Better Business Letter
Index
A. Instruction Message
No.
1
2
3
4
5
6
7
8
9
10
Subject
Page
Normal instruction
............................. 8
Instruction of Agreement, Comfirmation
............................. 9
Enclosure
........................... 10
Notice, Information, Request
...................... ..... 11
Notice,Information,Request with Regret, Complaint ........................... 13
Quotation, Proposal, Invoicing
........................... 16
Acceptance of proposal or Quotation
........................... 17
Objection to Proposal or Quotation
........................... 18
Alternative, Counter Proposal, Comments
............................ 20
Apologizing
........................... 22
B. Message Text
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Subject
Page
C. Closing Message
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
Subject
Page
Subject
Page
No.
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
Subject
Page
Amendment of Contract
Side Letter Agreement
Shuttle Tanker Delivery
Ugland Shuttle Tanker Delivery
Remainder Notice
Correspondence Identification
Labour Disputes 1
Labour Disputes 2
Labour Disputes 3
Labour Disputes 4
Labour Disputes 5
Labour Disputes 6
Labour Disputes 7
Labour Disputes 8
Labour Disputes 9
Labour Disputes 10 without prejudice
Labour Disputes 11
Additional Butt Joints 1
Additional Butt Joints 2
Noise Level in E/R Store 1
Noise Level in E/R Store 2
Noise Level in E/R Store 3
Noise Level in E/R Store 4
Noise Level in E/R Store 5
Agreement for Buyers Supplies
H.1029 Grounding Damage 1
H.1029 Grounding Damage 2
H.1029 Grounding Damage 3
H.1029 Grounding Damage 4
Regal Opinion
H.1029
Electric Cable Test 1
Electric Cable Test 2
Change order Quotation 1
Change order Quotation 2
Request Action
E/R Block Division
Notice for Tender of H.1029 1
Notice for Tender of H.1029 2
Notice for Tender of H.1029 3
Notice for Tender of H.1029 4
Noise level in E/R Store 5
.............................. 90
............................... 90
............................... 91
................................ 91
............................... 92
............................... 92
............................... 93
............................... 94
............................... 94
............................... 95
............................... 96
............................... 96
............................... 97
............................... 98
............................... 99
............................. 100
.............................. 101
............................... 103
............................... 104
............................... 104
............................... 105
............................... 106
............................... 106
............................... 107
............................... 108
................................ 110
.................................. 110
.............................. 111
.............................. 111
............................... 112
............................... 114
.............................. 115
.............................. 115
............................. 115
............................. 116
.............................. 116
............................. 117
............................ 118
............................ 118
............................ 119
............................ 119
........................... 120
Sequence
1.
2.
3.
3.
Begin with questions you want to ask ; your reader then knows at once what your inquiry
is about.
Put your request in the form of a question, not a statement. Dont say, I would like to
know in what shades you can supply stockings?. Say instead, In what shades can you
supply the stockings?
Keep your inquiry short and to the point. Say what need to be said and then stop.
Arouse interest
Create desire
Carry conviction
Include action
Apologizing letter
1.
2.
3.
4.
Apologize
Explain how the mistake occurred
Hope that the inconvenience caused is not serious
State that what action he is taking
6
Late payment
1.
2.
3.
4.
What would be my aim if I were to receive a letter of the kind I propose to write?
What do I want my letter to do.?
Keep your sentences short and avoid the over frequent use of such conjunction as, and, but,
however, consequently, and etc.
Deal promptly with all letters needing a reply. Answer them the day you receive them if you can.
If you cannot deal with a complaint promptly, acknowledge it at once. We are looking into it and
that you will send a full reply later.
INTRODUCTION
Normal Introduction
1.
2.
3.
4.
5.
6.
7.
8.
9.
10. We thanks you for your orders of 19th May and as it is your first with us would like to say
how pleased we were to receive it. When opening new accounts it is our practice to ask
customers for trade references.
11. I feel I must write to tell you how pleased we were to receive it.
12. We are obliged for your quotation of......., and should be glad if you accept our order for
the following goods: ( and enclose our official order for the following : )
13. we acknowledge with thanks your letter of yesterday asking us to cover you in the sum of
USD 2000.
14. We are replying to your letter of Feb. 20th asking us to extend the time for payment of the
amount due to our statement for 30th September.
15. First of all I would like to thanks you for the quick response to my letter of March 15.
Please insure that prompt action is taken on these items so as to resolve this matter while
Mr. Manley is here.
11.
12.
13.
Enclosure
1. Enclosure herewith please find one copy of each of the drawing for the subject change
orders which are being returned herewith approved.
2. We are enclosing enclosures 1 through 4 as guidance to allow Daewoo to fabricate two
sheet metal enclosures for the aforementioned subject.
3. As requested , we are sending with this letter our draft for the balance of USD 100.
4. Below as listed you will find a CRI list for electrical pertaining to SF Rig.
5. Pursuant to ref. A, your attention is invited to line 6.
6. Please find attached copy of the letter addressed to myself from Mr. Manley.
7. You are kindly advised as follows :
8. Enclosed we are sending you our invoice for the rug ordered on 5th January, 1996.
9. Referring to your advice of 30th March, we enclose one copy of our invoice.
10. We enclosure a current price list as requested in your letter of 18th May. You will find
particulars on page 12 of the catalogue.
11. Per Mr. Eums request, the following is being disclosed for your information. The present
12.
13.
14.
15.
16.
17.
10
5.
6.
7.
8.
9.
10.
11.
12.
13.
As instructed in your letter of 28th May we are arranging to open a documentary credit
with our branch in Busan in labour of Santa Fe, valid until 30th May.
Based on the weekly fabrication status report from 3D shop and my judgement upon
actual inspection of work underway, progress to date is as follows :
As you are wares of, we are now in process of eliminating the AAA system from Rig 140
and converting to an H.P system.
We would like to express their genuine pleasure in working with you and your respective
companies. We want to thank-you for your kind cooperation, support and for the
opportunity to work with you. We have committed ourselves to endeavor to constantly
improve and give you our best efforts.
We take this opportunity with great pressure, and as a taken of our thanks, to invite you
to a dinner party on the 19th of May, 1996, from 19:00 to 21:00 in the lobby of the Okpo
Tourist Hotel.
We are pleased to notify you that keel laying of H.4001 has been completed at 11:00 on
Oct. 1986, in the presence of your representative Mr. Laird and concerned classification
society surveyor.
In followup to our previous letter, describing the preliminary requested work prior to
arrival of the tug boat, now we present this formal request for Daewoos assistance to load
and tie down the equipment.
In view of the fact that it is your intention to deliver your H.1000 to the owner on or 16
June 1996, we would like to take this opportunity to summarize the outstanding
correspondence in our hull letter files.
I am glad to say that by making a special effort we have been able to improve by a few
days on the delivery date agreed upon.
The position with the various items in this Fax highlight a general concern.
In keeping with the intent of the above referenced letter, I am pleased to submit an outline
of changes necessary to accommodate the wintrization of Rig 135.
We have agreed to send the owned by SF to Okpo which we believe will be of substantial
benefit to Daewoo.
As soon as I saw your advertisement in todays Times for a foreign correspondent I felt it
was just a kind of post for which I have the qualifications and for which I have been
looking for some time.
14. Since I was appointed as a member of your general office staff four years ago I had made
several requests for an increase salary, but without success. I have not previously either
held or applied for a passport of any description.
15. Please be advised of the following comments recently received from the UK concerning
certificate.
11
16. Subsequent to numerous arrangements, it has come to light that a single BCR will not
adequately house all of the equipment purchased by owner.
17. This is to inform you that the present phone number of the Embassy of USA(111-2222) is
no logger valid as from 31st January 1996. The new number read as follows : 111-3333.
18. This is inform you that we completed the proceeding test. It is getting a little late to start
this test now. We should have no problems if all went all, but if our previous experience is
anything to go by, this is unlikely. Our suggestion is that we start it first thing tomorrow .
19. We wish to notify you that Mr. Robert, who has been our manager, has now left our
service and therefore no longer has authority to take orders or to correct accounts on our
behalf.
20. As required by them we have included all charge in our invoice, which account to USD100.
21. I am write now to find out when you expected to complete the work and to ask you to
press forward with it without any further delay.
22. It will come to you as no surprise that our own costs have continued to rise with the
general trend. You are requested to insure that the installation of 2 JP tanks is
incorporated into the design and construction of SF H 3003. Drawings pertaining to this
matter, which are on hand in Okpo office, will be made available to Daewoo. Please advise
the undersigned if you have any comments.
23. Please see that the following comments are incorporated into the design and construction
of vessel as applicable.
24. Daewoo was then requested to solicit an additional quotation for this later arrangement.
25. Please have the design dept. look into the possibility of installing this. I think that 30 days
time is a little bit excessive for an answer to this letter.
12
2.
3.
4.
5.
According to our record, your subscription for membership of the society, due on 1st May,
has not yet received. Nor have we received any reply to the two reminders sent to you on
10th Feb. and 13th March. I am sorry to have to say that unless we receive your check
within the next ten days, we shall have to assume that you dont wish to continue your
membership.
