OSHAWA HARBOUR

TRANSPORT CANADA, OSHAWA, ONTARIO

The Oshawa Harbour Commission oversees the and risk assessments, presented the remedial cost
operation of industrial portland and recreational marina estimates and recommended options for cleanup. The
facilities at Oshawa Harbour, located on the north table below presents the comparative costs of
shore of Lake Ontario in southern Ontario. Transport full-scale remediation by excavation and off-site
Canada, on behalf of the Crown, retains ownership of disposal, versus the recommended risk management
the lands and water lots. measures, consisting primarily of placing a barrier
(cover) over contaminated areas of the site,
DCS was retained by Transport Canada to carry out a undertaking limited excavations in isolated areas which
Phase I and Phase II ESA for certain lands at Oshawa could pose health risks, and carrying out long term
Harbour. The works consisted of a historical review, monitoring. As shown, the risk-management option
facilities audit, soil and groundwater sampling, and would save over $25 million versus full-scale cleanup.
surface water and sediment sampling in order to
delineate contaminant areas and provide remedial cost Area Risk Management Cost* Full Cleanup Cost
estimates. Upon completion of the Phase II, further A $ 1,191,000 $ 10,800,000
delineation was recommended by Transport Canada to B and C $ 0.00 $ 0.00
D $ 577,000 $ 8,940,000
reduce uncertainty in contaminant volume estimates. E $ 574,000 $ 9,424,000
The supplemental Phase II ESA included further Total Estimated Cost $ 2,342,000 $ 29,164,000
borehole and monitoring well installations, surface * Recommended option.
water sampling and research into City drainage
discharges. Qualitative and screening level risk A presentation on the findings of the Phase I/II ESA
assessments for contaminant areas were prepared. and the recommended remediation plan was made to
City Council. DCS met the budget and schedule as
A comprehensive three volume report was prepared, determined by Transport Canada. Overall project value
which outlined the findings of the Phase I and II ESAs was $125,000 and was completed in October 2003.