Signalling is one of the most important parts of the many
components which make up a railway system. Train movement
safety depends on it and the control and efficient management of
trains depends on them. Over the years many signalling and train
control systems have been evolved. The journey started with very
simple systems such as simple coloured flags and semaphore arms
to that today a highly technical and complex electrical and
electronic systems. Here is an attempt to explain, in simple terms,
how railway signalling really works.
Fig-1 Semaphore Signals that stoop (lower quadrant)
Fig-2 Semaphore Signals that raise (upper quadrant)
Nowadays IR has converted what are known as Color Light Signals (CLS) with
Multiple aspects where the color of Light indicates meaning to Drivers ( Now called
Loco Pilots)
Why Signalling is required?
In road transportation the direction and speed of a vehicle are
controlled by the driver and the different vehicles share the same
way at the same time in both the directions. However in Rail
transport the the driver controls only the start / stop and speed of
the train and the direction is controlled by the track components
themselves. There is no steering wheel. One more factor to be
considered is that the trains are very large vehicles and hence need
large distances to increase and decrease speed i.e to start and stop
also. Hence they need to be separated by considerable distances
while traveling behind one another.
Signalling at Stations :-
We are aware that though there are only one or two lines between
stations (called block section); at stations there are many lines onto
which the trains are allowed to be received and dispatched. We
have also learned that a train driver cannot steer his train in the
required direction. Thus railway is called guided transportation. The
track itself modifies its components dynamically to lead the train to
required line (platform). An important part of the track that achieves
routing of trains is a point.
Point also called
Turnout
Fig 5 : A point is capable of changing the route of a train , a train by itself cannot do
so
Points are switched ie changed from one position to another to change the couse of
train. Of course all required points are to be switched to the required positions to lead
to a given line before lighting up the signal and shall remain so untill complete arrival
of train.
The railway signalling does the change over of points, their locking and holding of the
route without any unsafe discretion of the station master.
All such points and connected line at a station is known as a yard. A typical simplified
signalling diagram is indicated below:
Fig 6 : Yard Signalling sketch of a small station on Double Line (Double
Line Means seperate tracks between stations for UP and DOWN direction trains).
Welcome to IRSSE Website....... Web Publisher R.V.B. Babu, IRSSE
Sign In or Register
Links and Other Interests
FAILSAFE ENGINEERING
INTRODUCTION : Fail-safe or fail-secure describes a device or feature which, in the event of
failure, responds in a way that will cause no harm or at least a minimum of harm to other devices
or danger to personnel. Fail-safe components of a system are distinguished from fail-secure
components in that, in the former, component failure allows but does not cause or invite a certain
improper system behavior, whereas in the latter, component failure does not allow a certain
improper system behavior, although some proper behaviors are impeded.
For example, . a pass word improperly fed may prevent access (by OS) which is a failure for
the genuine owner/user but will not allow undue access without thorough verification of
authenticity. ........ for detailed explnantion visit the related page on this site.
Recent Blog Entries
Welcome to all Railway Signal Engineers
by irsse | 7 comments
Copyright ©2009
Create a Free Website
For example, . a pass word improperly fed may prevent access (by OS) which is a failure but ensures
safety for the genuine owner/user but will not allow you to reset it without thorough verification of
authenticity. Multiple trails with wrong pass word lead to access lock up which is failsafe
outcome since it protects the data or other assettes of customer.
Also a power controlled access control door is so designed that if power fails , the door will allow
egress(exit) but not ingress.(entry). This failsafe concept.
All Railway Signalling installations are required to meet this meticulously. That means when any
failure in any component takes place, the signal shall be fixed at RED bringing train to a stop but
shall NEVER allow the signal to go to YELLOW or GREEN under such condition.
Electronics in Failsafe Design : Electronic devices are not inherently failsafe and tend to behave
erratically. Designers are using the power of microprocessors for control of railroad, aircraft, and space
vehicles to minimize the dangers of complex transportation systems.
A mean time between unsafe failures (MTBUF) for transportation is one billion hours, or once
in 23 years for 500 units in continuous operation.
Good safety architecture includes redundancy in various forms, such as additional equipment.
Redundancy is achieved by duplicating components, or by use of diverse components or use of
redundant software.
It is critical that the first failure of a controller be detected, so that human monitors can take action
before a fault-induced catastrophe occurs. A microprocessor's highly reliable circuits can continuously
confirm the operating status of components, and automatic monitors can interrupt the system when
an error occurs. The first microprocessor interlockings for railroads have entered service in
the US, Canada and Europe and in India (In india they were first introduced since 1993). Use of
microprocessors for aircraft safety is also described.
For example, . a pass word improperly fed may prevent access (by OS) which is a failure for
the genuine owner/user but will not allow undue access without thorough verification of
authenticity. ........ for detailed explnantion visit the related page on this site.
Recent Blog Entries
Welcome to all Railway Signal Engineers
by irsse | 7 comments
Copyright ©2009
Create a Free Website
What is IRSSE ?
Secunderabad, India
IRSSE stands for Indian Railway Service of Signal
Engineers , an Organized Gazetted Government service of the
Government of India.
The incumbents are selected by the Union Public Services
Commission, the apex gazetted recruitment body of the Goverment
of India. The examination consists of CESE ; all india written test
followed by interview for selected candidates. Based on the marks
obtained, a choice can be made to join this service. It has been
common in the past 20-25 years for toppers from EEE/ECE streams
of CESE to join this service.
This site is created by one of the mebers of this service with a view
to creating public awareness about this important service
responsible for safe and speedy train travel and creating user
friendly Passenger information systems and public interfaces.
Brief Role
Signal Engineers in Railway take care of Train safety in Operations,
Capacity enhancement, Corporateand Operational Telecom and IT
services, creation of Electronic interfaces for Passenger information
dispersal and creation of advanced Signal and Telecom (and IT)
assettes as per Operational Requirements.
Signals are Sentinels of safety
This Day in His
UNDER CONSTRUCTION
Under Construction... may take about a month. Site building started on 26-07-2009
Welcome to IRSSE Website....... Web Publisher R.V.B. Babu, IRSSE
Sign In or Register
Links and Other Interests
FAILSAFE ENGINEERING
INTRODUCTION : Fail-safe or fail-secure describes a device or feature which, in the event of
failure, responds in a way that will cause no harm or at least a minimum of harm to other devices
or danger to personnel. Fail-safe components of a system are distinguished from fail-secure
components in that, in the former, component failure allows but does not cause or invite a certain
improper system behavior, whereas in the latter, component failure does not allow a certain
improper system behavior, although some proper behaviors are impeded.
For example, . a pass word improperly fed may prevent access (by OS) which is a failure for
the genuine owner/user but will not allow undue access without thorough verification of
authenticity. ........ for detailed explnantion visit the related page on this site.
Recent Blog Entries
Welcome to all Railway Signal Engineers
by irsse | 7 comments
Copyright ©2009
Create a Free Website
Organization
The Engineers recruited for IRSSE are normally part of Signal & Telecom (S&T)
Department of Indian Railways (IR).
APEX LEVEL :The S&T Organization is headed at apex level (ie Railway Board) by
ML (Member-eLectrical)who heads Electrical and S&T branches. He is assisted by
two Addl Secy rank (equivalent to GM) officers v.i.z Additional Member (Signal) and
AM(tele).
ZONES :The Indian Railways has 16 Zonal Railways with an average Track length of
about 4000 km and average staff strength of about 80,000 headed by GMs. The Zonal
Organizational structure of Signal Engineers is headed by CSTE (Chief S&T Engr)
who is assisted by CSE (Chief Signal Engr), CCE (Chief Telecom Enr), CSTE
(Planning), CSTE(Projects) and CSTE(Construction) and DyCSTEs, SSTEs etc.
DIVISIONS : Each Zone is divided into 4-7 Divisions each with an average track
length of about 1000 km and staff strength of about 15000 headed overall by DRM
(Divisional Railway Manager). The Division is the basic operational Unit and a Profit
Centre.
At this Level the Signal Engineers are Headed by SrDSTE (Senior Divisional S&T
Engineer) who is in turn assisted by DSTEs and ADSTEs. An IRSSE officer starts
his career as an ADSTE who is the Team leader of about 100-200 staff.
For example, . a pass word improperly fed may prevent access (by OS) which is a failure for
the genuine owner/user but will not allow undue access without thorough verification of
authenticity. ........ for detailed explnantion visit the related page on this site.
Recent Blog Entries
Welcome to all Railway Signal Engineers
by irsse | 7 comments
Copyright ©2009
Create a Free Website
Free site is hosted by
Top of Form
Go Get It!
Railway Signaling
[ 1. Introduction ] [ 2. Track Circuit ] [ 3. Relays ] [ 4. Signals ] [ 5. Moter Points ] [ 6. Gate barriers ] [
7. Automatic Blocking System ]
Career
Photo Album Hello Railway Enthusiast,
Welcome to my site of Railway
Signaling. During one of my undergrad
Railway
Sri Lanka training, I was attached to the Signal and
Telecommunication Department of the
Sri Lanka Railways. It was amazing to
learn how a set of simple engineering
techniques put together form the bottom
line safety gear of the railways. Believe
me; no Differential Equations or Discrete Cosine Transforms! Just relays,
sensors, power supplies and of course signal heads. Yes, it is a centaury old
system, but, still serves its purpose.
Following are the elements of signaling as used in Sri Lanka Railways.
[ 1. Introduction ] [ 2. Track Circuit ] [ 3. Relays ] [ 4. Signals ] [ 5. Moter Points ] [ 6. Gate barriers ] [ 7. Automatic Blocking System
]
© R. Jayanthan
Last updated on 01 January, 2002
Free site is hosted by
Top of Form
Go Get It!
1. Introduction
[ Up ]
Career
Photo Album The heart of the signaling system is the interlocking plant. This can be
claimed as the decision making part of the system. The signal outputs are
based on the track occupancy, motor point status, output of the remote end
Railway signal and the input from traffic controller.
Sri Lanka
This plant ensures that before a signal goes in to 'clear' (green) state, it is
absolutely safe for a train to enter into the track segment. The traffic
controllers commands are not executed if it is not safe to do so.
The interlocking plant is built out of electromechanical relays. We will
discuss the type of relays under the respective section. Now we will move
on to the first element: Track Circuit; which is used to sense the presence of
a train on a track segment..
[ Up ]
[ 1. Introduction ] [ 2. Track Circuit ] [ 3. Relays ] [ 4. Signals ] [ 5. Moter Points ] [ 6. Gate barriers ] [ 7. Automatic Blocking System
]
© R. Jayanthan
Last updated on 01 January, 2002
Go Get It!
2. Track Circuit
[ Up ]
Career
Photo Album Track circuit is one of the primary input for a signal interlocking plant.
Opps ! hold on. What is an 'interlocking plant'? It is the control logic behind
the signaling system. The signal cannot be 'green' while there is another
Railway train on track segment ahead. The system should able to detect the condition
Sri Lanka of the track segment: occupied or not.
The tracks are segmented into 'blocks'. Each block is track circuited
separately. The figure below illustrates a track circuit.
The track circuit consists of a power supply on one end and a directional
(polarized) relay on the other end. The power supply has a 6V battery kept
charged by a 6V/6A rectifier. In case of power failure the battery will
supply power to the circuit.
The track relay (TR), which has a resistance of 30 ohm and a pickup voltage
of 1.4 volt, is normally held in picked-up state the circuit being completed
via the rails. When a train enters the segment the axels of the train short
circuit the supply to the relay and the relay drops. The contacts of the track
relays appear in most of the safety circuits of the interlocking plant. The
interlocking logic is arranged such that only one train can be permitted to
enter a section. If you carefully observe, the track circuit is fail safe; if the
circuit fails it will indicate occupancy.
The variable resister is introduced into the circuit such that it can be tuned
to make the system works under all weather conditions.
The rails are insulated to separate the adjacent track circuits. The polarity of
the adjacent track circuit is always reversed, so that the power supply of one
circuit cannot operate the relay of the other circuit should the insulate
between the circuits breakdown. Within one track circuit the rails are
electrically connected by two wires (for safety).
The minimum length of track circuit is depends on the degree of control
necessary and the maximum length is limited by the weather conditions. On
the Northern line from Loco Junction (Maradana) to Veyangoda, the
segments have a maximum length of 2000 feet. On the Southern line from
Loco Junction to Wadduwa, due to the saline atmosphere along the cost
line, the track circuits are limited to 1500 feet max.