We write this letter with the upmost regret. It is to ask you to accept a temporary
reduction in the agreed rate.
As of today I fail to see steps being taken to incorporate these comments.
Subsequent to the review of level 3 drawings, it appears that in my cases, there are
considerable deviation from the level 2 engineering drawings.. An example of this
deviation appears on the watertight BHD.
This report serves to point out what I continually stress to you. Daewoo continues to place
more importance on meeting a scheduled plan than having Rig ready to meet test
required. Included in this report you will note that repairs are required and Santa Fe
expects these to be carried out in a timely and orderly manner
6. There seems to be an extra conflict here somewhat. We have received approval after the
rejection of the ABS surveyor but now Owner representative is raising objection.
7. We have just received information from our client that one of four cases of crockery
shipped, could not be traced when the ship arrived at Busan. As these goods were supplied
to an order of special urgency, this loss is most unfortunate and I shall be glad if you will
make immediate inquiries into the cause. Meanwhile, we give formal notice to reserve our
right to claim on you for the shortage should the missing case not be found.
8. We were very concerned when we get official letter from our Design Dept. that.......,
9. Drawwork arrived at Daewoo damaged. It is not known at what point and the time the
damage occurred and or who caused the damage to occur. Please notify SF in advance of
the repair being carried out.
10. Our records reflect that your account still remain unpaid and is classified wwww. In
fact , more than 60days have elapsed since our initial billing. Do you have a specified
problem which we can help resolve? Possibly, we may be able to establish a monthly
installment payment plan, thereby helping your fulfill this financial obligation. The status
of your account is USD 45,000. It is very important to note that late payment charges will
continue to accumulate on your account at the current annual rate of 12%. Send your
remittance by check or money order payable to USCG citing the bill/reference no. shown
above to. If payment has already been sent, disregard this letter.
11. I am very concerned about difficulties you are having with goods we supplied earlier this
year. He informs me that a local property repair has estimated the cost of the damage at
USD 5,000 and he has now claims this amount from me.
13
12. It is becoming increasingly difficult to market your goods in the country and there seems
to be little chance of increasing sales so long as present conditions continue. The main
reason for poor sale is the high prices of your goods. We put this to you because we believe
that it would increase your share of a market in which price is more important than
quality, though this is not to suggest that quality is not of some importance.
13. Looking through our records we note with regret that we have not had the pleasure of on
order from you.
14. As already explained in our letter of 17th May this goods was unsatisfied.
15. We want to draw your intention to clauses 1 & 2 of our Contract dealing with late delivery.
16. We thank for your order of 15th May for electric power generators, but regret that we
cannot supply them immediately owing to a fire in our factory. We are making every
effort to resume the production and fully expect to be able to deliver the electric power
generators by the end of this month. Meanwhile, we apologize for the delay and trust it
will not cause you serious inconvenience.
17. We regret to report that a consignment of 4 cause of engine spare has not yet reached
them. We hold your carriers receipt No.1234. As the owner is now urgently needing the
22.
23.
goods, we must ask you to make inquire and let us know the cause of delay and when
delivery will be made. Please treat the matter as one of extreme urgency.
The purpose of this letter is to ask you foresee any difficulties in bringing in the barge and
loading O.F.E. on board for reexport of O.F.E. and barge.
In connection with the annual examination of our financial statements at June 2, 1996,
kindly confirm directly to our auditors whether or not the following information is correct
at June 2, 1996. If the above information is not correct at June 2, please supply our
auditors with any information you may have which will assist them in locating the
difference. This is not a request payment. A postage paid envelope is enclosed for your
convenience in responding directly to us. Thank you for your assistance.
We need a repeat manual WPS100. Please send as soon as possible it is our 2nd request for
repeat. Thanks.
Please refer to the list of 77 operating comments which we discussed with your Mr. Eum
last week. Please incorporate the following as remarks to the items listed below. The item
Nos. below to the same Nos. as the list of operating comments.
From what you say it would seem that.....,
Re owners Fax quoted below, we look forward to having your answer top urgently, since
24.
25.
26.
27.
18.
19.
20.
21.
14
28.
29.
30.
31.
delivery by 5th Nov. at the latest, the date on which the new school session was due to begin.
I have received no acknowledgment of the order, nor have the books been delivered.
Failure to receive they on time is causing serious inconvenience and I shall be glad if you
will look into the matter as one of urgency and let I know when the books may be expected.
Referring to your fax 15th March 1996 we have previously advised you on many occasions
of the need to have an all inclusive contract for classification and related services.
Not having received any reply to our letter of 5th May requesting settlement of the above
account, we are writing again to remind you that the amount still owing is USD50,000.
After carefully examining the pump, we must stress surprise and disappointment at their
quality. Some of them are so poor that we cannot help feeling there must have been some
mistake in making up the order. We have no choice but to ask you to replace them by
material of the quality ordered.
It is now 3 weeks since we place orders for replacement parts. You acknowledged the
order on 5th September, but as we have not yet received advise of delivery we are
wondering if the order has since been overlooked. The delay in delivery is now causing
inconvenience and .....,
32. We wish to draw your intention to our letter of May 3, 1996 for sum of USD 5,000, which
we have not received.
33. We are at a loss to understand why we have had no reply to our two previous application
for payment of your account.
34. I am writing now to inform you that we reserve the right to claim compensation for any
part of consignment that may be damaged by rain.
15
2.
3.
4.
5.
6.
For the purpose you mention we recommend the following repair method, which is
specially made to stand up to this hard situation. Your views have been given every
consideration to determine our clear understanding of each parties responsibilities for this
unfortunate chain of events and we have also taken into account various other items of
communication omitted from your description of the chronological order of events. To
clarify our viewpoint to you, we would ask that you review the following observations of
the topics raised by your letter.
Subsequent to mutual acceptance of this notification of change, including the cost thereof
and delivery, we will submit you an invoice for this change.
We confirm having just called you a firm offer, subject to your reply received here within
2days.
We are very pleased for the opportunity to submit for your consideration our technical
and price proposal. The associated prices are those currently in effect at the time of this
quotation. I wish to thank you for the prompt and considerable way in which you have
handled this transaction and enclose a check in settlement.
It is in a sincere effort to be of assistance to you that we are pleased to make the following
constructive comments.
Attached thereto was a comprehensive breakdown of the costs involved for these changes.
16
2.
3.
4.
5.
6.
7.
8.
One copy of the following drawings applicable to the vessel is returned herewith approved.
Our approval is conditioned upon your `incorporating all comments and amendments
made in this letter or on the drawing, and is subject to the conditions set forth in our
drawing approval stamp. When this drawing is subsequently revised by you to
incorporate Owner comments or for any other reason including Class, it is to be
resubmitted for our approval.
After receiving the background on this item it is my opinion that Daewoo is entitled to
extra cost for material.
Pleased be advised that you are hereby authorized to proceed with steel procurement and
implementation of the ice strengthening modification as originally proposed and as
repeated below : Clarification of the above items is essential before a mutually agreed to
cost and delivery impact can be determined.
This is to confirm receipt of your above referenced change order which was submitted by
you on May 15.
Review of your request to spilt P. notes on H.4001 is nearly complete. Your request
appears to be basically acceptable and only minor details need to be mutually agreed upon.
The second alternative delineated in the Fax forwarded by reference AA is acceptable.
Presuming the inclining of the second vessel is satisfactory the V.C.G so determined may
be used retroactively to the first vessel.
Having carefully reviewed your letter of 10th September we should like to go further into
your proposal for an agency.
We have received a copy of your letter dated March 10th 1996 which forwards your
comments on the preliminary on board test for the subject vessel.
17
2.
3.
4.
5.
6.
7.
8.
9.
Having reviewed this request, it is my opinion that Daewoo has overlooked several
important items concerning this matter. Based on the foregoing, the next difference is as
follows : I suggest that the extra cost of this change be offset against the pump credit and
that net result is a cancellation of this change. Please review the above and advise your
thoughts concerning this matter.
I regret to inform you that you should not expect Daewoo to precede any modification or
change work which you are directly requesting to our Design Dept. or concerned men
verbally or by a letter without any written request to Contract Management Dept. Prior to
design development.
Based on that review, it is my opinion that the total extra cost should be substantially less
than stated. The following is an estimate for the installation of this system which I
consider fair .
We have considered your counter proposal of 15th August referring to our Fax of 10th
August, but must at the outset inform you that we consider it unreasonable.
This is to confirm receipt of your above referenced Fax. We understand your rig has
operated as 100% intact and without restraint for its use in the north sea where we believe
its capacity of 1,500ft. left considerable margins over the average water depth of perhaps
800ft. Our price reduced the face value of cable from USD 10,000 to USD8,000 to allow
generous margins for manhour costs. We consider that this is more that reasonable and
for you offer less is taking advantage of the situation. After reconsideration of the facts,
we consider that the principals involved are as important as the financial aspect. We
must therefore advise that we are not prepared to reduce our offer of UDS8,000 and are
not prepared to barging further on this matter. If this offer is not acceptable we must
regret that you return the cable immediately to Okpo with associated cost on your account.
Our potential use for the cable is not relevant to the discussion.
