Sie sind auf Seite 1von 6

CURRICULUM VITAE

1. PROPOSED POSITION

CIVIL STRUCTURE DESIGNER (TEKLA)

2. NAME

RICKY YULIARTO DWI SUHARTO PUTRO

3. DATE OF BIRTH

Jakarta, September 17, 1982

4. NATIONALITY

Indonesian

5. ADDRESS

Jl. Kalibata Utara I No. 1 RT/RW : 04/02


Kel. Kalibata Kec. Pancoran
Jakarta Selatan 12740

6. PHONE

+ 62 852 1336 7099, + 62 882 1070 9065

7. E-MAIL

ricky_yuliarto@yahoo.com

8. EDUCATION

Diploma of Civil Engineering (Civil and Structure)


At University State of Jakarta (UNJ), graduated 2006

9. OTHER QUALIFICATIONS / TRAININGS:


10 days Traning, Tekla Structure release 19.0,
From Tekla Singapore and Tekla Indonesia
- Intermediate (Certificate Graduate) - Very Good qualified
- Advance - Good qualified
Sea Survival Course, PT. Industrialindo Konsultrain Services, Jakarta
Civil and Structure design drawing and modeling Program :
- AutoCAD 2013, Expert (Self Learning).
- Tekla Structure release 19.0, Basic (Self Learning)
BoCAD Offshore Introduction
In-house Training Structure Typical Standard Details for Offshore Structure
Design (Topside/Deck)
In-house Training Drawing Development Procedure for Offshore Design and Drafting
10. MEMBERSHIP CERTIFICATION : 11. LANGUAGE AND PROFICIENCY IN EACH :
Language
Indonesia
English
12. COUNTRIES OF WORK

Speaking
Excellent
Good

Writing
Excellent
Good

Reading
Excellent
Good

Indonesia

Ricky Yuliarto
Page 1 of 6

13. EMPLOYMENT RECORD

More than 12 years of civil/structural engineering, design and drafting work experience,
More than 6 years in oil & gas plants. I have been involved in design of civil and structural
engineering facilities for oil and gas offshore platform projects. I am familiar with the
following:
Setting design criteria for designing offshore platform jacket and deck structures.
Lifting for the additional structure Design. Including Installation sequence
Material Take-Off (MTO) preparation.
Structural engineering design of equipment support offshore structure.
Manage and coordinate a team of CAD operation and prepare structural drawings for
tender and construction.
Familiar with International Standards and Codes, such as AISC, ASTM, etc.
Familiar with Indonesian Standards and codes, such as SKSNI and Peraturan Beton
Bertulang Indonesia (PBI), Peraturan Perencanaan Bangunan Baja Indonesia (PPBBI),
Peraturan Pembebanan Indonesia, Peraturan Konstruksi Kayu Indonesia (PKKI), etc.
Various constructions related to the oil and gas industry, as well as general structural
projects.
Familiar with several civil and structural design drawing and modeling software such
as: AutoCAD 2013 and Tekla Structure release 19.0
Work Experiences
May 2014 Present
: PT. TRIPATRA ENGINEERS AND CONSTRUCTORS
INDONESIA DEEPWATER DEVELOPMENT
ENI JANGKRIK FPU PROJECT, JO. WITH PT. SAIPEM INDONESIA
TOPSIDE AND HULL STRUCTURAL STEEL.
Using Tekla Structure release 19.0
Client
Position
Project Value
Responsibilities

:
:
:
:

ENI
Structural-Offshore Designer (TEKLA)
$ 1,15 Billion
Topside structural steel detailing design.
Material Take-Off (MTO) preparation.

The scope of work includes:


1. ENI, Indonesia Deepwater Development
Jangkrik FPU Project. - (Using Tekla Structure release 19.0)
Jangkrik Integrated Topside Module (ITM) and non ITM modeling
Jangkrik Integrated Topside Module (ITM) and non ITM design drawing
Jangkrik Integrated Topside Module (ITM) and non ITM steel detailing
Jangkrik Material Take-Off (MTO) preparation.

Ricky Yuliarto
Page 2 of 6

June 2013 May 2014

PT. TRIPATRA ENGINEERS AND CONSTRUCTORS

PROJECT MANAGEMENT SERVICES (PMS) FOR PERTAMINA HULU


ENERGY (PHE) OFFSHORE NORTH WEST JAVA (ONWJ). - (by AutoCad)
Client
Position
Responsible for

:
:
:

Pertamina Hulu Energy (PHE)-ONWJ, Ltd


Structural Offshore Designer
Offshore jacket and deck structure Design.
Lifting for the additional structure Design.
Including Installation sequence
Material Take-Off (MTO) preparation.

Project scope of work :


1. Pertamina Hulu Energy ONWJ Project. - (by Auto Cad)
Lifting for the additional structure Design for :
Additional Pig Launcher, Spool and Basket at MRA Platform
Additional Pig Receiver and Basket at MMJ Platform
Additional Ball Valve at MMF Platform
Replacing Fin Fan Cooler and Basket at FPRO Platform
Piping & Instrument Diagram (P&ID) revision Design for :
Launcher, Receiver, MOL and Gas Lift for MRA and MMJ Project
February 2013 June 2013 : PT. TRIPATRA ENGINEERS AND CONSTRUCTORS
MOBIL CEPU Ltd.
BANYU URIP PROJECT
Client
Position
Responsible for

:
:
:

Mobil Cepu Ltd.


Onshore Civil Designer
Pilling, Equipment Platform, Service Platform, Shelter Package
detail design and design checked.
Material Take-Off (MTO) preparation.

