0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
7 Ansichten2 Seiten
REGUL-OS STRING 3 TEST GMT CREW ACTIVITY 02:00-02:10 BREAKFAST 03:55-04:20 CDR,FE-2 prep for work 04:05-04:20 FE-1 prep for work Physical Exercise (RED) Remove Portable Repress Tank [BNP] from SM [RO] and stow Post-EVA PkhO / DC1 Reconfiguration and Tool Stowage. Tagup with specialists as necessary (S
REGUL-OS STRING 3 TEST GMT CREW ACTIVITY 02:00-02:10 BREAKFAST 03:55-04:20 CDR,FE-2 prep for work 04:05-04:20 FE-1 prep for work Physical Exercise (RED) Remove Portable Repress Tank [BNP] from SM [RO] and stow Post-EVA PkhO / DC1 Reconfiguration and Tool Stowage. Tagup with specialists as necessary (S
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen
REGUL-OS STRING 3 TEST GMT CREW ACTIVITY 02:00-02:10 BREAKFAST 03:55-04:20 CDR,FE-2 prep for work 04:05-04:20 FE-1 prep for work Physical Exercise (RED) Remove Portable Repress Tank [BNP] from SM [RO] and stow Post-EVA PkhO / DC1 Reconfiguration and Tool Stowage. Tagup with specialists as necessary (S
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen