Beruflich Dokumente
Kultur Dokumente
July 29th thru August 4th the elevator will be dismantled and removed.
August 5th – 7th …Remove the brick wall in the dental waiting room to expand the
elevator shaft about 18 inches.
August 8th – 10th cut concrete and bricks to expand elevator shaft.
August 6th – 16th remove flooring, install flooring, demo dental and install dental.