It is with surprise that we note the content of your letter.
We are very disappointed and feel rather sad to receive the subject Fax which is so
uncharacteristics and contrary to our belief and knowledge of SFs normal business
practice.
We have carefully considered your counter proposal of 15th May to our effort of change
order No. 5, but very much regret that we cannot accept it.
We have finally received all documents referenced in your above letter and in process of
reviewing contents. Please be advised that APL is not agreement with Daewoos
18
12.
13.
14.
15.
shipment by the end of July, as your request. The shortest period in which we are able to
obtain the goods from manufacturers is four to five weeks. We could not therefore
promise delivery for much before mid September. If you are able to wait until then, we
shall be pleased to act for you. Otherwise , we are afraid we cannot accept the order. We
are sorry about this.
16. Your letter of 25th August complaining about riser tentioner reaving has caused us a good
deal of concern. We are nevertheless glad that you brought this matter to our notice. We
always dislike refusing request of any kind from the owner, but that on this occasion we
have no choice but to do so, considering extra costs thereof, and the delivery impact. We
hope therefore you will understand why we must hold this work to be initiated until your
written confirmation.
19
2.
3.
We are very disappointed by your reaction to our request which was a genuine effort to
give amicable settlement of a difficult item without undue cost free to either party. We
firmly consider that the excess is additional to the Spec. and that it is unreasonable to
expect to be free of charge.
As of date, we have submitted our change order No.1 through No.11 and expect for your
withdrawal of change order No.9, we have had no response and no formal resolution of
the remaining ten changes. Thus, we must inform you that unless you respond soon the
completion dates of the affected drawing will be delayed.
We acknowledge receipt of your fax, wherein you reject our change order request
regarding the subject. The two contractual statements you make are correct but should
not be considered in isolation. In ensure, we dont believe the intent of the contract is for
the owner to have the right of changing the agreed design and completed works at any
time without any restriction. In view of this we would request you reconsider your
4.
5.
6.
7.
8.
9.
10. We are presently completing our review of the drawings for the subject Vessel and wish to
advise you of the following decisions. In addition, several questions have come up which
require your input before we can make intelligent decisions and they are as bellows :
20
11. I have reviewed your above referenced letter and have the following comments in response
thereto.
12. This is to confirm receipt of your above referenced letter which has been carefully
reviewed. The following are my comments based upon this review, which has been
attached for your reference.
13. Based on that review, we have the following comments.
14. Thank you for your response in the above referenced letter. In reviewing its contents, I
have the following comments.
15. With reference to your letter of 2nd May, I regret not having been able to find a ship of the
size you mention that could be free at Busan, but I have been given an option on M/V
Marina.
16. Thank you for your fax 3333/May 30, 1996 proposing accelerated delivery of H4030, our
response as follows.
21
Apologizing
1.
2.
3.
4.
Your letter of 10 th May complaining about the fans supplied to your order No.5 has
caused us a good deal of concern. We are nevertheless very glad that you brought the
matter to our notice.
I regret to have to inform you that an unfortunate error in our change order No.5 has just
come to light. The correct cost for USD25,000 is USD 30,000 and not USD25,000 as stated.
The mistake is due to a typing error and we are sorry it not noticed before we sent the
quotation letter.
Apologize for being late with information requested pertaining to ceremonies however I
am unable to even at this time to advise definite date and time for ceremonies. Neither
can I inform you of the names of APL personnel to be in attendance.
We thank you for drawing our attention to a situation of which we have been unaware
until you wrote to us and ask you to accept our apologizes for the inconvenience you have
been caused.
5.
We are sorry not to have replied sooner to your letter of May 5 about general
arrangement, but we have.......,
6. On referring to our earlier correspondence we find that we had mistaken the date for
completion. The fault is entirely us and we deeply regret that it should have occurred.
We realize only to well the inconvenience my oversight must be causing you and will do
everything possible to avoid any further delay.
7. We hasten to reply to your letter of the 15th and express our concern and regret that any
mistake should have occurred in dealing with your order.
8. We are very sorry to learn from your letter of 15th May that pipe was damaged when
delivered. Trouble is too serious not to be reported . Based on such information as is currently
available.
22
Message Text
Text 1 : Simple Notice of Fact
u Alarm bell may be borrowed from second vessel in order to expedite installation.New
items, when received, shall replenish borrowed stock.
u Each change order will describe the change and its impact on cost, weight and
schedule.
u In the upper light hand corner of the form is a 2 by 2 square for placement of a
photograph of yourself. When completing the following questions, do not be overly
concerned regarding presentation or hesitant to jot down on idea.
u For your information, This plate is available in the U.S. on at immediate basis and
delivery date on this material in Korea.
u For the same reason, when writing to firms in the United State, make sure to add the
name of the State after the name of town, as in example.
u They notified the importer of the date sailing and portable date of arrival.
u Manpower was 900 average for past week which is about 120% schedule.
u HP system is being redefined in order to facilitate installation and maintenance and to
have operation system. We feel the percentage as reported. This an accurate figure.
u One of the most critical tasks at this stage is to rectify the C.G comments.
u Many customers overlook the need for this power supply and they are virtually
impossible to purchase in Korea.
u It is customary to supply trade references. Alternatively, or in addition, the customers
may give the name and address of his banker.
u The original intentions given by the specifications, as far as Regulatory Bodies are
concerned are given by.....,
u Within the board pattern illustrated above, there may sometimes be slight differences,
but they do not effect the general principal on which the system works.
u This machine would suit your purpose as well. For the purpose you mention, .....
u Each drawing will be prepared in pencil on Daewoos standard size, 42inch by 30inch,
sheets of tracing paper.
u Each drawing prepared by Daewoo and submitted by owner to classification society
for review and approval. These are only engaged with Daewoos prior approval.
u We will issue the purchase order to vendors pursuant to a general purchasing plan
prepared by us.
u Prior to customs clearance in Korea a copy of such shipping documents shall also be
forwarded to Daewoo.
u A banker is willing to provide the customer with a statement at any time on request.
u Usually on the basis of a specification, ......
u Please note that the number hereinafter are corresponding to those in your estimate
23
u
u
u
u
u
u
u
sheets.
One of our major problems of outfitting in engine room is the lack of space.
His expert acknowledgment and wide experience will continue to be of great value to
the firm.
The following drawings were issued to Daewoo. A sepia and a print are via DHL
pouch to Okpo.
The anodes should be installed in a such manner as to minimize damage to ice flows.
As you will note, I have added an item No.5 entitled Vessel delivery impact and
indicated none. For all future change orders, would you please include this item.
We are following an approved copy of drawing to you by DHL today.
As between Builder and Company, the responsibility is on the companys side and they
are so listed in the column party responsible. We would be pleased to draft in the
first instance some items such as those numbered 16, 18 and 20 if you would care for us
to do so.
u There appears to be a difference of opinion between HEMCO and B&W as to the need
of the water separator.
u Spares may be purchased on any day which is in a business day in Korea at the offer
price ruling on the dealing day following receipt of application.
u The remaining drawing submitted with your letter of 10th May have been approved
with our letter of 1st June.
u The work is done in close cooperation with the Contract Dept. and other department
concerned.
u As individual check bills have been handled over personally to the customer, no copy
of item is available to your bill. Please pay upon presentation of bill.
The site office will be staffed by an item of twenty as listed below. The remainder of the team
will be informed later.
24
25
u
u
u
u
u
u
intent to secure a certificate of fitness for DOE in order to operate at North sea.
It has been of great help to us a time when we ourselves have been faced with heavy
commitments connected with the expansion of our business.
We have received and reviewed the supplementary delivery documents which were
executed following my departure from Okpo on May 1, and find them to be in order
except as respects the list which was attached to the protocol of tools. An appropriate
list is as enclosed, and should be included with your file copy of the protocol.
Nevertheless, as an exceptional measure, we have decided to overlook its late
submission, though we are bound to say that it should.....,
I disagree with the assumption that the Hull, when fully deballasted, will have a water
line of approximately 20feet.
Now that I have covered a brief history of the crane for H.1075 I would like to review
each item you are requesting a change order to fabricate.
In view of these many discrepancies, which ultimately affect the seaworthiness of the
vessel, and the resultant massive oil spill experienced on H.1234 it is necessary to
establish an inspection schedule to prevent a reoccurrence of future Hull.
u The report should also outline Daewoos plan to increase production on H.1111 in
u
u
u
u
u
26
27
u
u
u
28
u
u
u
u
u
u
u
u
u
caisson blocks.
Also, for to proceed, the following information is required.
I have circulated the enclosure to Bank of America for comment, and I would appreciate
it if you also dispatch copies of the enclosures to your counsel to make sure that there
are no problems with their form.
I the event you believe special provisions of Korea Law are necessary or desirable, then
such special provisions should be brought to our attention for consideration.
To enable us to meet your exact requirements we shall need to know which colors you
prefer. Perhaps you will make your choice and when we hear from you we will send the
goods immediately.
Your drafts must be accompanies by the following documents which are to be delivered
to us against our acceptance of the draft : Bill of lading in triplicate.
To help us improve our service to you by speeding up our response to matters arising
from receipt of your correspondence, we would be most grateful if you would forward
information copies of all future faxes of all future faces ad letters to Contract
Management Dept, for the attention of C. D. Kim.
Is goes without saying that this matter should receive immediate action by Daewoo.
I suggest that you check to determine and verify the details of life preservers being
provided.
Diligent effort on your part must be to ensure timely submission of timesheets for all
employees.
We are most anxious to resolve these issues in a positive manner. We appreciate your
feedback and are endeavouring to supply a high level logistical service.
We would appreciated by return fax the name and the place of contact for Mr. Ks
29
u
u
u
u
counterpart in Daewoo. After this information is received, Mr. K will contact your rep.
Directly.
However, APL would prefer to mutually resolve this matter rather than submitting it
for final arbitration. In keeping with this desire, Daewoo is requested to submit the
information per my fax to my departure to Korea.
Based on the situation as outlined herein APL requests that Daewoo supply APL the
following information.
We would ask that you note that bearing aside change order No.5 agreement now of
consumables for H.4029 would man it is unnecessary to change the export license. If you
do not agree them now, it is necessary to change the license at least 10 days in advance of
delivery.
Because the situation continues to deteriorate, we ask for your special help in continuing
the problem.
In this regard, we would advise that it is not accessible for the Builder to NMD and
thereby request your cooperation and assistance by making application on our behalf
for certificates issued by NMD : all necessary information and back up will be of course
provided by ourselves.
u Therefore. If has become necessary to the modify the hydraulic trolley drive unit, as per
the method shown on the attached sketch, to make the requirement operational.
Daewoo is advised to adhere to the following guidance for expedient and satisfactory of
the modifications.
u Please on pass this information to proper parties involved to insure that bins when
erected conform to the attached sketch.
u We appreciate the circumstances and were prepared to wait a sensibly reasonable time
for return of the cable and in this respect would ask that you inform us of the promised
delivery date of the replacement.
30
31
Text 6 : Itinerary
u I will visit Korea 18 May to 2 June with following Itinerary. Please arrange for my
transportation from Busan airport to the yard with your hel, lodging at your hotel and
transportation to Hyundai. I look forward to seeing you and discussing CG
involvement in the USL project.
u We are well served by public transport to City Hall which can normally be reach from
here in less than a Quarter of an hour.
u Special information is provided for your convenience as follows :
u Will you please send me a copy of your brochure and details of terms for partial board ,
namely breakfast and evening. One doubleroom and two single rooms for 10 nights
commencing 10th May.
u When replying to an inquiry of this kind it is advisable to repeat details of rooms and
dates asked for in order to avoid misunderstanding. In the following reply the manner
taked the opportunity to refer to the advantage his hotel can offer.
Standard
price. ceiling price. floor price.
u E.S. proposed to visit UK on the compants business. He will be leaving London on 5th
August for a business tour of United States and, subject to issue of the necessary visa,
proposes to arrive LA. On 8th August, and to stay for about 14 days,when he will leave
for Japan.
32
33
u
u
u
u
u
35
u You are requested to elect any one of the following options for the resolution of these
change works.
u You accept this notification of change and authorize us to proceed with the extra work,
without agreeing to the cost of the extra work, and with the understanding by both parties
that the cost of the extra work will be negotiated at a later date.
u You do not accept this notification of change and instruct us to discontinue any further
completion of the extra work described herein. You acknowledge that even though this
option is elected, we may have accrued costs due to your proceeding in good faith with the
extra work prior to your election of this option, and that the costs accrued by us will be
the subject of further negotiation.
u We seem to have sorted out the problems with change order.
36
37
u
u
u
u
u
u
u
u
u
u
letter we feel that you consider this modification should be done at our expanse.
We moreover, issued the P.O. in order to shorten the lead time of purchasing the
necessary materials and relieve the adverse effects on our production progress, running
the risk of your cancellation of this modification work.
I am sure you will agree that the expeditious resolution of all changes in an amicable
manner is in the best interest of all parties.
In forwarding these change orders to you, we should like to take to precaution to sign for
these under clear understanding that any further trouble stemming from your request
should be beyond us and Owner grant us for this trouble at your own end.
For the purposes of keeping Owner records in order, I request that you reissue these
change orders against APL H.4029. Further, I suggest that when it comes time to settle
these amounts that they be done so in the form of a Daewoo credit which shall be applied
against the costs accrued on C/O 101.
As you know, it would be reasonable to pay the total charge against the first ship as it
actually increases the largest costs. However, we have also quoted you a price per vessel
of the basis of equal sharing but with an increase financing charge. Therefore, our total
charges for the services outlined in your letter, inclusive of computer time, programming
and hard printed copy would be USD 25,000 lump sum total paid against the first vessel
or alternatively USD 2,500 for each of the 12 ship.
Assuming the cable is of little or no use to Daewoo it would seem that a compromise would
best suit both our interests.
We are anticipating that our comments 1&2 would offset each other with respect to cost.
By the time materials arrive, most of the preparation are complete.
They are not to our normal standard but the owners representative wanted them that way
and the class society agreed.
We would also request that you supply certain equipment as is OFE which is not available
in purchasing locally and having correct rule requirements. We will discuss the exact
requirements when the above information is to hand.
There detailed request was put to you by our letter, which also gave early warranty that
some equipment might need to be supplied by yourselves.
To establish the solid facts, please advise when you passed on the information in question
to our Engineer and to whom.
To establish the solid facts, please advise when you passed on the information in question
to our Engineer and to whom. Your reply will allow us to establish firm facts without
coloration of rumors and hearing. We must add as a constructive criticism, that many of
our internal communication problems arise from the way that on any single topic, you
communicate piece meal with different parts of our organization. Some parts are verbal
some parts are written, but no one part of the organization receives all of the information.
38
u To avoid any further difficulties, we attach the supporting documents as evidence to the
fact that the installation of A60 Class BHD in the electric workshop is beyond our
responsibility as defined by the Contract.
u The following main factors (A) financial charges (B) insurance charges (D) lost
opportunity costs made up from the P.M team, the labour forces, etc which could be
employed elsewhere and the typing up of facilities and utilities. Based on the above we
have arrived at a figure of USD 20,000 and therefore consider the previous figure of USD
15,000 to be concessionaire and low, based on the best information we have at that time.
To summarize the position, we consider that there are two major factors now holding up
completion and that these 1) matter 2) C.O. initiated at a late stage of construction.
It
will be immediately apparent that the total impact of these factors at this late stage cannot
be absorbed within our normal change order rates as it extends the project into a
completely different area of financing which must be accounted for in some additional
way. Based on consideration of all these factors, we consider that the most reasonable
reflection of the circumstances is as follows : We think this will compensate us for the
situation which has developed which is not of our making and will best serve both parties
to get completion and delivery.
39
40
41
42
u
u
u
u
u
u
weather condition and such delay shall be deemed as a permissible delay in the delivery of
the Vessel.
They are making urgent inquiries at this end, but we should be glad if you would take the
matter up with the shipping company at your end since their bill of lading shows clearly
that 5 cases were taken on board.
This would enable us to meet a temporarily difficult situation, forced upon us by
circumstances that could not be foreseen.
As you have failed to make delivery on time you leave us no choice but to cancel the order.
Delivery of the rugs is a matter of urgency. Will you please find out from British Rail
what have happened to the consignment and let us know when may expect delivery. We
are of course making our own inquires at this end.
The lead time for the purchase of required materials are very tight so we have allowed 2
weeks to be delayed.
The lead time for the purchase of required material is very tight so you have allowed 10
days to be delayed behind production schedule.
I consider this to be a subject of grave importance, in that winterization touches on several
aspects of the overall Vessel design. I believe that this matter is addressed promptly, with
proper forethought, and early in the design and construction phases of the project, any
impact to Vessel construction and cost will be minimized. In conclusion, I would like to
point out that I disagree with Daewoos opinion that the delivery date of the vessels will be
impacted by a time equal to the time period that level 2 drawings are impacted. Based on
this assumption, it must be concluded that all winterization design lay on the critical path
of the construction schedule and this is in fact not the cases. Delays in the delivery of the
vessel will be granted solely to the extent that Daewoo can demonstrate, with proper
43
u
u
u
substantiation, that extra work required by the owner does in fact, adversely affect the
production schedule of vessel.
The combined effect of these two situations results in an expectation that delivery of vessel
cannot be scheduled before November 1. In view of the foregoing, and assuming that
delivery by Daewoo could be effected prior to the end of October, it will be necessary to
adopt an approach similar to that outlined in your fax. We are of the opinion that the
lesser rate would be closer to the reasonable rate for the vessel.
If the Daewoo critical path is accurate then the vessel delivery date Feb.30 is jeopardy.
Be understood that this modification would cause adverse effect to our timely delivery
efforts and to the required stability and payload of the vessels as well.
Unfortunately, this situation is causing us serious problems. Whilst we will always be as
cooperative as possible, we do not have unlimited resources and we have other
commitments which have to be carefully interfaced into our capacity. Apart from
causing us production capacity problems, delays also create significant additional costs.
u our efforts to keep the delivery date is overshadowed by the lead time of material.
u This work makes our production progress undergo a drastic change. We can hardly
keep the delivery date for the burden of manpower allocation.
44
Text 15 : Invoicing
u Any additional oversee packing will be paid for by the customer and separate invoicing
will be submitted after such costs are ascertained.
u The freight charge for a case weighting 150Kgs would be USD 10, to which must be added
$ 5 for insurance and our own handling charges of $ 5, making a total of $ 20. Our
charge covers all the formalities connected with the consignment, including preparation
and customs clearance.
u As the issuance of invoices from the office concerned is normally around one or two
months in arrears, we have difficulties in quickly invoicing for the telephone usage charge.
u In the event that the numbers of drawings are not delivered during a given month, APL
shall only invoice for a prorated amount, based on the number actually delivered divided
by the number scheduled.
u 25 percent of the fixed fee specified in Art. 2.1 shall be invoiced upon advice by APL to
Daewoo that work has commenced on the preparation of the operations.
u Ten percent of the fee may be retained by Daewoo until receipt of all final deliverables
and the final invoice.
u The invoice will be made out in Korean won at the exchange rate ruling on the day of
preparation.
u It would be appreciated if you all charges to our G.A.D upon receipt of the invoice
prepared by CMD. The invoice will be made out in Korean Won at the exchange rate
ruling on the day of preparation
u All rate and payment are made in Korean Won. Prices and rates do not include V.A.T.
u The includes copy of the invoice shows quantities and total value of $150.
u The invoice value of the consignment, including freight and insurance is USD 50.
u All fees are to be remitted in Korean Won to ABS at the official ABS exchange rate in
effect at the time of invoicing. All fee will be payable in three approximately equal
installments : after keel laying, launching and completion. Payment is due upon receipt
of each invoice.
u Daewoo shall pay the amount of each invoice presented to it pursuant to Clause 3.1 within
30 days after receipt of the invoice.
u Daewoo shall pay retain the right to question the correctness of such invoice at any time
within the period of twelve months next following the date of receipt of such invoice.
u As the issuance of invoices from the office concerned is normally around one or two
months in arrears, we have difficulties in quickly invoicing for the telephone and fax
usage charge. We have no acknowledge of when APL intend to return the office space
and other accommodations. We therefore need an early discussion to settle on an
amicable method of payment of the various charges both up to, and after delivery of the
vessel.
u Please be advised that we are in process of collecting invoices and tabulating paperwork.
This is at best a slow process because of the number of vendors involved. Their slowness
in billing, and the research required to determine accountability.
45
Text 16 : Quotation
u We can assure you that so far as quality goes you have nothing at all to fear from
materials of other manufacturer in this country or aboard. We feel sure you realize that
our quoted price is very reasonable.
u As the urgency of your order left no time to make the usual inquires, we are compelled to
place this transaction on a cash basis.
u The value of the stock held varies with the season, but does not normally exceed USD 100
at any time.
u The price of each major component of the system is listed for your convenience in the
event that you have need to procure less than a complete system.
u Although verbal instructions were given we have not written to you regarding the pipe
layout and we must apologize for causing any embarrassment by not confirming the
above verbal instructions in writing.
u A periodical list showing prices prevailing on the date of issue.
u Presentation of the enclosed card, valid for one calendar month, will entitle you to select
goods of your own choice as your gift.
u All lump sum given are inclusive of financial costs and profit as defined by Amendment
No.1 to the Contract.
u He will ensure that goods supplied are sound in quality and reasonable in price.
u As the booking position is constantly changing the leaflet can serve only as a board guide
of what we can offer.
u Fears for this are given under the heading one class tourist
u We do our best to keep prices as low as possible.
u Because of our facilities for quick delivery there will be no need for you to maintain
stocks of our manufacturers
u All purchases to be made on your behalf and in your name and all accounts to be passed
to you for settlement direct with supplier.
u Prices are CIF Busan. Unknown transport cost to Okpo will be added on delivery.
Payment will be by cable or fax transfer within 50 days after delivery.
46
u
u
u
u
u
u
covered by underwrite.
We therefore regret that we cannot accept as a fair estimate of the loss the figure of USD
1,000 mentioned in your letter a figure which we understand is based on the cost of the
goods.
The remaining three copies are then passed by the shipping company to the consignor
when pays the freight and other charges.
They want to know about the goods and this means that my staff have to spend much of
their time in giving information that should be obtainable from the catalogue.
Materials received does not match packing list description
Cost of any governmental agency testing shall be borne by the Builder.
Our own estimate of the stock damaged, based on present market values, does not exceed
$500. We feel that this valuation is a very generous one.
The buyer is then liable for any loss or damage.
It would seem that the breakages have been caused by rough handling in transit.
47
48
49
u
u
u
u
u
u
u
u
u
50
u The main philosophy of progress report is to measure actual physical work completed,
regardless of manhours consumed versus planed. For a yard, the budget for manhours
cost shall be the calculated manhours rate or the agreed subcontractor manhours rate
multiplied by the appropriate number of manhour. From this, necessary decisions shall
be made, and action taken. PID is responsible for monitoring the owners approval of
drawings and advises the owner of drawings outstanding beyond the agreed time period.
The owner shall thereafter without delay, and within a timelimit to be mutually agreed
upon, approve the work or make his objections known to the yard.
u For the workperformed on time rates a minimum of 14 days notice would be given by
Daewoo to contractor in respect of fluctuations in the labor force requirements greater
than 10%. Contractor shall accommodate smaller fluctuations within 48 hours of
request. They noticed what they believe to be an error in the form of letter of credit.
The work shall be carried out at 10 hours shifts per day, including time for meals and
rest, 6days per week or at the most favorable shift plan approved by K.R. at Daewoo
choice for the completion of the work under this contract. Approval of time sheets
must be obtained on a daily basis from Daewoo. Consumables are defined as those
materials expanded in whole or in part during the course of the work and which do not
become a permanent part of facilities. All waste and surplus materials will be the
property of Daewoo. Contractor shall not purchase or rent any items to Daewoos
account in addition to that covered by this contract unless agreed upon in writing by
Daewoo authorized personnel.
u Rates for hire of equipment supplied by Contractor and for his use are not paid on
hours on standby.
u The procedures and routines and the philosophy behind the are under continued review
and will be updated from time to time as required. All incoming mail, as well as
outgoing mail to client, shall be addressed to the project Manager. If another person
should be addressed his name will come after the Project Manager. The Project
managers Dept. will do all internal distribution of mail. A list showing authorized
persons to sign letter and fax will be sent out.
u The Coast Guard will make every effort to be responsible to the ABS in matters of
interpretation. Where the Coast Guard is already involved in plan review and
inspection of some items as of 1 June 1996, such as piping or electric system, the C.G.
will normally retain these activities until the projects are complete. At the operating
level, C.G. and ABS personnel will continue to work in close cooperation. For areas
listed in Section 1 of enclosure, it is envisioned that C.G. inspectors will normally
perform inspections only for the following reasons : Upon receipt, the OCMI will
provide the principal surveyor of the local ABS office with a copy of the application for
inspection to forward to the ABS V. President. Upon completion of inspections, and
51
when a vessel is ready for classification, ABS will provide to the OCMI a copy.... The
ABS will forward one copy for approved plans and accompanying approval letter to the
cognizant OCMI, nothing in the approval letters and on the plans which plans were
approved as complying with C.G. regulation. If the submitter does not specially ask for
C.G. review, the plan will be forwarded to the ABS for action. MMT will ensure that
the design assumptions are appropriate for the service intended, and will advise the ABS
if any preliminary discrepancies are identified.
Daewoo has made a particular request that ABS provide it with all of the assistance for
the classification of vessels to be built at Okpo shipyard as yard H No. 4444. Daewoo
and ABS desire to enter into a written agreement wherein ABS will provide essential
service and Daewoo agrees to pay fees in accordance with schedules of fees attached
hereto and made a part hereof. Additional services, required for compliance with the
standards of other organizations will be covered by a separate memorandum of
agreement and will incur additional fee. All fees will be payable in three approximately
equal installments, after keel laying, launching and completion. Any and all taxes
imposed under the raws of the Republic of Korea on the payment made in accordance
with this agreement shall be borne by ABS, and then Daewoo shall be entitled to deduct
such taxes from the payments to be made, provided that Daewoo pays the taxes on
behalf of ABS under such raws.
52
Text 20 : Responsibility
u
u
u
u
If any dispute arises out of the performance or the interpretation of this agreement,
committee composed of 4 members whose duty shall be to seek a friendly solution.
We are not engaged in any liability or arbitration and we are not aware of any claim
pending or threatened against the fund.
Whether similar in character to those heretofore enumerated, beyond the reasonable
control of the party affected by the same.
We have taken all reasonable care to ensure that the facts stated herein are true and
accurate in all material respects and that there are no other material fact, and we accept
responsibility therefore accordingly.
