

300,000.00

41,975.00

341,975.00

Bahan
Door Closer

1.0000

Bh

300,000.00

300,000.00

Pekerja

0.0500

OH

59,500.00

2,975.00

Tukang Kayu

0.5000

OH

70,000.00

35,000.00

Kepala Tukang

0.0500

OH

80,000.00

4,000.00

Mandor

0.0025

OH

Tenaga

145 1 Buah Pegangan Pintu/ Door Holder

215,000.00

41,975.00

256,975.00

Bahan
Door Holder

1.0000

Bh

215,000.00

215,000.00

Analisa Harga Satuan


Halaman 51

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Tenaga
Pekerja

0.0500

OH

59,500.00

2,975.00

Tukang Kayu

0.5000

OH

70,000.00

35,000.00

Kepala Tukang

0.0500

OH

80,000.00

4,000.00

Mandor

0.0025

OH

Analisa Harga Satuan


Halaman 52

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

146 1 Buah Door Stop

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

310,000.00

8,395.00

318,395.00

Bahan
Door Stop

1.0000

Bh

310,000.00

310,000.00

Pekerja

0.0100

OH

59,500.00

595.00

Tukang Kayu

0.1000

OH

70,000.00

7,000.00

Kepala Tukang

0.0100

OH

80,000.00

800.00

Mandor

0.0005

OH

Tenaga

147 1 Buah Pasang Kaca tebal 3 mm

121,000.00

12,592.50

133,592.50

Bahan
Kaca Polos

1.1000

m2

110,000.00

121,000.00

Perkerja

0.0150

OH

59,500.00

892.50

Tukang Kayu

0.1500

OH

70,000.00

10,500.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0008

OH

Tenaga

148 1 Buah Pasang Kaca tebal 5 mm

165,000.00

12,592.50

177,592.50

Bahan
Kaca Polos

1.1000

m2

150,000.00

165,000.00

Perkerja

0.0150

OH

59,500.00

892.50

Tukang Kayu

0.1500

OH

70,000.00

10,500.00

Kepala Tukang

0.0150

OH

80,000.00

1,200.00

Mandor

0.0008

OH

Tenaga

149 1 Buah Pasang Kaca riben tebal 5 mm

165,000.00

22,000.00

187,000.00

Bahan
Kaca Riben 5 mm

1.1000

m2

150,000.00

165,000.00

Perkerja

0.1600

OH

59,500.00

9,520.00

Tukang Kayu

0.1600

OH

70,000.00

11,200.00

Kepala Tukang

0.0160

OH

80,000.00

1,280.00

Mandor

0.0008

OH

Tenaga

XIII

PEKERJAAN PENUTUP LANTAI DAN DINDING

150 1 m2 Pasang Lantai Keramik 30 x 30 cm

90,662.12

67,900.00

158,562.12

Bahan
Ubin Keramik 30 x 30 cm

11.8700

bh

3,601.69

42,752.12

Semen Portland

10.0000

Kg

1,500.00

15,000.00

Pasir Pasang

0.0450

m3

198,000.00

8,910.00

Semen Warna

1.5000

Kg

16,000.00

24,000.00

Perkerja

0.7000

OH

59,500.00

41,650.00

Tukang Batu

0.3500

OH

67,000.00

23,450.00

Kepala Tukang

0.0350

OH

80,000.00

2,800.00

Mandor

0.0350

OH

Tenaga

151 1 m2 Pasang Lantai Keramik 30 x 30 cm (Corak)

103,236.27

67,900.00

171,136.27

Bahan
Ubin Keramik 30 x 30 cm

11.8700

bh

4,661.02

55,326.27

Semen Portland

10.0000

Kg

1,500.00

15,000.00

Pasir Pasang

0.0450

m3

198,000.00

8,910.00

Semen Warna

1.5000

Kg

16,000.00

24,000.00

Tenaga

Analisa Harga Satuan


Halaman 53

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

JUMLAH
BAHAN

JUMLAH
UPAH

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Perkerja

0.7000

OH

59,500.00

41,650.00

Tukang Batu

0.3500

OH

67,000.00

23,450.00

Kepala Tukang

0.0350

OH

80,000.00

2,800.00

Mandor

0.0350

OH

TOTAL
HARGA

Analisa Harga Satuan


Halaman 54

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

152 1 m2 Pasang Lantai Keramik 40 x 40 cm

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

112,410.00

67,900.00

180,310.00

Bahan
Ubin Keramik 40 x 40 cm

6.2500

bh

10,320.00

64,500.00

10.0000

Kg

1,500.00

15,000.00

Pasir Pasang

0.0450

m3

198,000.00

8,910.00

Semen Warna

1.5000

Kg

16,000.00

24,000.00

Perkerja

0.7000

OH

59,500.00

41,650.00

Tukang Batu

0.3500

OH

67,000.00

23,450.00

Kepala Tukang

0.0350

OH

80,000.00

2,800.00

Mandor

0.0350

OH

Semen Portland

Tenaga

153 1 m2 Pasang Lantai Keramik 20 x 20 cm Anti Slip

116,430.00

67,900.00

184,330.00

Bahan
Ubin Keramik

26.5000

bh

2,490.57

66,000.00

Semen Portland

10.4000

Kg

1,500.00

15,600.00

Pasir Pasang

0.0450

m3

198,000.00

8,910.00

Semen Warna

1.6200

Kg

16,000.00

25,920.00

Perkerja

0.7000

OH

59,500.00

41,650.00

Tukang Batu

0.3500

OH

67,000.00

23,450.00

Kepala Tukang

0.0350

OH

80,000.00

2,800.00

Mandor

0.0350

OH

Tenaga

154 1 m2 Pasang Dinding Keramik 20 x 25 cm (KIA)

112,054.00

87,300.00

199,354.00

Bahan
Keramik 20 x 25 cm

20.0000

Bh

3,175.00

63,500.00

Semen Portland

9.3000

Kg

1,500.00

13,950.00

Pasir Pasang

0.0180

m3

198,000.00

3,564.00

Semen Warna

1.9400

Kg

16,000.00

31,040.00

Perkerja

0.9000

OH

59,500.00

53,550.00

Tukang Batu

0.4500

OH

67,000.00

30,150.00

Kepala Tukang

0.0450

OH

80,000.00

3,600.00

Mandor

0.0450

OH

Tenaga

155 1 m2 Pasang Dinding Keramik 25 x 40 cm (KIA)

114,554.00

87,300.00

201,854.00

Bahan
Keramik 25 x 40 cm

10.0000

Bh

6,600.00

66,000.00

Semen Portland

9.3000

Kg

1,500.00

13,950.00

Pasir Pasang

0.0180

m3

198,000.00

3,564.00

Semen Warna

1.9400

Kg

16,000.00

31,040.00

Perkerja

0.9000

OH

59,500.00

53,550.00

Tukang Batu

0.4500

OH

67,000.00

30,150.00

Kepala Tukang

0.0450

OH

80,000.00

3,600.00

Mandor

0.0450

OH

Tenaga

Analisa Harga Satuan


Halaman 55

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

156 1 m2 Pasang Dinding batu Hitam uk.20x40 cm + Coating

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

168,755.00

67,900.00

236,655.00

Bahan
Batu Tempel Hitam

1.1000

m2

123,000.00

135,300.00

11.7500

Kg

1,500.00

17,625.00

Pasir Pasang

0.0350

m3

198,000.00

6,930.00

Vernsi/coating

0.1000

kg

84,000.00

8,400.00

Kwas 3"

0.0500

bh

10,000.00

500.00

Perkerja

0.7000

OH

59,500.00

41,650.00

Tukang Batu

0.3500

OH

67,000.00

23,450.00

Kepala Tukang

0.0350

OH

80,000.00

2,800.00

Mandor

0.0350

OH

Semen Portland (PC)

Tenaga

157 1 m2 Pasangan Glass Block

843,888.00

42,281.25

886,169.25

Bahan
25.0000

bh

33,500.00

PC (50 kg)

0.1600

zak

1,500.00

240.00

Pasir pasang

0.0300

m3

198,000.00

5,940.00

Semen warna

0.0130

kg

16,000.00

208.00

Pekerja

0.1875

OH

59,500.00

11,156.25

Tukang batu

0.3750

OH

67,000.00

25,125.00

Kepala tukang

0.0750

OH

80,000.00

6,000.00

Mandor

0.0188

OH

Glass block

837,500.00

Tenaga

158 1 m' Saluran Grevel Beton 1/2 DIA.20 CM + Pasangan

191,950.88

10,625.00

202,575.88

Bahan
Galian tanah

0.1500

m3

46,812.50

7,021.88

Grevel beton 20 cm

1.0000

bh

42,500.00

42,500.00

Pas.bata + Plesteran

1.0000

m'

