Beruflich Dokumente
Kultur Dokumente
80
40
60
Section A-A
15
70
HRC Elevation
Bulldog
Grips
Front Elevation
70
.................
16
25
10
40
WC Elevation.
.................
Tower
Foundation
10
Erection Hook
12 13
3 Stirrups 10
each
11
65
300
150
Hard Rock
Anchor Rods 25
Inner Drum
150
100
Outer Drum
Tower
Foundation
Inner Drum
first stage
concrete
20
14
Erection Hook
Bulldog Grips
Handrail Cable
Walkway Cable
Double
Plan
View
20
Drum
Walkway Cable
Outer Drum
second stage
concrete
Hard
Rock
3 Stirrups 10
for each Drum
Anchor Rods
Ribbed Tor steel 25mm
drill holes as shown in table
volume per hole = 0.002m3
Handrail Cable
diameter
65
100
Standard
Cable
[mm]
arrangement
of anchor
rods
Stirrups 10 mm
outer drum for inner drum for
Total Required
handrail cable walkway cable Volume Anchor
RCC
for
Rods
RCC
for
of
cutting bending weight
Drum rod holes Drum rod holes Drum 25 mm nos length
dia
kg/pc
[cm]
[cm]
[mm]
[mm]
[kg]
[nos]
[cm]
[cm]
[m3]
for inner drum
Hand Rail 26
Walkway 26
160
145
100
85
1.10
16
3370
5250
Produced by
2.08
1480
3.24
Hand Rail 26
Walkway 32
880
or
3
180
Nepal
165
125
110
1.30
20
4150
1130
2.56
of rod holes
5880
1680
3.63
Quantities
Scale 1 : 50
Cement
Type of construction [m3]
[bags]
Chisel dressed
Stone Masonry 1:4
Hammer dressed
Stone Masonry 1:6
Hammer dressed
Dry Masonry
Broken stones
5.42
2.20
Concrete 1:2:4
0.50
Related Steel
Drawing is :
60D2
10.50
2.02
Concrete 1:3:6
Spacing
Cable
Nos
[cm]
mm
13
10
26
32
5
6
15
20
Bank :
Span
Construction Drawing:
...........
Swiss Association for International Cooperation, in partnership with His Majestys Government of Nepal, funded and supported by the Swiss Government (SDC Nepal).
46