Project scope of work :


1. Mobil Cepu Ltd., Banyu Urip Project - (by Auto Cad)
Pilling, Equipment Platform, Service Platform, Shelter Package detail design and
design checked for SPF 02 until SPF 08 (7 Service Platform) and PB 60 until PB 77 (18
Shelter)
September 2012 February 2013 :

PT. TRIPATRA ENGINEERS AND


CONSTRUCTORS

INDONESIA DEEPWATER DEVELOPMENT


GENDALO - GEHEM (GG) FPU PROJECT, JO. WITH PT. SAIPEM INDONESIA
TOPSIDE AND HULL STRUCTURAL STEEL, MATERIAL TAKE OFF (MTO)
Client
Position

:
:

Chevron
Structural Offshore Designer
Ricky Yuliarto
Page 3 of 6

Responsible for

Topside and hull structural steel FEED design checked.


Topside and hull structural steel detail design.
Material Take-Off (MTO) preparation.

Project scope of work :


1. Chevron, Indonesia Deepwater Development
Gendalo - Gehem (GG) FPU Project. - (by Auto Cad)
Gendalo Topside and hull structural steel detail design - review
Gendalo Material Take-Off (MTO) preparation.
Gehem Topside and hull structural steel detail design - review
Gehem Material Take-Off (MTO) preparation.
December 2010 September 2012 :

PT. TRIPATRA ENGINEERS AND


CONSTRUCTORS

ENGINEERING SERVICES FOR PERTAMINA HULU ENERGY (PHE)


OFFSHORE NORTH WEST JAVA (ONWJ). - (by AutoCad)
Client
Position
Responsible for

:
:
:

Pertamina Hulu Energy (PHE)-ONWJ, Ltd


Structural Offshore Designer
Offshore jacket and deck structure Design.
Lifting for the additional structure Design.
Including Installation sequence
Material Take-Off (MTO) preparation.

Project scope of work :


1. Pertamina Hulu Energy ONWJ Blanket Project. - (by Auto Cad)
UA Platform Additional Infill Well including Site Survey
KL Platform (KLA, KLB & KLC) Gas Lift Compressor including Site Survey
BNA Platform Additional Infill Well
ECHO EA, EPRO, FPRO, MMF, MMJ, NGLB, UPRO Riser Protector
Installation Sequence
B2C Platform Replacing Handrail and Trusses Installation Sequence
BPRO Platform Installation Sequence For Replacing Monorail
LPRO Platform Additional Deck Extension, Detail Bolting Connection, Installation
Sequence For Replacing 20" & 24" Ball Valves And Actuator
B1C RETROFIT Additional Fuel Gas Filter Skid and Electric Fuel Gas Heater Support
LSER Platform Replace Battery Bank
UB Platform Re-Install Outside Boatlanding Ladders, Replace Bollard and Remove
Sharp Of Barge Bumpers
UPRO Platform Replace Grating And Install New Solid Deck, Replace Corroded HBeam, Replace Boat Landing Handrail, Replace Bollard, Reinstall Outside Boat
Landing Ladder, Install New Truck Tire At Boatlanding
ECHO ESER Platform Replace Building Wall, Replace House Water Maker,
Replace Door Turbine Room, Replace Switchgear Door
KLA, KLB Platform, Replace Gas Lift Compressor
EB Platform Pipeline Replacement

Ricky Yuliarto
Page 4 of 6

May 2007 December 2010


Client

:
:

Position
Project
Responsible for

:
:
:

March 2006 May 2007


Client
Position
Project

:
:
:
:

Responsible for

September 2004 March 2006 :


Client
:

PT. INFRATECH INDONESIA


PT. Telkomsel Indonesia and
PT. Natrindo Telepon Selular (NTS)
Lead Estimator
Base Transceiver Station (BTS)
Calculating Quotation, Budget, Bar Bending,
Bill of Quantity (BoQ) and Shoping list.
PT. INFRATECH INDONESIA
PT. Telkomsel Indonesia
Chief Drafter
Base Transceiver Station (BTS) and
Base Station Controller (BSC)
Checked Design Drawing and Design
Foundation, Prepare Schedule for
Drawing Excecution, Control Progress
Drawing, Coordination Team.
PT. HOBASHITA TAKETAMA
PT. Telkomsel Indonesia and
PT. Excelcomindo
Senior AutoCAD Draftsman
Site Acquisition (SITAC) and
Base Transceiver Station (BTS)
Drafting Civil, Structure, Mechanical and
Electrical For Tower and Shelter,
Make a Construction Drawing until
As-Built Drawing

Position
Project

:
:

Responsible for

June 2004 September 2004


Client
Position
Project
Responsible for

:
:
:
:
:

PT. BERKAT KURNIA MITRA ABADI


PT. Telkomsel Indonesia
Senior AutoCAD Draftsman
Base Transceiver Station (BTS)
Drafting Civil, Structure, Mechanical and
Electrical For Tower and Shelter,
Make a Construction Drawing until
As-Built Drawing

September 2003 May 2004

Client
Position
Project
Responsible for

:
:
:
:

PT. TRIPATRA ENGINEERS AND


CONSTRUCTORS
Unocal
Structural Draftsman
Sapi Field Development Project
Offshore jacket and deck structure drafting.
Material Take-Off (MTO) preparation.
Ricky Yuliarto
Page 5 of 6

Ricky Yuliarto
Page 6 of 6

Das könnte Ihnen auch gefallen