142,429.00

142,429.00

1.0000

ls

10,625.00

Tenaga
Upah kerja
159 1 M2 Pasangan Paving Block Natural

10,625.00

6 & 8 CM

93,902.40

53,375.00

147,277.40

Bahan
Paving block natural 6 & 8 cm

1.0100

m2

66,240.00

66,902.40

Pasir beton

0.1000

m3

270,000.00

27,000.00

Perkerja

0.2500

org

59,500.00

14,875.00

Tukang Batu

0.5000

org

67,000.00

33,500.00

Kepala Tukang

0.0250

org

80,000.00

2,000.00

Mandor

0.0030

org

Peralatan

1.0000

lot

Tenaga

XIV

3,000.00

3,000.00

PEKERJAAN PENGECATAN

160 1 m2 Mengecatan Bidang Kayu Lama

40,320.00

10,015.00

50,335.00

Bahan
Plamir

0.1500

Kg

24,000.00

3,600.00

Cat Dasar (Emco Lux Warna Sedang)

0.1700

Kg

108,000.00

18,360.00

Cat Penutup (Emco Lux Warna Sedang)

0.1700

Kg

108,000.00

18,360.00

Perkerja

0.0700

OH

59,500.00

4,165.00

Tukang Cat

0.0750

OH

70,000.00

5,250.00

Kepala Tukang

0.0075

OH

80,000.00

600.00

Mandor

0.0025

OH

Tenaga

Analisa Harga Satuan


Halaman 56

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

161 1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

64,640.00

5,275.00

69,915.00

Bahan
Cat Meni (Emco)

0.2000

Kg

73,000.00

Plamir

0.1500

Kg

24,000.00

14,600.00
3,600.00

Cat Dasar (Emco Lux Warna Sedang)

0.1700

Kg

108,000.00

18,360.00

Cat Penutup (Emco Lux Warna Sedang)

0.2600

Kg

108,000.00

28,080.00

Perkerja

0.0700

OH

59,500.00

4,165.00

Tukang Cat

0.0090

OH

70,000.00

630.00

Kepala Tukang

0.0060

OH

80,000.00

480.00

Mandor

0.0025

OH

Tenaga

Analisa Harga Satuan


Halaman 57

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

162 1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

74,360.00

11,835.00

86,195.00

Bahan
Cat Meni

0.2000

Kg

73,000.00

Plamir

0.1500

Kg

24,000.00

14,600.00
3,600.00

Cat Dasar (Emco Lux Warna Sedang)

0.1700

Kg

108,000.00

18,360.00

Cat Penutup (Emco Lux Warna Sedang)

0.3500

Kg

108,000.00

37,800.00

Perkerja

0.0700

OH

59,500.00

4,165.00

Tukang Cat

0.1050

OH

70,000.00

7,350.00

Kepala Tukang

0.0040

OH

80,000.00

320.00

Mandor

0.0025

OH

Tenaga

163 1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup

16,720.00

6,104.00

22,824.00

Bahan
Plamur (Viny Paint)

0.1000

Kg

34,000.00

3,400.00

Cat Dasar (Metrolite)

0.1000

Kg

37,000.00

3,700.00

Cat Tembok (Metrolite)

0.2600

Kg

37,000.00

9,620.00

Perkerja

0.0200

OH

59,500.00

1,190.00

Tukang Cat

0.0630

OH

70,000.00

4,410.00

Kepala Tukang

0.0063

OH

80,000.00

504.00

Mandor

0.0025

OH

Tenaga

164 1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup

9,620.00

6,104.00

15,724.00

Bahan
Cat Tembok (Metrolite)

0.2600

Kg

37,000.00

9,620.00

Perkerja

0.0200

OH

59,500.00

1,190.00

Tukang Cat

0.0630

OH

70,000.00

4,410.00

Kepala Tukang

0.0063

OH

80,000.00

504.00

Mandor

0.0025

OH

Tenaga

165 1 m2 Pengecatan Tembok Lama ( 2 Lapis Cat Penutup )

9,620.00

6,104.00

15,724.00

Bahan
Cat Tembok (Metrolite)

0.2600

Kg

37,000.00

9,620.00

Perkerja

0.0200

OH

59,500.00

1,190.00

Tukang Cat

0.0630

OH

70,000.00

4,410.00

Kepala Tukang

0.0063

OH

80,000.00

504.00

Mandor

0.0025

OH

Tenaga

XIV

PEKERJAAN INSTALASI LISTRIK

166 1 Bh Titik Lampu Lengkap TL 20 Watt

65,000.00

4,410.00

69,410.00

Bahan
1.0000

titik

Tukang Listrik

0.0630

OH

Mandor

0.0450

OH

Titik Lampu Komplit

65,000.00

65,000.00

Tenaga
70,000.00

4,410.00

167 1 Bh Titik Sakelar Single

16,000.00

4,410.00

20,410.00

Bahan
1.0000

Bh

Tukang Listrik

0.0630

OH

Mandor

0.0450

OH

Sakelar single

16,000.00

16,000.00

Tenaga
70,000.00
-

4,410.00
-

Analisa Harga Satuan


Halaman 58

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

168 1 Bh Titik Sakelar Doubel

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

20,000.00

4,410.00

24,410.00

Bahan
1.0000

Bh

Tukang Listrik

0.0630

OH

Mandor

0.0450

OH

Sakelar Doubel

20,000.00

20,000.00

Tenaga
70,000.00
-

4,410.00
-

Analisa Harga Satuan


Halaman 59

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA
SATUAN
BAHAN
Rp.

HARGA
SATUAN
UPAH
Rp.
F

169 1 M Pasang Kabel NYM 3 x 2 1/2

JUMLAH
BAHAN

JUMLAH
UPAH

TOTAL
HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

597,000.00

4,410.00

601,410.00

Bahan
1.0000

m'

Tukang Listrik

0.0630

OH

Mandor

0.0450

OH

Kabel NYM 3 x 2 1/2

597,000.00

597,000.00

Tenaga
70,000.00

4,410.00

170 1 Bh Box MCB

400,000.00

4,410.00

404,410.00

Bahan
1.0000

Bh

Tukang Listrik

0.0630

OH

Mandor

0.0450

OH

Bok MCB

400,000.00

400,000.00

Tenaga
70,000.00

4,410.00

171 1 Bh Titik Stop Kontak

18,000.00

4,410.00

22,410.00

Bahan
1.0000

Bh

Tukang Listrik

0.0630

OH

Mandor

0.0450

OH

Stop Kontak

18,000.00

18,000.00

Tenaga
70,000.00

4,410.00

172 1 Bh Pipa Arde

4,410.00

4,410.00

Bahan
1.0000

m'

Tukang Listrik

0.0630

OH

Mandor

0.0450

OH

Pipa Arde P.3 m

Tenaga
70,000.00

4,410.00

173 1 Bh Pasangan Lampu Downlight

116,000.00

4,410.00

120,410.00

Bahan
Lampu XL 14 watt (Philips)

1.0000

Bh

56,000.00

56,000.00

Dudukan Lampu (downlight)

1.0000

Bh

60,000.00

60,000.00

Tukang Listrik

0.0630

OH

Mandor

0.0450

OH

Tenaga
70,000.00

4,410.00

46 1 m' Pasangan Kasteen

87,730.00

32,910.00

120,640.00

Bahan
Kasteen P. 60 cm

1.6700

bh

51,500.00

86,005.00

Pasir pasang

0.0075

m3

198,000.00

1,485.00

PC 50 kg

0.1600

kg

1,500.00

240.00

Perkerja

0.1800

org

59,500.00

10,710.00

Tukang Batu

0.2000

org

67,000.00

13,400.00

Kepala Tukang

0.1100

org

80,000.00

8,800.00

Mandor

0.0110

org

Tenaga

Analisa Harga Satuan


Halaman 60

1
2
4
5

#REF!

6
7
174
175
176
177
178
181
182
183
184
185
188
189

218
219
220
223
224
225
226
227
230
231
232

233
234
237
238
239
240
241
244

Analisa Harga Satuan


Halaman 61

#REF!

6
7
245
246
247
248
249
250
253

Analisa Harga Satuan


Halaman 62

#REF!

6
7
254
255
256
257
258
259
262
263

273
274
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324

Analisa Harga Satuan


Halaman 63

#REF!

6
7

Analisa Harga Satuan


Halaman 64

#REF!

6
7

325
326

360
361
362
363
364
365
366
367
368
369
370

Analisa Harga Satuan


Halaman 65

#REF!

6
7
371
372
373
374
375
376
377
378
379
380
381
382

Analisa Harga Satuan


Halaman 66

#REF!

6
7
383
384
385
386
387
388
389
390
391
392

478
479
480
481
482
483
484
485
486
487

659
660
661
662
663
664
665

Analisa Harga Satuan


Halaman 67

#REF!

6
7
666
667
668

Analisa Harga Satuan


Halaman 68

#REF!

6
7
669
670
671
673
674
675
676
677
678

710
711

731
778

Analisa Harga Satuan


Halaman 69

#REF!

6
7

779

Analisa Harga Satuan


Halaman 70

#REF!

6
7
806

807
870
871
872
873
874
875
876
877
878
879
880
881

Analisa Harga Satuan


Halaman 71

#REF!

6
7

Analisa Harga Satuan


Halaman 72

#REF!

6
7
905

906

1029
1030
1031
1032
1033
1034
1035
1036
1037

Analisa Harga Satuan


Halaman 73

#REF!

