1 CONTRACTOR TO CHECK AND VERIFY ALL DIMENSIONS BEFORE EXECUTION

OF THE WORK.
2 2 FIGURED DIMENSIONS SHALL BE FOLLOWED.
3 ALL DIMENSIONS ARE GIVEN IN MILLIMETRES UNLESS OTHERWISE SPECIFIED.
4 EXECUTIVE SHALL CHECK THE DRG BEFORE EXECUTION OF THE WORK.
5 THE FOUNDATION HAS BEEN DESIGNED FOR SBC OF SOIL OF 30T/Sqm AT A
DEPTH OF 1200 FROM EXISTING UNDISTURBED GROUND LEVEL. IF ANY
VARIATION IN SBC FOUND AT SITE,THE SAME SHALL BE REFERRED TO THIS
HQ FOR RE-DESIGN.
6 ALL REINFORCEMENT FOR RCC SHALL BE CORROSION RESISTANT STEEL OF
GRADE Fe415 MEETING THE REQUIREMENTS OF IS:1786
7 STRUCTURAL CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF
GRADE M-25 (DESIGN MIX) AS PER IS-456-2000
8 ALL MASONRY WORK SHALL BE IN CM 6
9 CLEAR COVER TO RCC MEMBERS SHALL BE AS SHOWN BELOW :- I)
SLAB/BAND : 20MM II) BEAMS: 20 MM III) COL AND RCC WALL: 40 MM
IV) FOOTING & FDN: 50MM
10 CRUSHING STRENGTH OF BRICK WALL SHALLNOT BE LESS THAN 35 KG/SQ M
11 WATER TO BE USED FOR CONCRETING SHALL MEET THE REQUIREMENTS OF
CLAUSE 5.4 OFIS-456-2000.
12 DEVELOPMENT LENGTH OF REINFORCEMENT SHALL BE 48D (D-DIA OF BAR).
13 LIVE LOAD TAKEN ON FLOOR AT 7200 LVL IS 10 KM/SQM AND 3 KM/SQM AT
11000 LVL
14 FOLLOWING CODES HAVE BEEN FOLLOWED:-IS-456-2000, IS-1893-2002,IS-
13920-1998 &SP-34FOR OTHER MISSING DETAILS PLEASE REFER ABOVE
CODES.
15 TO SUPPORT AND KEEP IN PLACE TOP REINFORCEMENT OF COMBINED
FOOTING, CHAIRS OF20mm DIA SHALL BE PROVIDED AT A SPACING OF
1000mm C/C.
16 THIS BUILDING IS DESIGNED FOR SEISMIC ZONE - II AND WIND SPEED OF
44M/SEC.
17 SPACER BAR OF 25# TO BE PROVIDED WHEREVER TWO OR MORE LAYERS OF
REINFORCEMENT PROVIDED IN A BEAM.
18 SLOPE OF THE ROOF HAS TO BE BROUGHT OUT IN THE BEAM FOR SLOPES
MORE THAN I IN 40
19 SPACERS OR CHAIRS SHOULD BE PLACED AT A MAXIMUM SPACING OF
1000mm AND CLOSERSPACING MAY SOMETIMES BE NECESSARY FOR
MAINTAINING COVER MENTIONED AT SL No. 9
20 SPACER COVER BLOCKS SHOULD BE OF PVC.
21 CORNER REINFORCEMENT & TORSION REINFORCEMENT IN SLABS SHALL BE
PROVIDED AS PER IS-456-2000.
22 CANTILEVER BEAMS & SLABS SHALL BE CAST MONOLITHIC WITH ADJOINING
SLABS / BEAMS.
23 UNLESS OTHERWISE INDICATED ON DRGS, REINFORCING BARS AT BEAM-
BEAM, COLUMN-BEAMJUNCTIONS WILL BE PROVIDED WITH FULL
DEVELOPMENT LENGTH AS SHOWN IN TYP. DETAILS.
24 WHEREVER BEAM IS RESTING ON BEAM,THE SPACING OF STIRRUPS IN
SUPPORTING BEAM SHALLBE PROVIDED AT HALF OF THE NORMAL SPACING
ON EITHER SIDE.
25 DISTRIBUTION BARS WHEREVER REQUIRED, AND NOT SHOWN IN DRGS.
SHALL BE 0.12% OFCROSS SECTION AREA WITH MAXIMUM SPACING OF
300C/C.
26 WHEREVER TWO TYPES OF BEAMS MEET AT ONE SUPPORT, THE EXTRA
BARS AT TOP AS SHOWN IN DETAILS OF BEAMS SHALL BE PROVIDED AS
HIGHER OF TWO.
