POWER PLANT
POWER PROJECT AT A GLANCE
Reliance Power is currently developing Fifteen large and medium sized power
projects with a combined planned installed capacity of 35,460 MW. All these projects are in
different stages of development and have made significant progress.
S.No PROJECTS CAPACITY in MW UNITS FUEL LOCATION
Total= 35460
2
3
Data Source: CEA
4
Data Source: CEA
ACTUAL POWER SUPPLY POSITION IN INDIA
5
Data Source: CEA
WHAT IS SUPER CRITICAL?
6
MAJOR ADVANTAGES OF USC
7
PROCESS OF POWER PLANT
Steam lines
FGD
Flue gas Coal Feed water
desulphurisation
tank
Flue gas Turbine Generator
injection Air
preheater
HP LP
Condenser
Electrostatic preheater preheater
precipitator
Draught FD PA Coal
Gypsum fan Ash Feed
fan fan mills
Fly ash removal pump
Cooling water
8
DESIGN PARAMETERS
Furnace Classification of
Boilers
Spiral Type
Vertical Type
11
BOILER
12
Fluid Temperature profile comparison for Water Wall Type
13
14
CONSTRUCTIONAL DIFFERENCE
15
SINGLE PASS BOILER TWO PASS BOILER
TWO PASS BOILER WATER STEAM CYCLE PROCESS
16
FUR ROOF I/L
HDR ECO HGR O/L
HDR
HRH LINE
MS LINE
SEPARATOR
S
T FINAL SH
FINAL
O RH LTRH
R
DIV PANELS SH PLATEN SH
A
G
E
T VERTICAL WW
A
ECO JUNCTION
G N
K
HDR
LPT LPT IPT
C
O HPT
N ECONOMISER
D
E
N
S
E
R
ECO I/L
lls
r wa
ate
lw
ira
Sp
FEED WATER
BWRP
18
SEPARATOR ECONOMISER
RH
HRH LINE
MS LINE SH
VERTICAL WW
S
T
O
G R
LPT LPT IPT A
C
O HPT G
N E
D
E
N T s
S
A all
rw
ate
E
R N
lw
K ira
Sp
CRH LINE
19
BOILER EFFICIENCY - 1000 MW
20
Data Source: MHI
STEAM TURBINE
21
STEAM TURBINE
22
Bird’s-Eye View of Tandem-Compound 1,000-MW Steam Turbine
and Generator.
23
Data Source: HITACHI
LP TURBINE BLADE DESIGN-1000MW
24
Data Source: HITACHI
TANDOM COMPOUND TYPE
25
Courtesy : Siemens
CROSS COMPOUND TYPE
26
Data Source: HITACHI
GENERATOR
27
COMPARISON OF 660MW Vs 1000 MW PARAMETERS
GE
ALSTOM
SIEMENS
HITACHI
MHI
TOSHIBA
SEC
30
Thank You
J.MURUGADASAN
Sr.Manager.
Dept. of Mechanical Construction