6
7
1038
1039

Analisa Harga Satuan


Halaman 74

#REF!

6
7
1059

1060

3000

0.0006

1666.6667
5000000

Analisa Harga Satuan


Halaman 75

#REF!

6
7

Analisa Harga Satuan


Halaman 76

#REF!

6
7
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1250

1283
1284
1285
1287
1288
1289
1290

Analisa Harga Satuan


Halaman 77

#REF!

6
7
1291
1292
1293

Analisa Harga Satuan


Halaman 78

#REF!

6
7
1316
1317
1318
1319
1321
1322
1323
1324
1325
1326
1327
1328
1329

1334
1335
1336
1337
1338
1339
1370
1371

0.6207142857
0.0880176211

Analisa Harga Satuan


Halaman 79

#REF!

6
7

Analisa Harga Satuan


Halaman 80

#REF!

6
7

Analisa Harga Satuan


Halaman 81

#REF!

6
7

Analisa Harga Satuan


Halaman 82

#REF!

6
7

1611
1612
1613
1614
1615
1616
1617
1618

Analisa Harga Satuan


Halaman 83

#REF!

6
7
1619
1620

Analisa Harga Satuan


Halaman 84

#REF!

6
7

1664
1665
1666
1667
1668
1669
1670
1671
1672
1673
1674
1675
1676
1677
1678
1679
1680
1681
1682
1683
1684
1685
1686
1687
1688
1689
1690
1691
1692
1693
1694
1695
1696
1697
1698
1699
1700
1701
1702
1703
1704
1705
1706
1707
1708
1709
1710

Analisa Harga Satuan


Halaman 85

#REF!

6
7
1711
1712
1713

Analisa Harga Satuan


Halaman 86

#REF!

6
7
1714
1715
1716
1717
1718
1719
1720
1721
1722
1723
1724
1725
1726
1727

33.333333
1

0.7

1.4285714

23.333333

Analisa Harga Satuan


Halaman 87

#REF!

6
7

82.6446280992

64563.958

#REF!

Analisa Harga Satuan


Halaman 88

#REF!

6
7

82.6446280992

76474.471

60.6060606061

94796.617

Analisa Harga Satuan


Halaman 89

#REF!

6
7

1757
1758
1759
1760
1761
1762
1763
1764
1765
1766
1767
1768
1769
1770
1771
1772
1773

Analisa Harga Satuan


Halaman 90

#REF!

6
7

Analisa Harga Satuan


Halaman 91

#REF!

6
7

Analisa Harga Satuan


Halaman 92

#REF!

6
7

Analisa Harga Satuan


Halaman 93

#REF!

6
7

1974
1975

Analisa Harga Satuan


Halaman 94

#REF!

6
7
1976
1977
1978
1979
1980
1981
1982
1983
1984

Analisa Harga Satuan


Halaman 95

#REF!

6
7
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2298
2299
2300
2301
2302
2303
2304
2305
2306
2307

Analisa Harga Satuan


Halaman 96

#REF!

6
7

2374
2375
2376
2377
2378
2379
2380
2381
2382
2383
2413
2414

Analisa Harga Satuan


Halaman 97

#REF!

6
7

Analisa Harga Satuan


Halaman 98

#REF!

6
7

1256
70
1326

2610
2611
2612
2613
2614
2615
2616
2617
2618
2619
2665
2666
2667
2668
2669
2670
2671
2672
2673
2674
2675
2676
2677
2678
2679
2680
2681
2682
2683
2684
2685
2686
2687
2700
2701
2702
2703

Analisa Harga Satuan


Halaman 99

#REF!

6
7
2704
2705
2706
2707
2708
2709
2710
2711

Analisa Harga Satuan


Halaman 100

#REF!

6
7
2712
2713
2714
2715
2716
2717
2718
2719
2720
2721
2722
2723
2735

0.6

0.6

0.9

0.324

2736
2737
2738
2739
2740
2741
2742
2743
2744

2931
2932
2933
2934
2935
2936
2937
2938
2939
2940
2941
2942
2943
2944
2945
2946
2947
2948
2949
2950
2951

Analisa Harga Satuan


Halaman 101

#REF!

6
7
2952
2953
2954
2955
2956
2957
2958
2959
2960

Analisa Harga Satuan


Halaman 102

#REF!

6
7

3033
3034
3035
3036
3037
3038
3039
3040
3041
3042
3043
3044
3045
3046
3047
3048
3049
3050
3051
3072
3073

Analisa Harga Satuan


Halaman 103

#REF!

6
7

Analisa Harga Satuan


Halaman 104

#REF!

6
7
3238
3239
3240
3241
3242
3244
3245
3246
3247
3248
3249
3262
3263
3264
3265
3267
3268
3269
3270
3271
3272
3273
3286
3287
3288
3289
3290
3291
3293
3294
3296
3297
3298
3299
3300
3302
3303

3305

Analisa Harga Satuan


Halaman 105

#REF!

6
7

3324
3325
3326
3327
3329
3330
3332

Analisa Harga Satuan


Halaman 106

#REF!

6
7
3342
3343
3344
3345
3347
3348
3350

3360
3361
3362
3363
3365
3366
3368

Analisa Harga Satuan


Halaman 107

#REF!

6
7

Analisa Harga Satuan


Halaman 108

#REF!

6
7

3423
3424
3425
3426
3427
3428
3429
3430
3431

3432
3433
3434
3435
3436
3437
3438
3439
3440
3504
3505
4009
4010
4011
4012
4013
4014
4015
4016
4017
4018
4019
4020

Analisa Harga Satuan


Halaman 109

#REF!

6
7

Analisa Harga Satuan


Halaman 110

#REF!

6
7

0.2

0.25

20

0.05

Analisa Harga Satuan


Halaman 111

#REF!

6
7

4329
4330
4331
4332
4333
4334
4335
4336
4337
4338

4429
4430
4490
4491
4492
4493
4494
4495
4496
4497
4498
4499

Analisa Harga Satuan


Halaman 112

#REF!

6
7
4500
4501
4502

fdads

4503
4504
4505
4506
4507
4508
4509
4510
4511
4512

Analisa Harga Satuan


Halaman 113

#REF!

6
7
4526
4527
4528
4529
4530
4531
4533
4534
4535
4536
4537
4538
4580
4581
4582
4583
4584
4585
4586
4587
4588
4589
4590

Analisa Harga Satuan


Halaman 114

#REF!

6
7

Analisa Harga Satuan


Halaman 115

#REF!

