Beruflich Dokumente
Kultur Dokumente
( DRENAJE SUPERFICIAL )
DATA:
300
1500
Lluvias san Simon
TR ( Aos )
1
5
10
25
50
Lluvias (mm/dia)
16.3
24.4
27.9
32.5
35.9
Tipo Suelo Franco " Moderadamente permeable Vegetado "
Seccion canal drenajeTriangular
1.- calculo de la seccion al final del tramo ( 1 + 500 )
Datos:
Lluvia ( TR=25 aos)
33
C (Suelo Mod.Permeable-Vegetado)
0.1
Area ( 300/4) has
75
100
39.4
mm
has
0.325 m/seg
< 0.75 m/seg
0.50 m/seg
0.626
P ( 33 mm/hora)
Dren Interceptor
S = 0.005
Dren Interceptor
q=0.69 m^3/s
q=0.69 m^3/s
500 m
CORTE A-A
L = 1500 m
A
2005
A = 75 has
s=0.003
D = 500m
A = 75 has
2002.5
S= 0.005
D = 500m
2000
A = 75 has
D = 500m
s=0.003
1997.5
A = 75 has
D = 500m
1995
A
PLANTA