Now that we have looked upon the track relay we will get into discuss the
types of Relays used in the railway signaling.
[ Up ]
[ 1. Introduction ] [ 2. Track Circuit ] [ 3. Relays ] [ 4. Signals ] [ 5. Moter Points ] [ 6. Gate barriers ] [ 7. Automatic Blocking System
]
© R. Jayanthan
Last updated on 01 January, 2002
Top of Form
Go Get It!
3. Relays
The contact springs are made out of nickel and the contacts tips are silver.
The front contacts are of twin contacts and the back contacts are single
contact type. The rear end of the contact springs are fixed between two
blocks of transfer molded carbonate plastic reinforced with glass fibre. The
stationary contact springs are supported at their free ends by a strip with
notches, which limits the spring movement. The lower end of this strip is
attached to the magnet support.
The movable contact springs are guided by an actuating strip which at the
lower end attached by bearings to the armature and at the upper end to the
upper most movable contact spring. The front edge of the actuating strip
provided with slots, which lock the spring and guide the movement of the
contacts.
The rear end of every contact spring has eight forked terminals. This
provides a very dependable connections to the plug board terminals, when
the relays are plugged in.
© R. Jayanthan
Last updated on 01 January, 2002
Free site is hosted by
Top of Form
Go Get It!
[ Up ]
Career
Relays can be categorized according to the magnetic system and operation.
Photo Album
Neutral Relays
Railway
Sri Lanka
This is the most elementary type of relay. The neutral relays have a
magnetic coil, which operates the relay at a specified current, regardless of
the polarity of the voltage applied.
Biased Relays
Biased relays have a permanent magnet above the armature. The relay
operates if the current through the coil winding establishes a magneto-
motive force that opposes the flux by the permanent magnet. If the fluxes
are in the same direction, the relay will not operate, even for a greater
current through the coil.
Polarized Relays
Like the biased relays, the polarized relays operate only when the current
through the coil in one direction. But there the principle is different. The
relay coil has a diode connected in series with it. This blocks the current in
the reverse direction.
The major difference between biased relays and polarized relays is that the
former allows the current to pass through in the reverse direction, but does
the not operate the relay and the later blocks the current in reverse
direction. You can imagine how critical these properties when relays are
connected in series to form logic circuits.
Magnetic Stick Relays or Permopolarized Relays
These relays have a magnetic circuit with high remanence. Two coils, one
to operate (pick up) and one to release (drop) are present. The relay is
activated by a current in the operate coil. On the interruption of the current
the armature remains in picked up position by the residual magnetism. The
relay is released by a current through the release coil.
Slow Release Relays
These relays have a capacitor connected in parallel to their coil. When the
operating current is interrupted the release of relay is delayed by the stored
charge in the capacitor. The relay releases as the capacitor discharges
through the coil.
Relays for AC
These are neutral relays and picked up for a.c. current through their coil.
These are very fast in action and used on power circuits of the point motors,
where high current flows through the contacts. A normal relay would be
slow and make sparks which in turn may weld the contacts together.
All relays have two operating values (voltages), one pick-up and the other
other drop away. The pick-up value is higher than the drop away value.
[ Up ]
© R. Jayanthan
Last updated on 01 January, 2002
Go Get It!
4. Signals
[ Up ] [ 4.1 Automatic Signals ] [ 4.2 Controlled Signals ] [ 4.3 Call-on Signal ] [ 4.4 Typ
ical Signal Layout ]
Career
Photo Album Signal posts carries signal light units consisting one or more aspects. This is
the final stage of communication that gives the driver necessary orders and
warnings about the track segments ahead. The signal aspects are powered
Railway individually by 110 V a .c. and each aspect has its own step down
Sri Lanka transformer. In the secondary circuit a relay is connected in series with the
lamp to get the indication back to the interlocking plant. The figure below
illustrates the circuit of a signal aspect.
Signal can be classified according to their mode of operation as follows:
Automatic Blocking Signal
Automat
ic
Automatic Approach Signal
Signals
High Controlled Signal
Controll
ed
Dwarf Controlled Signal
[ Up ] [ 4.1 Automatic Signals ] [ 4.2 Controlled Signals ] [ 4.3 Call-on Signal ] [ 4.4 Typical Signal Layout ]
[ 1. Introduction ] [ 2. Track Circuit ] [ 3. Relays ] [ 4. Signals ] [ 5. Moter Points ] [ 6. Gate barriers ] [ 7. Automatic Blocking System
]
© R. Jayanthan
Last updated on 01 January, 2002
Top of Form
Go Get It!
[ Up ]
Career
Automatic Signals can be identified by the circular number plate bearing the
Photo Album
distinctive number of that signal post and the gray color mast. They may
contain one, two or three aspects of one or more units. Only one aspect can
Railway be lit in a unit at a given time. The automatic signals are approach lit; i.e.
Sri Lanka light up only when a train approaches. This arrangement is used to conserve
power. The automatic signals operates according to the track conditions
ahead and are not controlled by the controller.
4.1.1 Automatic Block Signal
Automatic block signaling is used to control trains between two
stations. A detailed discussion about automatic block signals can be
found here. These signals have one unit of three aspects and have
the following meanings:
RED Dange
train on immediate block
r;
GREE Proce
line clear for the next two or more blocks
N ed:
The upper unit (three aspects) refers to the main line and the lower unit
refers to the loop line.
[ Up ]
[ 4.1 Automatic Signals ] [ 4.2 Controlled Signals ] [ 4.3 Call-on Signal ] [ 4.4 Typical Signal Layout ]
© R. Jayanthan
Last updated on 01 January, 2002
Top of Form
Go Get It!
[ Up ]
Career
The controlled signals normally show 'danger' aspect (RED) and are
Photo Album
controlled by the train controllers. They have a square number plate and
their mast and base are painted with red and white stripes.
Railway 4.2.1 High Controlled Signal
Sri Lanka
The high controlled signals control and guide the trains into
the yard. These signals will normally have two units of three
aspects in line. The upper unit corresponds to the main line
and the lower unit corresponds to the immediate loop line.
Some high controlled signals will also have, below the second
unit, a third unit of one aspect (AMBER). These are found at
the points where there are more than one turn out. The second
unit have a speed restriction of 48 km/h and the third unit has
16 km/h. The meanings of the aspects are given below.