6
7

Analisa Harga Satuan


Halaman 116

Analisa Harga Satuan


Halaman 117

Analisa Harga Satuan


Halaman 118

Analisa Harga Satuan


Halaman 119

Analisa Harga Satuan


Halaman 120

Analisa Harga Satuan


Halaman 121

Analisa Harga Satuan


Halaman 122

Analisa Harga Satuan


Halaman 123

Analisa Harga Satuan


Halaman 124

Analisa Harga Satuan


Halaman 125

Analisa Harga Satuan


Halaman 126

Analisa Harga Satuan


Halaman 127

Analisa Harga Satuan


Halaman 128

Analisa Harga Satuan


Halaman 129

Analisa Harga Satuan


Halaman 130

Analisa Harga Satuan


Halaman 131

Analisa Harga Satuan


Halaman 132

Analisa Harga Satuan


Halaman 133

Analisa Harga Satuan


Halaman 134

Analisa Harga Satuan


Halaman 135

Analisa Harga Satuan


Halaman 136

Analisa Harga Satuan


Halaman 137

Analisa Harga Satuan


Halaman 138

Analisa Harga Satuan


Halaman 139

Analisa Harga Satuan


Halaman 140

Analisa Harga Satuan


Halaman 141

Analisa Harga Satuan


Halaman 142

Analisa Harga Satuan


Halaman 143

Analisa Harga Satuan


Halaman 144

Analisa Harga Satuan


Halaman 145

Analisa Harga Satuan


Halaman 146

Analisa Harga Satuan


Halaman 147

Analisa Harga Satuan


Halaman 148

Analisa Harga Satuan


Halaman 149

Analisa Harga Satuan


Halaman 150

Analisa Harga Satuan


Halaman 151

Analisa Harga Satuan


Halaman 152

Analisa Harga Satuan


Halaman 153

Analisa Harga Satuan


Halaman 154

Analisa Harga Satuan


Halaman 155

Analisa Harga Satuan


Halaman 156

Analisa Harga Satuan


Halaman 157

Analisa Harga Satuan


Halaman 158

Analisa Harga Satuan


Halaman 159

Analisa Harga Satuan


Halaman 160

Analisa Harga Satuan


Halaman 161

Analisa Harga Satuan


Halaman 162

Analisa Harga Satuan


Halaman 163

Analisa Harga Satuan


Halaman 164

Analisa Harga Satuan


Halaman 165

Analisa Harga Satuan


Halaman 166

Analisa Harga Satuan


Halaman 167

Analisa Harga Satuan


Halaman 168

Analisa Harga Satuan


Halaman 169

Analisa Harga Satuan


Halaman 170

Analisa Harga Satuan


Halaman 171

Analisa Harga Satuan


Halaman 172

Analisa Harga Satuan


Halaman 173

Analisa Harga Satuan


Halaman 174

Analisa Harga Satuan


Halaman 175

Analisa Harga Satuan


Halaman 176

Analisa Harga Satuan


Halaman 177

Analisa Harga Satuan


Halaman 178

Analisa Harga Satuan


Halaman 179

Analisa Harga Satuan


Halaman 180

Analisa Harga Satuan


Halaman 181

Analisa Harga Satuan


Halaman 182

Analisa Harga Satuan


Halaman 183

Analisa Harga Satuan


Halaman 184

Analisa Harga Satuan


Halaman 185

Analisa Harga Satuan


Halaman 186

Analisa Harga Satuan


Halaman 187

Analisa Harga Satuan


Halaman 188

Analisa Harga Satuan


Halaman 189

Analisa Harga Satuan


Halaman 190

Analisa Harga Satuan


Halaman 191

Analisa Harga Satuan


Halaman 192

Analisa Harga Satuan


Halaman 193

Analisa Harga Satuan


Halaman 194

Analisa Harga Satuan


Halaman 195

Analisa Harga Satuan


Halaman 196

Analisa Harga Satuan


Halaman 197

Analisa Harga Satuan


Halaman 198

Analisa Harga Satuan


Halaman 199

Analisa Harga Satuan


Halaman 200

Analisa Harga Satuan


Halaman 201

Analisa Harga Satuan


Halaman 202

Analisa Harga Satuan


Halaman 203

Analisa Harga Satuan


Halaman 204

Analisa Harga Satuan


Halaman 205

Analisa Harga Satuan


Halaman 206

Analisa Harga Satuan


Halaman 207

Analisa Harga Satuan


Halaman 208

Analisa Harga Satuan


Halaman 209

Analisa Harga Satuan


Halaman 210

Analisa Harga Satuan


Halaman 211

Analisa Harga Satuan


Halaman 212

Analisa Harga Satuan


Halaman 213

Analisa Harga Satuan


Halaman 214

Analisa Harga Satuan


Halaman 215

Analisa Harga Satuan


Halaman 216

Analisa Harga Satuan


Halaman 217

Analisa Harga Satuan


Halaman 218

Analisa Harga Satuan


Halaman 219

Analisa Harga Satuan


Halaman 220

Analisa Harga Satuan


Halaman 221

Analisa Harga Satuan


Halaman 222

Analisa Harga Satuan


Halaman 223

Analisa Harga Satuan


Halaman 224

Analisa Harga Satuan


Halaman 225

Analisa Harga Satuan


Halaman 226

Analisa Harga Satuan


Halaman 227

Analisa Harga Satuan


Halaman 228

Analisa Harga Satuan


Halaman 229

Analisa Harga Satuan


Halaman 230

Analisa Harga Satuan


Halaman 231

Analisa Harga Satuan


Halaman 232

Analisa Harga Satuan


Halaman 233

Analisa Harga Satuan


Halaman 234

Analisa Harga Satuan


Halaman 235

Analisa Harga Satuan


Halaman 236

Analisa Harga Satuan


Halaman 237

Analisa Harga Satuan


Halaman 238

Analisa Harga Satuan


Halaman 239

Analisa Harga Satuan


Halaman 240

Analisa Harga Satuan


Halaman 241

Analisa Harga Satuan


Halaman 242

Analisa Harga Satuan


Halaman 243

Analisa Harga Satuan


Halaman 244

Analisa Harga Satuan


Halaman 245

Analisa Harga Satuan


Halaman 246

Analisa Harga Satuan


Halaman 247

Analisa Harga Satuan


Halaman 248

Analisa Harga Satuan


Halaman 249

Analisa Harga Satuan


Halaman 250

Analisa Harga Satuan


Halaman 251

Analisa Harga Satuan


Halaman 252

Analisa Harga Satuan


Halaman 253

Analisa Harga Satuan


Halaman 254

Analisa Harga Satuan


Halaman 255

Analisa Harga Satuan


Halaman 256

Analisa Harga Satuan


Halaman 257

Analisa Harga Satuan


Halaman 258

Analisa Harga Satuan


Halaman 259

Analisa Harga Satuan


Halaman 260

Analisa Harga Satuan


Halaman 261

Analisa Harga Satuan


Halaman 262

Analisa Harga Satuan


Halaman 263

Analisa Harga Satuan


Halaman 264

Analisa Harga Satuan


Halaman 265

Analisa Harga Satuan


Halaman 266

Analisa Harga Satuan


Halaman 267

Analisa Harga Satuan


Halaman 268

Analisa Harga Satuan


Halaman 269

Analisa Harga Satuan


Halaman 270

Analisa Harga Satuan


Halaman 271

Analisa Harga Satuan


Halaman 272

Analisa Harga Satuan


Halaman 273

Analisa Harga Satuan


Halaman 274

Analisa Harga Satuan


Halaman 275

Analisa Harga Satuan


Halaman 276

Analisa Harga Satuan


Halaman 277

Analisa Harga Satuan


Halaman 278

Analisa Harga Satuan


Halaman 279

Analisa Harga Satuan


Halaman 280

Analisa Harga Satuan


Halaman 281

Analisa Harga Satuan


Halaman 282

Analisa Harga Satuan


Halaman 283

Analisa Harga Satuan


Halaman 284

Analisa Harga Satuan


Halaman 285

Analisa Harga Satuan


Halaman 286

Analisa Harga Satuan


Halaman 287

Analisa Harga Satuan


Halaman 288

Analisa Harga Satuan


Halaman 289

Analisa Harga Satuan


Halaman 290

Analisa Harga Satuan


Halaman 291

Analisa Harga Satuan


Halaman 292

Analisa Harga Satuan


Halaman 293

Analisa Harga Satuan


Halaman 294

Analisa Harga Satuan


Halaman 295

Analisa Harga Satuan


Halaman 296

Analisa Harga Satuan


Halaman 297

Analisa Harga Satuan


Halaman 298

Analisa Harga Satuan


Halaman 299

Analisa Harga Satuan


Halaman 300

Analisa Harga Satuan


Halaman 301

Analisa Harga Satuan


Halaman 302

Analisa Harga Satuan


Halaman 303

Analisa Harga Satuan


Halaman 304

Analisa Harga Satuan


Halaman 305

Analisa Harga Satuan


Halaman 306

Analisa Harga Satuan


Halaman 307

Analisa Harga Satuan


Halaman 308

Analisa Harga Satuan


Halaman 309

Analisa Harga Satuan


Halaman 310

Analisa Harga Satuan


Halaman 311

Analisa Harga Satuan


Halaman 312

Analisa Harga Satuan


Halaman 313

Analisa Harga Satuan


Halaman 314

Analisa Harga Satuan


Halaman 315

Analisa Harga Satuan


Halaman 316

Analisa Harga Satuan


Halaman 317

Analisa Harga Satuan


Halaman 318

Analisa Harga Satuan


Halaman 319

Analisa Harga Satuan


Halaman 320

Analisa Harga Satuan


Halaman 321

Analisa Harga Satuan