We do not want to question whose responsibility applies to the failure supply vent duct
V/V on time. We still believe all the parties, and particularly Owner should share the
responsibilities. This unfortunate problem came to surface in early day and then Owner
agreed to supply them on our behalf.
u We request this material ship to Singapore via M/V Marine using our local agents. All
charges and costs shall be for the sole account of Owner, thereby relinquishing Daewoo
of all responsibility, once formal export customs clearance documents/licenses are issued
to owner.
u His terms leave no room for misunderstanding.
u If such approval or comment is unreasonably delayed by Owner, the delivery date shall
be adjusted accordingly but only to the extent such delay shall be the cause of delay in
the construction of the vessel.
u It is the legalduty of the buyer to collect his purchases from the seller and, unless the
terms of sale include delivery. The buyer is therefore responsible for any loss, damaged
or delay that may affect the goods after carrier has taken them over.
u Daewoo will provide insurance of comprehensive cargo warehouse to warehouse for
Owners account. Insured value is full CIF value with USD 5,000.
u APLs liability for any deficiencies in the services provided is limited to performing at its
expense any such services which are deficient because of APLs failure to perform said
services in accordance with the above standards.
u Owner will so remedy any such deficiencies, provided Daewoo has notified Owner in
writing within a reasonable time, not to exceed 30 days of the discovery of any such
deficiency, but in no event later than the delivery date of vessel, which is anticipated to
be 15 May 1996.
u Owner will carry and maintain in force the insurance coverage described below with
companies satisfactory to Daewoo.
u His probable arrival at the shipyard will be Thursday afternoon. Owner assumes
complete financial and personnel responsibility for Miss Lesiow while she is in Korea
53
and quarantines her return to the United States. The quarantine is forwarded with the
understanding that Daewoo will provide whatever assistance necessary in the issuance of
Miss Lesiows Korean Visa. Under separate fax you will find Miss Lesiows resume.
Please do not hesitate to contact I should you require further information. Thank in
advance for your help in this matter.
u Any notice or other communication required or permitted to be given or served
pursuant to this agreement shall be in writing sent by registered airmail or delivered by
hand to the address of the respective parties as follows :
u Notice shall be effective if sent by registered mail, postage prepaid, seven days after the
date of mailing.
u Daewoo shall notify the owner of unacceptable invoices without undue delay. Daewoo
shall maintain full responsibility for the work and functions of his subcontractor.
Claims of force major shall be forwarded in writing within 7 days of occurrence duly
certified by proper authorities.
u Owner shall receive from the Builder at least 6 days notice in writing, or by telegram
confirmed in writing, of the time and place.
u We meet the requirements the USCG which has regulatory control the vessel.
u This contract diagram establishes the minimum functional requirement of the system.
u Exact time for inspection will be given with reasonable notice, taking into consideration
location of MFG shop.
u Builder has exerted all reasonable efforts to expedite performance, avoid default, or
procure equivalent substitute performance.
u This contract shall be deemed to have come into force on June 1. The work governed
by this contract is planned to end July 1.
u Contractor shall abide by any regulations relating to the Project and other routines,
rules where applicable.
54
Text 21 : Payment
Such cancellation shall be effective as of the date the notice thereof is received by the
builder, upon receipt of such notice and upon the buyers demand, refund in accordance
with the contract.
u If the buyer is in fault of payment as to any installments as provided in para.4 of the
contract, the buyer shall pay interest on such installment at the rate of 185 per annum
from the due date thereof to the date of payment to the Builder of the full amount
including interest thereon.
u In any event of default by the Builder, the buyer shall also pay all charges and expenses
directly incurred by the Builder as a result of such default, but Buyer shall not by
reason of this provision be obligated to pay to Builder any so called consequential
damage.
u If owner supply items according to this contract are to Owners account and
responsibility, this will be done only against requisitions and costs will be late invoiced
u
u
u
u
u
to Contractor at ruling price list, or at cost plus 20%. Work shall preferable be carried
out on lump sum or schedule of rates basis. When no such agreement is made the work
shall be carried out on time rates
He is appointed as a liquidator to wind up the business and will discharge all the firms
liabilities and receive all payments due to it. According to our records the amount
outstanding on your account with the firm is USD 300.
We have had some trouble arranging L/C with bank because of the tight credit situation.
We are having some problems due to foreign exchange control regulations. We must
advise you therefore of a possible delay in payment of about 20 days.
Since we are aware from personal knowledge that firm is personally sound we presume
that failure to honor the bill was due to some mistake. We shall be glad if you will
explain the reason. At the same time we must ask you send by return the sum due on
the bill.
We were under impression that payment was not due until the end of the month, when
we would have had no difficulty in setting our account.
This loan is due for repayment at the end of this month and I have already taken steps to
prepare for this, but unfortunately due to a fire at my warehouse a fortnight ago, I have
been faced with heavy expected payment.
I am therefore writing for permission to defer payment of your invoice until the end of
September.
payment must at the time of application and a contract note will be sent to you written
48 hours of receipt of application. The share certificate will be forwarded within weeks
of the date of payment
Five percent of the Contract Price shall be paid by way of a deposit to be made in the
55
name of the Buyer at the Builders bank by telegraphic transfer remittance at least three
business days prior to the Delivery date of the Vessel.
u The amount due will then be paid in good time for you to issue the air ticket and details
of the flight booked.
u Payment will be made on presentation at Busan Bank.
u Provide you fulfill the terms of the credit we will accept and pay at maturity the drafts
presented to us under these credits and, if required, provide discounting facilities at
current rates.
u Please be advised that third installment payment of USD 1,500 was transferred for value
on March 15 to Bankers Trust U.S. for deposit to the account of KEXIM bank, account
no. 14.128.898 in favor of Daewoo.
56
Text 22 : Confirmation
u Before drafting up the formal contract for signature we should like to conform the main
points upon which we reached agreement , namely :
u Before we expedite further steps, we would request your cooperation for clarifying the
following matters.
u Although we believe proceeding on the basis outlined above will benefit all concerned
parties, we wish to obtain ARCOs consent before committing to such a change order.
u We are proposing to obtain cover of USD 500,000 and in the circumstances would ask
you to pay half the cost of the premium. We are now investigating possibility of
obtaining this cover and cost of doing so, but would appreciate your agreement in
principal. If such insurance cover cannot be obtained, we repeat our proposal that any
such liability be shared equally.
u We note and agree with your comments on the transfer of title. However, as we were
simply seeking to shed the associated risks, your acceptance of the following points
57
Closing Message
Close 1 : Request Change Order Quotation
u Would you please advise the credit to be extended to Owner for this change.
u You are hereby authorized to proceed with this change for Vessel based on the foregoing.
Please issue change orders for my signature which I will approve and return.
u We trust you will accept this as being a fair and reasonable solution of the matter. Please
advise the credit which is to be extended to us.
u Please submit c/o quote based on the prior information submitted in letter dated May 1.
58
59
u Assuming the manufacturers quotation to be accepted and that the date of delivery at the
factory is known, the agent will now write to the shipping company.
u The foregoing information is given to you on the clear understanding that it is treated as
strictly confidential.
u We are in the process of sending them by DHL to Korea.
u We look forward to receiving this information from you very soon.
u We feel sure you will find these goods satisfactory in every way and perfectly suited to
your needs.
u We will use our best to put matters right.
u We place this order on the clear understanding that the consignment is dispatched in time
to reach us by end the of this month.
u Hope this answers you questions.
u Please note that only items 12 threw 19 on this p.o. apply to the subject equipment.
u Any information on hand in Owner office will be made available to Daewoo.
u This list is not considered to be a final list from D.O.T. and additional items may be
forthcoming.
u We trust that procedure will be satisfactory to Daewoo.
u In our review, your decision to consign lower priced good is a step in the right direction
and we think you will find that future statements of sales will confirm this.
u We return for these charges you have our assurance that interests would be carefully
protected.
u Please note that the above quote is actually an informal translation of the Korean
document and in the event of conflict, the Korean document shall take precedence.
u The experience gained would provide a valuable guide to future projects.
60
u We hope the above comments satisfactorily clarify some of the issues now being raised.
u I have noted that the delivery on this schedule is shown as Jan 30, 1996, a full two months
ahead of the contract schedule. I wish your good fortune in the pursuit of this schedule
and I will do whatever is necessary from Owners side to help maintain this schedule.
u As already discussed verbally with your Mr. Eum, we can reluctantly accept your invoice
but feel the need to record our feelings on the matter and in fact would welcome your
consideration of whether such a charge is really necessary and take this as your will
established practice which will be applied in the future at the same instance.
u In summary, it would appear that in order for Daewoo to meet the intentions of the spec.
they must place draft marks on two sides of the column.
61
62
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
64
u All these items are urgently required by the owner. We therefore hope you will
send the immediately.
u We shall be pleased to receive your letter, which will have our prompt and careful
attention.
u Will you please expedite this request and inform me as possible.
u Pls let me know what the present situation is regarding this matter.
u I will be pleased to hear from you in the near future. I know that I can help you in
this area.
u I trust that you will be able to take some positive action to correct the foregoing,
and by doing so effectively reduce the number of exceptions on delivery of each
vessel.
u Upon completion of test, onpass this information to me soonest for my file.
u We would ask that you reevaluate your position as stated in your telex of Jan 27
and are hopeful that you will be in a position to reinstate the commitments and
promises Daewoo made to SF regarding these rig deliveries.
u We would appreciate your transmitting to Mr. F. Howall a copy of your telex of
May 11th, so that he will be aware of all agreements.
u No doubt there is some special reason for the delay in payment and we should
welcome an explanation or your remittance.
u As there appears to have been ample time for you to collect and credit the sums
due on the check paid in, I should be glad if you would explain why payment of
check was refused.
u We hope it will not be necessary to send you any further reminders.
u We quite understand the need for references.