27 FOR SECONDARY REINFORCEMENT SUCH AS STIRRUPS AND TRANSVERSE
TIES COMPLETE DEVELOPMENT LENGTH AND ANCHORAGE SHALL BE
PROVIDED & SAME SHALL BE DEEMED TO HAVE BEEN PROVIDED. WHEN THE
BAR IS BENT THROUGH AN ANGLE OF AT LEAST 135 DEGREE ROUND, A BAR
OF ATLEAST ITS OWN DIAMETER IS CONTINUED BEYOND THE END OF THE
CURVE FOR A LENGTH OF AT LEAST 10BAR DIAMETER IRRESPECTIVE OF
WHAT IS SHOWN IN DRG (REFER FIG-3 OF TD/STR/17 SHEET NO: 2/5).
SPACING OF STIRRUPS IN BEAMS SHALL NOT EXCEED d/4 IN A LENGTH OF
THE BEAM EQUAL TO 2d MEASURED FROM FACE OF COL WHERE ,d, IS
EFFECTIVE DEPTH OF BEAM FIRST STIRRUP MAY BE LOCATED 50mm FROM
THE FACE OF THE COL.
28 THE DESIGN MIX SHALL BE GOT DESIGNED FROM CONCRETE LABORATORIES
OF REPUTED INSTITUTES.THE DESIGN MIX SHALL SPELL OUT WORKABILITY
FOR DIFFERENT PLACING
INSTITUTES.THE DESIGN MIX SHALL SPELL OUT WORKABILITY FOR
DIFFERENT PLACING
SHALL BE APPROVED BY THE GE.
29 MINIMUM CEMENT CONTENT FOR M-25 GRADE OF CONCRETE SHALL BE AS
PER TABLE 5 OF
IS 456-2000 FOR RELEVANT EXPOSURE CONDITION
30 THE THICKNESS OF WATER PROOFING TREATMENT ON ROOF TOP SHALL NOT
BE MORE THAN 150mm.
31 ALT REINFORCEMENT BARS IN RCC SLAB SHALL BE CRANKED UP AT L/5 AND
L/7 FROM THE FACE OF SUPPORT FOR CONT. SUPPORT AND DISCONT.
SUPPORT RESPECTIVELY. CRANKED UP AND EXTRA BARS AT SUPPORT SHALL
CONTINUE UPTO 0.3L OF ADJACENT SUPPORT UNLESS OTHERWISE SHOWN.
32 TOP AND BOTTOM EXTRA BARS IN BEAMS TO EXTEND BEYOND THE FACE OF
SUPPORT AS SHOWN IN THE DRAWING UNLESS OTHERWISE SHOWN.
33 FORM WORK OF CONCRETE SHALL HAVE ADEQUATE STRENGTH AND
RIGIDITY TO SAFELY WITHSTAND FORCES DUE TO POURING AND
COMPACTION OF CONCRETE .THE ENTIRE FORMWORK SHALL BE DESIGNED
TO WITHSTAND MOST ADVERSE COMBINATION OF DEAD LOAD, LIVE LOAD,
CONSTRUCTION AND WIND LOAD. SCHEME FOR ERECTION AND REMOVAL OF
FORMWORK SHALL BE APPROVED BY THE SITE ENGINEER.
34 THE FORM WORK SUPPORTING THE OVER HANGING CHAJJA, CANOPY OR
ANY CANTILEVER SLAB SHALL BE RETAINED UNTIL SUFFICIENT LOAD OVER
THE BEARING HAS BEEN ATTAINED BY BUILDING MASONRY IN ORDER TO
PREVENT THE OVERTURNING OF THE PROJECTING MEMBER.
35 THE SHUTTERING FOR THE CANTILEVER SHALL BE REMOVED STARTING
FROM THE OVER HANGING EDGE. THE PROPS SHALL BE RETAINED UPTO 21
DAYS..
36 STRIPPING TIME OF FORM WORK SHALL BE IN ACCORDANCE WITH CLAUSE
11.3 OF IS-456-2000
37 FOUNDATION SHOULD NOT REST ON BC SOIL AND IN CASE BC SOIL IS
AVAILABLE BEYOND THE DEPTH OF FOUNDATION, MATTER SHOULD BE
REFERRED TO THIS HQ.
38 THE LAST COURSE OF NON LOAD BEARING WALLS SHALL BE BUILT AFTER
THE REMOVAL OF FORM WORK FOR THE SOFFIT OF SLAB OR BEAMS.
39 12# CHAIRS @ 1000 C/C IN BETWEEN TOP AND BOTTOM LAYERS OF
REINFORCEMENT IN FLOOR/ROOF SLABS SHALL BE PROVIDED.
40 WHEREVER BRICK WORK LENGTH INCREASES BY MORE THAN 4000mm
PROVIDE VERTICAL BANDS AT EVERY 3000MM C/C WITH A MINIMUM SIZE OF
230x230 WITH 4 Nos 10 # BARS.
41 LOADING CONSIDERED AS PER I S: 875.