Halaman 322

Analisa Harga Satuan


Halaman 323

Analisa Harga Satuan


Halaman 324

Analisa Harga Satuan


Halaman 325

Analisa Harga Satuan


Halaman 326

Analisa Harga Satuan


Halaman 327

Analisa Harga Satuan


Halaman 328

Analisa Harga Satuan


Halaman 329

Analisa Harga Satuan


Halaman 330

Analisa Harga Satuan


Halaman 331

Analisa Harga Satuan


Halaman 332

Analisa Harga Satuan


Halaman 333

Analisa Harga Satuan


Halaman 334

Analisa Harga Satuan


Halaman 335

Analisa Harga Satuan


Halaman 336

Analisa Harga Satuan


Halaman 337

Analisa Harga Satuan


Halaman 338

Analisa Harga Satuan


Halaman 339

Analisa Harga Satuan


Halaman 340

Analisa Harga Satuan


Halaman 341

Analisa Harga Satuan


Halaman 342

Analisa Harga Satuan


Halaman 343

Analisa Harga Satuan


Halaman 344

Analisa Harga Satuan


Halaman 345

Analisa Harga Satuan


Halaman 346

Analisa Harga Satuan


Halaman 347

Analisa Harga Satuan


Halaman 348

Analisa Harga Satuan


Halaman 349

Analisa Harga Satuan


Halaman 350

Analisa Harga Satuan


Halaman 351

Analisa Harga Satuan


Halaman 352

Analisa Harga Satuan


Halaman 353

Analisa Harga Satuan


Halaman 354

Analisa Harga Satuan


Halaman 355

Analisa Harga Satuan


Halaman 356

Analisa Harga Satuan


Halaman 357

Analisa Harga Satuan


Halaman 358

Analisa Harga Satuan


Halaman 359

Analisa Harga Satuan


Halaman 360

Analisa Harga Satuan


Halaman 361

Analisa Harga Satuan


Halaman 362

Analisa Harga Satuan


Halaman 363

Analisa Harga Satuan


Halaman 364

Analisa Harga Satuan


Halaman 365

Analisa Harga Satuan


Halaman 366

Analisa Harga Satuan


Halaman 367

Analisa Harga Satuan


Halaman 368

Analisa Harga Satuan


Halaman 369

Analisa Harga Satuan


Halaman 370

Analisa Harga Satuan


Halaman 371

Analisa Harga Satuan


Halaman 372

Analisa Harga Satuan


Halaman 373

Analisa Harga Satuan


Halaman 374

Analisa Harga Satuan


Halaman 375

Analisa Harga Satuan


Halaman 376

Analisa Harga Satuan


Halaman 377

Analisa Harga Satuan


Halaman 378

Analisa Harga Satuan


Halaman 379

Analisa Harga Satuan


Halaman 380

Analisa Harga Satuan


Halaman 381

Analisa Harga Satuan


Halaman 382

Analisa Harga Satuan


Halaman 383

Analisa Harga Satuan


Halaman 384

Analisa Harga Satuan


Halaman 385

Analisa Harga Satuan


Halaman 386

Analisa Harga Satuan


Halaman 387

Analisa Harga Satuan


Halaman 388

Analisa Harga Satuan


Halaman 389

Analisa Harga Satuan


Halaman 390

Analisa Harga Satuan


Halaman 391

Analisa Harga Satuan


Halaman 392

Analisa Harga Satuan


Halaman 393

Analisa Harga Satuan


Halaman 394

Analisa Harga Satuan


Halaman 395

Analisa Harga Satuan


Halaman 396

Analisa Harga Satuan


Halaman 397

Analisa Harga Satuan


Halaman 398

Analisa Harga Satuan


Halaman 399

Analisa Harga Satuan


Halaman 400

Analisa Harga Satuan


Halaman 401

Analisa Harga Satuan


Halaman 402

Analisa Harga Satuan


Halaman 403

Analisa Harga Satuan


Halaman 404

Analisa Harga Satuan


Halaman 405

Analisa Harga Satuan


Halaman 406

Analisa Harga Satuan


Halaman 407

Analisa Harga Satuan


Halaman 408

Analisa Harga Satuan


Halaman 409

Analisa Harga Satuan


Halaman 410

Analisa Harga Satuan


Halaman 411

Analisa Harga Satuan


Halaman 412

Analisa Harga Satuan


Halaman 413

Analisa Harga Satuan


Halaman 414

Analisa Harga Satuan


Halaman 415

Analisa Harga Satuan


Halaman 416

Analisa Harga Satuan


Halaman 417

Analisa Harga Satuan


Halaman 418

Analisa Harga Satuan


Halaman 419

Analisa Harga Satuan


Halaman 420

Analisa Harga Satuan


Halaman 421

Analisa Harga Satuan


Halaman 422

Analisa Harga Satuan


Halaman 423

Analisa Harga Satuan


Halaman 424

Analisa Harga Satuan


Halaman 425

Analisa Harga Satuan


Halaman 426

Analisa Harga Satuan


Halaman 427

Analisa Harga Satuan


Halaman 428

Analisa Harga Satuan


Halaman 429

Analisa Harga Satuan


Halaman 430

Analisa Harga Satuan


Halaman 431

Analisa Harga Satuan


Halaman 432

Analisa Harga Satuan


Halaman 433

Analisa Harga Satuan


Halaman 434

Analisa Harga Satuan


Halaman 435

Analisa Harga Satuan


Halaman 436

Analisa Harga Satuan


Halaman 437

Analisa Harga Satuan


Halaman 438

Analisa Harga Satuan


Halaman 439

Analisa Harga Satuan


Halaman 440

Analisa Harga Satuan


Halaman 441

Analisa Harga Satuan


Halaman 442

Analisa Harga Satuan


Halaman 443

Analisa Harga Satuan


Halaman 444

Analisa Harga Satuan


Halaman 445

Analisa Harga Satuan


Halaman 446

Analisa Harga Satuan


Halaman 447

Analisa Harga Satuan


Halaman 448

Analisa Harga Satuan


Halaman 449

Analisa Harga Satuan


Halaman 450

Analisa Harga Satuan


Halaman 451

Analisa Harga Satuan


Halaman 452

Analisa Harga Satuan


Halaman 453

Analisa Harga Satuan


Halaman 454

Analisa Harga Satuan


Halaman 455

Analisa Harga Satuan


Halaman 456

Analisa Harga Satuan


Halaman 457

Analisa Harga Satuan


Halaman 458

Analisa Harga Satuan


Halaman 459

Analisa Harga Satuan


Halaman 460

Analisa Harga Satuan


Halaman 461

Analisa Harga Satuan


Halaman 462

Analisa Harga Satuan


Halaman 463

Analisa Harga Satuan


Halaman 464

Analisa Harga Satuan


Halaman 465

Analisa Harga Satuan


Halaman 466

Analisa Harga Satuan


Halaman 467

Analisa Harga Satuan


Halaman 468

Analisa Harga Satuan


Halaman 469

Analisa Harga Satuan


Halaman 470

Analisa Harga Satuan


Halaman 471

Analisa Harga Satuan


Halaman 472

Analisa Harga Satuan


Halaman 473

Analisa Harga Satuan


Halaman 474

Analisa Harga Satuan


Halaman 475

Analisa Harga Satuan


Halaman 476

Analisa Harga Satuan


Halaman 477

Analisa Harga Satuan


Halaman 478

Analisa Harga Satuan


Halaman 479

Analisa Harga Satuan


Halaman 480

Analisa Harga Satuan


Halaman 481

Analisa Harga Satuan


Halaman 482

Analisa Harga Satuan


Halaman 483

Analisa Harga Satuan


Halaman 484

Analisa Harga Satuan


Halaman 485

Analisa Harga Satuan


Halaman 486

Analisa Harga Satuan


Halaman 487

Analisa Harga Satuan


Halaman 488

Analisa Harga Satuan


Halaman 489

Analisa Harga Satuan


Halaman 490

Analisa Harga Satuan


Halaman 491

Analisa Harga Satuan


Halaman 492

Analisa Harga Satuan


Halaman 493

Analisa Harga Satuan


Halaman 494

Analisa Harga Satuan


Halaman 495

Analisa Harga Satuan


Halaman 496

Analisa Harga Satuan


Halaman 497

Analisa Harga Satuan


Halaman 498

Analisa Harga Satuan


Halaman 499

Analisa Harga Satuan


Halaman 500

Analisa Harga Satuan


Halaman 501

Analisa Harga Satuan


Halaman 502

Analisa Harga Satuan


Halaman 503

Analisa Harga Satuan


Halaman 504

Analisa Harga Satuan


Halaman 505

Analisa Harga Satuan


Halaman 506

Analisa Harga Satuan


Halaman 507

Analisa Harga Satuan


Halaman 508

Analisa Harga Satuan


Halaman 509

Analisa Harga Satuan


Halaman 510

Analisa Harga Satuan


Halaman 511

Analisa Harga Satuan


Halaman 512

Analisa Harga Satuan


Halaman 513

Analisa Harga Satuan


Halaman 514

Analisa Harga Satuan


Halaman 515

Analisa Harga Satuan


Halaman 516

Analisa Harga Satuan


Halaman 517

Analisa Harga Satuan


Halaman 518

Analisa Harga Satuan


Halaman 519

Analisa Harga Satuan


Halaman 520

Analisa Harga Satuan


Halaman 521

Analisa Harga Satuan


Halaman 522

Analisa Harga Satuan


Halaman 523

Analisa Harga Satuan


Halaman 524

Analisa Harga Satuan


Halaman 525

Analisa Harga Satuan


Halaman 526

Analisa Harga Satuan


Halaman 527

Analisa Harga Satuan


Halaman 528