RED Danger ; Stop
© R. Jayanthan
Last updated on 01 January, 2002
Go Get It!
Career To enter locomotive in the yard while shunting, the high controlled signals
Photo Album cannot be given because of the presence of the coaches on the same line
(platform). In this situation a call-on signal is used. The call-on signal,
Railway which is mounted above the base of the high controlled signal, has three
Sri Lanka lamps and two aspects as illustrated below.
[ Up ]
[ 4.1 Automatic Signals ] [ 4.2 Controlled Signals ] [ 4.3 Call-on Signal ] [ 4.4 Typical Signal Layout ]
© R. Jayanthan
Last updated on 01 January, 2002
Go Get It!
Career The simple station layout below depicts the positions of the respective signals
Photo Album in a typical yard.
Railway
Sri Lanka
The first signal a train will see when arriving from left is the one before last
ABS signal. It will inform the track condition ahead. It may show 'caution' if a
train is awaiting to enter or just entering the station yard. The second will the
last ABS which is also the outer home signal. It will hint about the platform the
train will be stopping or passing through (if it is an express train). The third will
be the inner home (high controlled) signal. This will allow the train to enter the
station yard or pass through the station if it is an non-stopping station for that
particular train. If the train stops at the station, when ready the starter (dwarf
controlled) signal is given to proceed.
[ Up ]
[ 4.1 Automatic Signals ] [ 4.2 Controlled Signals ] [ 4.3 Call-on Signal ] [ 4.4 Typical Signal Layout ]
© R. Jayanthan
Last updated on 01 January, 2002
Go Get It!
5. Moter Points
[ Up ]
Career Point is a place where the track branches off. The points can be either
Photo Album manually switched (lever frame) or motor driven. Most of the points in the
color light area are motor points and can be controlled by the Maradana
Railway control office.
Sri Lanka
The point motor is powered by 110V d.c. supplied
by the nearby relay house. When an order is given
to switch the point, power is given to the motor in
the respective direction. The motion is used to
either push or pull the drive rod. Point machine has
contacts for detection of the switching. These
contacts are operated by the long and short
detection rods. When the point is set properly an
indication is obtained by the relay house through
these contacts. The allowable gap between the
stock rail and the switch blade is 3mm. When a
foreign material such as a stone prevents the point
from setting properly, the indication contacts stay
neutral and no indication is sent. The clutch mechanism in the point
machine will start slipping in order to protect the machine from mechanical
damages. The safety relay attached to the motor circuit will cut off power in
15 seconds. When no indication is obtained at the control office, the
controller will inform the Signal and Telecommunication Inspector (STI) in
charge of the respective yard. On receipt of the information, STI will go to
the motor point in question and remove the obstacle. The point machine has
a facility to operate it by manual cranking. Once the point is cranked, the
operation is finished and the indication will received by the control office.
Some points in the color light area are of lever frame type. They are not
frequently switched during routine operations. These type of points are
protected by a device called "magnetic lock", which has to be released by
the controller at the central office to enable station master to switch the
point. After the operation is completed station master will switch the point
back to its normal position and it is locked by the controller. This ensures
that all the points are under the controller at the central office.
[ Up ]
[ 1. Introduction ] [ 2. Track Circuit ] [ 3. Relays ] [ 4. Signals ] [ 5. Moter Points ] [ 6. Gate barriers ] [ 7. Automatic Blocking System
]
© R. Jayanthan
Last updated on 01 January, 2002
Go Get It!
6. Gate barriers
[ Up ]
Career Gate barrier protects the level crossing. In the color light area gate barriers are
Photo automatically operated when a train approaches it from either direction. The gate
Album
machine has 110V d.c. motor to operate the gate. It also consists of contacts to
get indication of the status of the gate. The figure below illustrates a gate barrier
Railway system.
Sri Lanka
The gate barrier has two signals on the track on either side of the road. The
signal at the distance is called an early warning. It has two aspects of amber and
green. The five lamps are arranged in a manner to represent letter "W" for
Warning. The amber aspect means the gate is not protected. This signal is
located at a distance to allow the driver of the train to apply brakes and stop the
train if necessary. The green aspect means the gate is protected and the train can
pass the gate at its normal speed. The signal near the gate has a similar
arrangement; red on top unit and green on lower unit. If the gate is protected the
green aspect will be lit and if not the red.
The gate barrier system also has flashing two unit warning signals on either side
of the track for the road traffic. A warning bell is also fixed on the mast. It rings
before and while the gate is closing. The circuits are wired in such a manner a
failure on the gate motor circuit will result in the continuous ringing of the bell.
In such an occasion the gate-man will inform this to the nearest station master
using the gate telephone and he in turn will inform the STI.
[ Up ]
[ 1. Introduction ] [ 2. Track Circuit ] [ 3. Relays ] [ 4. Signals ] [ 5. Moter Points ] [ 6. Gate barriers ] [ 7. Automatic Blocking System
]
© R. Jayanthan
Last updated on 01 January, 2002
Free site is hosted by
Top of Form
Go Get It!
Career
Photo Album Automatic block signaling (ABS) safeguards the train operations between
stations and an effective means of increasing the line capacity. In the color
light area, where the trains are worked on the ABS, each running rail is
Railway divided into a series of blocks sections (track between the stations) and
Sri Lanka station sections (track between entry and exit signal). Each section is track
circuited separately. Entry into each block section is governed by the
automatic block signals at the entry point of the section. (Signals 1, 2 and 3
in the coming pages). The train leaving station block A and entering station
block B will be controlled by the controlled signals at respective stations.
The color light area has dual tracks and under normal operation the up trains
will be using up line and the down trains will be using the down line.
[ Continue... ]
Top of Form
Go Get It!
[ Up ]
Career
Photo Operation
Album In the figure below consider the line between station A and Station B, which is
divided in to 4 blocks. The signals at A and B are home signals (controlled
signals) and the signals 1, 2 and 3 are automatic blocking signals. In the reverse
Railway direction the entire track segment is treated as one block.
Sri Lanka
Establishment of route
In the idle condition controlled signals show 'danger' and the ABS signals are
extinguished.
The "green" current passes to the remaining block posts and their signal switch
on to 'proceed'. When the current reaches station A, the home signal (starter)
shows 'proceed'. There after the black current is cut off. The direction of
movement is now locked.
