Sie sind auf Seite 1von 6

Doc. No.

: LIL-GEA-DC-014

GREENSVILLE PROJECT
NESTING PROCEDURE

LILAMA69-1
JSC

Total sheets : [6]

Vendor's NAME:
Owner Name:
Purchaser:
Plant Location:
Project name:
P.O. No./ Date:
Item number:
DOCUMENT TITLE:
DOCUMENT NO.:

Lilama 69-1 Joint Stock Company


GEA Heat Exchangers, Inc.
USA
Greenville / USA
4500118183 / 09.11.2015
Steam Ducting

Nesting Procedure
LIL-GEA-DC-014

Enter Issue Purpose

3
2
1
0

11-Apr-2016

Rev

Submission Date

FA
Issue
Purpose

Lilama69-1 Joint Stock Company

FA:

For Approval

FI:

For Information

FC:

For Construction

C.V.LANG

V.T.THANG

V.T.THANG

Prepared

Checked

Approved

Page 1 | 1

how can they ensure that


during nesting procedure
the different temporary
supports will rotate and
bend what could create
stress to the SDD?

Nesting will be apply CU.9 to CU.3


And CU.10 to Cu.4 of row-01 to row-05

as an alternative: if the the nested SDD


as well as the railing system will be
proper fixed to each other leave the
railsystem in place during transortation!
Please think about the possibility!

support beams must be


fixed - e.g. by tack welding to avoid rotation inside the
shell during transortation!

fixation by means of cable and rubber


wont be stable enough - stresses
occurred by transportation moving will
given directly to the SDD internals what
wont be acceptable!