Radiogram No.

4771u Form 24 for 02/26/07


POST-EVA TOOL STOWAGE. РЕГУЛ-ОС STRING 3 TEST
GMT CREW ACTIVITY
02:00-02:10 . Morning inspection
02:10-02:25 FE-2 Post-sleep
02:10-02:20 FE-1 МО-8. Configuration set-up
02:10-02:20 CDR Calf volume measurement
02:20-02:35 CDR Body mass measurement
02:20-02:40 FE-1 Post-sleep
02:25-02:35 FE-2 Calf volume measurement
02:35-02:50 FE-2 Body mass measurement
02:35-03:05 CDR Post-sleep
02:40-02:50 FE-1 Calf volume measurement
02:50-03:05 FE-1 Body mass measurement
02:50-03:05 FE-2 Post-sleep
03:05-03:15 FE-1 MO-8. Close-out ops
03:05-03:55 CDR,FE-2 BREAKFAST
03:15-04:05 FE-1 BREAKFAST
03:55-04:20 CDR,FE-2 Prep for Work
04:05-04:20 FE-1 Prep for Work
04:20-04:35 . Daily Planning Conference (S-band)
04:35-04:50 FE-1 Prep for Work
04:45-05:00 FE-2 RED inspection and access evaluation
04:50-05:00 CDR 1st Orlan Battery Pack 825М3 discharge (start)
05:00-06:00 FE-2 Physical Exercise (RED)
05:00-05:30 CDR Remove Portable Repress Tank [БНП] from SM [РО] and stow
Post-EVA ПхО / DC1 Reconfiguration and Tool Stowage. Tagup with specialists as
necessary (S-band)
05:00-07:00 FE-1
DC1 Comm Config / Communications System [РТК],
Restore Nominal Comm. Configuration
05:30-06:00 CDR СОЖ Maintenance
06:00-07:00 CDR,FE-2 TVIS semi-annual IFM
07:00-09:05 FE-2 TVIS semi-annual IFM
07:00-08:30 FE-1 Physical Exercise (RED) day 2
07:00-08:30 CDR Physical Exercise (CEVIS)
08:30-09:00 CDR,FE-1 Photo skills training for the Shuttle R-Bar Pitch Maneuver
09:00-09:05 CDR Downlink images obtained during RPM OBT
09:00-09:05 FE-1 On MCC Go ISS O2 repress from Progress 358 СрПК (start)
09:05-10:05 . LUNCH
10:05-10:10 CDR Payload status check /
10:05-10:10 FE-1 ISS O2 repress from Progress 358 СрПК (terminate)
10:05-12:30 FE-2 TVIS semi-annual IFM
Procedure review for СКВ1 Heat Exchanger Unit [БТА] R&R. Tagup with
10:10-11:40 CDR,FE-1
specialists (S-band)
11:40-12:00 CDR IMS update
11:40-11:55 FE-1 Charging Stimul Suit Battery
11:55-12:55 FE-1 Physical Exercise (CEVIS) day 2
12:00-12:15 CDR UROLUX hardware setup
12:30-13:00 CDR,FE-2 TVIS semi-annual IFM
Changeout of СРВК-2М Water Conditioning Unit Purification Columns [БК БКВ]
12:55-14:25 FE-1
(start)
13:00-13:15 CDR RED Harness Cord R&R
13:00-14:30 FE-2 Physical Exercise (CEVIS)
13:15-14:15 CDR Physical Exercise (RED)
14:15-14:50 CDR Evening work prep
14:25-15:15 FE-1 Evening work prep
14:30-15:15 FE-2 Evening work prep
Processing condensate from CWC #1062 (00059251J, NOD1P2) using
14:50-15:10 CDR
Condensate Feed Unit (БПК) (mode 4) (start)
15:10-15:15 CDR Transfer TVIS/RED/CEVIS/HRM data to MEC
15:15-15:30 . Daily Planning Conference (S-band)
15:30-15:45 FE-2 DINNER
15:30-16:00 CDR,FE-1 DINNER
15:45-15:50 FE-2 HAM radio setup
15:50-16:00 FE-2 HAM radio session
16:00-16:30 . Daily Food Prep
16:30-17:30 FE-2,FE-1 Pre-sleep
16:30-17:25 CDR Pre-sleep
17:25-17:30 CDR 1st Orlan Battery Pack 825М3 discharge (terminate)
17:30-02:00 . SLEEP
PLANTS-2. Payload status check
Task List FE-1 PLANTS-2. Recharging water tank
ТБУ (Universal Bioengineering Thermostat). Temperature check
Note: See OSTP for references to US activities.
End of Radiogram