Sie sind auf Seite 1von 9

Raised weir Power duct

142 m long

Desilting Tank
Inlet Adit

I
69 m
long

Adit II:-171 m
long & 99 m
excavated

Legend
Work Executed

Work yet to be done

Critical position

Escape pipe
200 m long

Penstock
1.7 m dia
500 m long up
to trifercation

261 m
Tunnel 3928 m long
Completed 1205M
Remaining 2723m
2105 m
1823 m

Forebay
40.1m X 8 m

1048 m excavated

Power channel
21 M Long

20

157 m tunnel
from outlet has
been excavated

859 m
excavation is
remaining up to
adit II

73.75 m long
500 m

Power house
55m long

960.5 m underground
excavation has been
completed

Power channel

Intake

power tunnel
141 m long

-2723.00

15 m

Switchyard

MADHYAMAHESHWAR SHP (3X5) MW

power tunnel
141 m long

MADHYAMA

Intake

Tunnel
73.75 m long

1088 m excavated
20
261 m

Raised weir
142 m long

Desilting TaPower chaannel Inlet

MADHYAMAHESHWAR SHP (3X5) MW tunnel status as on 20-06-2


###

3928 m long
Completed 1088+ 1260

excavated

Remaining m

2668
2105

1823 m

Remaining

Remaining 735

Adit I
69 m
long

Adit
II:171
m
long
& 99
m
exca
vate

1933

Legend

15 m
500 m

Power house

s as on 20-06-2016

172
m
Power
chann Foreb Penstock
ay
1.7 m dia
el
500 m long
21 M
up to
Long 40.1m
X 8 m trifercation

long

Work Executed
Critical position

Das könnte Ihnen auch gefallen