[ Continued... ]
[ Up ]
[ 7.1 Route Establishment ] [ 7.2 Train on Line ] [ 7.3 Release of Route ]
© R. Jayanthan
Last updated on 01 January, 2002
Go Get It!
Career
Photo As soon as the train passes the controlled signal at station A, the signal switches
Album to 'danger'. Note that the "green" current is short circuited by the train axle and
does not reach signal A.
Railway
Sri Lanka
Sooner or later the the controlled (home) signal at station B will be set to
'proceed' by the controller. As a result signal 3 switches to 'proceed' as well.
When the train leaves the first block, the the signal 1 switches to 'danger' since
the "green" current is now cut off by the train. This signal post sends a "yellow"
current backward. Since the signal A is a controlled signal it ignores the
"yellow" current and remains 'danger'.
As the train enters block 3, the "yellow" current set the signal 1 to 'caution'.
"Green" current is sent to the previous signal. Now a new train can be dispatched
on the line from A to B and ABS ensures at least on block space between the
two trains.
The train proceeds and the "green" current switches the signal 1 to 'proceed'.
Now you can deduce the aspect meanings of the ABS signal.
Red Stop! Train on next block
Amber Train on block after next; proceed with caution
Green Normal speed; next two blocks are unoccupied
[ Continue... ]
[ Up ]
[ 7.1 Route Establishment ] [ 7.2 Train on Line ] [ 7.3 Release of Route ]
© R. Jayanthan
Last updated on 01 January, 2002
Top of Form
Go Get It!
Career
When the train has passed the home signal at station B and the signal is turned
Photo
Album
'danger' and the release of the route is automatically started. The release current
("black") is sent from station B to station A.
Railway
Sri Lanka
When the release current reaches station A, it checks that the exit signal does not
show 'proceed', i.e station A is not intending to dispatch another train toward
station B. If it does show 'proceed', release of route will not take place. If signal
A shows 'danger', a black current is sent back to station B.
Route is released when the current reaches station B. The signal aspect currents
("yellow" and "green") are cut off and the block signal are extinguished. The
"black" current from A is also cut off and the system returns to idle condition.
Design
All the information is transmitted on a two wire under ground cable. The aspect
currents "yellow" and "green" are d.c. with opposite polarity and the locking and
releasing current, "black", is a.c. The wires are connected with filters in block
posts. This enables simultaneous transmission of d.c. and a.c. on the same wire
pair.
The locking relays in the block posts are of magnetic stick type and
once picked up by the locking current, they remain picked up until the
release current is applied. If a ABS post is locked and it receives no
aspect current it shows 'danger' and sends a "yellow" current to the
post at the back. If it receives "yellow" or "green" aspect current it
will show 'caution' or 'proceed' aspect and send a "green" current to
the post at the back. When the releasing take place all aspects are
extinguished. The controlled signal do not respond to aspect current
but take it into consideration when a order to is given. It turns
'danger' as soon as the train passes it.
The spacing of block signals varies from 4000 to 8000 feet according to the
curvatures on the running rail and the visibility. On double line area only one
block is provided between station in the reverse direction.
[ Up ]
[ 7.1 Route Establishment ] [ 7.2 Train on Line ] [ 7.3 Release of Route ]
© R. Jayanthan
Last updated on 01 January, 2002
http://verificationandvalidation.blogspot.com/
Tags: Railway Signalling, Signal Designer, Signal Engineer, Signalling, Wireless Sensor
Network
This entry was posted on Saturday, July 10th, 2010 at 7:36 pm and is filed under Signalling. You
can follow any responses to this entry through the RSS 2.0 feed. You can leave a response,
or trackback from your own site.
Leave a Reply
Top of Form
Name (required)
Website
Submit Comment
Bottom of Form
The most important part of the railways is to carry out operations like safe movement of trains,
this is achieved by Signalling. The Railway signalling is governed by a concept called
Interlocking. Many interlocking system still in use follow either relay based technology or the
Microprocessor based technology called Electronic Interlocking System (EIS). Relay based
systems are very huge in size and have cumbersome wiring to perform operations. The advent of
Electronic Interlocking systems reduced the relays and wiring to some extent, but still uses
traditional copper cabling to be connected to the field functions such as signals, Track Detection
equipment, points (Switches). In modern signalling systems, the signal and switch status needs
to be sent to the On-Board Computers in the locomotives, this involves traditional radios
connected to the wayside field functions that communicate this information to the OBC. This
involves laying out track loops or balises that send this information to the OBC, these loops are
venerable to climatic conditions such as ballast resistance, water flooding during rains, etc. Due
to the failsafe nature of these systems the cabling has to be redundant, this results in large maze
of complex wiring that is very difficult to maintain and upgrade. There is need to upgrade the
existing Railway Signalling Infrastructure and addition of new technologies like failsafe wireless
communications which shall combine both the ground based signalling (Interlocking Systems)
and the Locomotives (On Board Computers of the train) which directly leads to simple distributed
architecture which are highly maintainable and easy to upgrade in future.
Sandeep Patalay
http://verificationandvalidation.blogspot.com/
Tags: Railway Signalling, Signal Designer, Signal Engineer,Signalling, Wireless Sensor Network
This entry was posted on Saturday, July 10th, 2010 at 7:36 pm and is filed underSignalling. You can follow any responses
to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.
Leave a Reply
Top of Form
Name (required)
Website
Submit Comment
Bottom of Form
Rail Professionals Blog is maintained by Connectioni.com
Entries (RSS) and Comments (RSS).
In order to achieve a safe operation (to give a green signal),the signalling system assure that the
track ahead of the signal to the next is free.
In other words signals may not be operated to permit conflicting train movement to take place at the
same time.
The interlocking ensure the switches(the electric or pneumatic equipment lead the train to different
track) and other appliances in the route must be set in position before a signal allow the train to enter
in to that route(between two signals).
When a route is set ,the train is given a the signal(yellow for example ,the first proceed aspect or
green) to proceed with the movement and the interlocking ensures all the switches and other movable
appliances(say trainstop for an example,a simple electro mechanical or pneumatic device mounted
just outside the track which make the train to apply break automatic , if the driver overshoot a red
signal) in the route are locked in position ,until either the train complete the journey of the route set
or the proceed signal is withdrawn and sufficient time has passed to ensure that a train approaching
that signal replaced or withdrawn(green to red by an operator or a system) has had an opportunity to
stop before over shooting that signal.
