Organization and accountability are ensured by assigning a single organizational unit and person responsible for each element of the work breakdown structure. This provides unambiguous accountability at multiple levels below the top level of responsibility. The accountability matrix reflects strategic thinking about program implementation by requiring consideration of all implementation steps. Monthly status reports including cost to date, cost variance, and scope changes provide periodic control over the project.
Organization and accountability are ensured by assigning a single organizational unit and person responsible for each element of the work breakdown structure. This provides unambiguous accountability at multiple levels below the top level of responsibility. The accountability matrix reflects strategic thinking about program implementation by requiring consideration of all implementation steps. Monthly status reports including cost to date, cost variance, and scope changes provide periodic control over the project.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PPTX, PDF, TXT herunterladen oder online auf Scribd lesen
Organization and accountability are ensured by assigning a single organizational unit and person responsible for each element of the work breakdown structure. This provides unambiguous accountability at multiple levels below the top level of responsibility. The accountability matrix reflects strategic thinking about program implementation by requiring consideration of all implementation steps. Monthly status reports including cost to date, cost variance, and scope changes provide periodic control over the project.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PPTX, PDF, TXT herunterladen oder online auf Scribd lesen
without clear unambiguous response to this question their can be no assurance that the task will be done . • So, there will be one organizational unit responsible for each element in the WBS & one person is that organizational unit to holds final responsibility. • Thus accountability implies a single names to be mapped to the task of elements of the WBS. • Accountability have the multiple levels below the top level of complete responsibility . • Accountability Matrix reflects considerable thoughts about the strategy of the programme • The one of its great advantage is that it forces the originator to think through the process of implementation Control System Periodic status checking will be performed monthly Labor costs will be collected manually & estimated where necessary with group engineering management. Out of pocket cost will be collected through commitments and invoice payment records. Monthly status report will be issued which including: COST TO DATE, COST VARIANCE,CHANGES IN SCOPE etc.