ae
TE * URBAN
NAME QF WORK:
ERO DESCRIPTION RATE” LON [AMOUNT
DisTaning H removing of road mevtalling 35040) wc
Senay RMN. a | Liso720-| ca
Pet work excavation undressed ical uplo 1
single throw of Kasi Phawarah or Shavel in! |
oedinary sl saaso_| ocr
Earth Work Excavation under Tead upo.a single
fivow of Kasi Phawarah or Shavel in ashes sand |
sof orsitelearance,
Carlage of 100 CHVS ton of all material Tikes on
aggregates spavel coal lime surkhi ete. B.G. Rail
fastening points and crossing bridges evanders,
Pipes sheets rains, MS, Bars etc., or 1000 Nos,
bricks 10x5x3 pr 100 moulds of fuel wood by
trucks or any other mean owned by the eontracior
ead upto 3 miles.
161.85
ver
‘Cement conerele plain He placing compacting
finishing & curing complete ife screening & |
washing of stone aggregate without shuttering |
ratio 1:48. af
mach
TF air aoe pre-cut Ro Wook TIS bah
ck cauhiog.srengih. 3730 pst sing SR
Sma (eRe) Sze height 43cm wt tse
Sem waa op 15 cr length 302m 5p stand
ovo shall be lak on 2m thick 1 cement
se ewan jing wh cen mot |
{et and eutng ee, cnet
pra. |
Cement concrete plain ic placing compacting
finishing & curing complete ife sercening & |
washing of store aggregate without shuttering |
S041 30
cn,
ratio 124. 3
Stops Laylag & Spreading wavir sblen|
course upto any thickness & off any size Between
Somm fo 9.5mm stacked a site in required grade |
& compacting to the required density by approved |
mechanical menas i/o watering wilh all leads & |
Tin (actual compacted depth shall be considered |
for payment) |
1400.00_|
+
Providing & laying Sem age regate base course |
using Hub gravel wih sand & silt fom 9 t 60 |
mmm laid in layers /e compacting upto 98% of
maximum dry density determined by AASHTO
(1-180 method D) or as directed by the Engineer
Tncharge ete. complete in accorgance with the
ls
specification.
_| 2200.00.50) ; DESCRIPTION [Quantity [RATE [UN
If | Providing and spraying prime coat with medium | |
‘curing asphalt of penetration grade 60/70, Prime |
coats shall be used @ of 11 liters % Sit (1.2 liters |
sq, meter) at 70 dearee centigrade mixed with |
adequate quantity of kerosene oil, using uniformly
pressure spray dlstbutorboier with automate | |
‘temperature controller. Prior to application for the |
prime coat all used material shall be removed |
from the base course and the same shall be |
cleaned by means of approved mechanical |
sweeper, blower hard brooms and disposal the
same within three chain. Aficr the application,
traffic shall be kept of from surface till the laying | |
of bituminous course. Material and methodology |
shall fully comply the tests and specification of
AASHTO and as directed by the engineer
Incharge. ( Rate include cost of material, labour, |
all tests, T & P and all leads & fils)
PAL asphaltic concrete binder course (Hem to Bem)
compacted thickness as per approved job mix
formula sing crush aggregate from Hub sources or |
equivalent, Using asphait of grade 60/70 during
ted by steel wheel & PTR roller, The procedure of |
|
270.00_| %sn | |
laying Binder course material & methodology
shall fully comply as directed by the Engineer
Incharge minimum bitumen content should be |
|
t
spread using paver machines the hinder course |
shall meet the following Gradation and Marshall |
test criteria, Compacting Thickness 50-100mm. —_|
13. | Laying proper line and grade plant mixed Asphalt
concrete paver finished (Hydraulic / electronic
Conttol) prepared to specified formula according
fo job mix fonnula approved by Engincer |
%. [ncharge including rolling and finishing to proper | |
line grade level and camber ete., complete. Rate !
includes tack coat with bitumen 80/100
Penetration and all cost of materials roller T & P
supply to plant and plant to site of work
|
Laer
|__| 2 thick completed vasa
14. [Erection & removal of centering for RCC. or
plain cement concrete works of pertal wood 2!
class. ssn
|
|
ou
Providing & Laying RCC. Pipe of Class A in
‘trenches including cutting fiting and jointing with
rubber ring including testing with water to a head
of tft
9° dia
ida
16. | Providing & painting Tane walking by Whee |
Plastic paints of approved make shade and quality
| prior to the application of paint the road surface
| shall be clean from dust dirt dinning and other the‘execution oF the paint of allio shall be kept off
Aill it paint fully dried up & the existing damaged
surface of the lane making be recovered through
‘wearing process at required temperature wherever
necessary the thickness of the making shall-not be
fess than 2mm as per direction of the Engineer
Incharge.
covers cost in 1:2:4 concrete ratio 3 inch depth at
center, reinforced with 3/8” dia for steel bars at 4”
cle welded to 1/8” thick 2.5 inch deep Angle Iron
Frame i/c curing, stacking and transportation with
in 10 miles.
24 inch dia
Manufacturing and supplying R.C.C. manhole |
wt
418.80 | Each
Supply and fixing of plastic road studs double
face (Cat Eyes).
257.64_| bach
Filling, watering and ramming earth under floor
with new (excavated from outside) lead upto 5
miles,
2907.95 | woch |
20.
| Shifting of Telephone Pole & Cables including
| refixing et [
20000 _
2
Shifing of Electric Pole & Wires including
sefixing et.
ELON NOUES
Za
Manufacturing and supplying of RC, ring Slab
of 21” dia inside 36” dia outside 7.5 width and
6” thick ile 3/8" dia 8 Nos. cross cross linked
bars welded and two sunk type hooks, casted ina
LiL 4 3 cone. With embedded Angle Iron frame
in perfect position i/c transportation charges for
average lead of 20 km per trip from casting yard
to site of work.
1084.55 | Bach
3
Raising of Manhole by pre-cast ring & cover as
directed by the Engineer Incharge to required size
& shape complete in all respect including all
material & equipment required
| 3500.00 | Each,
2
under floor including erush stone dust.
PIL Dry stone metal 4 thick with compaction |
600.00
3.
Providing. & Laying. 2” thick topping coment
concrete (1:24) inching surce Pnshing & |
dividing into panels. |
6.67 | SA
26.
Cement concrete ties laid Tat” TT cement mora |
Lover 2" thick bed of cement mortar 1:2
| 2271.69 | ssn
i)
Providing C.C. 1.24 circular manhole 3 fea Dia
inside dimension and the following depth as per
drawing & specification on complete upper
portion 9” thick RCC lintel, 12” thick 1:2:4 Cc.
21 dia to 3” dia, 4” depth fe 9 inches thick lintel
1:24 CC. Circular Wall Ve providing & xing of |
RCC Cover 4” din Ve excavation & backing |
with disposal of surplus stuff, the depth as per |
instruction of Engineer Incharge. (3° dia 4” depth) |
Extra Depth beyond 4”
_| s7a930 | each |