Analisa Harga Satuan


Halaman 529

Analisa Harga Satuan


Halaman 530

Analisa Harga Satuan


Halaman 531

Analisa Harga Satuan


Halaman 532

Analisa Harga Satuan


Halaman 533

Analisa Harga Satuan


Halaman 534

Analisa Harga Satuan


Halaman 535

Analisa Harga Satuan


Halaman 536

Analisa Harga Satuan


Halaman 537

Analisa Harga Satuan


Halaman 538

Analisa Harga Satuan


Halaman 539

Analisa Harga Satuan


Halaman 540

Analisa Harga Satuan


Halaman 541

Analisa Harga Satuan


Halaman 542

Analisa Harga Satuan


Halaman 543

Analisa Harga Satuan


Halaman 544

Analisa Harga Satuan


Halaman 545

Analisa Harga Satuan


Halaman 546

Analisa Harga Satuan


Halaman 547

Analisa Harga Satuan


Halaman 548

Analisa Harga Satuan


Halaman 549

Analisa Harga Satuan


Halaman 550

Analisa Harga Satuan


Halaman 551

Analisa Harga Satuan


Halaman 552

Analisa Harga Satuan


Halaman 553

Analisa Harga Satuan


Halaman 554

Analisa Harga Satuan


Halaman 555

Analisa Harga Satuan


Halaman 556

Analisa Harga Satuan


Halaman 557

Analisa Harga Satuan


Halaman 558

Analisa Harga Satuan


Halaman 559

Analisa Harga Satuan


Halaman 560

Analisa Harga Satuan


Halaman 561

Analisa Harga Satuan


Halaman 562

Analisa Harga Satuan


Halaman 563

Analisa Harga Satuan


Halaman 564

Analisa Harga Satuan


Halaman 565

Analisa Harga Satuan


Halaman 566

Analisa Harga Satuan


Halaman 567

Analisa Harga Satuan


Halaman 568

Analisa Harga Satuan


Halaman 569

Analisa Harga Satuan


Halaman 570

Analisa Harga Satuan


Halaman 571

Analisa Harga Satuan


Halaman 572

Analisa Harga Satuan


Halaman 573

Analisa Harga Satuan


Halaman 574

Analisa Harga Satuan


Halaman 575

Analisa Harga Satuan


Halaman 576

Analisa Harga Satuan


Halaman 577

Analisa Harga Satuan


Halaman 578

Analisa Harga Satuan


Halaman 579

Analisa Harga Satuan


Halaman 580

Analisa Harga Satuan


Halaman 581

Analisa Harga Satuan


Halaman 582

Analisa Harga Satuan


Halaman 583

Analisa Harga Satuan


Halaman 584

Analisa Harga Satuan


Halaman 585

Analisa Harga Satuan


Halaman 586

Analisa Harga Satuan


Halaman 587

Analisa Harga Satuan


Halaman 588

Analisa Harga Satuan


Halaman 589

Analisa Harga Satuan


Halaman 590

Analisa Harga Satuan


Halaman 591

Analisa Harga Satuan


Halaman 592

Analisa Harga Satuan


Halaman 593

Analisa Harga Satuan


Halaman 594

Analisa Harga Satuan


Halaman 595

Analisa Harga Satuan


Halaman 596

Analisa Harga Satuan


Halaman 597

Analisa Harga Satuan


Halaman 598

Analisa Harga Satuan


Halaman 599

Analisa Harga Satuan


Halaman 600

Analisa Harga Satuan


Halaman 601

Analisa Harga Satuan


Halaman 602

Analisa Harga Satuan


Halaman 603

Analisa Harga Satuan


Halaman 604

Analisa Harga Satuan


Halaman 605

Analisa Harga Satuan


Halaman 606

Analisa Harga Satuan


Halaman 607

Analisa Harga Satuan


Halaman 608

Analisa Harga Satuan


Halaman 609

Analisa Harga Satuan


Halaman 610

Analisa Harga Satuan


Halaman 611

Analisa Harga Satuan


Halaman 612

Analisa Harga Satuan


Halaman 613

Analisa Harga Satuan


Halaman 614

Analisa Harga Satuan


Halaman 615

Analisa Harga Satuan


Halaman 616

Analisa Harga Satuan


Halaman 617

Analisa Harga Satuan


Halaman 618

Analisa Harga Satuan


Halaman 619

Analisa Harga Satuan


Halaman 620

Analisa Harga Satuan


Halaman 621

Analisa Harga Satuan


Halaman 622

Analisa Harga Satuan


Halaman 623

Analisa Harga Satuan


Halaman 624

Analisa Harga Satuan


Halaman 625

Analisa Harga Satuan


Halaman 626

Analisa Harga Satuan


Halaman 627

Analisa Harga Satuan


Halaman 628

Analisa Harga Satuan


Halaman 629

Analisa Harga Satuan


Halaman 630

Analisa Harga Satuan


Halaman 631

Analisa Harga Satuan


Halaman 632

Analisa Harga Satuan


Halaman 633

Analisa Harga Satuan


Halaman 634

Analisa Harga Satuan


Halaman 635

Analisa Harga Satuan


Halaman 636

Analisa Harga Satuan


Halaman 637

Analisa Harga Satuan


Halaman 638

Analisa Harga Satuan


Halaman 639

Analisa Harga Satuan


Halaman 640

Analisa Harga Satuan


Halaman 641

Analisa Harga Satuan


Halaman 642

Analisa Harga Satuan


Halaman 643

Analisa Harga Satuan


Halaman 644

Analisa Harga Satuan


Halaman 645

Analisa Harga Satuan


Halaman 646

Analisa Harga Satuan


Halaman 647

Analisa Harga Satuan


Halaman 648

Analisa Harga Satuan


Halaman 649

Analisa Harga Satuan


Halaman 650

Analisa Harga Satuan


Halaman 651

Analisa Harga Satuan


Halaman 652

Analisa Harga Satuan


Halaman 653

Analisa Harga Satuan


Halaman 654

Analisa Harga Satuan


Halaman 655

Analisa Harga Satuan


Halaman 656

Analisa Harga Satuan


Halaman 657

Analisa Harga Satuan


Halaman 658

Analisa Harga Satuan


Halaman 659

Analisa Harga Satuan


Halaman 660

Analisa Harga Satuan


Halaman 661

Analisa Harga Satuan


Halaman 662

Analisa Harga Satuan


Halaman 663

Analisa Harga Satuan


Halaman 664

Analisa Harga Satuan


Halaman 665

Analisa Harga Satuan


Halaman 666

Analisa Harga Satuan


Halaman 667

Analisa Harga Satuan


Halaman 668

Analisa Harga Satuan


Halaman 669

Analisa Harga Satuan


Halaman 670

Analisa Harga Satuan


Halaman 671

Analisa Harga Satuan


Halaman 672

Analisa Harga Satuan


Halaman 673

Analisa Harga Satuan


Halaman 674

Analisa Harga Satuan


Halaman 675

Analisa Harga Satuan


Halaman 676

HARGA SATUAN UPAH


NO.

JENIS UPAH

HARGA UPAH
Rp.
3

SATUAN
4

Perkerja / Buruh tak terlatih

59,500.00

Org/Hr

Buruh terlatih

62,500.00

Org/Hr

Tukang Batu

67,000.00

Org/Hr

Tukang Besi

70,000.00

Org/Hr

Tukang Besi Konstruksi

83,500.00

Org/Hr

Tukang Cat

70,000.00

Org/Hr

Tukang Gali

58,500.00

Org/Hr

Tukang Kayu

70,000.00

Org/Hr

Tukang Listrik

70,000.00

Org/Hr

10

Tukang Las

71,500.00

Org/Hr

11

Kepala Tukang

80,000.00

Org/Hr

12

Mandor

Org/Hr

13

Operator kurang terlatih

99,000.00

Org/Hr

14

Operator terlatih

148,000.00

Org/Hr

15

Supir truk

77,000.00

Org/Hr

16

Pembantu supir

54,000.00

Org/Hr

17

Tukang plituran

71,500.00

Org/Hr

HARGA SATUAN BAHAN

NO

JENIS BAHAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

Aluminium foil @60 m


Bak mandi fiber glass oval 120 ltr
Bata merah
Batu belah uk. 15-20 cm
Batu candi
Rooster bata Uk. 12 x 22 untuk gapura (biasa)
Besi beton/Baja tulangan beton
Besi U / langko kuda-kuda
Besi Hollow 40/40 mm (pagar)
Besi Hollow 20/40 mm (plapond)
Besi Hollow 40/40 mm (plapond)
Cat luar EMCO LUX warna sedang
Cat meni Emco
Cat tembok Metrolit
Vernis / coating
Closet duduk TOTO/INA
Closet jongkok porselin merk INA / TOTO (putih)
Engsel jendela nylon
Engsel pintu nylon
Grendel Tanam
Genteng Natural Nok Bulat
Genteng pres jatiwangi tipe Plentong Natural
Grevel beton dia 1/2 dia. 20 cm
Kabel NYM 3 x 2 1/2 - 50 m'
Kaca polos tebal 3 mm
Kaca polos tebal 5 mm
Kait Angin
Kawat beton
Kayu dolken dia. 10 cm
Kayu lokal kelas II
Kayu lanan
Kayu Stoot bekisting
Kayu Usuk 5/7 lanan
Kayu Reng 2/3 Lanan
Kayu kaso 5/7 kelas II
Kayu Reng 2/3 kelas II
Keramik dinding 20/25 motif (KIA)
Keramik dinding 25/40 motif (KIA)
Keramik 20/20 anti slip
Keramik Lantai 30/30 motif sekw. Mulia
Keramik Lantai 30/30 putih sekw. Mulia
Keramik Lantai 40/40 putih sekw. KIA
Krikil beton (split) uk. 2-3 cm
Kran dia. 1/2'' SAN''EI
Kunci tanam besar merk Viali
Kunci tanam sedang Js Itali
Kunci anak tanam
Pegangan Pintu (Hendel)
kwas 3"
Langko kuda-kuda
Kunci sloot pintu / jendela
Lem kayu fox
List kayu profil 3 x 3 cm
Minyak Bekisting