Any other information you can give us about this company would be very welcome.
We shall be most grateful for any information you can obtain for us.
u As we are not familiar with conditions in your country, this is a matter on which
we would welcome your views.
u Without regard to these deficiencies or without a realistic effort to remedy them,
newbuilding 4004 cannot be expected to the either fouling free or
hydrodynamically smooth.
u Your help in rectifying this matter will be most appreciated.
65
66
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
68
Close 9 : If Clauses
u Should you be unable to deliver the goods, please let us know at once.
u We trust that the above will be sufficient for your purpose and if you do not
entirely concur, please advise accordingly.
u If there is any way in which either our company or our subcontractor can be of
any help either now or later, do please let us know we shall be only too glad to do
anything we can.
u We should find if most helpful if you could also supply samples of the various
skins in which the gloves are supplied.
u If the schedule time conflicts with your business or if the frequency of meetings
proves insufficient, we will make ourselves available at any time.
u If you cannot do so, then I must regretfully decline your offer as it stands.
u If you are in doubt about the contents of this document, you should consult your
advice.
u Should you need any further information, please let me know.
u If the day and time suggested are not convenient and if you will suggest an
alternative appointment, I will rearrange my other engagements as may be
necessary.
u Should you have further questions on this quotations, feel free to contact us.
u If you have any questions concerning the above please advice.
u My company would guarantee Mr. D. K. park's financial security during his stay
in Iran and payment of expenses he may incur.
I enclose the following supporting documents. Should you require any further
information, and if you will let me know, I shall be happy to supply it.
u If I can help you further please do not hesitate to get in touch with me.
69
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
71
73
75
76
77
78
80
and as requested, we now supply you with confirmation and more detail of various factors
discussed to date.
The mark-up of our requirements for compensation of delay in as follows :
It must be noted that the facility charge is intended to cover the effective rental for
loss of use as well as the availability of equipment and labor.
Bearing in mind the extremely high capital invested and the premium space occupied,
we consider this figure to be much lower than really required but this is intended to
reflect the mutually cooperative business we have shared.
Considering now the late receipt of critical materials and equipment. Quite apart
from the obvious lateness caused to the directly dependent activities, the effects have
been diverse and varied from insidious erosion of performance to immediately
identifiable consequential losses.
One prime example of the latter is the postponement of the intended sea trials in
early September caused by lack of O.F.E. The weather at that time was perfect but the
postponement led us to a period of typhoon activity which forced the return of the rig
from its trials and resulted in weather delay.
Erosion of performance was caused by waiting time, disruption and fading effects or
loss of inertia. Inefficient utilization and excessive mobilization/ demobilization of
resources were the natural conclusion.
Having already completed work on Rig 135, we did not anticipate more than a few
minor additional changes on Rig 140. We were therefore surprised to find ourselves in
receipt of a further 43 changes amounting to an additional 89,450 manhours of work.
Included in these are Halon fittings for which we have already requested a 25 days
extension, duct valve for which we asked 10 days, towing bridle for which we requested
a further 8 days.
Attached for your consideration are two schedules, one showing latenesses in
delivery of OFE, the other showing late availability of vendors service engineers. In both
lists, the significant items have been underlined.
As you are aware from our discussions, a very great number of other factors
including electrical work, also had a direct bearing on project delays.
However, as you know, now only is it now impracticable, it is to neither parties benefit
to go into all the details at this stage.
Suffice it to say that we can demonstrate delays to your account of in excess of 40
days and therefore we believe we are more than reasonable in seeking compensation for
such delays to commence on the lst October 1983.
We hope that now you have been given the opportunity to consider the facts, that
you will accept not only the quoted rate, but also its commencement date. In both cases,
because of our appreciation for our business relationships, we are asking for much less
than we feel we could justify.
We look forward to your early favorable response.
In the spirit of fairness, I would like to ask you how Daewoo might handle this
situation if our rolls were reversed, I.E, if Daewoo were in SF's opinion.
In my opinion, and in view of the fact that SF has agreed that DW shall only be required
to apply 2 coats, I think that DW should give further consideration to the price they
have charged for change order no. 4 to sandblast and repaint JP tanks.
I suggest that if DW deems it appropriate, that they extend a credit to SF which is to be
applied against this change order.
I will leave this matter strictly in your hands and whatever decision D/W make, I
will accept it as final and not bring this matter up again. My only request is that you
look at this issue with an open mind and treat it in a fair manner and recall that SF has
agreed to the above spec. interpretation on both Hulls.
83
84
86
87
88
90
92
93
Further to our previous correspondence, we regret to advise you that the current spell
of labor disputes nationwide throughout all fields of industry makes our overall
shipbuilding schedule undergo a drastic change.
On all projects of our shipyard, planned work schedules have been completely
disrupted throughout the entire duration of our yard's labor disputes which commenced
August 8, 1987. Even at this time, the disputes outside our yard are still persisting.
A great number of our sub-contractors who supply vital equipment and material
advised us that their on-time delivery is in jeopardy, which has a direct bearing on your
project delays, However, as you know, not only it now impracticable, it is to neither
party's benefit to go into all the details at this stage.
As you are well aware, punctual delivery of all projects in our yard has been
frustrated by this unfortunate event and we are at the critical point where we are unable
to achieve flexibility and feasibility from transfer or redirection of labor and new
allocation of resources. These resources are not without limit.
In this light, we have no choice but to revise our overall production program and
batch schedule.
As the impact on the schedule of your newbuildings has been reviewed in conjunction
with the previous production program and the new program under development, we
must ask you to share the common recognition that both parties now foresee the
practical completion dates for Hulls 5017/27/29 to be extended 20 days. Additionally all
key event dates are scheduled to be postponed around one month according to our new
program.
One minor solace is, however, that the scheduled completion fate for Hull December,
1988 are within each contractual delivery date. However, we cannot assure you at this
stage that we will be able to meet the contractual delivery dates without having free float
on the schedules.
We regret having to make this request but in the meantime, give you our assurance
that we will continue to minimize the final delay as far as possible.
95
therein.
You were given notice of the commencement and termination of force major event in
our yard within the prescribed 7 days and were advised that the full impact was now
made available until after a few days had elapsed from August 31.
As you are well aware, all office members and site managerial staff were now allowed
to enter the shipyard and accordingly were blinded off during the whole period of labor
disputes. After reopening of the yard, we have had many difficulties in grasping. and
collecting the effects of the disputes within a few days due to the severity of damage to
our facilities including office appliances, loss of documents and data, and forced us to
spend substantial further time to collect, evaluate and analyze the damage influences
both from our side and from many sub-contractors for devising the countermeasurement and adjusting our overall production program to effect of minimizing
possible mitigation of impact for the benefit of yourselves.
It is normal practice, and all the other owners take it for granted, that under the
aforesaid circumstances the builder shall carefully review, comprehensively evaluate the
damage effects, and then notify the specific dates of accumulated delivery impact to the
owner as soon as possible, nor is this in any way a failure to comply with the relevant
contractual provisions.
It appears to us that to attitude in this matter is both unjustified and unduly technical.
It will be disturbances of the magnitude and extent of those we have recently suffered in
the Korean industries in such that it is just not possible to give a sensible and definitive
evaluation of the effect on delivery in as little as seven days.
We would like to know purpose you think would have been served by our making an
initially exaggerated claim simply in order to protect what you appear to be saying, in
equivalent to a time limit.
We trust that in reflection you will look at this situation in a more positive and
practical manner and that you can bear with us under these circumstances.
97
98
99
100
Your response was by two telexes, one which said that a claimed delay for any item for
which the delivery date had not arrived was premature cannot be claimed until delivery
date. This is in conflict with your demand for notice in seven days of the delay and
obviously not acceptable.
Your other telex refused to accept the validity of our notice for items with contractual
delivery dates more than seven days in advance of our notice. This logic also is
unacceptable, you were notified of actual delay which is all that is relevant.
The points you appear to be consistently overlooking are that :
1. The delay had not ended and therefore the time limit of seven days had not yet
become operative.
2. The giving of notices within seven days is one of the performances under the contract
which was prevented by the force major circumstances.
On Sep 11th, our telex C MS/SGH-T138 gave you notice that normal operation had
been restored in most respects and advised that the entire docking schedule of the entire
yard had been delayed by one month which was not recoverable. It also advised that
other related factors would also affect delivery but that we would do our best to reduce
these as far as possible.
It requested your acceptances of a delay of 30 days on all vessels since all are subject to
the same one month delay in the docking schedule. We feel sure that you must realize
this is a central key facility which dictates the hard core of every building program and
that it is impossible to construct a vessel without this key facility.