Mechanical Interlocking
The above mentioned operations can be achieved either mechanical(outdated),electrically(with the
help of relays) or electronically(with the help of computer ,named as solid state interlocking).
In olden days signals are controlled by manually operated levers ,which operates signals,swtiches
,derailer (forcefully derail the train before a standstil the train enter in to another track in
operation).Reliability ,time delay in operation ,inefficiency,wear and tear t more mecanical devices
were some of the drawbacks.
Electrical Interlocking
It was later replaced by better relay interlocking,which was achieved by electrical highly reliable relays
,make and break depends on the status of other relays/appartus.
In a complex interlocking 20’s of relays will be operating to ensure a single route is free before the
signal goes ‘clear’.
There may be 100’s of relays operating for a complex yard or station for a secure operational
requirement.
Based on the route request from an operator (entry exit) or OCS or GUI or ATS ,the relays will start
checking the availablility of that route,based on the status of the track,other
signals,points(switches)etc and make the route “locked’ for a safe operation by ensuring all the
elements are “Set”,”locked’ and “detected” in desired condition.
One of the disadvantages of this system is large requirement of signalling hut(Where signalling control
appartus housed) to mount 100’s of relays for a single area.
Electronic/Solid State Interlocking
This is the most modern interlocking ,(before anything could replace!!!)started installing in late
80’s,are generally soild state(Appartus made out of solid materials!!!) where wired network of relays
are replaced by software logic running on a special hardware(a microcontroller assembly).
Modification of the network with a solid state interlocking is easy compared to relay interlocking as the
software logic modification is easy compared to the hard wired elements.
SSI(Solid State Interlocking) is used as a product name as well,which is the first generation electronic
interlocking,jointly developed by British rail,GEC(Alstom) and Westinghouse.
Second generation SSI is known as CBI(Computer Based Interlocking),where
SmartLock(Alstom,France),Microlok(Ansaldo,Italy/USA),Westlock(Westinghouse,UK) are some of the
product examples.
Each system uses its own style of programming ,and has merits and demerits.
Generally,a PBI(Processor Based Interlocking) or a CBI consists of a CPU card(where the system
software process according to the application logic), a power supply card,
Input/Output Cards(I/O cards) a device driving card to mention a few..
There are flash memories,EEPROM(Electrically Erasable Program Read Only Memory) where an
experienced application logic person write the logic(replacing the hard relay functions with
software)and load into the flash memory.(Burn an EPROM or load through a serial port)
The I/O cards are responsible for Input and Outputs.Input card read the status of the the field
equipments(Switch position,Track Occupancy,Trainstop Position,Route Request and Cancel,Point Call
etc).
Where as Output cards drives the output to set the route in desired condition,after the application
logic is processor based on the input status.
The system is programmed in such a way that,it takes the most solid input before changing the status
to ensure a fail safe operation.
(For example a track is showing ,occupied and free alternatively ,known as bobbing,the system will
consider that track as occupied until the Input card read a stable un occupied status)
There are serial communication ports available in the PBI for communicating with other systems,to
make hot stand by arrangement,and with adjacent interlocking.
Serial communication ports are 485,232/432
Depends on the application ,modem are used to communicate with a long distance train control
system or other PBI.
For the sake of explanation,I can generalize the discussion and stick to Microlok ,one of the cheap and
popular systems.
Here the application logic is written in terms of Boolean equation.
The Boolean operators (AND,OR ,NOT are most commonly used,where as other operators like XOR are
also available)
Microlok syntax for AND is ‘ * ‘ ,for OR ‘+‘ , and NOT is ‘~‘
For explanation I can show a simple logic here,
ASSIGN ~A42VSNR * ~42VSNJR * I2_42MA_HR * ~ACE19.6U_VSNR * ~CE19.6U_VSNJR *
CE19.6U_VCSR TO 42MA_HR;
Here ,to drive the software relay for controlling the yellow aspect of 42 signal A route various status of
other relay has been proved…
Some of the logic can be very complex…Another example below
Depend on the interlocking there could be around 5000 Assign statements….for each interlocking
data….
This is an example taken from a data detailing just two assign statements,apart from this we need to
assign ports for communication,re direct logic,log bits define all the Boolean bits ,baud rate and many
other things..
Processor based system explained above is the brain of the system…which operates on the status of
the external situation ,commands from the operator or an automated system..
As per the train schedule loaded on to the ATS system ,a train located miles away in a yard come to
the platform on right time,open the door and set to go when you are in.
Where as a train protection system ,calculate a speed profile based on the train ahead and ahead
signal status to apply service break or maintain speed depend on other trains!!!
There are systems On borad can be be set to run manual or auto mode .GPS based signalling is the
latest trend.Thanks to ERTMS (European Rail Transport Management System) which could allow inter
operable between railways and system across the boundary,run train on more than 450KM/HR…
Now its time to literally flying train ,flying in a vacuum tunnel floating on English Channel with two
times speed of an aeroplane…Yes our new generation can get ready to fly on a train !!!
One can realise the complexity of system running a train
over 450KmPH
Deepu Dharmarajan
Signal Design Engineer/Consultant.
Tags: Computer Based Interlocking, ERTMS, History of Railway Signalling, Railway Signalling, Route
Relay Interlocking, SSI, Train Control Systems
Posted in Signalling | 3 Comments »
1. Lack of domain Knowledge in Signalling and Traditional Route Relay interlocking Systems, This
creates a technological gap between the software programmers and the Domain consultants. This
leads to Errors in software, which might lead to unsafe failures of the system
2.Increasing the complexity of the System by Employing distributed architecture, which is difficult to
validate and verify and difficult to maintain, thus leading to very high time repair
3. Extending the working scope of the Interlocking systems for monitoring and other non-Interlocking
functions, which leads to degraded performance of the system
4. Employing Non-Formal Interlocking principles instead of traditional RRI Principles leads to software
complexity. For Ex: The Geographical method needs every system that is installed for new Yard needs
validation, which is not practicable.
5. Since the software and hardware is so complex, complete test of the system is not possible and
most of the faults are revealed at the field Installation stage or during normal working of the system
in field.
