Beruflich Dokumente
Kultur Dokumente
2.0 Architectural
2.1 Architectural - AB requested ATA+C to study the expansion of powder room from grid 3
plans to grid 4.
-The body agreed that by nest Saturday the formworks for beams at
second floor have been installed.
3.0 Trade
Contractors -AB instructed Sonny Panaligan to indicate in the proposal the time table
3.1 Steel Trusses and to refer the floor height and inside gutter to architectural plans.