Iskan Contracting company.

LLC
GMC Showroom - Sohar
Variation Note

Amount
Item Description Qty Unit Rate
R.O. Bz.

A Gypsum Board False Cilings in Service Bay Area 396 m2

Additional cost for the Glass glazing hand rails in the


B ### 22.24 Rm
show room balcony area

Gypsum board false ceilings in showroom area as


C 75 m2
specified

Suppy and installation of 4000 x 3000 mm electric


D 1 nos
operated Roller shutter door in ground floor.

Suppy and installation of 2000 x 2200 mm manually


E 1 nos
operated Roller shutter door in ground floor.

Additional cost for applying ceiling paint part of the


F service bay area before the consultants instructions 240 m2
regarding the false ceilings.

G 8000 x 2000 mm sliding Entrance gate (Two way


opening) 1 Nos

H 8000 mm two way opening barriers (Electrical operated


with the sensor) 1 Nos

Total amount due on this Valuation R.O. 0.000


RATE ANALYSE FOR FIXING OF THE INTERCOM

Supplying and Fixing a intercom for Villa


2 nos
Materials
2.00 no Intercoms at. R.O 55.000 R.O 110.000
R.O 110.000
Labour
1 Skilled
1.00 day at. R.O 10.000 10.000
labour
Tools R.O 10.000
3% of
R.O
labour cost 0.300
120.300
Overheads
R.O
& profit. 30.075
R.O 150.375
Cost for 1 no with overheads & profit.. R.O 75.188

Supplying and Fixing a intercom for Town House


2 nos
Materials
2.00 no Intercoms at. R.O 15.000 R.O 30.000
R.O 30.000
Labour
1 Skilled
1.00 day at. R.O 10.000 10.000
labour
Tools R.O 10.000
3% of
R.O
labour cost 0.300
40.300

Overheads
R.O
& profit. 10.075
R.O 50.375
Cost for 1 no with overheads & profit.. R.O 25.188