The software is to be changed for every yard , the software structure should be in a generic form, but
we seldom see a generic form and this the stage errors creep in.
6. The lack of standardization in the railway working principles and the core Interlocking principles,
the software developers are forced to do changes in the software for every yard in Different railway
zones, this is the time that errors in the software creep in.
7. Because of the above said reasons the Interlocking systems have failed to create the necessary
confidence in the railway operators. Because of this reason the Solid state Interlocking systems have
become unpopular.
If we examine broadly the reasons for failure and lack of reliability and maintainability that are forced
by the designers are as follows:
1. Lack of standardization of interlocking principles, every railway zone has its own set of rules and
principles which are conflicting with other railways, this makes the life of the developers difficult
because they have change their systems settings and software accordingly.
2. There is no standard book or reference available describing the core interlocking principles, since
these rules are only known by the people working in this domain.
3. Increase in the complexity of the software leads to difficulty in testing, since most of the
Interlocking systems are sequential machines they are error prone are very difficult to test.
Sandeep Patalay
Top of Form
Search
Main Page | See live article | Alphabetical index
Bottom of Form
Railway signaling
Railway signaling is a safety system used on railways to
prevent trains from colliding. Trains are uniquely susceptible to
collision because, running on fixed rails, they are not capable of
avoiding a collision by steering away, as can a road vehicle;
furthermore, trains cannot decelerate rapidly, and are frequently
operating at speeds where by the time the driver/engineer can see
an obstacle, the train cannot stop in time to avoid colliding with it.
Most forms of train control involve messages being passed from those in charge of the
rail network or portions of it to the train crew; these are known as 'signals' and from
this the topic of train control is known as 'signaling'.
Table of contents
1 Timetable Operation
2 Timetable and Train
Order
3 Signals
4 Blocks
5 History of block signaling
6 Modern railway signaling
7 Notes on U.S. Signalling
8 Notes on UK signal colour
order
9 See Also
10 External Links
Timetable Operation
The simplest form of operation, in terms of equipment at least, is operation according
to a timetable. Everything is laid down in advance and every train crew knows the
timetable. Trains can only operate in pre-arranged time periods, during which they
have 'possession' of the track and no other train can operate.
When trains are operating in opposing directions on a single-line railroad, meets are
scheduled, where each train must wait for the other at a point they can pass. Neither is
permitted to move until the other has arrived.
The timetable system has several disadvantages. The first is that there is no positive
confirmation that the track ahead is clear; only that it should be clear. This system
does not allow for breakdowns and other such problems. The timetable is set up in
such a way that there should be sufficient time between trains for the crew of a
broken-down or delayed train to walk back up the line far enough to set up warning
flags, flares and the explosive devices known as detonators or torpedoes (UK and US
practice, respectively) which alert a train crew to a blocked track ahead.
The second problem is the timetable system's inflexibility; trains cannot be added or
delayed; trains cannot be rescheduled.
The third is a corollary of the second; the timetable system is inefficient. To give a
little flexibility, the timetable must give trains a broad swath of time to allow for some
delay. Thus, the line is possessed by the train for much longer than is really necessary.
Nonetheless, this system permits operation on a vast scale, with no requirements for
any kind of communication that travels faster than a train. Timetable operation was
the normal mode of operation on American railroads in the early days.
Timetable and Train Order
With the advent of the telegraph, a more sophisticated system became possible. The
telegraph allows the dissemination of alterations to the timetable, known as train
orders. These override the timetable, allowing the cancellation, rescheduling and
addition of trains, and most anything else. Sufficient time must be given, however, so
that all train crews can receive the changed orders.
Train crews generally receive the orders at the next station at which they stop; or
sometimes orders are handed up to a locomotive 'on the run' via a long staff.
Timetable and train order operation was commonly used on American railroads until
the 1960s, including some quite large operations such as the Wabash Railroad and the
Nickel Plate Road.
Timetable and train order was not used widely outside North America.
Signals
Timetable and train order operation still has some significant flaws, such as an over-
reliance on the ability of the crew of a stranded train to let other trains know of the
problem, and a general intolerance for human error. When everything goes perfectly it
works well, but mistakes are easy and deadly.
Timetable and train order is only suitable for railway lines which carry relatively little
traffic, and is unworkable on busy rail lines because it requires great seperation
between trains. Where this is the case, physical signals need to be used (either
mechanical semaphore signals, or - more commonly in the modern era - electric light
signals) to show the train crew whether the line ahead is occupied and to ensure that
sufficient space is kept between trains to allow them to stop.
Blocks
If two trains cannot be running on the same section of track at the same time, then
they cannot collide. This notion forms the basis of most signalling systems.
The rail network is divided into sections, known as blocks. Two trains are not allowed
to be in the same block at the same time. A train cannot enter a block until it is
permitted, generally by a signal that the block ahead is empty.
On high-speed railways (where trains travel at speeds faster than 200 km/h (125 mph)
the trains travel too fast for the driver to see conventional lineside signals, so a system
of in-cab signals transmitted byradio are used.
History of block signaling
In the very early days of railways, on double-tracked railway lines, where trains
traveled in one direction on the same stretch of track, a means was needed to space
out the trains to ensure that they did not collide. In the very early days of railways,
men were employed to stand next to the line at certain intervals with a stop watch,
these men used hand signals to signal to train drivers that a proceeding train had
passed more or less than a certain number of minutes ago, this was called "time
interval working". If a train had passed the man only a short while ago, the following
train was expected to slow down or stop to allow sufficient space to develop between
the trains, to prevent a collision.
This system was however flawed as the watch-man had no way of knowing whether
the proceeding train had cleared the tracks ahead. And so if the proceeding train broke
down or stopped for some reason, the following train would have no way of knowing,
and collide with it rear-on. Accidents of this type were common in the early days of
railways.
However with the invention of the electrical telegraph, it became possible for the
ahead station or signal box to send a message (usually a bell ring) back to confirm that
a train had passed and that the line ahead was clear, this was called the "block
system". mechanical semaphore signals replace hand signals in the early 1840s. And
when the all clear signal was received, a signalman in a signal box would pull a lever
which would move the signal into the all clear position. This required that signal
boxes were spaced at regular intervals along the line.
Modern railway signaling
On most modern railways, detection of the train's position on the line, and signal
changing are done automatically. and colour light signals have largely replaced
mechanical ones.