HARGA BAHAN

SATUAN

Rp.
3

473,000.00
390,000.00
700.00
200,000.00
123,000.00
4,500.00
13,500.00
41,000.00
108,000.00
31,500.00
45,000.00
108,000.00
73,000.00
37,000.00
84,000.00
1,470,000.00
335,000.00
38,000.00
52,000.00
76,000.00
3,600.00
2,350.00
42,500.00
597,000.00
110,000.00
150,000.00
16,500.00
23,000.00
16,000.00
3,500,000.00
6,530,000.00
1,980,000.00
6,530,000.00
6,530,000.00
2,625,000.00
2,900,000.00
63,500.00
66,000.00
66,000.00
55,000.00
42,500.00
64,500.00
405,000.00
81,500.00
142,000.00
55,000.00
150,000.00
100,000.00
10,000.00
30,500.00
30,500.00
35,000.00
18,000.00
3,000.00

rol
bh
bh
m
m
bh
kg
kg
btg
btg
btg
kg
kg
kg
kg
bh
bh
bh
bh
bh
bh
bh
m'
rol
m
m
bh
kg
btg
m
m
m
m
m
m
m
m
m
m
m
m
m
m
bh
bh
bh
bh
set
bh
bh
bh
kg
btg
ltr

Halaman : 684

NO

JENIS BAHAN

55
56
57
58
59
60
61
62
63
64
65
66
67

Paku biasa 1''


Paku biasa 2' - 5''
Paku Seng
Paku skrup 1''
Panel Box Zekering / MCB
Papan borneo / MC
Papan gipsum (plapond) 9 mm
Papan Lanan
Papan kayu lokal kelas II (mahoni)
Papan terentang (Perancah/Acuan beton)
Paping blok/conblok T = 6 cm
Papan Calsiplank GRC (0,8x20)cm
Pasir beton

HARGA BAHAN

SATUAN

Rp.
3

24,000.00
15,000.00
29,000.00
400.00
400,000.00
5,720,000.00
75,000.00
7,056,000.00
3,100,000.00
1,150,000.00
1,840.00
45,000.00
270,000.00

kg
kg
kg
bh
unit
m
lbr
m
m
m
bh
btg
m

Halaman : 684

NO

JENIS BAHAN

68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119

Pasir pasang
Pasir urug/ timbunan
Plamir kayu tawon kensai
Plamour tembok Viny paint
Semen adepsip (Gip)
Semen Portlan (PC) (50 kg)
Semen Warna
Seng Plat 0,3 (lebar = 55 cm)
Seng Plat 0,3 (lebar = 90 cm)
Sirtu tidak tersaring
Tanah urug / bahan timbuhan tindihan
Teakwood 0,9 x 2,2 x 3 mm ukuran pintu
Wastafel lengkap
Lampu TL 20 watt komplit
Lampu SL 14 watt (Philip)
Besi Pipa dia. 6" Medium
Pipa Paralon / PVC dia. 1/2" wavin type AW
Pipa Paralon / PVC dia. 3/4" wavin type AW
Pipa Paralon / PVC dia. 1" wavin type AW
Pipe paralon / PVC dia. 2 1/2" wavin type D
Pipa paralon /PVC dia. 4" wavin type D
Lem PVC
Seal Tape
Plafond GRC Internal 4mm
Polywood 1.20 x 2 .40 cm
Kusen Alumunium 4" (silver)
Kusen Alumunium 4" (coklat)
Daun pintu rangka alumunium silver kaca bening 5 mm
Daun pintu rangka alumunium coklat kaca bening 5 mm
Daun pintu rangka alumunium coklat panel plywood
Daun jendela silver kaca bening 5 mm
Daun jendela coklat kaca bening 5 mm
Atap metal spandex
List gypsum 7 cm
Pintu Fiber KM/WC
Floor drain stainless
Glass block 20 x 20 cm
Rooster keramik 20/20
Baja ringan
Genting metal untuk konstruksi baja ringan
Genting bubungan metal untuk konstruksi baja ringan
Wiremesh di las
Kunci Door Holder
Kunci Door Stop
Kunci Door Closer
Urinoir (lengkap)
Atap sirap 5 mm
Saklar single (broco)
Saklar doble (broco)
Stop kontak
Dudukan lampu (downlight)
Kasteen beton cetak P. 40 cm

HARGA BAHAN

SATUAN

Rp.
3

198,000.00
99,000.00
24,000.00
34,000.00
9,500.00
75,000.00
16,000.00
31,000.00
42,500.00
108,000.00
63,000.00
120,000.00
650,000.00
65,000.00
56,000.00
2,931,500.00
28,600.00
34,700.00
35,200.00
78,100.00
163,900.00
12,000.00
4,500.00
71,000.00
117,000.00
100,000.00
113,000.00
1,350,000.00
1,500,000.00
750,000.00
365,000.00
420,000.00
488,000.00
20,000.00
345,000.00
61,000.00
33,500.00
37,000.00
170,000.00
120,000.00
54,000.00
33,000.00
215,000.00
310,000.00
300,000.00
1,800,000.00
165,000.00
16,000.00
20,000.00
18,000.00
60,000.00
51,500.00

m
m
kg
kg
kg
zax
kg
lbr
lbr
m
m
lbr
bh
bh
bh
btg
btg
btg
btg
btg
btg
tube
bh
lbr
lbr
m'
m'
unit
unit
unit
unit
unit
lbr
m'
bh
bh
bh
bh
m
m
bh
m
bh
bh
bh
unit
ikat
bh
bh
bh
bh
bh

Halaman : 684

RENCANA ANGGARAN BIAYA ( RAB )


Kegiatan

: Bantuan Pengembangan SMK Ketahanan Pangan APBN Tahun 2016

Pekerjaan

: Pembangunan Ruang Praktek Siswa ( 2 lokal)

Lokasi

: SMK Negeri 1 Kuningan Kabupaten Kuningan

Tahun Anggaran : 2016


NO

URAIAN PEKERJAAN

VOL

SAT

HARGA SATUAN JUMLAH HARGA


(Rp.)
(Rp.)

PEKERJAAN PERSIAPAN

PEKERJAAN PERSIAPAN

Pengukuran dan pasang bouwplank

1.00

ls

750,000.00

750,000.00

Membersihkan lapangan

1.00

ls

1,000,000.00

1,000,000.00

3
4

Persiapan steiger
Mobilisasi

1.00
1.00

ls
ls

1,000,000.00
1,500,000.00

1,000,000.00
1,500,000.00
4,250,000.00

B
I
1

PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA


PEKERJAAN TANAH DAN PONDASI
Galian tanah biasa

69.12

m3

44,625.00

3,084,480.00

4.32
17.28

m3
m3

136,650.00
14,875.00

590,328.00

24.00

m3

93,450.00

Urugan tanah dipadatkan


Pasangan batu kosong (aanstamping)

17.28

m3

358,428.00

2,242,800.00
6,193,635.84

Pasangan pondasi batu belah 1Pc : 5Ps

41.58

m3

697,212.00

2
3

Urugan pasir lantai kerja, t= 5cm

Urugan tanah kembali

257,040.00

28,990,074.96
41,358,358.80

II
1
2
3

PEKERJAAN DINDING
Pasangan dinding bata merah 1pc : 5Ps
Plesteran Dinding 1Pc : 5Ps tebal 15 mm

Acian
Pengecatan dinding

III

PEKERJAAN BETON

Sloof beton bertulang 15/20


Adukan 1Pc: 2Ps: 3Kr (K175)

305.41
610.82

m2
m2

97,780.00
42,024.00

29,863,185.36

610.82

m2

24,275.00

610.82

m2

22,824.00

14,827,752.60
13,941,446.98

25,669,267.78

84,301,652.71

Pembesian (4 12mm, 8mm - 150 mm)


Bekisting ( 2 x pakai )
2

Kolom Struktur beton bertulang 20/20 K1


Adukan 1Pc: 2Ps: 3Kr (K175)
Pembesian (8 12mm, 8mm - 150 mm)
Bekisting

Kolom Selasar beton bertulang 20/25 K2


Adukan 1Pc: 2Ps: 3Kr (K175)
Pembesian (6 12mm, 8mm - 150 mm)

Bekisting
Kolom praktis beton bertulang 15/15
Adukan 1Pc: 2Ps: 3Kr (K175)
Pembesian (4 12mm, 8mm - 150 mm)

Bekisting
Balok gantung beton bertulang 15/20
Adukan 1Pc: 2Ps: 3Kr (K175)
Pembesian (4 12mm, 8mm - 150 mm)

Bekisting
Ring balok beton bertulang 15/20
Adukan 1Pc: 2Ps: 3Kr (K175)
Pembesian (4 12mm, 8mm - 150 mm)
Bekisting

3.24

m3

1,063,111.43

3,444,481.03

384.48

kg

15,482.50

5,952,711.60

10.80

m2

102,020.00

1,101,816.00

m3

1,063,111.43

3,401,956.57

3.20
746.40

kg

15,482.50

11,556,138.00

16.00

m2

220,260.00

3,524,160.00

0.36

m3

1,063,111.43

382,720.11

93.72

kg

15,482.50

1,451,019.90

2.40

m2

220,260.00

528,624.00

1.17

m3

1,063,111.43

1,243,840.37

327.08

kg

15,482.50

5,064,016.10

3.90

m2

220,260.00

859,014.00

0.54

m3

1,063,111.43

574,080.17

99.18

kg

15,482.50

1,535,554.35

1.35

m2

220,260.00

297,351.00

3.00

m3

1,063,111.43

3,189,334.29

551.00

kg

15,482.50

8,530,857.50

7.50

m2

102,020.00

765,150.00
53,402,824.99

NO

URAIAN PEKERJAAN

IV

PEKERJAAN KUSEN PINTU DAN JENDELA

Pekerjaan Kusen Pintu Allumunium 4" (coklat) P1

1
2

Pekerjaan kusen allumunium 4"


Pasangan daun pintu allumunium panel plywood (lengkap)

HARGA SATUAN JUMLAH HARGA


(Rp.)
(Rp.)

