Beruflich Dokumente
Kultur Dokumente
will narrow down the selections available in the other columns below
the Catalog field. Double-click on an item in any one of the columns
and the selections will again be filtered. As data is selected in each
column the other columns dynamically change to reflect the selections
available. Once a selection is made in all columns the OK button
becomes available. Click OK to save the selection or Reset to start
again.
Landmark
4-39
Cementing Report
The Cementing report is used to record the operations details of each
cement job performed on the well.
Oilwell cementing is the process of mixing and pumping a cement slurry
down the casing and up the annulus behind the pipe where it is allowed
to set, thus bonding the pipe to the wellbore formation and providing
hydraulic isolation. Cementing operations may be categorized as
Primary or Secondary (or Remedial). In OpenWells, three Cement Job
types are supported: Primary, Plug and Squeeze.
4-40
Landmark
Job Area
Use the dropdown arrow to make a selection for the Job Type field. The
job type selected from this picklist defines the availability of certain data
entry fields and panels in the General section of the Cementing report.
For example, the Plug area is only available for plug job types.
Details Area
Use the Assembly field to specify the assembly that is to be cemented.
A dropdown picklist is available for this field.
Note:
If Casing reports have not been created for this Well, only the Open Hole appears
in the picklist. OpenWells populates this picklist by searching the database for the
String Type entries in Casing reports dated on or before the date of the Cementing
report. If the Casing report is dated after the Cementing report, the Assembly Name
for that Report will not appear in the picklist.
Plug Area
This area will only appear when 'Plug' is selected as the Job Type in the
Job area of the General section. Use this section to enter information on
the Plug Type. A checkbox can be activated to indicate that the plug
was Drilled Out, then enter the Drilled Out Date in the corresponding
field.
Landmark
4-41