The light signals mean:
• green: proceed at full speed.
• yellow: proceed slowly.
• red: Stop.
Railway signalling differs from the traffic lights used on roads, in
that trains cannot stop quickly (for instance a train travelling at 160
km/h (100 mph) would need several kilometres to stop). Therefore
on a railway, trains need to be given advanced warning of a red stop
signal so that they can slow down to a speed where they can stop
quickly (a yellow signal). Put another way, yellow signals (generally)
do not indicate an impending change to a red signal at the same
location. Rather, a yellow signal gives a train advance warning that
the following signal will be red.
To achieve this the railway is divided into 'blocks', blocks consist of the strech of
track between two signals. Trains are automatically detected when they enter a block,
this is done by what is known as a "track circuit".
The track at either end of the block is electrically insulated, and within the block a
small electrical current passes through the track, when a train passes a signal and
enters a block, the metal wheels and axle of the train short-circuits the current, this
short-circuiting, triggers a switch.
When the switch is triggered, the signal which the train has just passed, automatically
turns from green to red, and the signal behind that one automatically turns yellow, the
signal behind that one will turn green.
If any train is following behind, the yellow signal will warn it to slow down in order
to stop at the next signal, if however the train in front has passed into the next block,
the following train will come across another yellow signal. If the train in front is
travelling faster than the following train and clears two blocks, the following train will
come across a green signal.
In the UK a variation of this is used whereby each set of signal lights has four lights in
order from top down: amber, green, amber, red. The red, and green signals are used as
described, as is the lower amber light. The upper amber light is used to provide a
'double amber' signal which serves as a warning that the next block is on amber, thus
providing a warning of a red signal a further block in advance.
Double signalling is sometimes used; this is the method used in some areas of New
South Wales, Australia. It derives from semaphore signalling. Two sets of lights are
displayed, one atop each other, and the topmost light represents the condition of the
lights at the current signal, and the lower is the condition at the next signal. Some
lights have a small lamp at the bottom; this is an indication to continue at low speed.
The double signals indicate:
• green over green: continue
• green over red: caution, next signal at stop
• green over yellow: caution, next signal at green over red
• red over red: stop
○ red over red with small lamp lit: low speed, 25 km/h.
The track circuit is also used by signalmen to detect exactly where a
train is on a line, in a signal box, a map of the strech of track the
signal box is controlling is usually put up on the wall, when a train
enters a particular block, a light representing that block on the map
will light up to show a trains location. Track circuits are also used to
trigger automatic barriers on level crossings. (Grade crossings in
U.S. usage)
Fact-index.com financially supports the Wikimedia Foundation. Displaying this page does not
burden Wikipedia hardware resources.
This article is from Wikipedia. All text is available under the terms of the GNU Free
Documentation License.
resentation Transcript
ENSURING SAFETY FOR INDIAN RAILWAYS THROUGH GPS :
ENSURING SAFETY FOR INDIAN RAILWAYS THROUGH GPS Presented by J.HINA AAFREEN
TABLE OF CONTENTS :
TABLE OF CONTENTS INTRODUCTION STATISTICS ON RAIL ACCIDENTS WHAT IS GPS? APPLICATION OF
GPS WHY GPS HERE? COMPONENTS AND FUNCTIONS PRINCIPLE OF WORKING ONBOARD UNIT DESIGN
IMPLEMENTATION NEEDS CONCLUSION
INTRODUCTION :
INTRODUCTION Indian railways is the biggest railway network in the world On the other hand it has
faced large number of accidents due to negligence,techinical fault etc…. Even though we have got
many techniques of preventing these accidents NO METHOD CAN BE MORE EFFECTIVE AS THAT OF
GPS
WHAT IS GPS :
WHAT IS GPS GPS – Global Positioning System A network radionavigation system formed from a
constellation of minimum of the 24 satellites rotating in 6 orbitals and their ground stations
APPLICATION OF GPS :
APPLICATION OF GPS Mapping and GIS Data Capture Navigation Vehicle Tracking Mining &
Construction
PRINCIPLE OF WORKING :
PRINCIPLE OF WORKING Whenever a train will move over the track there will be vibrations that will be
created on the track. These vibrations that are produced on the track are dependent on the speed of
the train, load or the weight of the train A software traces these vibrations using microphones and
convert these vibrations in such a form that they can be compared with the already existing data of
the database If there will be any problem on the track, bridge etc. such as the removal of the fish
plates the vibrations produced from the train will change (they will either get damped or will get
excited which is a noticeable change from the ideal case)
PRINCIPLE OF WORKING :
PRINCIPLE OF WORKING If the obtained data and the stored data are the same then normal signal is
send to the receivers from the satellite If the vibrations from the track are more or less then
emergency signal is send to the receivers
IMPLEMENTATION NEEDS :
IMPLEMENTATION NEEDS Need of the towers for the transfer of the data to the various destinations A
high tech visual display system to show the actual position of the trains along with other details like
visual and audio warning systems Receivers and the transmitters tuned to proper frequencies and in
accordance to the network The train driver’s cabin must be such that the driver will come to know
about the track,weather, bridges and constructional status in advance Good communication system.
This can be achieved by the use of the GPS ITSELF
OPERATING FREQUENCY :
OPERATING FREQUENCY Uplink frequency-5.925 to 6.425 GHz Downlink frequency-3.700 to 4.200 GHz
may change as per the advancements that are made and the system requirements
TRAIN COLLISION :
TRAIN COLLISION
EXPECTED BENEFITS :
EXPECTED BENEFITS Railway Safety Automation in the Work Reduction in the Stress Levels because of
the good equipments and machinery Time Delays: As every time the position of the train will be known
thus there will not be any time delays Train Traffic Control: due to continuous monitoring of the trains
there will be a good train traffic control
CONCLUSION :
CONCLUSION The benefits and advantages of the proposed method outnumber the problems and
disadvantages. By considering this method for the most important transport system in India the most
valuable ‘human life’ and the national property can be protected Thus the integration of GPS, sensors
along with software systems can be effectively used to provide safety as well as huge income to the
Indian Railway
REFERENCE :
REFERENCE www.trimble.com www.discoveryindia.com www.irsuggestions.com
www.howstuffworks.com
Slide 21:
THANK YOU
Slide 22:
QUERIES