Other delays were mentioned as existing but were not claimed and this means that we
accept the risk for recovering these even though there is no contractual obligation to do
so.
We therefore firmly consider that we have acted responsibly, have conflicted with the
requirements of the contract and have been gone beyond this in our offer.
No sights have been or will be waived by ourselves and we did not anticipate that in
this situation, the owner would try tp evade his responsibilities.
We are prepared, without prejudice to any of our rights, to repeat our offer for an
acceptable delay of 30 days but since this already leaves us with unnecessary risks, we
are not prepared to allow this to be considered as a starting point for negotiation. We
have certain sight which we are not willing to relinquish and see no good reason for
giving additional concessions.
We would be grateful if your would reconsider the position on this matter as soon as
possible.
102
103
104
105
106
107
The Buyer hereby requests and authorizes Daewoo to purchase and supply the Buyers
Supplies, as detailed in G 12 of the specifications and as designated by the Buyer, on behalf
of the buyer.
2. The Buyer shall provide to Daewoo with the above mentioned information for all supplies at
one time with classification of their destinations. With the exception of times purchased in
Korea, it is clearly understand that it is not possible to purchase supplies from any country if
delivery is to be made in that country.
3. Daewoo shall arrange for delivery of the Buyers Supplies to the destination designated by
the Buyers pro forma invoice. For supplies from Europe to Okpo Shipyard, certain items
will be delivered to a collection port and for convenience will be purchased by a designated
single vendor acting as an agent. The Buyer shall therefore make the necessary
arrangements for Daewoo to be able to open a suitable Master Letter of Credit to such
vendor who shall be designated by the Buyer. All items which are to be delivered to the
collection port will be covered by this single Master Letter of Credit and will be supplied on
a FOB collection forwarding agent who will take care of suitably packing in container or
otherwise:
- Anthony veder & C. O. B.V., Amsterdam
De Ruyterkade 124, P.O.box 1485
Amsterdam, Netherlands
Tel No. : 247944
Tlx No. : 14072
In any change of said contact party, Daewoo will advise the Buyer in writing to make such
change.
4. The Buyer assists Daewoo to secure safe and timely delivering of all the supplies to the
108
5.
6.
7.
collection port by the time advised by Daewoo. The packing charge, freight, insurance, etc,
duly incurred by this service shall be reimbursed by the Buyer to Daewoo by deducting from
the deposit funds.
Upon arrival at a Korean port, Daewoo will take delivery of the cargo and arrange for and
execute customs clearance and formalities in Korea. Daewoo shall carry out the visual
inspection and acceptance of all cargo as it is received by it and give notice of arrival at
Daewoo warehouse. In the event of overage/shortage and/or damages Daewoo shall
immediately give written notice and details to the Buyer. In the case of a third party
inspection being required, the Buyer shall take care of the inspection at its sole expense. The
Buyer shall carry out the inspection and acceptance of all cargo delivered to any other
country than Korea.
After acceptance of each cargo by both parties, Daewoo will classify and store the cargo at
its discretion.
Daewoo shall install and load the Buyers Supplies on board Hull 5016 at their own expense.
8.
All charges and expenses related to the Buyer shall be calculated and prepared by Daewoo
and shall be deducted from deposit fund of USD2,407,000 as set forth in the sideletter of Feb
6th 1986.
9. It further agreed that the Buyer shall reimburse Daewoo for administration and financing
costs incurred.
Such charges to be devided by the addition of a fixed:
a) 2% mark up of the CIF prices for Buyers supplies outside Korea
b) 3% mark up of the Buyers CIF Okpo supplies
c) 5% mark up of the Buyers CIF Busan supplies
The financing costs the period between incurred charges and vessel Delivery shall be
deducted from the deposit fund interest of USD 55,300, as set forth in the sideletter of Feb 6th
1986.
10. Daewoo shall keep proper records and account pertaining to the services it performs under
this agreement and shall render such reports to the Buyer at any reasonably required time.
11. Both parties shall be bound by this agreement as of the date first above written.
In witness whereof, each party has executed this agreement as of date herein first above
written.
109
110
111
attend inspections in accordance with the requirements of the general principle of mitigation of
loss, but the most important thing to notice is that any conduct on your part which is consistent
only with the continued existence of a contract as a waiver of your rights following on the
repudiation.
One needs to consider also what the position is if you are wrong in claiming that the contract has
been repudiated. We are inclined to think that the Buyers would have great difficulty in proving
any loss. They could plainly contract another vessel to perform to their requirements without
incurring any damages with market conditions as they are and they have made it plain that they
are in no hurry to have the vessel, in order to avoid any marginal risk of damages, and because
of the principle that a wrongly ascertain of repudiation is itself potentially repudiatory, we
included that the last paragraph in our draft message sent to you late on 18thSeptember.
No doubt you will be considering the standard to which the vessel needs to be completed and
other like matters with the class. It is obviously important that these matters are kept closely
under review and that PNSL are kept informed of your decisions. We will be pleased to discuss
with you such matters as possible return of Buyers property if and when you find that useful.
We have give preliminary consideration to your position as to the retention of installments
and/or the claiming of further damages. At present the provisions of Article 12 of the contract
are now strictly relevant to the position in all respects because the Buyers have, on our view,
committed a different, and indeed more serious, default that any mentioned there. Nevertheless,
it seems to us likely that you can retain the installments already paid. More difficult questions
arise as to whether you can succeed in claim for further damages. The basic principle is that
your entitled to be put in the same position as you would have been if there had been no breach
of contract against you. This means that if it would have worked out that the Buyers could have
rejected the vessel for delay in deliver you will not succeed in any further damages claim. That, it
turns will depend upon whether the casualty was or not within the force major provisions of the
contract and your hypothetical responsibility (had the contract continued) in liquidated damages
would also have to be taken into account. In summary, we think you must assume that you are
unlikely to recover any further damages beyond the retention of the installments already paid.
Considerations must next be given to whether arbitration should be commenced either to enforce
legal rights or simply on tactical grounds. If you do not commence arbitration, it is a plain
signal to the Buyers that you are content with the installments you have already recovered. We
are inclined to recommend you to send a message in due course to the Buyers telling them that
they will understand of course that you have further substantial claims against them, that you
will be keeping them informed of developments towards the completion of the vessel and that if
there is a short fall of realization after sale, and bringing into account what they have already
paid, arbitration will be commenced against them.
Look forward to your comments on the above.
113
114
115
116
117
We are pleased to inform that all outstanding technical matters have been cleared and
verified by the Classification Society on 14th March 1996.
All appropriate documents are already at hand and available to you at your earliest
convenience as informed by our previous fax CMDPO4 of 6th March.
Since we had already proposed that delivery and acceptance of the vessel should be effected
on 12th march,1996, we therefore formally declare that delivery of the vessel should be regretted
as tendered as from the date of 14th March ,1996,. We will confirm this notice by separate letter.
We would appreciate notice of your detailed intentions for accepting
We therefore to the state of completion of the above Vessel and would advise that we
recently met your senior representative to clearly establish that no remaining items remain.
At this time, it was agreed that only one minor matter was outstanding and this was
immediately rectified.
We consider that can be quite fairly interpreted that the Vessel is complete in every respect
for delivery.
However, until such time as delivery is formally effected, you now have crew members on
board and equipment is being used.
We therefore must advise that if any other defects arise, this will be handled as a matter and
not as a condition of acceptance of delivery.
We will as matters of course make every attempt to resolve anything which arises before the
Vessel sails but we ask for your understanding that we cannot isolate the Vessel to prevent minor
damages occurring when personnel are on board who are not under our control.
118
Many thanks for your fax AMSL.111 and DGM/115 of the 18th and 19th March respectively.
Your assumption was correct in that we sent our fax CMDP-111 on March 19th before either
or your faxes came to hand.
However, we do not accept the logic behind either of your faxes and must insist on the
conditions stipulated in our fax of the 19th.
It happens that all items are now cleared, including the two items mentioned in the letter of
your two faxes but in ant event, your wish to reject previous notices of delivery until vessel
completion has been certified by your site staff in writing, is not acceptable since there is no such
rectification of the punch list item.
Even though our own inspection and the Classification Society were entirely satisfied, we also
checked with your representative to ensure he was satisfied. As pointed out by our previous fax,
the agreed that only one deficiency item remained and this was rectified on the same day, we
consider it is therefore self evident that we had complied with all contractual obligations for
delivery of the vessel.
However, it is obviously impossible to freeze the ship in that condition, and minor deficiencies
can occur thereafter . it is therefore only feasible to handle these as ongoing repairs.
We trust you can concur with this logic.
We refer to your fax AMSL-1900 of March 21st,1987 and would advise that your comments
are not accepted.
As clearly notified by our fax CMDP-22 of March 17th, our confirmation letter CMD/PNSL101 of March 18th, we consider the vessel was complete on March 14th, tender of delivery was
accordingly offered with effect of that date, and we stands firm by this position.
As already point out, the items you mentioned were minor faults such as what will occur
daily in the life of any vessel and as such they were not complete items.
We do not intend to issue any further notices of readiness for delivery since we consider the
position is adequately made clear.