VOL

SAT

19.14
4.00

m1
unit

130,790.00
750,000.00

2,503,320.60
3,000,000.00

1.92

m2

187,000.00

359,040.00

Pasangan kaca polos 5 mm

B
1

Pekerjaan Kusen Pintu Allumunium 4" (coklat) P2


Pekerjaan kusen allumunium 4"

29.44

m1

130,790.00

3,850,457.60

Pasangan daun pintu allumunium panel plywood (lengkap)

4.00

unit

750,000.00

3,000,000.00

Pasangan kaca polos 5 mm

1.92

m2

187,000.00

359,040.00

C
1

Pekerjaan Kusen Pintu Allumunium 4" (coklat) (kmr mandi)


Pekerjaan kusen allumunium 4"
14.32

m1

130,790.00

1,872,912.80

Pasangan daun pintu allumunium panel allumunium (lengk

2.00

unit

750,000.00

1,500,000.00

Pekerjaan Kusen Jendela Allumunium 4" (coklat) J1

1
2

Pekerjaan kusen allumunium 4"


Pasangan daun jendela allumunium panel kaca 5 mm (leng

52.24
8.00

m1
unit

130,790.00
465,000.00

6,832,469.60
3,720,000.00

7.87

m2

187,000.00

1,472,064.00

Pasangan kaca polos 5 mm

Pekerjaan Kusen Jendela Allumunium 4" (coklat) J2

Pekerjaan kusen allumunium 4"

9.27

m1

130,790.00

1,212,423.30

Pasangan daun jendela allumunium panel kaca 5 mm (leng

1.00

unit

465,000.00

465,000.00

Pasangan kaca polos 5 mm

1.52

m2

187,000.00

284,988.00

Pekerjaan Kusen Jendela Allumunium 4" (coklat) J3

Pekerjaan kusen allumunium 4"

9.27

m1

130,790.00

1,212,423.30

Pasangan daun jendela allumunium panel kaca 5 mm (leng

1.00

unit

465,000.00

465,000.00

Pasangan kaca polos 5 mm

1.52

m2

187,000.00

284,988.00

G
1

Pekerjaan Kusen BV1 Allumunium 4" (coklat)


Pekerjaan kusen allumunium 4"

101.36

m1

130,790.00

13,256,874.40

Pasangan kaca polos 5 mm

18.14

m2

187,000.00

3,392,928.00

Pekerjaan Kusen BV2 Allumunium 4" (coklat)

1
2

Pekerjaan kusen allumunium 4"


Pasangan kaca polos 5 mm

10.16
1.73

m1
m2

130,790.00
187,000.00

1,328,826.40
323,136.00

V
1

PEKERJAAN ATAP
Pasangan rangka atap baja ringan profil C 0,75 mm

3.07

m3

9,056,000.00

27,820,032.00

Pasangan penutup atap genteng metal (multiroof) tabur pa

2.23

m3

8,547,400.00

19,036,769.28

Pasangan bubung genteng metal (multiroof) tabur pasir

388.44

m2

64,690.00

25,128,265.18

Pemasangan woodplank 1/20

92.00

m1

35,000.00

3,220,000.00

Pasangan talang datar galvalume

14.50

m2

45,200.00

655,400.00

Pengecatan listplank

38.61

m2

69,915.00

2,699,418.15

VI

PEKERJAAN PLAFOND

Pekerjaan rangka plfond GRC uk. 5/7 kayu kelas 2

330.00

m2

90,311.25

29,802,712.50

Pasangan penutup plafond GRC

330.00

m2

38,334.00

12,650,220.00

Pengecatan plafond

330.00

m2

22,824.00

7,531,920.00

Pasangan list plafond gypsum propil

294.00

m1

30,675.00

50,695,892.00

78,559,884.61

9,018,450.00
59,003,302.50

VII

PEKERJAAN PENUTUP LANTAI

1
2

Urugan pasir lantai kerja, t= 5cm


Pembuatan lantai kerja

Pasangan keramik lantai uk. 40x40

Pasangan keramik lantai uk. 20x20 anti slip (WC dan tempa

5
VIII

6.90

m3

6.90

m3

136,650.00
911,721.43

942,885.00
6,290,877.86

230.00

m2

180,310.00

41,471,300.00

16.00

m2

184,330.00

2,949,280.00

Pasangan keramik dinding uk. 20x25 corak (WC dan tempat 25.50

m2

199,354.00

5,083,527.00
56,737,869.86

20.00

ttk

69,410.00

1,388,200.00

8.00
4.00

bh
bh

22,410.00
24,410.00

179,280.00
97,640.00

PEKERJAAN INSTALASI LISTRIK

Pas. Instalasi titik Lampu

2
3

Pas. stop kontak + Instalasi


Pas. Saklar ganda

Pas. Saklar tunggal

4.00

bh

20,410.00

81,640.00

Pas. Lampu TL 20 w

10.00

bh

65,000.00

650,000.00

Pas. Lampu SL 18 w

10.00

bh

56,000.00

560,000.00
2,956,760.00

NO

URAIAN PEKERJAAN

IX

PEKERJAAN PENGADAAN MEUBELAIR

Pengadaan perabot

VOL

2.00

SAT

pkt

HARGA SATUAN JUMLAH HARGA


(Rp.)
(Rp.)
15,000,000.00

30,000,000.00
30,000,000.00

PEKERJAAN SANITASI

Pembuatan septictank 2,5x2,5x2

2
3

Pasangan closed jongkok


Pasangan pipa PVC 3/4"

Pasangan pipa PVC 4"

Pasangan Keran Air

Pasangan floor drain

XI

PEKERJAAN RABAT

1
2
3
4

Urugan tanah dipadatkan

Pembuatan lantai kerja

Pasangan pondasi batu belah 1Pc : 5Ps

7
8

1.00

Unit

2,500,000.00

2,500,000.00

2.00
18.00

Unit

625,980.00
20,088.25

1,251,960.00
361,588.50

8.00

m1
bh

78,455.75

627,646.00

12.00

89,707.50

1,076,490.00

2.00

bh

69,095.00

138,190.00
5,955,874.50

Galian tanah biasa

7.56

m3

44,625.00

337,365.00

Urugan pasir lantai kerja, t= 5cm


Urugan tanah kembali

0.84
1.89

m3
m3

136,650.00
14,875.00

114,786.00
28,113.75

13.44

m3

93,450.00

1,255,968.00

3.36

m3

911,721.43

3,063,384.00

6.30

m3

697,212.00

4,392,435.60

Plesteran Dinding 1Pc : 5Ps tebal 15 mm

42.00

m2

42,024.00

1,765,008.00

Acian

42.00

m2

24,275.00

1,019,550.00

m1

11,976,610.35

REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
:
Pekerjaan
:
Lokasi
:
Tahun Anggara :

Bantuan Pengembangan SMK Ketahanan Pangan APBN Tahun 2016


Pembangunan Ruang Praktek Siswa ( 2 lokal)
SMK Negeri 1 Kuningan Kabupaten Kuningan
2016

NO.
(1)
A

JUMLAH HARGA
(Rp)

URAIAN PEKERJAAN
(2)

(3)

PEKERJAAN PERSIAPAN

PEKERJAAN PERSIAPAN

4,250,000.00

Jumlah A
PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA

I
II

PEKERJAAN TANAH DAN PONDASI


PEKERJAAN DINDING

41,358,358.80
84,301,652.71

III

PEKERJAAN BETON

53,402,824.99

IV
V

PEKERJAAN KUSEN PINTU DAN JENDELA


PEKERJAAN ATAP

50,695,892.00
78,559,884.61

PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN

59,003,302.50
56,737,869.86
2,956,760.00
30,000,000.00
11,976,610.35

VI
VII
VIII
IX
XI

Terbilang :

4,250,000.00

PLAFOND
PENUTUP LANTAI
INSTALASI LISTRIK
PENGADAAN MEUBELAIR
RABAT
Jumlah B

468,993,155.82

BIAYA FISIK DAN MEUBELAIR

473,243,155.82

BIAYA PERENCANAAN

4,160,000.00

BIAYA PENGAWASAN

3,380,000.00

JUMLAH TOTAL

480,783,155.82

JUMLAH DIBULATKAN

480,783,000.00

Lima Ratus Sebelas Juta Tiga Ratus Enam Puluh Ribu Rupiah